Loading...
HomeMy WebLinkAboutCOD-068-08u Leadtag the Way REPORT CORPORATE SERVICES DEPARTMENT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE Date: NOVEMBER 3, 2008 Report #: COD-068-08 File #, ~SO~~I t~ ~~~R -~j ~ ^~o By-law #. Subject: 02008-28, SNOW CLEARING AND WINTER MAINTENANCE FOR MUNICIPAL LAW ENFORCEMENT Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report COD-068-08 be received; 2. THAT Dicon Construction, Pickering, Ontario being. the only compliant bidder meeting all terms, conditions, and specifications of Quotation 02008-28, be awarded the contract for the Snow Clearing and Winter Maintenance as required by the Municipal Law Enforcement Office Division of Municipal Clerk's Department for a one year period; and 3. THAT the total funds required be drawn from the operating budget as required Submitted by: rte Marano, H.B.Sc., C.M.O. Director of Corporate Services MM/NT/JB/km Reviewed by: Franklin Wu, Chief Administrative Officer CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T (905)623-3379 F (905)623-4169 REPORT NO.: COD-088-08 PAGE 2 1.0 BACKGROUND AND COMMENT 1.1 Quotation specfications were prepared and issued, as required by the Municipal's Clerk's Department. 1.2 Quotations were advertised electronically. Subsequently, quotations were downloaded and picked up by a number of potential bidders. Only one submission was received and projection of cost estimates are provided in Schedule "A° attached. 2.0 ANALYSIS 2.1 As there is no sure way of determining the cost for the upcoming year, due to the inability to predict the snow fall or the number of properties which are required to be cleared, we have projected the costing using historical usage. The first is assuming that the work to be completed in 2008/09 season is equivalent to the work completed during the 2007/08 season. If the exact number of metres to be cleared in 2008/09 is equal to the number of metres in 2007/08, then the cost to complete the work would be approximately $219,446.00 (Excluding GST) compared to last year's cost of $28,269.20 (excluding GST). Last year we experienced a heavier than normal snowfall therefore, if we were to average the number of metres cleared in 2006/07 and 2007/08 the cost would decrease to approximately $142,017.00 (excluding GST). See attached Schedule `A'. 2.2 As there is only one bidder, the recommendation is to award to this bidder for a one year period. During this year, the Municipality will investigate alternatives for securing pricing for the following and future years. 2.3 The low bidder has not performed work for the Municipality of Clarington however references prove to be satisfactory. REPORT NO.: COD-068-08 PAGE 3 3.0 FINANCIAL IMPLICATIONS 3.1 The funds required will be drawn from Municipal Law Enforcement Division's Snow Removal operating account and recovered from the property owner. 3.2 Queries with respect to department needs, specifications, etc., should be referred to the Municipal Clerk. 3.3 After further review and analysis of the bids by the Municipal Clerk's Department and Purchasing, it was mutually agreed that the low bidder, Dicon Construction, Pickering Ontario, be recommended for the contract for the Municipal Law Enforcement Snow Removal. Concurrence: Municipal Clerk Attachments: Schedule "A" -Cost Comparison Chart C~ar~ngton Leading tke Way Schedule "A" Metres Cost Comparison for Snow Clearing for Municipal Law Enforcement Division Rates and Rates and Quantity for Quantity for 2008109 2008/09 2008/09 Average Based on Based on of 2006/07 006/07 Qt 2007/08 Q & 2007!08 Q s 3904.44 13184.6 8544.5 $33,187.74 $112.069.10 572828.4 ~ Metres Sanded ~ 3904.44 ~ 13184.6 ~ 3904.44 13184 6 8544 52 I LCost far Sanding ~ $3,904.44 $13.184.60 531.235.52 x~n~ a~a an can Ica ,a for Call outs ota $7 973 88 $28,269.20 $64,588.26 $219,445.90 $142,017.08 (excluding GST)