HomeMy WebLinkAbout09/20/2004 • Leading the Way w. GENERAL PURPOSE AND ADMINISTRATION COMMITTEE "- DATE: September 20, 2004 TIME: 9:30 A.M. PLACE: COUNCIL CHAMBERS 1. ROLL CALL 2. DISCLOSURES OF PECUNIARY INTEREST 3. MINUTES (a) Minutes of a Regular Meeting of September 7, 2004 301 ow 4. DELEGATIONS (a) Paul Lenardon & Viveca Rupa, 22 Brock Street East, Uxbridge • L9L 1 P1 — regarding Report PSD-115-04 (b) Yvonne Gilkes, 45 North Street, Newcastle, L1 B 1 H7 — regarding .. Report PSD-115-04 (c) Sheila Pethick, 68 North Street, Newcastle, L1 B 1 H7 — regarding Report PSD-115-04 (d) Stephen Craig, 37 North Street, Newcastle, L1 B 1 H7 — regarding Report PSD-115-04 5. PUBLIC MEETING (a) Application to Amend the Zoning By-law 501 Applicant: Penwest Development Corporation Limited • Report PSD-109-04 (b) Application to Permit Retail and Offices Uses 503 Applicant: 1287561 Ontario Limited Report PSD-110-04 CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T (905) 623-3379 .r G.P. & A. Agenda - 2 - September 20, 2004 (c) Application to Amend the Clarington Official Plan, Zoning By-law 505 and for a Draft Plan of Subdivision Applicant: WED Investment Ltd. Report PSD-111-04 rw 6. PLANNING SERVICES DEPARTMENT wo (a) PSD-109-04 — Proposed Zoning By-law Amendment Increasing 601 the Lot Coverage to Permit the Development of Seven Semi-Detached Dwellings 40 Owner: Penwest Development Corp. Ltd. (b) PSD-110-04 — Rezoning Application to Permit Retail and Offices 606 Use Applicant: 1287561 Ontario Limited �w (c) PSD-111-04 — Proposed Official Plan Amendment, Plan of 613 Subdivision and Zoning By-law Amendment to Permit 390 Residential Units, a Park Block and an •. Elementary School Block Applicant: WED Investments Ltd. (d) PSD-112-04 — Application for Removal of Holding Symbol 628 Owner: Velma and William Griffin Applicant: John Hill/Remax Spirit • (e) PSD-113-04 — Application for Removal of Holding Symbol and 634 Application for Removal of Part Lot Control Applicant: Mearns East Developments Inc. (f) PSD-114-04 — Places to Grow: Growth Plan for the Greater Golden Horseshoe, Discussion Paper, Summer 2004 (circulated under separate cover) Wd (g) PSD-115-04 — Rezoning Application to Permit Commercial 642 uses with Reduced Parking and Load Standards Applicant: Viveca Rupa 7. ENGINEERING SERVICES DEPARTMENT .o (a) EGD-44 -04 — Response to a Request for the Installation of a 701 Barrier Structure at the Westerly Terminus of No Boundary Road in Burketon (b) EGD-45-04 — Monthly Report on Building Permit Activity for 709 .r August, 2004 NO G.P. & A. Agenda - 3 - September 20, 2004 (c) EGD-46-04 — Concession Street West, Bowmanville Traffic 714 and Parking Concerns 8. OPERATIONS DEPARTMENT %w No reports a' 9. EMERGENCY SERVICES DEPARTMENT (a) ESD-012-04 — Monthly Response Report— June to 901 ' September, 2004 10. COMMUNITY SERVICES DEPARTMENT No reports ' 11. CLERK'S DEPARTMENT No reports 12. CORPORATE SERVICES DEPARTMENT (a) COD-047-04 — Request for Proposal RFP2004-7 1201 Supply and Installation of Playground Equipment `V 13. FINANCE DEPARTMENT (a) FND-019-04 — Cash Activity— Second Quarter of 2004 1301 (b) FND-020-04 — Annual Leasing Report — 2003 1325 14. CHIEF ADMINISTRATIVE OFFICER'S DEPARTMENT p,. No reports 15. UNFINISHED BUSINESS 16. OTHER BUSINESS •• 17. ADJOURNMENT +rr• on r. THE MUNICIPALITY OF CLARINGTON . General Purpose and Administration Committee September 7, 2004 Minutes of a meeting of the General Purpose and Administration Committee held on Monday, September 7, 2004 at 7:00 p.m., in the Council Chambers. ROLL CALL Present Were: Mayor J. Mutton Councillor A. Foster Councillor D. MacArthur Councillor P. Pingle, Councillor G. Robinson Councillor J. Schell Councillor C. Trim Also Present: Chief Administrative Officer, F. Wu Director of Engineering Services, T. Cannella Director of Community Services, J. Caruana Director of Planning Services, D. Crome Director of Operations, F. Horvath Director of Corporate Services, M. Marano �. Director of Finance/Treasurer, N. Taylor Divisional Fire Chief, G. Weir Solicitor, D. Hefferon �• Deputy Clerk, M. Knight Stanley Clerk II, C. Doiron r Mayor Mutton chaired this portion of the meeting. DISCLOSURES OF PECUNIARY INTEREST Councillor Pingle indicated that she will be stating a pecuniary interest regarding Confidential Report PSD-108-04. MINUTES Resolution #GPA-343-04 Moved by Councillor Trim, seconded by Councillor Robinson THAT the minutes of a regular meeting of the General Purpose and Administration Committee held on June 21, 2004, be approved. `� "CARRIED" G.P. & A. Minutes - 2 - September 7, 2004 DELEGATIONS �+ (d) Lynda Towsend-Renaud, Solicitor, Lyn Townsend-Renaud Law Office, 1400 Cornwall Road, Suite 2, Oakville, od L6J 7W5 — regarding Report PSD-104-04, Ms. Towsend- Renaud is the lawyer for both Beth Kelly (delegation a) and Robert Hann (delegation b) and she is speaking on their behalf. She agrees with four out of the five recommendations in Report PSD-104-04. It is Number 4, a denial to the request to have the designation of lands changed from high density to medium density, that she would like to address to the Committee. They would like to construct townhouses rather than apartment buildings. She introduced Bryce Jordan (delegation c) GM Sernas Associates, 110 Scotia Court, Unit 41, Whitby, L1 N AY7 who stated that the property is designated as high density and he and his associates would ad like to have this changed to medium density. He believes that high density is not appropriate within the Bowmanville area even though the location would be ideal with the GO station proposal for that area. Medium density would be a compromise. He stated that the previous owner had the zoning for this property designated for high density. (e) Dr. Peter Zakarow, 282 Liberty Street North, Bowmanville, L1C 2N1 — regarding Report PSD-104-04, Dr. Zakarow stated that the intersection is a very busy corner now and it would be extremely congested if they allowed this designation to proceed. He also mentioned that the school board is concerned about the over population if apartments were to be erected. He agreed to reduce to medium density. If there was to be apartments erected this would take away from privacy in homes and backyards. He does not want a high rise apartment. High rises should be located closer to the .r downtown sector. He has reservations about having a high rise building in his backyard. (f) Mario Veltri, 68 King Street, Bowmanville, L1C 3X2 — regarding Report PSD-104-04, Mr. Veltri agrees with Dr. Zakarow that high density would not be appropriate in this area, it will ■+ change the aesthetics of the sites that he is prepared to build. (g) Tony Samson, TS Environmental, 373 Lake Road, �+ Bowmanville, L1C 4P8 — regarding Site Plan Approval SPA- 2004-017, Mr. Samson is asking that the Planning Department reimburse his $25,000 Letter of Credit regarding the landscape on a building that has not yet been erected. 382 •• G.P. & A. Minutes - 3 - September 7, 2004 as (h) Libby Racansky, 3200 Hancock Road, Courtice, L1 E 2M1 — regarding Percentage of natural cover in Black/Farwell suitable for infiltration and why rehabilitation is needed. Ms. No Racansky circulated a copy of her presentation and stated that she is concerned about the Black-Farewell watershed study prepared by CLOCA, Ganaraska, GRCA, Environment am Canada, Ontario Power Generation and Durham Region for Durham Regional costal wetlands. She feels that the community wants a clean and steady supply of water, .m protection against flood, contamination of water and recent severe climate conditions like rain, air temperature, winds. All this depends on the amount of natural areas within our watersheds. She requested Council and Municipal Staff to consider current conditions of the Black-Farewell. Start making plans for rehabilitation and avoidance/protection of the .. remaining natural area in all ongoing and future projects. It was not so long ago that this watershed was the most extensive forested area within CLOCA's jurisdiction according ■. to the previous studies. Resolution #GPA-344-04 r Moved by Councillor Schell, seconded by Councillor MacArthur +� THAT the Committee recess for 10 minutes. "CARRIED" The meeting reconvened at 7:50 pm. +� Councillor Schell chaired this portion of the meeting. PUBLIC MEETINGS Pursuant to the Planning Act, the Council of the Municipality of Clarington, through its General Purpose and Administration Committee, is holding a Public Meeting for the following applications: (a) Application for Draft Plan of Condominium Approval Applicant: 426719 Ontario Inc. Report PSD-097-04 (b) Application to Amend the Clarington Official Plan and Zoning By-law 84-63 Applicant: The Kaitlin Group "` Report PSD-098-04 30 am G.P. & A. Minutes - 4 - September 7, 2004 (c) Application to Amend the Zoning By-law i° Applicant: Prestonvale Heights Limited Report PSD-099-04 David Crome, Director of Planning Services provided a verbal report pertaining to Report PSD-097-04. (a) The proposed draft plan of condominium submitted by 426719 Ontario Inc. would permit condominium tenure for an existing (13) unit industrial building. No one spoke in opposition to or in support of this application. The applicant was present but did not wish to speak. David Crome, Director of Planning Services provided a verbal report pertaining to Report PSD-098-04. (b) The application would add a Medium Density symbol in the .• Clarington Official Plan and rezone the lands from "Agricultural (A)" to an appropriate zone to permit the development of 62 townhouse condominiums. Thorsten Koseck, 7 Munday Crt., Bowmanville, L1C 4R7 ..,, spoke in opposition to this application. He presented a petition from the residents of Munday Court. The residents oppose the application for the following reasons: • Environmental; The Amendment ZBA-2004-027 as shown in the letter does not adhere to the Brookhill Subwatershed Study Water Quaility Control Flood and Erosion Control Wildlife Impact Review all environment effects to ensure that it is in keeping with the Durham Regional Official Plan .r • Safety; Traffic mergence from Stevens Road to Highway #57, Ud and the increase of traffic flow along the Longworth Road extension .r .r .. G.P. & A. Minutes - 5 - September 7, 2004 Pedestrain traffic from the proposed development, plans do not indicate sidewalks or safe passage/crossing for access to downtown Bowmanville or to the businesses across Highway#57 Bank erosion is extensive along the edge of the tree line. The residents of Munday Court recommend that the mentioned lands be kept as "Agricultural" or re-zoned to "Parklands" with soccer fields, playgrounds and access to the Bowmanville Creek. Robert Stevens, 33 Stevens Road, Bowmanville, L1 C 4R7 spoke in support of the application. Mr. Stevens stated that he contacted three persons listed on the petition that were opposed to this application, and they stated that they are not in opposition. He also stated that he has lived in Bowmanville for the past 76 years and does not wish to ever move. He would like to live in the upscale condominium that is proposed for this area. He is the previous owner of the said lands, and he stated that he would not have sold his property to the �.. developer if he didn't feel that the condominium development would not deface the value of any of the homes or hurt the community in anyway. Kelvin Whalen, 1029 McNicoll Avenue, Scarborough, M1W 3W6 was present to answer any questions and •• concerns. The developer proposes to build upper scale bungalow style with some two storey townhouses. David Crome, Director of Planning Services provided a verbal report pertaining to Report PSD-099-04. dw (c) The proposed Zoning By-law Amendment submitted by Prestonvale Heights Limited would permit the development of a commercial/residential mixed development with 1020 m2 of " ground floor commercial spaces, and eight (8) residential units on the second floor. No one spoke in opposition to or in support of this application. Nick Mensink, GM Sernas and Associates, 110 Scotia Court, Unit 41, Whitby, L1N 8Y6, the applicant, stated that there are still some fine tuning for this application to be completed. G.P. & A. Minutes - 6 - September 7, 2004 ow PLANNING SERVICES DEPARTMENT "' Draft Plan of Resolution #GPA-345-04 Condominium Eli Application Moved by Councillor Robinson, seconded by Councillor MacArthur 426719 Ont. Inc. THAT Report PSD-097-04 be received: .. THAT the draft plan of condominium application, submitted by .d 426719 Ontario Inc. be referred back to Staff for further processing and preparation of a subsequent report pending receipt of all outstanding comments; and go THAT the interested parties listed in Report PSD-97-04 and any delegations be advised of Council's decision. .r "CARRIED" Clarington Resolution #GPA-346-04 da OPA Amendment and Zoning Moved by Councillor Trim, seconded by Councillor Pingle By-law Amendment to THAT Report PSD-098-04 be received; Permit a 62 Unit Townhouse THAT the applications to amend the Clarington Official Plan and Complex Zoning By-law submitted by the Kaitlin Group to permit a 62 unit townhouse complex be referred back to staff and held in abeyance until the completion of the Brookhill Subwatershed Study and the Brookhill Secondary Plan; and THAT the interested parties listed in Report PSD-098-04 and any delegations be advised of Council's decision. .r "CARRIED" Proposed Zoning Resolution #GPA-347-04 ., By-law Amendment to Moved by Councillor Robinson, seconded by Councillor MacArthur Permit a Mixed Use Development THAT Report PSD-099-04 be received: THAT the application submitted by Prestonvale Heights Limited be referred back to Staff for further processing and the preparation of a further report following the receipt of all outstanding agency comments; and, �+ 06 on G.P. & A. Minutes - 7 - September 7, 2004 am THAT the interested parties listed in Report PSD-099-04 and any delegations be advised of Council's decision. we "CARRIED" Application for Resolution #GPA-348-04 am Removal of Holding Moved by Councillor Trim, seconded by Councillor Foster �., THAT Report PSD-100-04 be received: THAT the application submitted by 2001544 Ontario Limited to ,,. remove the Holding (H) symbol be approved and that the By-law attached to Report PSD-100-04 to remove the Holding (H) symbol be passed and a copy forwarded to the Regional Municipality of .. Durham; and THAT all interested parties listed in Report PSD-100-04 and any delegations be advised of Council's decision. "CARRIED" Draft Plan of Resolution #GPA-349-04 Subdivision and Rezoning Moved by Councillor MacArthur, seconded by Councillor Trim Appl. THAT Report PSD-101-04 be received: THAT the City of Oshawa be advised that the Municipality of Clarington would have no objections to the approval of the proposed Draft Plan of Subdivision (S-0-2004-02) and Rezoning Z-6/2004, provided that: (a) The City of Oshawa confirm in writing that it will assume and accept all costs of street illumination and/or sidewalk improvements that are deemed necessary on Townline Road as a result of this development including all future maintenance; and (b) The condition contained in Attachment 3 to Report PSD-101-04 is incorporated in any Draft Approval; THAT a copy of Report PSD-101-04 be forwarded to the City of Oshawa Planning Department and Region of Durham Planning Department; and