HomeMy WebLinkAboutPSD-033-19Clarington
Planning Services
Report
If this information is required in an alte nate accessible fo mat, please contact the Accessibility
Coordinator at 905-623-3379 ext. 2131.
Report To: Joint Committees
Date of Meeting: September 9, 2019
Submitted By
Reviewed By:
File Number
Report Subject:
Faye Langmaid
Acting Director of Planning Services
Andrew C. Allison, CAO
PLN 41.6
Report Number: PSD -033-19
By-law Number:
Resolution: PD -092-19
Expansion of Clarington Energy Business Park Secondary Plan
Study Area to include the Courtice Waterfront
Recommendations:
1. That Report PSD -033-19 be received;
2. That staff be authorized to include the Courtice Waterfront as part of the Clarington
Energy Business Park Secondary Plan Update;
3. That staff be authorized to engage Urban Strategies Inc. for the additional work
provided that all costs are funded by the Courtice Waterfront landowners;
4. That the Director of Planning Services be authorized to execute the necessary cost -
recovery agreements;
5. That the cost recovery agreements with the landowners require payment of 100% of the
costs of the preparation of the Secondary Plan, including consultants and municipal
resources such as review time from various departments, project management and
administration costs; and
6. That all interested parties for Report PSD -033-19, any delegations and the Region of
Durham Planning and Economic Development Department be notified of Council's
Decision.
FIM -FF]
Municipality of Clarington
Report PSD -033-19
Report Overview
Page 2
This report outlines a strategy to develop the Courtice Waterfront implementing the
Clarington Official Plan and Council's recently adopted Strategic Plan 2019 to 2022. Council
identified in its Strategic Plan the Courtice Waterfront as one of its Legacy Projects.
This report identifies the steps to explore the development potential of the Courtice
Waterfront in collaboration with the private sector (landowners of the area). The Courtice
Waterfront will explore the development of a municipal wide waterfront park together with
other uses such as tourism and residential. Given that the lands are adjacent to the
Clarington Energy Business Park Secondary Plan area, the project will also explore
opportunities to complement the Energy Park vision, especially after the Ontario Power
Generation (OPG) announcement to centralize its offices and bring approximately 2,000 new
jobs to the Clarington Energy Business Park.
1. Background
Official Plan Update
1.1 The updated Clarington Official Plan was approved by the Region of Durham in June of
2017 as Official Plan Amendment 107 (OPA 107). Prior to OPA 107, the subject lands
located between the Clarington Energy Business Park Secondary Plan (Energy Park)
area and Darlington Provincial Park south of Highway 401 were designated "Waterfront
Greenway" with "Environmental Protection" along the Lake Ontario shoreline and
Tooley Creek valley (see location in Figure 1 below). The intention of the "Waterfront
Greenway" designation is for areas located near the Lake Ontario waterfront to
accommodate recreational and tourism uses. For reference regarding the subject lands'
ownership, see Attachment 1.
FIM -FF]
Municipality of Clarington
Resort PSD -033-19
Page 3
Figure 1. Area to be added to Energy Park Secondary Plan Update
1.2 The approval of OPA 107 modified the vision for this area from a "District" to "Municipal
Wide Park" designation along a large portion of the Lake Ontario waterfront. Community
access to the waterfront already exists in Bowmanville and Newcastle but less so in
Courtice. The goal of the "Municipal Wide Park" designation is to create better public
access and facilities for the waterfront in Courtice.
1.3 Prior to Council approval of OPA 107, Municipal staff had discussions with the property
owner of the lands identified as the future Municipal Wide Park. It was decided that the
extent and configuration of the future Municipal Wide Park would be best determined in
conjunction with a future development application submitted by the owner. As a result,
the "Municipal Wide Park" designation was deferred by Durham Region.
psurcrta,.0.�
.J V
m
~
V
0.
F
OC
—Cigas,Road
Baseline Road
— —�•'—
u
Baseline Road
sp
III
d o c
�
Courtice Court 0
ay
- �-
-
- a ing on a
Z
H'ghwaY 407
Darlington
4
Pr"incial
Park
g
\
�Erter9Y Qri�e
- r3Y Drive
R
I
V
c
•r
f
r�
a
r C
y
Clarington
Bu5ines5
Secondafy
Energy
Park
Plan
- �CragcAwf --�
Figure 1. Area to be added to Energy Park Secondary Plan Update
1.2 The approval of OPA 107 modified the vision for this area from a "District" to "Municipal
Wide Park" designation along a large portion of the Lake Ontario waterfront. Community
access to the waterfront already exists in Bowmanville and Newcastle but less so in
Courtice. The goal of the "Municipal Wide Park" designation is to create better public
access and facilities for the waterfront in Courtice.
1.3 Prior to Council approval of OPA 107, Municipal staff had discussions with the property
owner of the lands identified as the future Municipal Wide Park. It was decided that the
extent and configuration of the future Municipal Wide Park would be best determined in
conjunction with a future development application submitted by the owner. As a result,
the "Municipal Wide Park" designation was deferred by Durham Region.