THAT the interested parties listed in Report PSD-101-04 be advised of Council's decision. "CARRIED" G.P. & A. Minutes - 8 - September 7, 2004 Monitoring of the Resolution #GPA-350-04 Decisioins of the Committee Moved by Councillor Pingle, seconded by Councillor Trim Adjustment for June, July, and THAT Report PSD-102-04 be received; and August 2004 THAT Council concurs with the decision of the Committee of Adjustment made on June 24, July 8, July 29 and August 19, 2004 for applications A2003/021, A2004/017, A2004/019, A2004/020, A2004/021, A2004/022, A2004/023, A2004/024, A2004/-25, A2004/026, A2004/027, A2004/028, A2004/029, A2004/030, A2004/031, A2004/032, A2004/033, A2004/034 and A2004/035; and THAT Staff be authorized to appear before the Ontario Municipal Board to defend the decisions of the Committee Adjustment. "CARRIED" Semi-Annual Resolution #GPA-351-04 Report on Site Plan Activities Moved by Councillor Robinson, seconded by Councillor Foster January 1 to June 30, 2004 THAT Report PSD-103-04 be received for information. "CARRIED" .N OPA and Resolution #GPA-352-04 Rezoning Applications Moved by Mayor Mutton, seconded by Councillor Pingle Halloway Holdings Ltd. THAT Report PSD-104-04 be received; & Towchester Dev. Ltd. THAT the Ontario Municipal Board be requested to defer the .. Application submitted by Halloway Holdings Limited and Towchester Developments Limited to redesignate lands from "Local Central Area" to "Medium Density Residential" within Subject Site 1 until the Municipality's Commercial Policy Review has been completed; THAT the Ontario Municipal Board be requested to approve the •+ application submitted by Halloway Holdings Limited and Towchester Developments Limited to reduce the amount of retail commercial floorspace from 3,500 m2 to 1,700 m2 within the "Local Central Area" located at Subject Site 2; ;.i � u No G.P. & A. Minutes - 9 - September 7, 2004 THAT the Ontario Municipal Board be requested to deny the application submitted by Halloway Holdings Limited and Towchester Development Limited to redesignate lands contained within the "Local Central Area" from "High Density Residential" to "Medium Density Residential" located at Subject Sites 2 and 3; and THAT the Ontario Municipal Board and all interested parties and delegations listed in Report PSD-104-04 and any delegations be advised of Council's decision. "CARRIED" Planning Reform Resolution #GPA-353-04 Initiatives: Consultation Moved by Councillor MacArthur, seconded by Councillor Robinson ,w Discussion Paper On Planning Act THAT Report PSD-105-04 be received and endorsed as the Reform Municipality's comments on the Consultation Discussion Paper#1 on Planning Act Reform and Implementation Tools and Consultation Discussion Paper#2 on the Provincial Policy Statement; and �. THAT Report PSD-105-04 be forwarded to the Ministry of Municipal Affairs and Housing and the Region of Durham Planning Department. •• "CARRIED" Planning Reform Resolution #GPA-354-04 .. Initiatives: Discussion Paper Moved by Councillor MacArthur, seconded by Councillor Foster on OMB Reform ■• THAT Report PSD-106-04 be received and endorsed as the Municipality's comments on the Consultation Discussion Paper#3 on Ontario Municipal Board Reform; and THAT Report PSD-106-04 be forwarded to the Ministry of Municipal Affairs and Housing and the Region of Durham Planning Department. "CARRIED" Confidential Resolution #GPA-355-04 Reports Property Matter Moved by Councillor Foster, seconded by Councillor MacArthur THAT Confidential Reports PSD-107-04 and PSD-108-04 be referred to the end of the agenda to be considered at a "closed" meeting. "CARRIED" J V r1U G.P. & A. Minutes - 10 - September 7, 2004 Naming of Resolution #GPA-356-04 Street in Port of Moved by Mayor Mutton, seconded by Councillor Trim Newcastle THAT the Planning Services Department take appropriate steps to have a street in the Port of Newcastle development named "Corporal Patterson Lane"; and THAT the poppy symbol be excluded from the street sign. "CARRIED" Councillor MacArthur chaired this portion of the meeting. ENGINEERING SERVICES DEPARTMENT Appointment Resolution #GPA-357-04 Of Building Inspector Moved by Councillor Schell, seconded by Councillor Pingle THAT Report EGD-39-04 be received; THAT Mr. Bill Tan be appointed as Inspector for the Municipality of Clarington effective Tuesday, September 7, 2004 and that his name be added to Schedule 'B' of By-Law 2004-092; and THAT the appropriate by-law be forwarded to Council. ••�+ "CARRIED" Monthly Resolution #GPA-358-04 Report June 2004 Moved by Councillor Trim, seconded by Councillor Robinson THAT Report EGD-40-04 be received for information. INA "CARRIED" Monthly Resolution #GPA-359-04 Report July 2004 Moved by Councillor Schell, seconded by Mayor Mutton r THAT Report EDG-41-04 be received for information. "CARRIED" M G.P. & A. Minutes - 11 - September 7, 2004 Confidential Resolution #GPA-360-04 ` Report Property Matter Moved by Councillor Schell, seconded by Councillor Foster THAT Confidential Report EGD-42-04 be referred to the end of the agenda to be considered at a "closed" meeting. "CARRIED" w Bowmanville Resolution #GPA-361-04 Downtown Streetscape Moved by Councillor Schell, seconded by Councillor Robinson `. Revitalization THAT Report EGD-43-04 be received; .,, THAT sidewalk replacement from Scogug Street to Silver Street and from Division Street to George Street in the amount of $60,500 be added to the contract works; THAT the works and associated project costs in the amount of $211,026.90 deferred as part of the staff award of Contract �• CL2004-12 be added back into the contract; THAT additional funding in the amount of $270,000 be allocated to the project from the General Capital Reserve # 100-00-000-00000- 2917; and THAT members of the Downtown Bowmanville Community Improvement Program Steering Committee be advised of Council's decision through Faye Langmaid of the Planning Services Department, FORTHWITH. "CARRIED" OPERATIONS DEPARTMENT There were no reports considered under this section of the agenda r. EMERGENCY SERVICES DEPARTMENT There were no reports considered under this section of the agenda. COMMUNITY SERVICES DEPARTMENT There were no reports considered under this section of the agenda. Councillor Foster chaired this portion of the meeting. go G.P. & A. Minutes - 12 - September 7, 2004 CLERK'S DEPARTMENT 's' Livestock, Resolution #GPA-362-04 Poultry and `� Honey Bee Moved by Councillor Schell, seconded by Councillor Robinson THAT Report CLD-27-04 be received for information. .r "CARRIED" Banning of Resolution #GPA-363-04 Pitbulls and other vicious Moved by Mayor Mutton, seconded by Councillor MacArthur dogs THAT Staff investigate the banning of Pitbulls in Clarington in .. co-ordination with other Municipalities in the Region of Durham, including restrictions and requirements being placed on their owners. "CARRIED" Mayor Mutton chaired this portion of the meeting. CORPORATE SERVICES DEPARTMENT Tender Awards Resolution #GPA-364-04 Summer Council Break Moved by Councillor MacArthur, seconded by Councillor Foster • THAT Report COD-044-04 be received; and THAT the By-laws attached to Report COD-044-04, marked Schedules "A", "B", "C", "D" and "E" authorizing the Mayor and Clerk to enter into the necessary agreements be approved. "CARRIED" RFP2004-10 Resolution #GPA-365-04 Consulting Services Moved by Councillor Schell, seconded by Councillor Robinson THAT Report COD-045-04 be received; .r .r ,. G.P. & A. Minutes - 13 - September 7, 2004 THAT Hemson Consulting Ltd., Toronto, Ontario with a total bid in No the amount of $79,388.00 (including disbursements plus G.S.T.), being the lowest most responsible bidder meeting all terms, conditions and specifications of Request for Proposal RFP2004-10 be awarded the contract for the Consulting Services for the Development Charges and Official Plan Growth Management Study as required by the Finance and Planning Services Departments; THAT the funds be drawn from Account#100-50-130-X-7160, Planning Consulting; and THAT the By-law attached to Report COD-045-04 marked Schedule "A" authorizing the Mayor and Clerk to execute the necessary agreement be approved. ,�. "CARRIED" FINANCE DEPARTMENT Financial Resolution #GPA-366-04 Update ,,. Moved by Councillor Schell, seconded by Councillor Trim THAT Report FND-017-04 be received; THAT a Rate Stabilization Reserve Fund be established pursuant to the By-law attached to Report FND-017-04; THAT the non-refundable portion of the Assessment Appeals Reserve Fund be transferred to the Rate Stabilization Reserve Fund; THAT any unencumbered balance remaining in the Working Funds Reserve be transferred into the Rate Stabilization Fund; and r. THAT any annual surplus or deficit as a result of the annual audit be financed from the Rate Stabilization Reserve Fund. "CARRIED" .. Clarington Resolution #GPA-367-04 Address Locations Moved by Councillor Schell, seconded by Councillor Foster THAT Report FND-018-04 be received for information; and G.P. & A. Minutes - 14 - September 7, 2004 THAT the Municipal Property Assessment Corporation be thanked for their assistance in this matter. "CARRIED" .r CHIEF ADMINISTRATIVE OFFICER'S DEPARTMENT r There were no reports considered under this section of the agenda. UNFINISHED BUSINESS Tony Samson Resolution #GPA-368-04 delegation • Moved by Councillor Trim, seconded by Councillor Schell THAT the request of Tony Samson for the Municipality of Clarington to reimburse this letter of credit of the amount of$25,000 be referred to the Director of Planning Services. .r "CARRIED" Libby Racansky Resolution #GPA-369-04 delegation Moved by Councillor Schell, seconded by Councillor Foster THAT the delegation of Libby Racansky be referred to Staff. "CARRIED" OTHER BUSINESS Joseph Caruana, Director of Community Services, gave an update on the expected completion date for the Fire Hall/Police Station to be April, 2005. The Indoor Soccer Facility has been delayed due to unforeseen weather conditions, the opening date should be in November or December, 2004. Confidential Resolution #GPA-370-04 Reports Moved by Councillor Schell, seconded by Councillor Pingle THAT the Committee recess for five minutes and reconvene at a .r "closed" meeting for consideration of Confidential Reports PSD-107-04, PSD-108-04 and EDG-42-04 pertaining to property matters. "CARRIED" _ 4 .w G.P. & A. Minutes - 15 - September 7, 2004 Councillor Pingle, stated a pecuniary interest regarding Confidential Report PSD-108-04 due to her house being in close proximity of subject sites. Ratify Actions Resolution #GPA-371-04 Moved by Councillor Schell, seconded by Councillor Robinson THAT the actions taken at the "closed" meeting be ratified. .r "CARRIED" aw ADJOURNMENT Resolution #GPA-372-04 up Moved by Councillor MacArthur, seconded by Councillor Foster THAT the meeting adjourn at 9:50 p.m. "CARRIED" MAYOR DEPUTY CLERK Public Meeting Penwest Development ,., Corporation Limited CORPORATION OF THE Report # PSD-109-04 MUNICIPALITY OF CLARINGTON a Leading the Way NOTICE OF PUBLIC MEETING DEVELOPMENT APPLICATION BY: PENWEST DEVELOPMENT CORPORATION LIMITED r AN APPLICATION TO AMEND THE ZONING BY-LAW TAKE NOTICE that the Council of the Corporation of the Municipality of Clarington will consider a proposed Zoning By-law Amendment, under Section 34 of the Planning Act, 1990,as amended. APPLICATION DETAILS The proposed Zoning By-law Amendment submitted by Penwest Development Corporation Limited would permit the development of six(6)semi-detached and linked dwellings with a maximum lot coverage of 53%. The subject properties are located within Part of Lot 9, Concession 1, former Town of Bowmanville, Lots 10, and 13 to 18 on Plan 40M-2094. .. Planning File No.: ZBA 2004-028 PUBLIC MEETING The Municipality of Clarington will hold a public meeting to provide interested parties the opportunity to make comments, identify issues and provide additional information relative to the proposed development. The public meeting will be held on: DATE: Monday, September 20,2004 �. TIME: 9:30 a.m. PLACE: Council Chambers,2"d Floor,Municipal Administrative Centre, 40 Temperance St., Bowmanville,Ontario �. ANY PERSON may attend the public meeting and/or make written or verbal representation either in support of or in opposition to the proposal. The start time listed above reflects the time at which the General Purpose and Administration Committee Meeting commences. If you cannot attend the Public Meeting on this application you can make a deputation to Council at their meeting on Monday, September 27, 2004, commencing at 7:00 p.m. Should you wish to appear before Council, you must register with the Clerks Department by the Wednesday noon, September 22, 2004, to have your name appear in .. the Agenda. COMMENTS OR QUESTIONS? r. If you wish to make a written submission or if you wish to be notified of subsequent meetings or the adoption of the proposed Zoning By-law Amendment, you must submit a written request to the Clerk's Department, 2nd Floor, 40 Temperance Street, Bowmanville, Ontario L1C 3A6. Additional information relating to the proposal is available for inspection between 8:00 a.m. and 5:00 p.m. at the Planning Services Department, 3`d Floor, 40 Temperance Street, Bowmanville, Ontario L1 C 3A6, or by calling Tracey Will at(905) 623-3379 extension 326 or by e-mail at twill @municipality.clarington.on.ca r APPEAL If a person or public body that files a notice of appeal of a decision for the proposed Zoning By-law Amendment to the Ontario Municipal Board does not make oral submissions at a public meeting or does not make written submissions before the proposed Zoning By-law Amendment is approved, the Ontario Municipal Board may dismiss all or part of the appeal. Dated ;1tT_thh_Q Municipality of Clarington this 17th day of August, 2004. Davi rome, M.C.I.P., R.P.P. 40 Temperance Street _ Director of Planning Services Bowmanville,Ontario 1 Municipality of Clarington L1C 3A6 rr w w � I IIII III I II � CONCESSION STREET EAST W 0 z •• 0 DADSON DRIVE W 0 r � W W o ci as 0 co Da DC � ,� W M M M ao V a s � m M � a Z a a d m a s a W a 0- 0 272 a a Part 18 Q ""� W 46 _J DADSON DRIVE N z 45 25 19 Q W 44 :18:::A7:::-A6"A5 : 14::: 13:: 12 11 :10 2 N 20 43 ...... ....... ..... 