Municipality of Clarington Page 4
Report PSD -033-19
History of the Clarington Energy Business Park
1.4 The Secondary Plan for the Energy Park was adopted in 2006. It outlines a vision for
the Energy Park that focuses on the development of prestige, energy-related
employment uses on a site that is adjacent to the OPG Darlington Nuclear Generating
Station.
1.5 The original vision for the Energy Park — to foster employment growth in the fields of
energy and environment — was established at a time when growth in energy-related
uses and expansion of the Darlington Nuclear Generating Station were expected. Soon
after the adoption of the Secondary Plan, however, expansion plans at Darlington were
put on hold and development of the Energy Park did not proceed as rapidly as
anticipated.
1.6 After approval of OPA 107, in 2018 the Municipality of Clarington retained Urban
Strategies Inc. to undertake a review of the Secondary Plan for the Energy Park. The
purpose of this review is to identify a renewed vision and updated policy framework for
the future. Urban Strategies is also the Municipality's consultant preparing the Courtice
Employment Lands Secondary Plan and the Southwest Courtice Secondary Plan
Update.
OPG Moving Headquarters to Clarington
1.7 As Council is aware, the vision for the Energy Park received a major boost earlier this
year when OPG announced that it was moving its headquarters to the Energy Park.
While preparing the Secondary Plan in 2006, planning staff held discussions with OPG
about creating a campus at the Energy Park. Subsequently, OPG bought lands to
accommodate the Darlington Energy Complex and additional lands for a future OPG
Campus.
1.8 In 2011, the Municipality prepared and Council adopted the Streetscape and
Sustainable Development Design Guidelines for the Energy Park. As part of the
planning for these guidelines, Urban Strategies Inc. planning staff and OPG explored
conceptual designs for the OPG Campus (see Attachment 2). The OPG announcement
on June 10, 2019 to bring more than 2,000 OPG jobs to the Municipality will make this
vision a reality and attract additional jobs. The OPG announcement mentions "this is an
exciting opportunity for OPG to create a high-tech energy hub that promotes innovation
and collaboration across the organization and with our partners and suppliers".
2. Land Owner Request and Terms of Reference
2.1 On March 1, 2019, after a number of discussions with planning staff, the Municipality
received a letter from Weston Consulting representing the owner of the subject lands
(see Attachment 3). In the letter, the owners request that the study area of the Energy
Park Secondary Plan be modified to include their lands to the west (see Attachment 1).
FIM -FF]
Municipality of Clarington
Resort PSD -033-19
Page 5
2.2 The letter stated the size and location of their lands should be included in order to
achieve a progressive planning vision for both the Energy Park and the Courtice
Waterfront. Planning staff agree this approach implements the intent of the Clarington
Official Plan.
2.3 After receiving the letter, Planning Services staff met with the owners of the subject
lands. The owners have agreed to fund the additional work to expand the study area for
the Energy Park Secondary Plan Update. The pattern of private funding for secondary
plan work has previously been endorsed by Council and has already been implemented
in several other areas throughout Courtice and other urban area of Clarington.
2.4 The Municipality uses a roster to select planning consultants for the different secondary
plans. The roster has been successful as it has significantly reduced the time to secure
a consultant. Urban Strategies Inc. is part of this roster and is currently undertaking the
Energy Park Secondary Plan Update and preparing the Courtice Employment Lands
Secondary Plan for the Municipality. Should Council decide to proceed with this project,
Urban Strategies Inc.'s current scope of work will be expanded to include the Courtice
Waterfront as outlined in the attached Terms of Reference (Attachment 4).
2.5 After the landowners made a commitment to fund the project, staff requested Urban
Strategies Inc. prepare preliminary Terms of Reference (TOR) for the additional work.
The preliminary TOR are included as Attachment 4. The proposed work would take 12
to 15 months to complete and encompass three phases:
a. Analysis and Visioning (5-6 months);
b. Preferred Concept (3-4 months); and
c. Secondary plan (4-5 months).
2.6 Once Council approves the strategy outlined in Report PSD -033-19, staff will circulate
the TOR to all agencies and work closely with Durham Region to finalize the document.
3. Concurrence
3.1 This report has been reviewed by the Director of Engineering who concurs with the
recommendations.
4. Conclusion
4.1 Staff recommend that Council include the Courtice Waterfront when undertaking the
update of the Clarington Energy Business Park Secondary Plan. This provides Council
with the opportunity to initiate the planning for one of its Legacy Projects: the Courtice
Waterfront. Moreover, it will allow the Municipality to develop the planning tools to
support the OPG expansion and create jobs in the Energy Park.
4.2 All additional costs for consultants and municipal project management will be covered
by the landowners. As Urban Strategies Inc. is currently updating the Clarington Energy
FIM -FF]
Municipality of Clarington
Resort PSD -033-19
Page 6
Business Park Secondary Plan and preparing the secondary plan for the employment
lands to the north, staff recommends that their scope of work be expanded to include
the TOR as proposed subject to 100% funding commitments from the owners
(see Attachment 5).
Staff Contact: Carlos Salazar at 905-623-3379 x 2409 or csalazar@clarington.net
Attachments:
Attachment 1 — Subject area with public/private land ownership identified
Attachment 2 — Urban Strategies Inc. Conceptual Drawing — OPG Campus
Attachment 3 — Letter from owners requesting land to be added
Attachment 4 — Urban Strategies Inc. — Terms of Reference
Attachment 5 — Letter of Funding Commitment
List of interested parties to be notified of Council's decision is on file in the Planning Services
Department.
FIM -FF]
Municipality of Clarington
Subject area with public/private land ownership identified
Attachment 1 to
Report PSD -033-19
Municipality of Clarington
Attachment 2 to
Report PSD -033-19
Urban Strategies Conceptual Drawing — OPG Campus (figure from Clarington Energy Park Streetscape and
Sustainable Development Design Guidelines, 2011)
Courtice '•.•
Western Marsh Gateway/
F •r
1 ' •
Y 401'
�►1
WESTON
CONSULTING
planning + urban design
Planning Services Department March 1, 2019
Municipality of Clarington File 9365
40 Temperance Street
Bowmanville, ON
L 1 C 3A6
Attn: Carlos Salazar, Manager of Community Planning and Design
Dear Mr. Salazar,
Re: Participation in the Clarington Energy Business Park Secondary Plan Update
113 DOWN RD & PT LT 31 CON BROKEN FRONT DARLINGTON PT 1
Municipality of Clarington
Weston Consulting is the authorized planning consultant for 1725596 Ontario Limited, the
registered owner of the lands known as 113 Down Road and PT LT 31 CON BROKEN FRONT
DARLINGTON PT 1 in the Municipality of Clarington (herein referred to as the "subject lands"). It
is our understanding that the Municipality of Clarington is currently undertaking an update to the
Clarington Energy Business Park Secondary Plan. On behalf of the owner, we request that the
Study Area of the Secondary Plan be modified to include the subject lands.
The subject lands are located on the south side of Darlington Park Road, east of Darlington
Provincial Park and are approximately 51.94 hectares (128.36 acres) in area. The lands are
currently being used for agricultural purposes and are accessed by Down Road. The subject
lands are located along the waterfront and are situated in an area of land south of Highway 401,
east of Darlington Provincial Park and west of the current Energy Business Park Secondary
Plan.
The existing Energy Business Park Secondary Plan Area currently consists of 12 parcels of land
located between Crago Road and Courtice Shores Drive, and it is our understanding that the
MOC has expanded the Energy Park Study Area to include the lands south of the railway tracks.
However, the Study Area is not inclusive of the lands located between Courtice Shores Drive
and Darlington Provincial Park, which includes the subject lands.
Given the context of the subject lands as described above and their prominence along the
waterfront, it would be appropriate to include the lands within a comprehensive planning vision.
Given that the purpose of the Energy Park Secondary Plan Update is to identify a renewed
vision for the area, it is our opinion that the subject lands and adjacent lands should be included
within the Study Area in order to achieve a comprehensive and progressive planning vision for
Vaughan Office 201 Millway Avenue, Suite 19, Vaughan, Ontario L4K 5K8 T.905.738.8080 westonconsulting.com
Toronto Office 268 Berkeley Street, Toronto, Ontario Mty _ T 116.640.9917 1-800-363-3558 F. 905.738.6637
2
the Energy Park and waterfront area based on an updated policy framework and emerging land
use planning matters.
Weston Consulting and our client look forward to working with the Municipality of Clarington and
actively participating in the Clarington Energy Business Park Secondary Plan review and update
process. We kindly request that our team be notified of any updates pertaining to the Energy
Business Park Secondary Plan and we look forward to discussing this further with you in the
coming weeks. Please contact the undersigned at ext. 241 or Heather Au at ext. 259 if you have
any questions or concerns.
Yours
ulting
Ryan er, �E`S�MCTP�PP
Senior es ent
C. 17125596 Ontario Limited
Vaughan Office 201 Millway Avenue, Suite 19, Vaughan, Ontario L4K5K8 T.905.738.8080 westonconsulting.com
Toronto Office 268 Berkeley Street, Toronto, Ontario M5A 2X5 T.416.640.9917 1-800-363-3558 F. 905.738.6637
❑ ❑❑❑LI]❑❑
URBAN
STRATEGIES 1 Spading Avenue, Suite 600 tel 416 340 9004
Tororo nto, ON Canada M5T 2C8 fax 416 340 8400
wWW.urbanstrategies.com admin@urbanstrategies.com
INC
■■■■■■■■■1■■1
■■I■■■■I■■■■I■■■■1
El
El
Ell 11111 11 1111111111
1111111111111
111111
■II11I■11111111I611IIIIiIl111I11161111111111111111111111ii11111t1I181i1i11111161.1Ni111111111Ii11111111Ii1111111111'6■IIIIli111111111116■IiB1i1PgIlIIIil11i1a11►�I 1fi1i11111111tI11i111
■IIIiIIIIlIHII Iii! Ila 1i1INIIN1;Iwo 11111111i111i111111111111iM1111■
II■II■I■1111■ 1111111111111111111111■IIIIIIIII1111111111milli
111111111111111111111111111111111111111111111111■IIIIIIIIIIIIIIIIIIIIIIIIIII■111111111111111111111