21 22 23 24 25 26 27 28 29 30 31 r 40M-2094 SQUIRE FLETCHER DRIVE Q .r aW 42 F2 41 40 39 38 37 3 34 F332 =D «+II I _T 7 V O II '--�—B-}Jowmanville Key Map "K� ! I I CHANCE CRT / / ZBA 2004-028 Ali C3IJCESSivN SiictE� r.:, Zoning By-law Amendment FEE DADSON DRIVE Mc � w � � 2 � ¢ F � H R TR ORR CRT. . DADSON DRIVE Q Owner: Penwest Developments pW U 1� Subject DOWNHAM OR��f Corporation Limited Site SQUIRE FLETCHER DR. W U �ICODVCIC111 PDT � GOB :5192 �' Public Meeting Truestone Project Managers rr Limited Report # PSD-110_04 CORPORATION OF THE MUNICIPALITY OF CLARINGTON Len�ingtJ�eWay NOTICE OF PUBLIC MEETING DEVELOPMENT APPLICATION BY: TRUESTONE PROJECT MANAGERS LIMITED AN APPLICATION TO AMEND THE ZONING BY-LAW 84-63 TAKE NOTICE that the Council of the Corporation of the Municipality of Clarington will consider a proposed Zoning +�+ By-law Amendment, under Section 34 of the Planning Act, 1990, as amended. APPLICATION DETAILS The proposed submitted by Truestone Project Managers Limited would permit a 2336 mZ of retail and office floor area. The subject property is located Part Lot 34, Concession 2, former Township of Darlington (1461 Highway No. 2, Courtice), as shown on the reverse. r.. Planning File Nos.: ZBA 2004-034 .. PUBLIC MEETING The Municipality of Clarington will hold a public meeting to provide interested parties the opportunity to make comments, identify issues and provide additional information relative to the proposed development. The public meeting will be held on: DATE: Monday,September 20, 2004 TIME: 9:30 a.m. PLACE: Council Chambers,2nd Floor, Municipal Administrative Centre, ,r. 40 Temperance St.,Bowmanville,Ontario ANY PERSON may attend the public meeting and/or make written or verbal representation either in support of or in opposition to the proposal. The start time listed above reflects the time at which the General Purpose and Administration Committee Meeting commences. If you cannot attend the Public Meeting on this application you can make a deputation to Council at their meeting on Monday , September 27, 2004, commencing at 7:00 p.m. Should you wish to appear before Council, you must register with the Clerks Department by the Wednesday noon, September 22, 2004 to have your name appear in the Agenda. r. COMMENTS OR QUESTIONS? If you wish to make a written submission or if you wish to be notified of subsequent meetings or the adoption of the proposed Zoning By-law Amendment, you must submit a written request to the Clerk's Department, 2nd Floor, 40 Temperance Street, Bowmanville, Ontario L1C 3A6. Additional information relating to the proposal is available for inspection between 8:00 a.m. and 5:00 p.m. at the Planning Services Department, 3rd Floor, 40 Temperance Street, Bowmanville, Ontario L1C 3A6, or by calling Richard Holy at(905)623-3379 extension 332 or by e-mail at rholy(amunicipality.clarington.on.ca. APPEAL If: nersnn todv that files a noti-ce of anneal of a decision!For the oroDosed Zn inc 9V-12w Amendrrent to the 4W Ontario Municipal Board does not make oral submissions at a public meeting or does not make written submissions before the proposed Zoning By-law Amendment is approved, the Ontario Municipal Board may dismiss all or part of the appeal. Dated at Municipality of Clarington this 28th day of July 2004. David Crome, M.C.I.P., R.P.P. 40 Temperance Street Director of Planning Services Bowmanville,Ontario +� Municipality of Clarington L1C 3A6 .r REGI A� HIGHWAY 2 - ,I rt �'1• wu'-P .r I OT r r---- —a"y--•r �� I els 1 LE I 1 PO§ low I ✓ 1` I F I OFF j •.Is. iRETAI ADI � � .✓ i I (326 I is j Y I r I I 1 1 i 1 S no --JI me • I � 1 1 I p 1 I r ^;, , ✓ 1 1 QZ 1 I I yJ_J r.• e,. PRL?POS PROPO"ED BOWL A RETAI ' -16:1 h�.SF •'6.000 9F (1500'JgM) (636 SM.) Other Lands • , s .. � Owned By I " Applicant .r �• r r ' 1 WW Courtice Key Map L_4 I ZBA 2004-034 Zoning By-law Amendment a w a 3 Owner: 1287561 Ontario Limited Subject Site w 5 04 Public Meeting 1011 WED Investments Ltd. CORPORATION Report # PSD-111-04 Clare n 11 MUNICIPALITY OF F THE CLARINGTON r LeadingflicWay NOTICE OF PUBLIC MEETING 1 DEVELOPMENT APPLICATION BY: WED INVESTMENTS LTD. "r AN APPLICATION TO AMEND THE CLARINGTON OFFICIAL PLAN,ZONING BY-LAW AND FOR A DRAFT PLAN OF SUBDIVISION TAKE NOTICE that the Council of the Corporation of the Municipality of Clarington will consider a proposed Official Plan Amendment, a proposed Zoning By-law Amendment, and a Draft Plan of Subdivision under Sections 17, 34 and 51 respectively of the Planning Act, 1990,as amended. APPLICATION DETAILS +1111 The proposed Official Plan Amendment submitted by WED Investments Ltd would relocate the Medium Density site to the north side of Aspen Springs Drive and relocate the public elementary school site and neighbourhood park site to the south side of Aspen Springs Drive. The proposed Draft Plan of Subdivision and Zoning By-law would permit the development of 390 residential units,a park block and public elementary school block The subject � property is located on the west side of the Green Road road allowance, approximately 230 metres north of Baseline Road and continuing northerly to the Canadian Pacific Railway tracks, being in Part Lot 17, Concession 1, former Township of Darlington(as shown on reverse). WIN Planning File Nos.: COPA 2004-004,DEV 91-003 AND 18T-90051 PUBLIC MEETING The Municipality of Clarington will hold a public meeting to provide interested parties the opportunity to make comments, identify issues and provide additional information relative to the proposed development The public meeting will be held on: DATE: Monday,September 20,2004 TIME: 9:30 a.m. PLACE: Council Chambers,2nd Floor,Municipal Administrative Centre, go 40 Temperance St.,Bowmanville,Ontario ANY PERSON may attend the public meeting and/or make written or verbal representation either in support of or in opposition to the proposal. The start time listed above reflects the time at which the General Purpose and Administration Committee Meeting commences. war If you cannot attend the Public Meeting on this application you can make a deputation to Council at their meeting on Monday, September 27,2004,commencing at 7:00 p.m. Should you wish to appear before Council,you must register with the Clerks Department by the Wednesday noon,September 22,2004 to have your name appear in the Agenda. ar COMMENTS OR QUESTIONS? If you wish to make a written submission or if you wish to be noted of subsequent meetings or the adoption of the proposed Official Plan Amendment and approval of the Zoning By-law Amendment and Draft Plan of Subdivision, you must submit a rra written request to the Clerk's Department,2nd Floor,40 Temperance Street,Bowmanville,Ontario L1C 3A6. An Official Plan Amendment adopted by the Municipality of Clarington is forwarded to the Region of Durham for approval, unless it is determined during the review process that the Amendment is exempt from Regional approval. For an exempt Amendment, the decision to adopt by Clarington Council becomes final, subject to any appeal during the statutory appeal �r period. Additional information relating to the proposal is available for inspection between 8:00 a.m. and 5:00 p.m. at the Planning Services Department, 3n' Floor, 40 Temperance Street, Bowmanville, Ontario L1C 3A6,or by calling Cynthia Strike at(905) 623-3379 extension 219 or by e-mail at cstrike(&municipality.clarington.on.ca. APPEAL If a person or public body that files a notice of appeal of a decision for the proposed Official Plan and Zoning By-law Amendments and Draft Plan of Subdivision to the Ontario Municipal Board does not make oral submissions at a public meeting +tr or does not make written submissions before the proposed Official Plan Amendment is adopted or the Zoning By-law Amendment and Draft Plan of Subdivision are approved,the Ontario Municipal Board may dismiss all or part of the appeal. wr Dated at the Municipality of Clarington this 13d' day of August 2004. DavidCome,M.C.I.P.,R.P.P. 40 Temperance Street Director of Planning Services Bowmanville,Ontario Municipality of Clarington L1C 3A6 �c �.• L. �t�a Pf \ \ _.i._.j iii E EIT 7=4 I ,,ti.\ ( •\ \ 1 i .Yr I --•-------�--i i Iii i I ,. —._.—._._._._.__._.y I I ----1---- -----------� BASELINE ROAD Bowmanviile Key Map COPA 2004-004 � O e Clarington Official Plan Amendment .r I 18T-90051 Subdivision Application Qd� DEV. 91-003 ..� Zoning By-law Amendment S bj Ct Owner: WED Investments Ltd. .r .r .r �r :>' 06 r. • larJ� n Leading the Way REPORT PLANNING SERVICES PUBLIC MEETING Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE .. Date: Monday, September 20, 2004 Report #: PSD-109-04 File #: ZBA2004-028 By-law#: Subject: PROPOSED ZONING BY-LAW AMENDMENT INCREASING THE LOT COVERAGE TO PERMIT THE DEVELOPMENT OF SEVEN SEMI-DETACHED DWELLINGS OWNER: PENWEST DEVELOPMENT CORPORATION LIMITED RECOMMENDATIONS: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report PSD-109-04 be received; 2. THAT the application submitted by Penwest Development Corporation Limited be referred back to Staff for further processing and the preparation of a further report following the receipt of all outstanding agency comments; and, 3. THAT the interested parties listed in this report and any delegations be advised of Council's decision. r Submitted by: Reviewed by: ,,. David J. Crome, MCIP, R.P.P. Franklin Wu, Director of Planning Services Chief Administrative Officer TW/LT/DJC/df 13 September 2004 CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1 C 3A6 T(905)623-3379 F (905)623-0830 r. 601 ad REPORT NO.: PSD-109-04 PAGE 2 1.0 APPLICATION DETAILS 1.1 Owner: Penwest Development Corporation Limited 1.2 Applicant/Agent: Somer Rumm, 1619959 Ontario Limited 1.3 Rezoning: from "Urban Residential Type One (R1)" to an appropriate zone category to permit the development of seven (7) semi- detached and linked dwellings with a maximum lot coverage of 53%. 1.4 Location: Lots 10 and 13 to 18, Plan 40M2094 1.5 Site Area: 5945 m2 2.0 BACKGROUND 2.1 On June 4, 2004, Somer Rumm, 1619959 Ontario Limited submitted a rezoning and application on behalf of Penwest Development Corporation Limited for Lots 10 and 13 to 18 and lot 42, Plan 40M2094, in order to permit the development of eight (8) semi-detached dwellings with a maximum lot coverage of 53% and an exterior side yard of 4.2 metres and a rear yard of 6.5 metres for lot 42. The applicant submitted a letter on August 10, 2004 revising the application by removing Lot 42 from the application. 3.0 SITE CHARACHERISTICS AND SURROUNDING USES 3.1 The subject properties consist of seven (7) lots for semi-detached or linked dwellings within the Penwest Subdivision. Single detached dwellings have been constructed on the lots to the south of the subject properties, on Squire Fletcher .., Drive. Four linked dwellings have been constructed on Lots 11 and 12 on Dadson Drive. Construction of a semi-detached dwelling had begun on Lot 5, however the framing had been destroyed by fire. The remaining lots on Dadson Drive are currently vacant. 3.2 The surrounding land uses area as follows: North - Residential South - Residential „w East - Residential West - Residential .m. 602 REPORT NO.: PSD-109-04 PAGE 3 4.0 PUBLIC NOTICE AND SUBMISSION 4.1 Public notice was given by mail to each landowner within 120 metres of the subject property and a public meeting notice was installed on the property. 4.2 As of the writing of this report, no inquiries were received. 5.0 OFFICIAL PLAN POLICIES 5.1 The Clarington Official Plan designates the subject lands "Urban Residential". This designation is intended predominantly for housing purposes. ow 6.0 ZONING BY-LAW 6.1 The property is within a "Urban Residential Type One (R1) Zone". Semi-detached dwellings are permitted with a maximum lot coverage of 45 %. 7.0 AGENCY COMMENTS 7.1 The Durham Regional Planning Department offered no objections to the proposal. It was indicated that the subdivision development had been previously screened for Penwest Development Corporation Limited (18T-97003) and that r` municipal water and sanitary services have been installed. 7.2 The Clarington Engineering Services Department advised that as all other provisions of the (R1) zone will be met they have no objections to the application as revised. It was noted that the applicant will be required to submit house .. siting/grading plans with each building permit at the time individual models are chosen for each lot. 7.3 The Clarington Building Services Department have no concerns with the proposal. 8.0 STAFF COMMENTS 8.1 The applicant intends to construct seven (7) semi-detached or linked dwellings, fourteen (14) units in total. The proposed units are one and two bedroom bungalows and bungalows with lofts. 8.2 The proposed lots have the same frontage and depth with the exception of Lot 18, which has an irregular lot line on the west side. The applicant has provided sitings for each of the proposed dwellings that could be constructed on the Lots 603 REPORT NO.: PSD-109-04 PAGE 4 to demonstrate that the General Provision of Zoning By-law 84-63 and the remaining "RV regulations can all be achieved. 8.3 It should be noted that the applicant will be required to receive approval of the models and siting for each lot by the Municipality's Control Architect in accordance the provisions of the subdivision agreement. .•r 9.0 CONCLUSIONS ,.► 9.1 The purpose of this report is to satisfy the requirements of the Public Meeting under the Planning Act. After hearing the comments received, it is respectfully recommended that this report be referred back to Staff for further processing and the preparation of a subsequent report. Wd Attachments: Attachment 1 - Key Map List of interested parties to be advised of Council's decision: Stephen Pustil Penwest Development Corporation Limited 390 Bay Street, #1710 Toronto, On M5H 2Y2 Somer Rumm 1619959 Ontario Ltd. 30-3 Intermodal Drive Brampton, On L6T 5K1 .r 604 �Ir � I IIII III I II � CONCESSION STREET EAST ■+• W D �+ Z N Q DADSON DRIVE LU r. o o o N m W N a!S to to e!S a0 4a -- D LU W a a r W a s m � W rr a a s ri 0 272 m a s W a Part 18 Q F- a a 46 _J DADSON DRIVE CO) 45 _UJ 19 ... ... ... 44 18: X17::;16;.:15... 14:;;13 12 11 :10 2 Or 20 43 ...... ..... ................ 21 .. . ...... 22 23 24 25 26 27 28 29 30 31 40M-2094 W Q SQUIRE FLETCHER DRIVE a w in 42 a F 41 40 39 38 37 3635 34 33 32 77 V 1 17 1 O Bowmanville Key Map 51MMI CHANCE CRT ZBA 2004-028 CONCESSION STREET EAST Zoning By-law Amendment DADSON DRNE ►,ICFEE p ORR CRT. DADSON DRIVE Owner: Penwest Developments Subject U DOWNHAM Dm Corporation Limited Slte SQUIRE FLETCHER DR. LU u uroovnn n ror � 605 larin n Leading the Way REPORT PLANNING SERVICES PUBLIC MEETING Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE �. Date: Monday, September 20, 2004 Report#: PSD-110-04 File#: ZBA 2004-034 By-law#: Subject: REZONING APPLICATION TO PERMIT RETAIL AND OFFICE USES APPLICANT: 1287561 ONTARIO LIMITED RECOMMENDATIONS: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: .r. 1. THAT Report PSD-110-04 be received; •• 2. THAT the application submitted by 1287561 Ontario Limited be referred back to Staff for further processing and the preparation of a further report following the receipt of all outstanding agency comments; and, 3. THAT all interested parties listed in this report and any delegations be advised of Council's decision. Submitted by: Reviewed by: �. Da J. Crome, M.C.I.P.,R.P.P. Franklin Wu Director, Planning Services Chief Administrative Officer RH*CP*DC*df 14 September 2004 CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T(905)623-3379 F (905)623-0830 606 .r. .r REPORT NO.: PSD-110-04 PAGE 2 1.0 APPLICATION DETAILS 1.1 Applicant: 1287561 Ontario Limited (Ken Pasricha) .. 1.2 Agent: Truestone Project Managers Limited 1.3 Rezoning: To rezone the subject lands from "Special Purpose Commercial (C5) Zone" to permit 2,336 sq.m. of retail and office uses. 1.4 Site Area: 1.02 hectares (2.52 acres) 2.0 LOCATION 2.1 The property under consideration is comprised of 1461 — 1469 Durham Highway 2, located on the south side of Durham Highway 2 and east of Darlington Boulevard in Courtice (See Attachment 1). The site area totals 1.02 hectares (2.52 acres). The property is located within Part Lot 34, Concession 2, in the former Township of Darlington. 3.0 BACKGROUND 3.1 On July 22, 2004, Staff received a rezoning application from Truestone Project Managers Limited on behalf of 1287561 Ontario Limited to permit 2,336 sq.m. of retail and office uses on the subject lands. The applicant intends to develop a mixed use project consisting of retail uses and office space. 