■IIIIIIIIII ■IIIIIIIII IIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIII■IIIIIIIIIII■1111■III■III■IIIIIIIII■IIIIIIIII ■1111111■ ■I ■ I■ ■IIIIIIIIIIII■IIIIIIIIIIIIIIII ■111111■11111■
■IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII111111111111111111111111■■IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII111■ ■111111 ■IIIIIIIIIIIIIIIIIIII■IIIIIIIIII■IIII■IIIIIIIIIIII■
■IIIIIIIII■ ■IIII IIIIIIIIIIIIIIIIIIIIIIIII1111111111111111111111111111111111111111111111■IIIIIIIIIIIIII■IIIIIII1111111111111111111111111111 ■IIIIIIII 11111111111111111111111111111■111111111111■
■111111111111111111111111■■IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII1111111111111111111111■IIIIIIII ■IIIIIIIIIIIIIIIIII I■■IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIPIIII
1111111111111111111111111111111111111111 ■IIIIIIIIIIIIIIIIII ■IIIIIIIIII■IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIII
■ ■IIII■IIIIIIIIII ■6■111116■IIIIIIIIII1111■ ■IIIIIIIIIIII11111111111111111■IIIIIIIIIIIIIII■1111111111111111111111■IIIIIIIIIIIII■IIIIIIIIIIII ■11111111■IIIIIIIIIIIIIIIIIIIIIIIIIIIIII■
■IIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII1111111111111111111111111111111■IIIIIIIIIIIIIIIIIIIIIIIIIIIIII611 ■IIIIIIIII1111111■■IIIIIIII■1111111 (IIIIIIIIIIIIIIIIII■
■■IIIIIIIIIIIIIIIIIIII■1111111 ■IIII■11111■IIII1111111111111111111111111111■ III11111111111111IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII■IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII■IIIIIIIIIIIII■I■
■ ■IIIIIIIIIIII■ ■ ■IIIIIIIIIIIIII■JII1111111111111111111111111111111111111111111111111111111111111111I■IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII111111■1111111111111111111111111■IIIIII■
■1111111 IJII■ ■1111111 IIIIIIIIIIIIIII IIIIIIIIIIIII■ ■1111111 111111111111111111111111111 ■IIIIII■ (IIIIIIIIIIIIIIIIIIII
❑ ❑❑❑IE-❑❑
URBAN
STRATEGIES 1 Spading Avenue, Suite 600 tel 416 340 9004
Tororo nto, ON Canada M5T 2C8 fax 416 340 8400
wWW.urbanstrategies.com admin@urbanstrategies.com
INC
.ill III 1111111111111IIIIIIIIIIIII■illillllmillIIIIIIIIIIIIIIIIIIIIIIIIIiIIIIIL.lillillillilImillilIIIIIIIIIIImIIII■ ■ ����1111111111111111111111�II�111111111�I1111111�����������������I�IILII�I■
■.I IIIIIIiiiiiiiiiiiiIIIIIIIIIIIIiiiiiiIIIIIIIIImIIIIIIII�IIIIIIII�IIIIIIIIIIImilli IIIIIIIIIII�����������.II�IIIIIIIIIIIIIII■ ■■��������.IIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIII��
■II111111I X111111 111111111111111111111111111111111111111111 IIIIIIII� II�IIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIII IIIIIII�IIIIIIIIIIIIII11111111111111�IIIII111111111.111�11111�II11.IIIIIIIIIIIIII■
..i.li.illilli,i.,
■■■IIIIII�IILI�IIIIIIIIIIIIII�IIIIIII�IIIIIII�IIIIIIIIIII�IIIIILIIII�IIIIIIIIIIIIIIIIIIIIliiiiiIIIIIiiiiiiIII IIIIIIIII■
...IIIIII�IILI�IIIIIIIIIIIIIIIIIII■■1111111 ,IIIIiIIIIIIIi11111111111111IIIiiiM 1111 MAIIIIII'
...IlIIIIiIILillillIIIIIIIIIIIIIII liiiiiIIIIIIII IIIIIIIIIII liiiiiIIIIIiiiiii III IIIIIIIIIIIIIIIiIIiiil liII
0 0 ■illillIIIIIIIIillllllllll iiiiiiIIIIIIiiiiiiiiii IIiIliiiIIIIIIIIIIIIIIIIII IIIIIIiiiiiiIIiIII111111111.Ills
URBAN
STRATEGIES 1 Spading Avenue, Suite 600 tel 416 340 9004
Tororo nto, ON Canada M5T 2C8 fax 416 340 8400
wWW.urbanstrategies.com admin@urbanstrategies.com
INC
■lililllllli11111111iilllilllillllilllllllilillilIllillllllllll!IIIA ■ilillllillll
■I■I �IIII IIIIIIIII�II
■■■IIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIII�LIIII1111111111111111111111�111�1111�111111111111111111111111�11111�11111111111�11111111111111111111111111111111111111111111111111111111■
11111■■I■■IIIII11111111�I111111111111111111 IIIIIIIIII■■IIIIIIIII�IIIIIIIIII1111111111111111111�II■I�IIIIII■I�IIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIII
■ ■ ■11111 IIII I�IIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIII I1111111111111111111111111111111111�I�11111111111111111111111111111111111111111
■I■I �IIII IIIIIIIII�II
■ ■■■111■■
7A"
WESTON
CONSULTING
planning + urban design
Planning Services Department
Municipality of Clarington
40 Temperance Street
Bowmanville, ON
L1 C 3A6
Attn: Carlos Salazar, Manager of Community Planning and Design
Attachment 5 to
Report PSD -033-19
August 16, 2019
File 9365
Re: Participation in the Clarington Energy Business Park Secondary Plan Update
113 DOWN RD & PT LT 31 CON BROKEN FRONT DARLINGTON PT 1
Municipality of Clarington
As you know, Weston Consulting is the authorized planning consultant for 1725596 Ontario
Limited, the registered owner ("Owner") of the lands known as 113 Down Road and PT LT 31 CON
BROKEN FRONT DARLINGTON PT 1 in the Municipality of Clarington (herein referred to as the
"subject lands"). This letter continues our correspondence regarding the Municipality's evaluation
of the subject lands as part of the Clarington Energy Business Park Secondary Plan Update,
including two (2) letters submitted to the Municipality dated March 1St, 2019 and June 5th, 2019,
respectively, which are attached for reference.