4.0 SITE CHARACTERISTICS AND SURROUNDING USES -' 4.1 The property is currently undeveloped and does not contain any significant vegetation. Drainage is generally away from Durham Highway 2 towards Farewell Creek. 4.2 Surrounding Uses: -+ East: Vacant lands designated for high density residential development North: Courtice Medical Clinic, Whitecliffe Seniors building, and urban residential West: Existing commercial uses South: Vacant lands designated for low density residential development 607 REPORT NO.: PSD-110-04 PAGE 3 5.0 OFFICIAL PLAN POLICIES 5.1 The Clarington Official Plan designates the subject property as "Mixed Use Area" within the Courtice Sub-Central Area Secondary Plan. This land use designation permits mixed use buildings with retail and personal service uses on the ground floor, professional and business offices, medium and high density residential development, and community facilities. The development proposal conforms to the policies of the Clarington Official Plan. 6.0 ZONING BY-LAW CONFORMITY 6.1 The property is currently zoned "Special Purpose Commercial (C5) Zone", which does not permit the proposed retail and office uses. In order to consider the proposed development, a rezoning application was submitted for consideration. w 7.0 PUBLIC NOTICE AND SUBMISSION 7.1 Public notice was given by mail to each landowner within 120 metres of the subject site and a public meeting notice sign was installed on the property's road frontage. 7.2 A concern was raised by the adjacent property owner to the east (Wayne Bolahood) that storm water from the proposed development would negatively impact his property. In particular, this owner would like a joint servicing solution for storm water generated by redevelopment along the south side of Durham Highway 2 east of Darlington Boulevard. This issue will be further discussed in Section 9.2 of this report. 7.3 An area resident has submitted a letter of objection to the proposal, indicating that sufficient commercial development is present in Courtice. The following issues are raised: • Recent development has increased the amount of traffic and noise in the area. Additional development will aggravate the situation. The existing traffic generates a lot of pollution, especially from idling vehicles. ■• • The resident experienced vandalism to her own property. Additional development will lead to more security problems. +� These issues will be further discussed in Section 9.3 of this report. r- 8.0 AGENCY COMMENTS 8.1 The Clarington Emergency Services Department has no objections to the proposed development. 608 REPORT NO.: PSD-110-04 PAGE 4 8.2 Due to the limited commenting period, comments from the Clarington Engineering Services Department, Durham Region Planning Department, Durham Region Public Works Department, Central Lake Ontario Conservation, Hydro One Networks Inc. and the school boards have not been received to date. • w 9.0 COMMENTS 9.1 Staff met with the applicant prior to submission of the application to discuss study •+� requirements for the development, which include the following items. • The applicant must submit a concept plan for the area, which demonstrates possible development on other vacant or underutilized properties south of Durham Highway 2 and east of Darlington Boulevard (see Attachment 2). The plan would also indicate possible locations of shared access points along Durham Highway 2 as well as the location of a rear laneway serving these -M properties, similar to a system, which is designated west of Darlington Boulevard. This process could encourage further property consolidation, would integrate the proposed Esso redevelopment and would ensure that development potential on surrounding sites is not compromised. • • A storm water plan will be required to ensure that storm water generated from the development can be appropriately handled on site. • A noise study is necessary to ensure that operational noise levels from the development will not negatively impact future adjacent residential uses. • The development must incorporate a high level of urban design. Some of the Phase 1 buildings must be street-front oriented. 9.2 The adjacent landowner, Mr. Bolahood, has requested that both the Municipality and Central Lake Ontario Conservation ensure that storm water is handled in an appropriate manner, preferably through a joint servicing solution through his property. All of the storm water from Durham Highway 2 flows through Mr. Bolahood's property into the Farewell Creek, which, according to Mr. Bolahood, has led to erosion on the property (see Attachment 2). Approximately 15 years ago, CLOCA determined that area landowners should develop a comprehensive solution for storm water management for undeveloped commercial lands along Highway 2 to address this issue. This included all lands where storm water drained towards Farewell Creek. A consultant prepared a drainage scheme on behalf of the landowners that would require all benefiting landowners to contribute towards a system that drained through this landowner's property. Although there was agreement among landowners for the solution, funding for the project was never secured. Individual development has proceeded on the basis of large on-site underground chambers that control the rate of storm water flow through Mr. Bolahood's lands to pre-development levels. Although Mr. Bolahood did appeal a development to Ontario Municipal Board on this basis, he was unsuccessful at the OMB. 609 REPORT NO.: PSD-110-04 PAGE 5 9.3 This section addresses the concerns raised by an area resident discussed in Section 7.3 of this report. Although recent development has increased traffic levels during the past ten years, Durham Highway 2 is designed to accommodate these traffic volumes and more. . Having designated lands for commercial and residential development in the area, traffic levels and the noise associated with these w. levels will continue to increase as Courtice grows. Noise fencing, in accordance with the Ministry of Environment noise criteria of the time, was erected along the rear of Highway 2 development to protect residents from excessive noise levels generated by the traffic. Although there is pollution from idling vehicles, Staff do not anticipate that there will be any drive-through facilities on the subject lands. • While the vandalism experienced by the resident is unfortunate, additional residential or commercial development will not necessarily create further security problems. Although Staff promote site planning solutions to minimize ,,. dark areas, vandalism and crime cannot be prevented by restricting development rights on property that is designated for development. 10.0 CONCLUSIONS 10.1 As the purpose of this report is to satisfy the requirements of the Public Meeting under the Planning Act, and taking into consideration all of the comments received, it is respectfully recommended that this report be referred back to Staff for further processing and the preparation of a subsequent report. •• Attachments: Attachment 1 - Key Map Attachment.2 - Land Use Plan Interested parties to be notified of Council's decision Denis O'Connel Truestone Project Managers Frances Walmsley 843 King Street West 42 Cherry Blossom Crescent Oshawa, ON L1 J 21_4 Courtice, ON L1 E 1 G7 Ken Pasricha 3 Jamieson Court Whitby, ON L1R 1V2 Wayne Bolahood 420 King Street West Unit 205 Oshawa, ON L1 J 2K8 �. _ 610 • - I I - ■* Ff = -� Illln•�p Courtice Key Map ■111111 ��� • PIP F1 oil 2 •, 1111,II� ` I X11111111 C� �' �■•; :■—_� 111. �� � `����,a�� � �I t ATTACHMENT 2 an/JO PlayJaluao \�\� ~� o C� 4 0 t N r.. m N ooh � os N 3 p ca c o0 c 0 m rr. C fl. cuosso/8 tiaaya o o a .11Z V L 3 0 Z� m = 3 cc Q r .. J .+ (D N =• E cc c L (D _ • E Q. • L � V O 0 200 1 0 o 0 m U :5 N C a • a� w ' • ui °—' • vi peon/ aooaen • c pJeAelnos uo/6ui/Jep a, ` • = N Ca = y • rnco � � _ ^� • � ca yarn c W0 J • • ■r • Le��ng�heWay REPORT PLANNING SERVICES Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE Date: Monday September 20, 2004 Report#: PSD-111-04 File #: COPA 2004-004, DEV 91-003 By-law#: 18T-90051 Subject: PROPOSED OFFICIAL PLAN AMENDMENT, PLAN OF SUBDIVISION AND ZONING BY-LAW AMENDMENT TO PERMIT 390 RESIDENTIAL UNITS, A PARK BLOCK AND AN ELEMENTARY SCHOOL BLOCK APPLICANT: WED INVESTMENTS LTD. RECOMMENDATIONS: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report PSD-111-04 be received; +� 2. THAT the application for proposed Official Plan Amendment, COPA 2004-004, Plan of Subdivision 18T-90051 and Rezoning, submitted by WED Investments Ltd. be referred back to staff for further processing and the preparation of a subsequent report. 3. THAT all interested parties listed in this report and any delegation be advised of Council's decision. Submitted by: Reviewed b : Y Y Davi . Crome, MCIP, R.P.P. Franklin Wu, Director of Planning Services Chief Administrative Officer " CS*LT*DJC*sn*df September 14, 2004 CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1 C 3A6 T(905)623-3379 F (905)623-0830 613 .r REPORT NO.: PSD-111-04 PAGE 2 1.0 APPLICATION DETAILS 1.1 Owner: WED Investments Ltd. 1.2 Applicant: Kelvin Whalen r" 1.3 Clarington Official Plan Amendment: • relocate the Medium Density symbol, north 'of Aspen Springs Drive, and to relocate the Public Elementary School and Neighbourhood Parkway symbols south of Aspen Springs Drive. • amend Table 9-2, by increasing the housing targets for the Darlington Green Neighbourhood from 1000" to 1175", reducing the Low Density units from 700" to "675" and increasing the Medium Density units from 175" to "375' and adjusting all other corresponding totals. • amend Map E2 by increasing the population target for the Darlington Green Neighbourhood from 2800 to 3200. r 1.4 Plan of Subdivision: 390 residential unit plan of subdivision consisting of 130 single detached dwellings, 63 street townhouses and a 197 unit medium density block, a public elementary school block and a park block. 1.5 Zoning By-law Amendment: Change the current zoning on the lands from "Agricultural (A) Zone" to an appropriate zone to permit the development. r 1.6 Site Area: 19.028 hectares (47 acres). 2.0 LOCATION 2.1 The subject property is located south of the St. Lawrence & Hudson Railway, west of Green Road and 230 metres north of Baseline Road, being Part Lot 17, Concession 1 in the former Township of Darlington (see Attachment 1). 3.0 BACKGROUND 3.1 On July 20th, 2004 Staff received an application to amend the Clarington Official Plan to alter the location of the Medium Density, Neighbourhood Park and Public Elementary •+ School symbols as well as to change the housing target and population target for the Darlington Green Neighbourhood. The OPA would permit the development of a 390 unit residential plan of subdivision, consisting of 130 single family dwellings, 63 street townhouses, a 197 unit medium density block, a public elementary school block and a park block. 614 REPORT NO.: PSD-111-04 PAGE 3 3.2 The applications for Plan of Subdivision and Rezoning were submitted in January 1991. An application to amend the Town of Newcastle Official Plan was also filed in January 1991. The application for Official Plan Amendment was to expand the Bowmanville Urban Area boundary, establish a neighbourhood boundary and include population targets. Following the adoption of the Clarington Official Plan in January 1996, Council approved a recommendation in April 1996 to include the site in the Urban Area boundary. In 1997 a revised draft plan was submitted in conformity with the new Clarington Official Plan. However, a related Clarington Official Plan Amendment was submitted to deal with discrepancies between the proposed draft plan and the designated transportation network, being the alignment of the collector road now referred to as Aspen Springs Drive. 3.3 There have been many submissions of Plan of Subdivision 19T 90051. The latest submission had shown the public elementary school site and neighbourhood park adjacent to the railway. (See attachment #2). Representatives of the Kawartha District School Board had many safety concerns with the location of the elementary school. Clarington Planning and Engineering Staff also had concerns with the location of the neighbourhood park. The proposed park was situated in close proximity to other .. neighbourhood parks, one located north of the railway, known as Clarington Corners, and the other in the adjacent draft approved Plan of Subdivision east of Green Road r. (18T 96014). The three parks would be within 500 metres of each other. The current Official Plan Amendment application COPA 2004- 004 was submitted after many discussions between representatives of the Kawartha Pine Ridge District School Board, r WED Investments and Staff. The proposed amendment is requesting the relocation of the Medium Density symbol to north of Aspen Springs Drive, and the Neighbourhood Park Symbol and Public elementary School symbol south of Aspen Springs Drive (See Attachment 3). 3.4 Supporting Documentation The applicant has provided documentation to support the previous submissions, including a conceptual servicing plan and on-street parking plan. The plans will be required to be updated to reflect the current submission. Additional information will also be required including a Noise Study, Phasing Plan, Functional Servicing Report and Transportation Study. .,. 4.0 SITE CHARACTERISTICS AND SURROUNDING LAND USES 4.1 The subject site is currently vacant. A drumlin (a hill comprised of glacial deposits) .. provides for steep grades. The drumlin within the vicinity of this site was re-graded to prepare the site for next phase of the Aspen Springs community, Draft Approved Plan of Subdivision 18T 96014. - 613 r. r REPORT NO.: PSD-111-04 PAGE 4 4.2 Surrounding Uses North — St. Lawrence and Hudson Railway South —Vacant, single detached dwelling East — Draft approved plan of subdivision (18T-96014) South —Vacant, single detached dwelling 5.0 OFFICIAL PLAN POLICIES 5.1 Durham Region Official Plan �+ Within the Durham Regional Official Plan, the lands are designated as Living Area. Lands designated as Living Area permit the development of residential areas with defined boundaries, incorporating the widest possible variety of housing types, sizes and tenure. 5.2 Clarington Official Plan 5.2.1 Within the Clarington Official Plan, the subject lands are designated as Urban Residential. The use of land in the Urban Residential designation is predominantly for single and semi-detached housing. Medium Density, Public Elementary School and Neighbourhood Park symbols are also on the subject site. The lands are within the Darlington Green Neighbourhood, which has a population allocation of 2800 and a housing unit target of 1000. r 5.2.2 The predominant use of land within the Urban Residential designation shall be for housing. The Medium Density category proposes a net density of 31-60 units per net residential hectare with predominant housing form to include townhouses. The medium density block is approximately 4,920 hectares (12.16 acres), resulting in a yield of 40 ha units per net hectare. The Medium Density symbol is currently located on the south side of Aspen Springs Drive. The proposed amendment requests the relocation of the Medium Density symbol north of Aspen Springs Drive and relocates the Neighbourhood Park and Public Elementary School symbols south of Aspen Springs Drive. 