At this time, we are pleased to inform the Municipality of Clarington that the Owner of the above
noted lands has accepted the work plan and budget associated with Urban Strategies' evaluation
of the subject lands as part of the Secondary Plan Update, and as outlined in their letter dated
June 18, 2019. The Owner's acceptance herein is based on and is subject to the finalization of
the appropriate agreement, which is to be negotiated in good faith between the owner and the
Municipality. We are currently reviewing the draft agreement provided and will provide our
comments under separate cover. It is recognized that the agreement will include relevant
components of the Urban Strategies work programs and may reflect any resultant modifications to
the work plan that may be required.
The Owner is keen to move the planning process forward in a collaborative manner with the
Municipality and is committed to this partnership.
In addition to the above information, we would like to reiterate our understanding of certain
components of the Urban Strategies work program and scope as discussed with Staff. In
accordance with the Terms of Reference documents enclosed with our letter dated June 51h, 2019,
we request that the Municipality of Clarington formally recognize D.G Biddle & Associates Limited
and Niblett Environmental Associates Inc. as consultants to our client with respect to the evaluation
of the subject lands as part of the Clarington Energy Business Park Secondary Plan Update.
Vaughan Office 201 Millway Avenue, Suite 19, Vaughan, Ontario L4K5K8 T.905.738.8080 westonconsulting.com
Toronto Office 268 Berkeley Street, Toronto, Ontario M5A 2X5 T.416.640.9917 1-800-363-3558 F. 905.738.6637
❑ ❑❑❑E[❑❑
2
Moreover, we request that Weston Consulting and the Owner be instated as members of the
applicable Stakeholder/Steering Committee and this will ensure effective collaboration and will
also allow the Owners' and our input to be of assistance to the Municipality and Urban Strategies
through this process.
Weston Consulting and the Owner look forward to working with the Municipality of Clarington and
Urban Strategies and actively participating in the Clarington Energy Business Park Secondary
Plan review and update process. We kindly request that our team be notified of any updates
pertaining to the Energy Business Park Secondary Plan and look forward to discussing this further
with you in the coming weeks.
If you have any questions, or if there is anything you would like to discuss, please contact the
understwned at ext. 241.
You
Iting
Ryan� MCIP, RPP
Seni e e nt
C. N 725596 QNNio Limited
Attachments:
1. Letter from Weston Consulting, dated March 1S1, 2019; (provided)
2. Letter from Weston Consulting, dated June 5th, 2019;
3. Letter from Urban Strategies, dated June 18, 2019, (provided)
Vaughan Office 201 Millway Avenue, Suite 19, Vaughan, Ontario L4K5K8 T.905.738.8080 westonconsulting.com
Toronto Office 268 Berkeley Street, Toronto, Ontario M5A 2X5 T.416.640.9917 1-800-363-3558 F. 905.738.6637
❑ ❑❑❑ED❑❑
WESTON
CONSULTING
planning + urban design
Planning Services Department
Municipality of Clarington
40 Temperance Street
Bowmanville, ON
L1 C 3A6
Attn: Carlos Salazar, Manager of Community Planning and Design
Dear Mr. Salazar,
June 5, 2019
File 9365
Re: Clarington Energy Business Park Secondary Plan Update — Terms of Reference for
Municipal Servicing and Environmental Analysis
113 DOWN RD & PT LT 31 CON BROKEN FRONT DARLINGTON PT 1
Municipality of Clarington
As you know, Weston Consulting is the authorized planning consultant for 1725596 Ontario
Limited, the registered owner of the lands known as 113 Down Road and PT LT 31 CON BROKEN
FRONT DARLINGTON PT 1 in the Municipality of Clarington (herein referred to as the "subject
lands"). The subject lands are currently being evaluated as part of the Clarington Energy Business
Park Secondary Plan update underway by the Municipality of Clarington.
As part of the Energy Park Secondary Plan Update, we are pleased to submit for review, the Terms
of Reference for Conceptual Servicing (Municipal) Study prepared by D.G-'Biddle & Associates
Limited, and the Terms of Reference for Preliminary Natural Heritage Constraints Study prepared
by Niblett Environmental Associates inc. for the subject lands (enclosed).