6.0 ZONING BY-LAW 6.1 Within Comprehensive Zoning By-law 84-63, as amended, the lands are zoned Agricultural (A). A Zoning By-law Amendment will be required in order to implement the proposed plan of subdivision. 7. 0 PUBLIC NOTICE AND SUBMISSIONS 7.1 Public Notice was given by mail to each landowner within 120 metres of the subject site. The subject site currently does not have access onto open maintained roads. However, Public Meeting signs were installed on Aspen Springs Drive, and Baseline Road. 616 r REPORT NO.: PSD-111-04 PAGE 5 r 7.2 As of the date of writing this report, Staff have received one email from Ms. Ann Fennell who is a Padfield Drive resident. She is concerned with the loss of trees and open r. space areas south of the St. Lawrence and Hudson Railway. She was led to believe that the subject lands would remain in their natural state. 8.0 AGENCY COMMENTS 8.1 Comments have not been received from the following departments and agencies: • Region of Durham Planning Department • Region of Durham Works Department • St. Lawrence and Hudson Railway • Public School Board • Separate School Board • Conseil scolaire de district catholique Centre Sud • Conseil scolaire de District du Centre-Sud Quest • Central Lake Ontario Conservation Authority • Enbridge Gas .. • Bell Canada • Canada Post • Hydro One Networks Inc. 8.2 The following agencies offered no objections: •- • The Clarington Emergency Services Department • Engineering Services- Building Division • Region of Durham Health Services Department 8.3 The Clarington Engineering Services Department has provided comments. The comments are summarized below: Road Dedication • The 5.2 metre road widening on Green Road indicated as Block 202 on the proposed draft plan must be dedicated to the Municipality. • A road widening will be required on Green Road to accommodate a future grade separation at the railway. The draft plan does not identify a road widening for this purpose. The necessary road widening must be determined and indicated on the draft plan as a road widening. • Sight triangles measuring 14.0 metres x 7.0 metres are required at the intersection of Green Road and Street A as well as the intersection of Green Road and Street C. Appropriate changes must be made to the proposed draft plan. 617 .n REPORT NO.: PSD-111-04 PAGE 6 Servicing Report The applicant will be required to submit a revised Servicing Report. The required report must indicate the servicing scheme for all utilities and services within the proposed' development and identify all of the proposed road grades. Areas of future development to the west and south must also be addressed in the Report. Transporation This development cannot be approved as proposed until the potential effects on the overall road and transportation infrastructure in the Bowmanville Urban Area have been identified and assessed. Actual development on the subject lands cannot proceed until all of the necessary road and related infrastructure improvements that are deemed necessary by the Director of Engineering Services have been completed. This development cannot proceed until such time that the Municipality has approved the expenditure of funds for the provision of the reconstruction of Baseline Road, Green Road, the installation of sidewalks and street illumination and any related external works or services which have been included in the Municipality's Development Charge By-law and have been deemed necessary by the Director of Engineering Services to service this development. .. Prior to actual development of the subject lands the Owner shall retain a Professional Engineer to prepare an updated Transportation Implementation Plan that is satisfactory to the Director of Engineering Services. The Plan must identify all transportation infrastructure improvements such as roads and bridges that will be necessary in this portion of the Bowmanville Urban Area to accommodate this development. Earthworks The applicant will be responsible for 100% of the cost of all earthworks that deemed necessary by the Director of Engineering Services to facilitate this development including earthworks within the road allowance on Green Road. All required earthworks must be - completed to the satisfaction of the Director of Engineering Services prior to any development of the subject lands. Parking The applicant must submit a revised on-street parking plan in support of this application. Noise Attenuation Measures so The applicant will be required to submit a Noise Study and preliminary engineering plan that details all of the proposed noise attenuation measures. The required plan must provide a suitable access to lands situated to the north of the noise berm and also 618 r REPORT NO.: PSD-111-04 PAGE 7 demonstrate that all drainage water from the north side of the noise berm can be appropriately accommodated. Grading and Drainage The storm water drainage works and facilities necessary for this development must be constructed in accordance with the West Side Creek Master Drainage Study, dated September 1992. Actual development of the proposed draft plan cannot occur until such time as all of the necessary storm water management and other external drainage facilities necessary to service this development have been constructed. The applicant must provide the Engineering Services Department with a Stormwater Management Implementation Report which provides for the sequential construction of the stormwater management works necessary for the entire watershed and addresses the impacts of developing this plan of subdivision in the absence of the balance of the watershed. The applicant's engineer will be required to prepare a Preliminary Lot Grading and Drainage Plan that details the configuration of the on-site storm sewer system (minor system) and the conveyance of the overland flow (major system) from this subdivision. The Plan must identify any of the lots along the west side of the proposed subdivision that cannot be developed due to the constraints of the existing topography and must therefore be placed on hold. The required Plan must also include a preliminary design for all proposed noise attenuation facilities such as berms or fences. Development Charges By-law This development cannot proceed until such time that the Municipality has approved the expenditure of funds for the provision of the installation of street lighting and sidewalks on Baseline Road and Green Road and any related external works or services. This development cannot proceed until such time that the Municipality has approved the expenditure of funds for the provision of the reconstruction of Baseline Road, Green Road, the Green Road underpass and any related external works or services. Parks Division The applicant proposes to dedicate a 0.48 hectare parkette block to the Municipality. The .. Official Plan currently identifies a Neighbourhood Park Symbol within the subject lands. .w 9.0 STAFF COMMENT 9.1 The Plan of Subdivision is within the western most portion of the Bowmanville Urban •. Area. In absence of a design plan, the proposed road networks, lot layout and park must be examined in conjunction with the balance of the lands available for development in the Urban Area. 619 to REPORT NO.: PSD-111-04 PAGE 8 .N The consultant for the land owners to the west and south have reviewed the current submission and are generally satisfied with the proposed layout of the current plan. ,. 9.2 The Official Plan states that Neighbourhood Parks shall be provided at 1.8 hectares per 1000 persons and shall be between 1 and 3 hectares in size depending on the potential for shared school facilities. At one time, there were three existing or proposed neighbourhood parks within 500 metres of each other. In consideration of an application by another Kaitlin company, the neighbourhood park on the east side of ..� Green Road was expanded so that it could better host a range of recreational uses. The applicant has redesigned the parkland on the subject lands by relocating the park site further south and downsizing of the park size. This provides for a more central .r location for the park facility for this neighbourhood but it will serve more of a parkette or central square function with limited recreation facilities. Staff is continuing to review the total area of parkland proposed relative to the additional population proposed by the applicant and will be reviewing the park configuration relative to its function as a focus for this neighbourhood. 9.3 The Public Elementary School has been relocated south of Street A. The Kawartha Pine Ridge School has always had concerns regarding the location of the school near the railway for liability reasons, although it is Planning staffs view that it is a type of land •» use that is less sensitive to noise and vibration from the railway than residential uses. The revised location is supported by the representatives of the Public School Board. The site has also been shifted south, away from the proposed new Separate -� Elementary School, reducing the chance of traffic conflicts between school bus traffic and parents dropping off and picking-up children. 9.4 The development of the Darlington Green area is dependant on servicing works to upgrade road infrastructure on Baseline Road and Green Road, including street lighting, sidewalks and the grade separation for Green Road at the CPR line (St. Lawrence & �+ Hudson Railway). These works are several years off, according to the current Development Charge program. 10.0 CONCLUSIONS The purpose of this report is to satisfy the requirements under the Public Meeting under the Planning Act, and taking into consideration the outstanding comments, staff respectfully request that this report be referred back to staff for further processing and the preparation of a subsequent report. Attachments Attachment 1 - Key Map Attachment 2 - Previous Draft Plan of Subdivision .r Attachment 3 - Current Proposed Draft Plan of Subdivision Attachment 4 - Amendment to the Clarington Official Plan - 620 ..r REPORT NO.: PSD-111-04 PAGE 9 r. List of Interested Parties to be advised of Council's decision Mr. Kelvin Whalen WED Investments Ltd 1029 McNicoll Avenue Scarborough, ON M 1 W 3W6 Ms. Anne Fennell 95 Padfield Drive, Bowmanville, ON L1 C 5H6 Mr. Kevin Tunney .. Tunney Planning Byron Street Whitby, ON L1 N 4P8 aw aw aw wo aw "' - 621 .r ATTACHMENT 1 1 01 i ! I Amt \ ` �'•``� t t„ // •' ' All (VI t i E f 7 •� w SE�� t ' v a \ .i:snx yi. ; °� ,�•� 0111 :` .r Ili,+1 sr 6s - _-- n O I Z I \ \ l I I - W s W p I .- I j III 1 ------------------•-I BASELINE ROAD Bowmanville Key Map COPA 2004-004 a o`. Clarington Official Plan Amendment 18T-90051 Subdivision Application ,. tp DEV. 91-003 ®�9 Zoning By-law Amendment Subject Owner: WED Investments Ltd. Site .,..t td. flE 6 .22 I 'ELI ;I J H ] I I I I II----------------- -------------- I I dean I I O'noe jai t I / I / I I L O T !P. Z.P.a t f■r r r r�t Z.P.a t ATTACHMENT 4 �.• AMENDMENT NO. TO THE CLARINGTON OFFICIAL PLAN PURPOSE: The purpose of this Amendment is to relocate the Medium Density Residential, Local Park and Public Elementary School symbols, and to .. revise the housing targets within the Darlington Green Neighbourhood of Bowmanville. BASIS: This Amendment results from a detailed review of the appropriate locations for the public elementary school, local park and medium density •- housing within Draft Plan of Subdivision 18T-90051. This review included extensive consultation with the Kawartha Pine Ridge District School Board. AMENDMENT: The Clarington Official Plan is hereby amended as follows: 1. By amending Map A3 — Land Use Bowmanville Urban Area as shown on Schedule "A" 2. By amending Table 9-2 Housing Targets by Neighbourhoods as shown on Schedule "B" IMPLEMENTATION: The provisions set forth in the Clarington Official Plan regarding the implementation of the Plan, shall apply in regard to this Amendment. w. INTERPRETATION: The provisions set forth in the Clarington Official Plan regarding the interpretation of the Plan, shall apply in regard to this Amendment. aw W. r. M 62� . SCHEDULE 'B' TO AMENDMENT NO. TO THE CLARINGTON OFFICIAL PLAN Chapter 9 Residential Neighbourhoods . .rr Horsing TargnAS try Ne+glnbourinoodt Ne ghbouhoods Ong Units Residential Area Central Mess Mensigaiion Tod LOW Medium High Medium High Connie *0 NI Main Central Area 0 0 0 0 250 10D 350 N2 Sub Central Arm 0 0 0 O 0 350 350 N3 Worden 1175 125 0 0 0 100 1400 nnr N4 Highland 1225 100 0. 0 0_ 75 1400 NS Glenview. 5SO 425 0 110 0 50 1135 N6 Hancock 850 100 0 0 0 .25 975 N7 ••'s= Avondale 825. 200 0 0 0 275• 1300 N8 Emily 5bwe 1475 275 0. 0 0 550 2300 N9 Penland 1075 75 0 0 0 75 1225 ' N10 - Darlington 950 25 0 0 O 383 856 i Nil Bayview, 1150 300 125 0 0 50 1625 N12 Farewell Height,-' TOTAL 8775 1625 125 110 250 2033 12918 Bavnnr"le N1 East Main Central Area 0 0 0 550 175 275 1000 N2 West Main Central Area 0 0 0 250 1500 0 1750 ran N3 Merrnorfal 975 0 250 0 0 350 1575 N4 Clemal 425 125 75 0 0 75 700 NS Moment Massey 1025 400 0 0 0 17S 1600 N6 Apple Blossan 1250 nn� 275 0 25 O 125 1675 N7 Elgin 1025 SO 50 •12S 75 150 1475 NO Fervid 1325 525 0 0 0 100 1950 N9 Knox 1450 125 0. 125 75 125 1900 �f N10 Northgle n 975 150 0 100 50 50 1325 Nlt Broolddll 1325 350 0 0 0 75 1750 N12 Darlington Green 675-PW 375-4fs- 0 0 0 125 48ee- ((75 +++ N13 We9vale 1025 350 275 25 0 75 1750 N14 Waverly 1075 250 50 25 0 75 1475 N15 Fort Darlington 550 450 175 0 0 25 1200 TOTAL � is 875 1225 1675 law 424410— 22575 NewntilaV11bV 13100 3425 N1 Main Central Area 0 0 0 100 SO 75 225 N2 Graham 1075 NO 100 0 0 0 100 1275 m Fogm 1450 200 0 0 0 125 1775 PN Port of Newcastle S00 325 0 0 250 0 1075 NS Nash Village 1050 250 0 0 0 s0 1350 go N6 Wilma 960 0 0 0 0 0 960 TOT/LL 5035 875 0 100 300 350 6660 . 11(118 i'btentia/housing units Ifor Faressep Heights neighbourhood subject to the provisions o/Speci Fblky Area No 5 lSee Section 17.61 Municipality of Clarington Official Plan- nPramh—A Wnnn .. __ �--- SCHEDULE'A'TO AMENDMENT NO. 1 TO THE CLARINGTON OFFICIAL PLAN ks) 0 m m 1 ► �� J �/ / ///' r �,7 V ...coO a" o aw Allm Lt %`il •// .i�//` ` ► �_ J� DEFERRED BY 4Yrr ;•%f;'� ///:- \ '�x'i i THE REGION OF DURHAM m ow X (Dm OM I1 t r' rm PoLicy �revl . •� t cacFSSm sRm f / AD ,a J nm_ Ji RELOCATE SCHOOL PAR[AND MEDIUM DENSITY SYMBOLS /r, rill Wit �l)L 1 a"•1 e..sci wF Rnw. "4) lHl wma: I ri �•� ,.t€r f i .L� , } ay :- f ±ARFA,�" PRESTIGE ir EMPLOYMENT AREA - LIGHT i► PUBLIC v yy t ��> a t f..L r y.�� -r..t,�• f-, A' �• UR6W BOUNDARY ; INDUSTRIAL AREA SECONDARY SCHOOL 1r 'h:<:.:!c« x '�,� t t••. * 'A / / FUTURE GENERAL It SEPARATE ..