Weston Consulting and our client look forward to working with the Municipality of Clarington and
actively participating in the Clarington Energy Business Park Secondary Plan review and update
process. We kindly request that our team be notified of any updates pertaining to the Energy
Business Park Secondary Plan and we look forward to discussing this further with you in the
comirr g. weeks. Please contact the undersigned at ext. 241 or Kyle Galvin at ext. 239 if you have
any/questpns or concerns.
nsulting
Ryan
Stt BES, MCP, RPP
eni i P ident
C. 96 Ontario Limited
Vaughan Office 201 Millway Avenue, Suite 19, Vaughan, Ontario L4K 51<8 T.905.738.8080 westonconsulting.com
Toronto Office 268 Berkeley Street, Toronto, Ontario M5A 2X5 T.416.640.9917 1-800-363-3558 F. 905.738.6637
NEANiblett Environmental Associates Inc.
Biological Consultants
'"Nm�
April 26th, 2019 PN 19-037
Hannu Halminen
Akero Developments Inc.
1748 Baseline Road West, Unit 100
Courtice, Ontario
L1E 2T1
c/o Mr. Asif Patel, Weston Consulting
RE: 113 DOWN ROAD
PART OF LOT 31, CONCESSION BROKEN FRONT
GEOGRAPHIC TOWNSHIP OF DARLINGTON, PART 1
MUNICIPALITY OF CLARINGTON
PRELIMINARY NATURAL HERITAGE CONSTRAINTS STUDY
TERMS OF REFERENCE
Dear Mr. Halminen,
Niblett Environmental Associates Inc. (NEA) has been retained to complete a preliminary
review of the natural features and constraints associated with future land development on
this property. At this time, the Municipality of Clarington is undertaking a Secondary Plan
process to determine land uses in this part of their municipality. To assist in that process,
NEA has been retained conduct two site walks of the property to confirm the natural
features, determine the presence of significant natural heritage features and recommend
setbacks, based on our field analysis and MOC natural heritage system requirements. This
information would be used to assist with recommending appropriate re -designation and
rezoning of the property. The confirmation of the boundaries of natural features and any
required buffers to maintain their functions will be the primary focus of the study. At this
early stage, a full Environmental Impact Study (EIS) is not required. Nevertheless, while NEA
biologists are on-site documenting the presence/absence of natural features, they will also
conduct biological inventories, the results of which will be incorporated into an EIS in the
future.
55 Mary Street West, Lindsay, Suite 112 Ontario K9V 5Z6
Tel (705) 878-9399 ext. 201 Fax (705) 878-9390 email: cellingwood@niblett.ca
■ ■■■111■■
Down Road - Constraints
Terms of Reference
The term of Reference (ToR) provides project -specific guidance for the biological surveys to
be completed, including timing and number and type of surveys required. It has been
developed based on our knowledge of the site and surrounding area, applicable municipal,
provincial and federal laws and regulations. It is recommended that this ToR be circulated
to Central Lake Ontario Conservation Authority (CLOCA) and the Municipality of Clarington
for their review and comments.
If you have any questions or concerns, please contact me.
Sincerely,
Chris Ellingwood
President and Sr. Terrestrial and Wetland Biologist
Niblett Environmental Associates Inc.
■ ■■■111■■
PN 19-037
Down Road - Constraints Terms of Reference
113 DOWN ROAD
PART OF LOT 31, CONCESSION BROKEN FRONT
GEOGRAPHIC TOWNSHIP OF DARLINGTON, PART 1
MUNICIPALITY OF CLARINGTON
PRELIMINARY NATURAL HERITAGE CONSTRAINTS STUDY
TERMS OF REFERENCE
1.0 Overview
1.1 Background
Niblett Environmental Associates (NEA) was retained to conduct a natural heritage
constraints study for a property in the geographic township of Darlington. At this early stage,
an EIS report for a development plan is not required. Instead, this study will be part of a
constraints exercise and will assist in determining the buildable area of the lands and the
land use designations and zoning.
While NEA biologists are on-site collecting information for the natural heritage constraints
report, they will also conduct biological inventories. This information will be kept on file until
it is required for further discussion about natural features, possible issues relating to species
at risk, or an EIS report. This scope of the natural heritage assessment will include:
• Determining constraints to development of the lands;
• Identifying any wetlands on site and delineating their boundaries;
• Identifying significant woodlands on site and associated boundaries;
• Identifying and mapping watercourses, fish habitat and seepage areas;
• Completing in season breeding bird, plant, ELC and wildlife inventories;
• Assessment of habitat of Species at Risk (bank swallow, barn swallow, butternut);
• Preliminary fish and aquatic habitat assessment.
1.2 Site Location
The study area is located at 113 Down Road, also referred to as Part Lot 31, Concession
Broken Front, Municipality of Clarington. A preliminary review of existing information
sources indicated the following natural features are either on, or within 120m of the subject
property: potentially significant woodland, potential habitat for threatened or endangered
Niblett Environmental Associates Inc. 3 PN 19-037
■ ■■■111■■
Down Road - Constraints Terms of Reference
species, outlet of Tooley Creek to Lake Ontario, fish habitat, floodplain, unevaluated wetland,
unnamed tributaries and drains, shoreline habitat (monarch, bank swallows), Darlington
Provincial Park.
2.0 Study Approach
2.1 General Approach
Our approach to the natural heritage constraints study will consist of four distinct phases.
The first phase is already underway and includes the collection and review of available
background information about the study area. Some of the data sources reviewed thus far
include: recent aerial photography, the Municipality of Clarington and Region of Durham
Official Plans, key natural features GIS mapping from the Ontario Ministry of Natural
Resources and Forestry (OMNRF) and other correspondence or files.
Our second phase involves the preparation of this ToR, which will be circulated to Central
Lake Ontario Conservation Authority for comment.
Our third phase will consist of two site visits (in April and June 2019) by our
terrestrial/wetland and fisheries biologists to perform the following tasks:
• Search for significant trees (e.g. butternut, Juglans cinerea) and rare plants;
• Delineate wetland boundaries; confirm whether the feature(s) meet the definition of
wetland as per the Ontario Wetland Evaluation System (OWES) and CLOCA
regulations;
• Conduct a preliminary assessment of habitat suitability for listed threatened and
endangered species;
• Conduct a single breeding bird survey;
• Record incidental observations of amphibians, snakes, turtles and other wildlife;
• Map the shoreline and any drains, creeks, seepage areas, or other water features on
the site.
As previously described, NEA staff members will collect in -season data, in anticipation of a
future EIS which requires in -season surveys. We will keep those data sheets on file for
subsequent stages of the process.
Niblett Environmental Associates Inc. 4 PN 19-037
■ ■■■111■■
Down Road - Constraints Terms of Reference
Our fourth phase will involve the completion of a constraints map and accompanying report.
The map will illustrate the location of all of the natural features in the study area as well as
any recommended setbacks. The report will discuss which natural features are present and
their buffer requirements. It will include a discussion of any species at risk detected and
steps required in the future to obtain relevant permits or permissions.
2.2 Field Inventories
2.2.1 Timing and Schedule
Surveys for the EIS will continue in the spring and summer with surveys anticipated to be
completed in April and June, 2019. Surveys will be conducted according to established
protocols, which include specific timing windows. These surveys will be completed across all
portions of the study area, as well as immediate adjacent areas to assess the boundary of natural
features such as wetlands and woodlands.
2.2.2 Detailed Methodoloy
Physical Site Characteristics
Site characteristics will be assessed during field visits. Such characteristics include: general
documentation of existing disturbances, current usage, age of vegetation cover, general
topography and soils.
Vegetation
All vegetation communities on and adjacent to the subject property will be visited, at which
time NEA staff will determine the dominant species composition. Classification of the
vegetation types will be based on the Ecological Land Classification for Southern Ontario -
First Approximation (Lee et al., 1998). Soil sampling will be conducted in each community to
describe the moisture, soil type and organic content of soils according to the ELC manual.
Detailed botanical inventories of the plant species in each community will be collected in the
spring and summer seasons.
Searches will be undertaken for rare, significant, or unusual species and ecological
communities. Should any be detected, their presence will be documented and locations
mapped. Photographs and/or specimens will be taken of plants requiring verification of
identification.
Niblett Environmental Associates Inc. 5 PN 19-037
■ ■■■111■■
Down Road - Constraints
Birds
Terms of Reference
A single breeding bird survey will be conducted following the Ontario Breeding Bird Atlas
point count methodology. It will be conducted during the peak breeding season (May 24 -
July 10th). All birds seen or heard within a five-minute station period will be documented
and breeding evidence codes recorded. The survey will be conducted in the early morning.
Survey stations will be established in locations where species from field, forest and wetland
habitats in the study area can be detected. In addition, a record of any incidental observations
of birds will be kept when NEA Biologists are conducting other surveys in the study area.
This is a preliminary survey primarily looking for Species At Risk. As the property is
primarily new orchard, natural habitats are very limited. We will also confirm if bank
swallows are using the banks along the shoreline or if barn swallows are in the structures.
Other Wildlife
While surveyors are on site conducting surveys of vegetation communities (i.e., ELC and
wetland) a record will be kept of any wildlife species encountered incidentally (including
mammals, amphibians and reptiles). Documentation will include notes about the species
detected, their location and the type of encounter (i.e., direct sightings and indirect evidence
such as calls, tracks, scat, burrows, dens, trails and browse) and sign trails and wildlife
corridors.
Species at Risk
The Ontario Endangered Species Act (ESA) places the onus on proponents to comply with the
Act. This is done by requiring surveys by a qualified biologist to determine whether species at
risk (SAR) are present through targeted in -season field surveys using species-specific
protocols. NEA's site visits will include an assessment of habitat for any SAR identified by
MECP as being potentially present in the area. We will also determine if other species may
find habitat on the site (e.g., breeding monarch) based on the conditions found during our
field visits.