-r t'',: t t •r'/ URBAN RESIDENTIAL 1:' i INDUSTRIAL AREA G4 SECONDARY SCHOOL URBAN RESIDENTIAL Unurr PC PRIVATE 2 LJ SECONDARY SCHOOL M M MEDIUM DENSITY EWRONM74TAL PUBLIC RESIOFMIAL PROTECTION AREA Z; ELEMENTARY SCHOOL rr LAKE ONTAR/O -1 RESK)ENW GREEN SP� �t ELEMENTARY MAP A3 MAIN CEMP.AL AREA WATERFRONT GREENWAY Is PRIVATE ELEMENTARY�� T>� s LAND USE LocAL cENTRa AREA e?1 coMMLx4rTY PARK --_ SECONDARY r. BOWMANVILLE URBAN AREA PLANNNC AREA HHOURHOOD ..' COMMERCIAL O •iu•� DISTRICT PARK ------- SPECIAL POLICY AREA FFTClAL PLAN MUNICIPALITY OF CLARINGTON HIGHWAY COMMERCIAL 'ix'1 NEIGHBOURHOOD PARK SPECIAL STUDY AREA DECEMBER 4.2000 x6 U 60UOa 0 s Pxv OfD Rw cuA]EHCE cuY y©�` AGGREGATE! TOURISM NODE ti:� GO SfATKN � A,o�rs xtml[stm tnoarwtva Aro EXTRACTION AREA 7� a-oat — / 17 tll� �J • arm n r Leading the Way REPORT PLANNING SERVICES Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE Date: Monday, September 20, 2004 Report #: PSD-112-04 File #: ZBA 2004-026 By-law#: Subject: REMOVAL OF HOLDING OWNER: VELMA AND WILLIAM GRIFFIN APPLICANT: JOHN HILL / REMAX SPIRIT RECOMMENDATIONS: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report PSD-112-04 be received; 2. THAT the application submitted on behalf of Velma and William Griffin to remove the Holding (H) symbol be APPROVED and that the attached by-law to remove the Holding (H) symbol be passed and a copy forwarded to the Regional Municipality of Durham; and, 3. THAT all interested parties listed in this report and any delegations be advised of .. Council's decision. Submitted by: Reviewed by: DAvidGVCrome, M.C.I.P., R.P.P. Franklin Wu, " Director of Planning Services Chief Administrative Officer TW*LT*DJC*df September 13, 2004 CORPORATION OF THE MUNICIPALITY OF CLARINGTON .. 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T(905)623-3379 F (905)623-0830 628 aw REPORT NO.: PSD412-04 PAGE 2 1.0 APPLICATION 1.1 Applicant: John Hill, Remax Spirit Inc 1.2 Owner: Velma & William Griffin 1.3 Rezoning: Removal of "Holding (H)" symbol from "Holding-Residential Hamlet ((H)RH)" to "Residential Hamlet (RH)" 1.4 Location: 2274 Regional Road 3 Part Lot 18, Concession 8, Former Township of Darlington (Attachment 1). 2.0 BACKGROUND ..r 2.1 On May 21, 2004, Staff received a request from John Hill, Remax Spirit Inc., on behalf of Velma and William Griffin for the removal of the "Holding (H)" symbol from 2274 Regional Road 3. A Hydrogeological Report prepared by Gibson Associates, June 2004 was submitted in support of the application. w 2.2 A Consent application to sever a 4603 m2 residential hamlet lot, retaining a 4454 m2 residential hamlet lot with an existing dwelling was approved by the Region of Durham Land Division Committee on May 17, 2004. 2.3 In order to fulfil a condition of approval for the Consent application, the applicant has , submitted the rezoning application to remove the "Holding (H)". The application recognizes both the proposed severed land and retained lands which contains the applicant's existing single detached dwelling. 3.0 STAFF COMMENTS 3.1 The (H) Holding Symbol has been applied to the Residential Hamlet (RH) zone category for the subject property. This was done to ensure that future development will have adequate access and services. 3.2 Section 12.3.5 of the Clarington Official Plan requires the submission of technical report demonstrating that new residential lots in rural settlement areas have no adverse impact on adjacent wells and septic systems in accordance with provincial guidelines for assessing water supply and risk of water quality impact. 3.3 The Clarington Engineering Services Department offered no objection to the proposal. 3.4 The application was circulated to the Region of Durham Planning and Health Departments for review. The Region reviewed the application and has offered no objections to the application. No concerns were identified within Hydrogeological + Report prepared by Gibson Associates. 629 REPORT NO.: PSD-112-04 PAGE 3 3.5 The Finance Department has indicated that taxes are up to date for the subject property. 4.0 RECOMMENDATIONS 4.1 The application has been reviewed in the context of Sections 23.4.2 and 23.4.3 of the Clarington Official Plan and all matters have been satisfactorily addressed. In consideration of the comments noted above, approval of the removal of the "Holding (H)" symbol as shown on the attached by-law and schedule (Attachment 2) is recommended. Attachments: Attachment 1 - Key Map Attachment 2 - By-law for Removal of Holding (H) Symbol List of interested parties to be advised of Council's decision: John Hill Remax Spirit Inc. 21 Drew Street Oshawa, ON L1 H 4Z8 r Velma and William Griffin 2274 Regional Road 3 +w Enniskillen, ON LOB 1J0 630 ATTACHMENT 1 50.18m LOT 18 CONCESSION Proposed 8 Severed Land E OR to E 00 o .r 37.98m.t 5.13m *w Road Widening E Ki r-I L M X E rr rn N 1 20m o Z rr � rn Proposed 3 EI Retained Land 3 g R 0 0 Q L ..r 48.51 DURHAM REGIONAL ROAD 3 Enniskillen Key Map ZBA 2004-026 II ® 0 � SUBJECT Zoning.By-law Amendment `n SITE Removal of Holding) ROAD 3 I � I � Owner: Velma and William Griffin ,. N O D 631 ATTACHMENT 2 THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON BY-LAW NO. 2004- r .. being a by-law to amend By-law 84-63,the Comprehensive Zoning By-law for the Corporation of the former Town of Newcastle nr. WHEREAS the Council of the Corporation of the Municipality of Clarington deems it �. advisable to amend By-law 84-63, as amended, of the Corporation of the former Town of Newcastle to implement ZBA 2004-026; i` NOW THEREFORE BE IT RESOVED THAT the Council of the Corporation of the Municipality of Clarington enacts as follow: 1. Schedule "9" to By-law 84-63, as amended, is hereby further amended by changing the zone designation from: r "Holding—Residential Hamlet((H)RH)Zone" To: "Residential Hamlet(RH)Zone" 2. Schedule"A"attached hereto shall form part of this By-law. aw 3. This By-law shall come into effect on the date of the passing hereof, subject to the provisions of Sections 34 and 36 of the Planning Act. r BY-LAW read a first time this day of 2004 rr BY-LAW read a second time this day of 2004 r BY-LAW read a third time and finally passed this day of 2004 r. •• John Mutton, Mayor Patti L. Barrie, Municipal Clerk �. 632 r This is Schedule "A" to By-law 2004- , passed this day of , 2004 A.D. 50.18m LOT 18 CONCESSION /Proposed 8 Severed Land ..r ® Zoning Change From "(H)RH" To "RH" .� 7.98m' Ilr 5.13m Road Widening E a_ n W E so F- o N 1 0 0 z Proposed w" 3 o Retained Land n z N �� 0 o John Mutton, Mayor J � rri Q 48.51 DURHAM REGIONAL ROAD 3 '++ Patti L. Barrie, Municipal Clerk I I I I I o SUBJECT SITE I I � I I I I I o I I Jo I I I I I I I I I I I I � .IY REGIail I I � I I I I I I 1 I J I I 1 I � I I f- o I too x Enniskillen 633 • Leading the Way REPORT PLANNING SERVICES Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE Date: Monday, September 20, 2004 ••• Report#: PSD-113-04 File#: ZBA 2004-039 and By-law#: ZBA 2004-040 Subject: APPLICATION FOR REMOVAL OF HOLDING SYMBOL AND APPLICATION FOR REMOVAL OF PART LOT CONTROL APPLICANT: MEARNS EAST DEVELOPMENTS INC. RECOMMENDATIONS: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report PSD-113-04 be received; 2. THAT the application submitted by Mearns East Developments Inc. to remove the Holding (H) symbol be APPROVED and that the attached by-law to remove the Holding (H) symbol be passed and a copy forwarded to the Regional Municipality of Durham; �. 3. THAT the request for removal of Part Lot Control with respect to Lots 1 to 12, 21 to 24 and Blocks 29 to 36 inclusive, on Plan 40M-2202 be APPROVED and that the attached Part Lot Control By-law be passed pursuant to Section 50 (7.1) of the Planning Act; and 4. THAT all interested parties listed in this report and any delegations be advised of Council's decision. Submitted by: Reviewed by: . " D i Crome, MCIP, R.P.P. r nklin Wu, Director of Planning Services Chief Administrative Officer LT/DJC/df 10 September, 2004 CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T(905)623-3379,F (905)623-0830 - 634 .r REPORT NO.: PSD-113-04 PAGE 2 1.0 APPLICATION DETAILS 1.1 Applicant: Mearns East Developments Inc. 1.2 Rezoning: Removal of the "Holding (H)" symbol from the following zoning categories: • "Holding-Urban Residential Type One ((H)R1)" • "Holding-Urban Residential Type Two ((H)R2)" • "Holding-Urban Residential Type Three ((H)R3)" • "Holding-Urban Residential Exception ((H)R3-15)" • "Holding-Urban Residential Exception ((H)R3-16)" to permit the development of draft plan of subdivision 18T-95005 now registered under plan 40M-2202. 1.3 Part Lot Control Removal:. Lots 1 to 12, 21 to 24 inclusive and Blocks 29 to 36 inclusive, Plan 40M- ••� 2202 (Attachment 2). 2.0 BACKGROUND 2.1 On August 30, 2004, Staff received a request from Mearns East Developments Inc. for the removal of the "Holding (H)" symbol from the recently registered Plan of Subdivision 40M-2202 as well as a request for the removal of Part Lot Control with respect to Lots 1to 12, 21 to 24 inclusive, and Blocks 29 to 36 on Plan 40M-2202. -+ 2.3 Draft Plan of Subdivision 18T-95005 received approval for 12 single family dwelling units, 32 semi-detached dwelling units and 40 townhouse units. The removal of Part Lot Control would facilitate the construction of the approved semi-detached dwelling and townhouse units. 3.0 COMMENTS 3.1 The "Holding (H)" symbol affects all Lots and Blocks, on Plan 40M-2202. The applicant has entered into a subdivision agreement with the Municipality and there are sufficient financial guarantees to ensure completion of subdivision 40M-2178. The application has been reviewed in the context of Sections 23.4.2 and23.4.3 of the Clarington Official Plan. Staff are satisfied that the following matters have been addressed and approved to the satisfaction of the Municipality including, but not limited to: • Services and municipal works; • Submission of technical studies; • Measures to mitigate the impact of development; and • Execution of the appropriate agreements. wr REPORT NO.: PSD-113-04 PAGE 3 3.2 Staff has no objection to the approval of a By-law exempting the subject lands from Part Lot Control. Attached is a By-law (Attachment 4) to exempt the subject lands from Section 50 (5) of the Planning Act. 3.3 Attachment 5 is a Summary Table provided in accordance with the Region of Durham's requirements under the delegation of Part Lot Control. It details lots/blocks affected by the Part Lot Control By-law, the unit type and the number of the Part Lot Control By-law. 3.4 The Finance Department has confirmed that the taxes are up to date for the subject properties. 4.0 RECOMMENDATIONS 4.1 In consideration of the comments noted above, approval of the removal of the "Holding (H)" symbol as shown on the attached by-law and schedule (Attachment 3) is recommended. 4.2 In accordance with Subsection 7.3 of Section 50 of the Planning Act, the Part Lot Control By-law may provide a specified timeframe during which the By-law shall be in force. As a result, it is not necessary for Staff to prepare a second By-law to restore Part Lot Control on the subject lands. The Planning Act leaves it to the Municipality to determine an appropriate timeframe during which the By-law shall apply. Staff recommends that the By-law be in force for a three (3) year period following Council approval, ending September 27, 2007. Attachments: Attachment 1 - Key Map for Removal of Holding Application Attachment 2 - Key Map for Removal of Part Lot Control Application Attachment 3 - By-law for Removal of Holding (H) Attachment 4 - By-law for Removal of Part Lot Control Attachment 5 - Unit Type and Number Summary Table 636 ATTACHMENT 1. This is Schedule "A" to By-law 2004- , passed this day of , 2004 A.D. f PLAN 7 E T—E9o41I yg °N.°a�. °^`• W •::::?36:^iiE: Ej i_ _IVA� L 0 T 8 F U T U R E o OR/V� :::titC:::: • MEDIUM • ` .... D EN SI r r, cz O 7 W L N O R T ti eia.roA oai a Pwv°scs A A q Q V f _ s r Q —j ora s•a F U T U R E I P A R T t d MEDIUM //�� 1� OE rvsl TT v) CrW_ Z w low OPEN SPACE BLOCK Se PMT 3 R/e1 10R-]SS] (9N.ECT 10[ASFet911T AS M NL 3t3W) t--� _ -TER aAUr BL= LLJ (aenenxR tse ec.) RAILWAY � PG�FIG E PLAN ter—a9061I ffi O1PN ® Zoning Change From "(H)R1" To "R1" Zoning Change From "(H)R2" To "R2" John Mutton, Mayor saw Zoning Change From "(H)R3" To "R3" Zoning Change From "(H)R3-15" To "R3-15" Patti L. Barrie, Municipal Clerk ® Zoning Change From "(H)R3-16" To "R3-16" .w m J - COU LONG ORTH I AIL WA TFP SCOTTSDALE DR ,nom o ® O Fes-( z SPRU Bowmanville ATTACHMENT 2 wr C 0 N C E P L A N 1 8 T— 8 9 0 4 1 0.3.RESERVE 0.3m RESERVE BLOCK BLOCK 45 —13" ......... 13 ':9.'.. V.- . 14 ... ........ 411 ................. .. 01111 . .......... ............................... ....... L , 6 . 17 . ............. L 0 T FUTURE . ..... go os h R/ M E D / U M ...... D E N S I T Y ...... ........... ......... .......1 20 OPEN SPACE BLOCK 40 Al ur, ......... 7.7.7.7.7. ................. .. ......... 1r::":XX-XX!X!. .. ... . ........... . ............ 0 ................... .....Y-7-7- LLJ ................. ................. L 0 N G BLOCK FOR MUNICIPAL PURPOSES 'C"WaRrm AVL BLOCK 4a X .............. ..... .......... ............ 28 27 +ter 25 . ...... 25 W SPACE FUTURE CL 'A EN FART BLOCK 30 M E D I U M ............ .. D E N S/ T Y us ............... ............ ....... ...... .... ...... ..... . ................... .................... 7 OPEN SPACE BLOCK 3 8 cr_ (tal 7 1` - 4,49 PART 2 PLAN IOR-3965 (SUBJECT TO EASEMENT AS IN NL 32206) WATER OUALITY BLOCK BLOCK 41 III (0.631 ho 1.56 ac.) RAIL WA Y P L A N 1 8 T 8 9 0 6 4 PQ Bowmanville Key Map Subject Site ZBA 2004-039 Lots Affected By Part Lot Control MA Lots 1-12 and Lots 21-24 incl. Blocks 29-36 incl. LON WORTH 40M-2202 Owner: Mearns East Developments Inc. 638 ow ATTACHMENT 3 THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON BY-LAW NO. 2004- g+ being a by-law to amend By-law 84-63,the Comprehensive Zoning By-law for the No Corporation of the former Town of Newcastle ..r WHEREAS the Council of the Corporation of the Municipality of Clarington deems it advisable to amend By-law 84-63, as amended, of the Corporation of the former Town of Newcastle to implement ZBA 2004-40; NOW THEREFORE BE IT RESOVED THAT the Council of the Corporation of the Municipality of Clarington enacts as follow: 1. Schedule"3"to By-law 84-63, as amended, is hereby further amended by changing the .r zone designation from: "Holding—Urban Residential Exception ((H)R1)Zone" "Holding—Urban Residential Exception ((H)R2)Zone" "Holding—Urban Residential Exception ((H)R3)Zone" "Holding—Urban Residential Exception ((H)R3-15)Zone" "Holding—Urban Residential Exception ((H)R3-16)Zone" To: "Urban Residential Exception (R1)Zone" .r "Urban Residential Exception (R2)Zone" "Urban Residential Exception (R3)Zone" "Urban Residential Exception (R3-15)Zone" "Urban Residential Exception (R3-16)Zone" 2. Schedule"A"attached hereto shall form part of this By-law. r 3. This By-law shall come into effect on the date of the passing hereof,subject to the provisions of Sections 34 and 36 of the Planning Act. .rr BY-LAW read a first time this day of 2004 �++ BY-LAW read a second time this day of 2004 BY-LAW read a third time and finally passed this day of 2004 rr John Mutton, Mayor .r Patti L. Barrie, Municipal Clerk 9 ATTACHMENT 4 THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON BY-LAW NO. 2004- .. being a by-law to exempt a certain portion of Registered Plan 40M-2202 from Part Lot Control +r� WHEREAS the Council of the Corporation of the Municipality of Clarington deems it advisable to exempt from Part Lot Control, Lots 1 to 12; 21 to 24 and Blocks 29 and 36 on Plan 40M- 2202, registered at the Land Title Division of Whitby; ,■„ NOW THEREFORE BE IT RESOVED THAT the Council of the Corporation of the Municipality of Clarington enacts as follow: 1. That Subsection 5 of Section 50 of the Planning Act,this By-law shall not apply to those lands described in Paragraph 2 within the By-law. irr 2. That this By-law shall come into effect upon being approved by the Municipality of Clarington and thereafter Subsection 5 of Section 50 shall cease to apply to the +r following lands: a) Lots 1 to 12; 21 to 24 inclusive and Blocks 29 to 36 inclusive on Plan 40M-2202. ■r 3. Pursuant to Subsection 7.3 of Section 50 of the Planning Act,this By-law shall be in force for a period of three (3)years ending on September 27, 2007. •r BY-LAW read a first time this day of 2004 BY-LAW read a second time this day of 2004 BY-LAW read a third time and finally passed this day of 2004 ■r rr John Mutton, Mayor Patti L. Barrie, Municipal Clerk ■r 6 . ATTACHMENT 5 •r PART LOT CONTROL EXEMPTION BY-LAW Unit Type and Number Summary Table Registered Plan #: 40M-2202 By-law: Result of Part Lot Control Exemption on Unit Type & Number Lots Affected Unit Type & Number Lot 1 Semi-detached — 2 No increase in units Lot 2 Semi-detached — 2 No increase in units ..