Targeted Species at Risk (SAR) Surveys- Butternut (Juglans cinereal
While vegetation surveys are being conducted, experienced biologists will search for rare,
significant and/or unusual species. Whenever these species were found, their occurrence
information will be documented. Should any butternut trees be found, they will be assessed
by our OMNRF-certified butternut health assessor. Completion of the documentation (BHA
form) and applying for a permit from MNRF/MECP, if necessary, can be completed.
Niblett Environmental Associates Inc. 6 PN 19-037
■ ■■■111■■
Down Road - Constraints
Wetlands
Terms of Reference
Any wetlands present on site and the boundaries and functions will be assessed in the field
following the methodologies contained in the Ontario Wetland Evaluation System, Southern
Manual, Third Edition (OMNR 2013 and updates, version 3.2) and CLOCA regulation
definitions.
Aguatic Habitat
NEA biologists will assess Tooley Creek located on the eastern portion of the property. A
general aquatic assessment will be conducted to verify the location of the creek and habitat
type(s) present to inform study design and additional study requirements.
Aquatic habitat types will be assessed in terms of substrate, riparian habitat, percent in -
stream cover and unique features. Habitat types will be identified on aerial imagery and a
site map illustrating the existing aquatic habitat characteristics will be provided.
Assessments will be conducted using standardized provincial aquatic protocols (Ontario
Stream Assessment Protocol, Ministry of Transportation). A spring spawning survey will be
conducted.
3.0 Report Preparation
After field surveys have been completed, the significance of any species and/or natural
features detected in the study area will be assessed in light of relevant policies and
regulations. A constraints map will be prepared that identifies natural features,
recommended setbacks and the potential buildable area. A summary report will also be used
to present potential constraints based on any natural features or species detected.
4.0 Deliverables
NEA will provide .pdf files of any maps or reports prepared to the proponent and the
agencies unless otherwise stated. Hard copies may be requested at an extra charge. These
documents will be prepared as per the requirements of Official Plans, standard EIS
procedures, and the details outlined in the Terms of Reference (ToR).
Niblett Environmental Associates Inc. 7 PN 19-037
■ ■■■111■■
Down Road - Constraints
Terms of Reference
If you have any questions on this Terms of Reference please contact me. A formal response
on the acceptance of the ToR would be appreciated.
Sincerely,
Chris Ellingwood
President and Sr. Terrestrial and Wetland Biologist
Niblett Environmental Associates Inc.
■ ■■■111■■
PN 19-037
0. G. Biddle & Ass-ooietes Limited
consulting engineers and
96 KING ST. E., OSHAWA. ONTARIO UH 1136 PHONE (905) 576-8500
e-mail: info@dgbiddle.com
May 31, 2019
Akero Developments Inc.
c/o Weston Consulting
Attention: Ryan Guetter
201 Millway Ave, Suite 19
Vaughan, ON L4K 51<8
planners
FAX (905) 576-9730
Re: 113 Down Road
Part of Lot 31, Concession B.F.
Geographic Township of Durham
Municipality of Clarington
Conceptual Servicing (Municipal) Study Terms of Reference
Our File: 119025
Dear Mr. Halminen:
D.G Biddle and Associates Ltd. has been retained to complete a preliminary
review of the municipal servicing options for the above referenced properties.
The preliminary review of servicing will, in a conceptual form, confirm design
constraints associated with urban development on the subject lands. We
understand that the Municipality of Clarington is undertaking a Secondary Plan
review for the area surrounding and including the subject property.
STORM DRAINAGE
We will obtain available topographic mapping in the local vicinity to assess the
opportunities and constraints relating to storm water collection, management and
its outlet. A plan will be prepared showing the conceptual drainage options and
locations which are available for storm water management facilities on the
subject property. This plan will also illustrate the potential locations on the site
that storm water drainage system outlets could occur.
Further detailed reporting will be required, at time of a development application,
which examines storm water pond designs as well the inclusion of low impact
development opportunities which are appropriate locally.
-ICM-CF]
— ITi
Available topographic mapping of the site and land adjacent to the east will be
obtained for review of sanitary sewage drainage options. Available record
drawing for sanitary sewers which lie local to the site will be obtained. Any
adjacent sanitary sewers will need to be reviewed for available system capacity.
An understanding of the sanitary sewer elevation will also be required to assess
the opportunity for a gravity system outlet. A plan will be prepared which illustrate
sanitary sewer drainage options.
WATER DISTRIBUTION
Available record drawings of watermain illustrations will be reviewed and
understood to assess system extension options. Adjacent watermains need to be
assessed to confirm available sizes, materials and extents. A plan will be
prepared which illustrated the watermain extension options.
The terms of reference provide site specific servicing opportunities which will
guide further detailed design considerations. The terms of reference has been
established based on our knowledge of the subject property, surrounding area
and applicable Municipal and Regional design criteria. It is recommended that
this terms of reference be circulated to the Municipality of Clarington, Central
Lake Ontario Conservation and the Region of Durham for their consideration.
If you should you have any questions, kindly contact our office.
Yours truly,
D.G. BIDDLE & ASSOCIATES LIMITED
R.M Larocque, P.
Water Resources Manager, Associate
RMURS
Job Fi1esl119025%119025 Administration1119025 2019053 Down Road Terms of Reference. doc