� Lot 3 Semi-detached — 2 No increase in units Lot 4 Semi-detached —2 No increase in units Lot 5 Semi-detached — 2 No increase in units �+ Lot 6 Semi-detached — 2 No increase in units Lot 7 Semi-detached — 2 No increase in units Lot 8 Semi-detached — 2 No increase in units Lot 9 Semi-detached —2 No increase in units Lot 10 Semi-detached — 2 No increase in units Lot 11 Semi-detached —2 No increase in units Lot 12 Semi-detached — 2 No increase in units Lot 21 Semi-detached — 2 No increase in units Lot 22 Semi-detached —2 No increase in units Lot 23 Semi-detached — 2 No increase in units Lot 24 Semi-detached — 2 No increase in units Block 29 Townhouse Units — 8 No increase in units Block 30 Townhouse Units —4 No increase in units Block 31 Townhouse Units — 5 No increase in units Block 32 Townhouse Units — 3 No increase in units Block 33 Townhouse Units — 5 No increase in units Block 34 Townhouse Units — 5 No increase in units .. Block 35 Townhouse Units —4 No increase in units Block 36 Townhouse Units — 6 No increase in units TOTAL Units 70 No increase r.. 611 Leading the Way REPORT PLANNING SERVICES Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE .. Date: Monday, September 20, 2004 Report#: PSD-115-04 File#: ZBA 2004-023 By-law#: Subject: REZONING APPLICATION TO PERMIT COMMERCIAL USES WITH REDUCED PARKING AND LOADING STANDARDS APPLICANT: VIVECA RUPA RECOMMENDATIONS: It is respectfully recommended that the General Purpose and Administration Committee r. recommend to Council the following: 1. THAT Report PSD-115-04 be received; 2. THAT the rezoning application submitted by Viveca Rupa be APPROVED and that the proposed Zoning By-law contained in Attachment 3 to this Report be passed; .. 3. THAT the Region of Durham Planning Department be forwarded a copy of this Report and Council's decision; and, " 4. THAT all interested parties listed in this report and any delegations be advised of Council's decision. wo Submitted by: Reviewed by: w Davi . Crom , M.C.I.P.,R.P.P. Franklin Wu Director, Planning Services Chief Administrative Officer RH*CP*DC*df 14 September 2004 CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1 C 3A6 T(905)623-3379 F (905)623-0830 �- - 642 REPORT NO.: PSD-115-04 PAGE 2 No 1.0 APPLICATION DETAILS 1.1 Applicant: Viveca Rupa 1.2 Agent: Paul Lenardon 1.3 Rezoning: To amend the "General Commercial (Cl) Zone" to permit retail •"' commercial and office uses with reduced parking and loading standards. 1.4 Site Area: 0.1 hectares (0.25 acres) .r 2.0 LOCATION 2.1 The property under consideration is located at the northwest corner of King Avenue West and North Street (14 North Street) in Newcastle Village (See Attachment 1). The site area totals 0.1 hectares (0.25 acres). The property is located within Part Lot 29, Concession 2, in the former Village of Newcastle. 3.0 BACKGROUND 3.1 On May 18, 2004, Staff received rezoning and site plan applications from Paul Lenardon on behalf of Viveca Rupa to permit retail commercial uses within the '" existing building with a reduction in parking and loading standards. The applicant intends to operate a commercial business on the main floor of the building with the option of retaining the existing apartment on the second floor or converting this space to retail or office uses. 3.2 A statutory Public Meeting was held on June 21, 2004. An area resident spoke in opposition to the proposal. Although the resident is not opposed to the business, the objection is based on the following reasons. • The intersection at King Avenue West and North Street is dangerous. • No on-street parking should be allowed for two car lengths from the intersection. r • Parked cars cause congestion for turning movements. • Since McDonalds has opened in Newcastle, large amounts of traffic use North Street to access Mill Street. The traffic travels at high speeds. One area resident called in support of the application, indicating that the business was a welcome addition to the western entrance of downtown .. Newcastle, praising the owner's efforts to clean up the property, and that they did not believe on-street parking would not be an issue. 6 .13 .� REPORT NO.: PSD-115-04 PAGE 3 A petition from seven (7) area households, as contained in Attachment 2, as well ® as an inquiry from an area resident were received by the Planning Services Department. The following concerns were raised. • Area residents have a perception that a reduction in parking standards will cause a problem with on-street parking. Patrons of this establishment will park on the street and/or sidewalks, making it difficult for children or elderly residents to cross North Street between parked cars. In addition, patrons may park too close to the North Street/King Avenue intersection, causing potential visibility problems. On-street parking should be prohibited on North Street. • Residents are concerned that the Municipality will take their rear yards associated with Foster Creek for trail purposes. These issues are addressed in Section 8.4 of this report. 4.0 SITE CHARACTERISTICS AND SURROUNDING USES 4.1 The property contains an existing 175 sq. m. two storey building, equally �. distributed between floors. The main floor has been recently used for office uses while the second floor has been used as an apartment. The required parking r was not previously provided. The property drains towards Foster Creek. The existing grading and drainage will not be materially altered through redevelopment. 4.2 Surrounding Uses: East: Commercial North: Urban residential West: Foster Creek and urban residential South: Commercial and urban residential , 5.0 OFFICIAL PLAN POLICIES 5.1 The Clarington Official Plan designates the developable portion of the property as "Mixed Use Area" within the Newcastle Village Main Central Area Secondary Plan and the rear portion of the property as "Environmental Protection Area". The Mixed Use Area land use designation permits residential uses, retail, personal service and office uses, mixed use buildings with commercial and residential uses, community facilities, and home-based occupations. The development proposal conforms to the policies of the Clarington Official Plan. .. 644 REPORT NO.: PSD-115-04 PAGE 4 6.0 ZONING BY-LAW CONFORMITY 6.1 The property is currently zoned "General Commercial (Cl) Zone" and "Environmental Protection (EP)". Although the commercial zoning permits the •+ proposed uses, the site does not contain sufficient zoned tableland to develop on-site parking and loading spaces required by the Zoning'By-law. In order to consider the proposed development, a rezoning application was submitted for consideration. 7.0 AGENCY COMMENTS •+� 7.1 The Clarington Emergency Services and Durham Region Public Works Departments have no objections to the proposed development. • 7.2 The Clarington Engineering Services Department has no objections to the rezoning application. Grading design on the subject property and the proposed municipal boulevard work will be finalized through site plan approval. 7.3 The Durham Region Planning Department has no objections to the proposal. The potential for on-site contamination should be addressed through the processing of the application. It is also recommended that a sufficient development. setback be provided from the environmentally protected lands to the satisfaction of the Ganaraska Region Conservation Authority. These comments are addressed in Section 8.6 of this report. 7.4 The Ganaraska Region Conservation Authority has no objections to the proposal. The existing parking embankment area on the north side of the house has pushed fill material into the floodplain. This material will be removed through site plan approval. Given the small size of the site, no storm water management review is necessary. 8.0 COMMENTS 8.1 The building was originally constructed and used as a single detached residential dwelling. The use of the building was converted in the early 1990's to an office and has been used for both various office uses and residential uses since. The second floor is currently vacant. 8.2 The building totals approximately 175 sq. m. equally divided between the two .� floors. The applicant proposes to use the main floor to operate a retail commercial business and retain the second floor apartment unit or convert this area for retail commercial or office uses. Based on current zoning provisions, the commercial or office uses on both floors would require 6 parking spaces and 1 loading space while ground floor commercial or office uses and the second floor apartment unit would require 5 parking spaces and 1 loading space. Although 645 REPORT NO.: PSD-115-04 PAGE 5 the current zoning by-law permits general commercial uses on the property, the majority of the property is floodplain lands associated with Foster Creek, and as such is zoned Environmental Protection. The amount of residual tableland is insufficient to permit the required on-site parking and loading spaces. The current zoning permits a wide variety of general commercial uses, many of which are assembly uses that would require large amounts of parking. To locate an assembly hall, restaurant, place of worship, or a tavern in the building would not be possible due to the lack of available on-site parking. Staff have worked with the Ganaraska Region Conservation Authority and the applicant to ensure that a minimum of 2 parking spaces can be provided on the property, off the road allowance and outside of the environmentally protected lands. The applicant has agreed to limit the types of uses to retail commercial, professional offices, and one apartment on the second floor. By limiting the range of uses to those that generate lower amounts of parking and loading, the amount of on-street parking generated by the building would be an equivalent of a maximum of 4 parking spaces. There is sufficient on-street parking both along King Avenue West and North Street. Given the small size floorspace area and the type of proposed uses, there is not likely to be any loading problems. Staff support the application on this basis. " 8.3 The Clarington Official Plan contains policies that require an environmental impact study to be prepared for development applications adjacent to environmental features identified in the Plan. Although the majority of the " property is designated and zoned environmental protection, an environmental impact study will not be required for the following reasons. .. • The applicant's proposal is a change of use of an existing building and will not materially impact the function or environmental health of the floodplain or Foster Creek. • No additions will be added to the building that would encroach into the floodplain or cause a public safety concern. Although the building ,. encroaches into the floodplain, the building predates all zoning and environmental regulations and is therefore legal non-conforming. • The existing drainage pattern will not be altered by the proposal. Although the .. 2 parking spaces proposed on the property may extend slightly into the floodplain, they are being designed to have minimal impact and the grade is not being altered as it affects the floodplain. •• • The applicant is dedicating a portion of the property to the Municipality containing the creek and a suitable buffer area. After reviewing the issue with GRCA staff, the Municipality determined the applicant does not need to dedicate all of the environmentally protected lands to the Municipality. 8.4 This section addresses the concerns raised by area residents discussed in ■- Section 3.2 of this report. 646 REPORT NO.: PSD-115-04 PAGE 6 to .r • Area residents have a perception that a reduction in parking standards will cause a problem with on-street parking. Since retail and office uses on both floors requires 6 parking spaces, 4 required parking spaces are not being accommodated on the property. This is not different from the uses that have been operating from the property for the past 10 years and staff are not aware of any complaints with respect to on-street parking. • Area residents are concerned that patrons may park on the street and/or sidewalks, making it difficult for children or elderly residents to cross North Street between parked cars. With respect to people walking between parked cars, care must be taken when crossing the street. Cars are also currently parked along King Avenue and people cross this busy street. • Concern was also raised over potential visibility problems if parking is permitted too close to the North Street/King Avenue intersection. Staff have reviewed this matter with the Operations Department, who have agreed to „• create a "No Parking Zone" along the entire property frontage to the street intersection. This should allay any visibility concerns. • Clarington has long-term objectives of developing trail networks along valley systems within urban areas through the Municipality. In addition to purchasing lands, the Planning Services Department acquires valleylands through subdivision, site plan or consent approval processes to accommodate these objectives. Although the Municipality currently does not have any specific plans to extend the Foster Creek trail north of King Avenue, the long-term objective would see its northward extension and connection to the future neighbourhood park located in the Foster Creek Neighbourhood. Part of the valley is required to be dedicated as a condition of draft approval of the subdivision to the north and west. • Newcastle will continue to grow and traffic levels will increase. Any issues relating to speeding should be forwarded to the Durham Region Police Department for enforcement. 8.5 The applicant will be dedicating a portion of the valleyland associated with the Foster Creek to the Municipality through site plan approval. The amount and location of the land dedication was determined at a site meeting between the Planning Services Department and Ganaraska Region Conservation Authority Staff. The lands to be dedicated are roughly equivalent to the area shown on Attachment 1 and is being identified in a survey. 8.6 Comments provided by the Durham Region Planning Department have been -+ addressed in the following manner. • In completing the site screening questionnaire for on-site contamination, the applicant has indicated that, to their knowledge, there has never been a use present on the property that is likely to generate any contamination. A Phase 1 repot was not required. • The Ganaraska Region Conservation Authority has no objections to this application. A portion of the land will be dedicated as valleyland free and 647 ,r REPORT NO.: PSD-115-04 PAGE 7 clear to the Municipality. Having reviewed the application, they support the proposed zoning amendment. 9.0 CONCLUSIONS 9.1 The application has been reviewed in consideration of comments received from the circulated agencies, the policies of the Clarington Official plan, the Zoning By- law regulations, and the public. In consideration of the comments contained in this report, Staff respectfully recommend that the proposed Zoning By-law amendment contained in Attachment 3 be passed by Council. Attachments: Attachment 1 - Key Map Attachment 2 - Petition from Area Residents Attachment 3 — Proposed By-law Amendment Interested parties to be notified of Council's decision Viveca Rupa Stephan Craig 306 Henry Street 37 North Street Whitby, ON L1 N 5C6 Newcastle, ON L1 B 1 H7 Paul Lenardon 22 Brock Street East Willi Schmahl Uxbridge, ON L9L 1 P1 122 North Street Newcastle, ON L1 B 1 H7 Derek and Tracey Hannan 24/26 North Street Lynn Couch Newcastle, ON L1 B 1 H7 88 North Street Newcastle, ON L1 B 1 H7 Yvonne Gilkes .. 45 North Street Newcastle, ON 1_113 1H7 Judith Pellarin 251 North Street .. Wylma Allin Newcastle, ON L1 B 1 H9 58 North Street Newcastle, ON 1_113 1H7 Sheila Pethick 68 North Street ■• Newcastle, ON 1_113 1H7 - 648 ATTACHMENT 1 1" .r d Lot 5 Lot 6 /W/ 47.33. I NEPa77PE /'L,/^�� Y I (p prYq WY) Cn I law �.em■aEm I'"°°'°°r'°'b'°"^ � Part 1 Existkg = 2 abm" LL co at w P.t E van Lore 3101 bWldinp O Z ao3an wrriaom � M KING AVENUE WEST Not Newcastle Key Map WI w T ZBA 2004-023 Subject .r site Zoning By-law Amendment KING AVENUE WEST KIN A N SPA 2004-016 LILLIAN 5. MT I Site Plan Approval W. ST. E. i RE I^® ®J W Q, 14 North Street, Newcastle } LRES. N ST. W. YC P 2 iu P Owner: Viveca Rupa rt EOWARO UST. W. DWARG ST. W. 177.r 7 9 Olt +n, ATTACHMENT 2 r June 1, 2004 David Crome, MCIP, RPP, Director of Planning Services 7?77 I 4 2004 1. Municipality of Clarington, i 40 Temperance St. ��UIVICIPALITY OF CLARINGTDN ' Bowmanville, On PLANNING DEPARTMENT L1C 3A6 Dear Sir Re by-law amendment Planning File#ZBA 2004-023 &SPA 2004-016 We the undersigned oppose the proposed development for the following reasons: There is no legal parking available on the east side of North St (even if it isn't posted) from King St. to the north. There is a hydrant next to a double driveway into the dentist's parking lot, then a community mailbox, which is posted"no parking". Next there is a double driveway to 37 North St including the Veterinary driveway plus two more driveways before Wilmot St. On the West side of North St there are 6 driveways between 14 North St and 58 North St which is the fourth house. The concrete curb is 22"wide between the traveled area of the street and the new 69" sidewalk. A vehicle cannot park on 22" and is not permitted to park on the sidewalk. Therefore,there should be no parking on the west side of North St. The intersection of North and King Streets is a dangerous one. There is a"No Parking Sign" on the north side of King St east of North St but it is rarely enforced. If there is a truck or camper parked in this area you cannot see to safely enter King St. Currently a situation exists, where frequently, cars are parked on the sidewalk on the west side of North St. creating a hazard to pedestrians. When the police are contacted,they tell us it is a by-law officer that needs to be contacted but there is no office open from .. Friday to Monday. If they park on the roadway it blocks traffic and creates a hazard for cars turning onto North St. r. Two parking spaces are not adequate for a commercial unit as at least one of those would be expected to be used by the employees thus not leaving enough for customers. Respectfully: 1 r l as A��z , I, I 6 J 0 ATTACHMENT 3 " THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON BY-LAW NUMBER 2004- being a By-Law to amend By-Law 84-63,the Comprehensive Zoning By-law ,rW for the Corporation of the Municipality of Clarington .r WHEREAS the Council of the Corporation of the Municipality of Clarington deems it advisable to amend By-Law 84-63, as amended, of the Corporation of the former Town of Newcastle in accordance with application ZBA 2004-023 to permit retail commercial and office uses with reduced parking and loading standards; NOW THEREFORE BE IT RESOLVED THAT the Council of the Corporation of the Municipality of Clarington enacts as follows: w 1. Section 16.5"SPECIAL EXCEPTIONS—GENERAL COMMERCIAL (Cl)ZONE"is hereby amended by introducing a new Subsection 16.5.37 as follows: .r 16.5.37 GENERAL COMMERCIAL EXCEPTION(C1-37)ZONE Notwithstanding Sections 3.13, 3.16, 3.21, and 16.1, those lands zoned C1-37 on the Schedules to the By-law shall be use in accordance with the following zone +" regulations. i) RESIDENTIAL USES a) one apartment unit accessory to a permitted non-residential use b) one single detached residential dwelling provided that no apartment- in-house is contained therein .�r ii) NON-RESIDENTIAL USES a) retail commercial establishment b) bank or financial establishment C) business, professional,or administrative office r iii) REGULATIONS a) gross floor area(maximum) 175 sq.m. b) off-Street Parking Spaces (minimum) 2 spaces c) loading Spaces Nil d) setback from an "EP"Zone(minimum) 0 metres e) parking Area entrance Setback to a Residential .. Interior Side Yard Nil f) parking Space Setback to a Residential Interior Side Yard Nil' .r 2. Schedule "5" to By-Law 84-63, as amended, is hereby further amended by changing the zone designation from: "General Commercial (Cl)Zone"to"General Commercial Exception(C1-37)Zone" as shown on the attached Schedule"A"hereto. w 6 31 WO 3. Schedule"A"attached hereto shall form part of this By-Law. r 4. This By-Law shall come into effect on the date of the passing hereof, subject to the provisions of Section 34 of the Planning Act, R.S.O. 1990. .r a. By-Law read a first time this day of 2004 By-Law read a second time this day of 2004 .�. By-Law read a third time and finally passed this day of 2004 John Mutton, Mayor Patti L. Barrie, Municipal Clerk r. �r 652 This is Schedule "A" to By-law 2004- 5 00 passed this day of , 2004 A.D. .t. awl C~ Lot 5 Lot 6 W LU 0000000 000 0000000000000000 7 0000000000000000000 0000000000000000 000000000000000000 000 0000000000000000 U) 000000004000000000 00 OOOL��tz,0000000000 > 000t"Ca�d a.a�on*a'}a:n"L'3�'3f30 ��� 000Pnrt X000000000 000000000000000000 000 0000000000000000 0000000000000000000 00 0000000000000000 Exstng 000000000000000000 OOOOOOOOOOt30(3000 2 storey t 0000000000 commercial bu Z Part 6 Pl n R- {� N72n E." Skh—Ak KING AVENUE WEST ® Zoning Change From "Cl" To "C1-37" Zoning To Remain "EP" John Mutton, Mayor Patti L. Barrie, Municipal Clerk �rY WILMOT ST. SUBJECT .W SITE w w to .r 0 ]ZI Iw KING AVENUE WEST .r LILLIAN CRES. EMILY ST. W. Newcastle w. �. 1 • arm � Leading the Way ]REUTORT ENGINEERING SERVICES DEPARTMENT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE Date: Monday, September 20, 2004 Resolution #: Report #: EGD-44-04 File #: By-law #: Subject: RESPONSE TO A REQUEST FOR THE INSTALLATION OF A BARRIER STRUCTURE AT THE WESTERLY TERMINUS OF BOUNDARY ROAD IN BURKETON Recommendations: 1. THAT Report EGD-44-04 be received; 2. THAT the Municipality of Clarington refer the request for a barricade on Boundary Road in Burketon and the issue of off-road vehicles and ATVs to the Regional sub-committee of the East Cross Forest Task Force for further consideration; 3. THAT interested parties be notified of Council's decision. r. Respectfully by, Submitted by: A.S. Cannella Reviewed by: Franklin Wu Director of Engineering Services Chief Administrative Officer ASC*jb August 30, 2004 . _ 701 . a Report#EGD-44-04 Page 2 RESPONSE TO A REQUEST FOR THE INSTALLATION OF A BARRIER STRUCTURE AT THE WESTERLY TERMINUS OF BOUNDARY ROAD IN Ali BURKETON 1.0 BACKGROUND On May 10, 2004 the Municipality of Clarington held a Public Meeting to consider altering the unopened Boundary Road allowance after having received direction according to a Council resolution passed on October 20, 2003. Resolution #C- 540-03 stated: .r "THAT Council consider altering the unopened Boundary Road allowance with the Township of Scugog located west of Old Scugog Road, in • cooperation with the Township by construction of a motor vehicle barrier with lockable gates at a location on the allowance satisfactory to the Director of Engineering Services, provided that the provisions of subsection 34(2) of the Municipal Act, 2001 respecting the giving of public notice of intention to pass the necessary by-law concerning the alteration of the unopened road allowance in question and the holding of a public meeting to consider representations by the public regarding the intended by-law are held, and provided that the Township of Scugog undertakes similar actions." .r As detailed in report EGD-30-04 of May 10, 2003, the Municipality has been involved in considering a recommendation made by the East Cross Forest Task Force, to consider the installation of a barricade at the westerly terminus of Boundary Road in Burketon as part of a pilot project. This regional committee, which was formed to address the impact of environmental damage to highly sensitive core areas of the Oak Ridges Moraine, has recommended that up to 50 .r barrier structures be installed across the Durham Region as a means of limiting access into the trails. Boundary Road in Burketon was seen as an ideal location .r to pilot this project because the number of recreational vehicles accessing the trails in this area is seen by some as a considerable issue in terms of its impact on the environment and on quality of life. 702 go Report #EGD-44-04 Page 3 RESPONSE TO A REQUEST FOR THE INSTALLATION OF A BARRIER STRUCTURE AT THE WESTERLY TERMINUS OF BOUNDARY ROAD IN an BURKETON No Engineering Services staff have been extensively involved in reviewing this request and as a result we have become increasingly aware that the local problems in Burketon are actually symptomatic of a much larger and more complex issue. Resident's, politicians and stakeholders from across the Durham +� Region have all been raising concerns regarding the increasing numbers of off- road vehicles across the entire Durham Region. Environmental damage to highly sensitive core areas of the Oak Ridges Moraine, personal injury and safety concerns, private property damage, confrontations with private landowners, noise problems in residential areas, as well as a general lack of awareness about what is and is not legal in terms of riding off-road recreational vehicles all point to the fact that this is a growing sport that requires strategic direction at a senior level. In terms of the issues in Burketon and our ability to respond to them at the local level the intent of our Public Meeting on May 20, 2004 was first to satisfy the provisions of subsection 34(2) of the Municipal Act, 2001 and also to determine whether we have the support we need to proceed. Of equal importance was the need to take a full inventory of the current permitted uses of the road allowance so that if it becomes appropriate to move to the design phase we will be informed and in a position to make the best choice possible. The intent of this report then is to summarize the findings of our research and to make what we believe is the best recommendation in terms of addressing the entire issue and in protecting public safety. 2.0 PUBLIC FEEDBACK The issue of public support has been approached on three separate occasions. In July of 2003 a preliminary circulation was made to a group of approximately 50 �• local area residents asking them for their comments and suggestions about the possible closure. A similar survey was again circulated to the same group of . �- residents in April of this year. Normally circulation involves only those residents immediately abutting the potentially affected road allowance but in this case we 703 Report #EGD-44-04 Page 4 " RESPONSE TO A REQUEST FOR THE INSTALLATION OF A BARRIER STRUCTURE AT THE WESTERLY TERMINUS OF BOUNDARY ROAD IN BURKETON felt it important to consider feedback from a meaningful cross-section of the community. The results of these surveys are as follows: first and Second Circulation to_Residents �} S w' P y 4(4 (July 20U3 8�April 2004 x ` N == *Responses received in writing—these results do riot include those received front inter x and exterrmal agencies which will be summanzetl lafer in the re ` , Those in Favour Those Opposed Those in Favour of a Partial Closure 4 11 1 • Those in favour of a barrier are understandably frustrated by the illegal dirt bike and ATV traffic entering and exiting the Oak Ridges Moraine by way of Boundary .� Road. It is their belief that even a single barricade will eliminate the illegal traffic. In addition to the traffic and noise, the East Cross Forest Task Force has reported significant environmental damage to highly sensitive areas of the Oak Ridges Moraine, stating that "illegal activities occurring in the East Cross Forest have given rise to a number of associated problems plaguing this ecologically sensitive area. The Forest has become a 'party pit' location, a venue for all- terrain vehicle enthusiasts, and a dumping ground for abandoned vehicles, tires, and other waste". Additional concerns are related to noise pollution, personal safety, and damage to the shoulder of Boundary Road. Those opposed to a barrier share two main concerns; the first being a very genuine concern that traffic will not be prevented; only re-routed around the "w barrier onto private or public property. Some residents immediately abutting the proposed barrier have indicated that while they were initially in favour they are .o now opposed to such a proposal because, having had time to give it some thought, they are convinced that their property could be damaged. As one resident has stated "the proposed gate will not prevent the traffic/noise/ r speed/etc. on the main portion of Boundary Road: Vehicles will still travel along the road and in front of most of our houses..... from #57 to Old Scugog and find other way(s) in". "I know of a possible 10 alternate points including going •• Report #EGD-44-04 Page 5 RESPONSE TO A REQUEST FOR THE INSTALLATION OF A BARRIER STRUCTURE AT THE WESTERLY TERMINUS OF BOUNDARY ROAD IN .. BURKETON around the gates on private property, by the railway and thru the park". This uncertainty about where the off-road vehicular traffic will go once the barrier is in place raises questions both of personal safety and of risk. Additional opposition relates to property access and lifestyle. One land owner has stated, "I am concerned that placing a permanent barrier on the road might somehow impact my right to get access to my property". He has explained that "the only way to access the portion of my 45 acres on the north side of the railroad tracks is through this Boundary Road". Others have talked about moving into the Burketon area specifically because it promised outstanding ,. recreational opportunities. 3.0 AGENCY COMMENTS Various agencies have been circulated for comment on this proposal and where there has been opposition it specifically relates to emergency access into the trails as well as the ability to enforce the law. An official response from the ,". Durham Regional Police states that "installing a barrier on Boundary Road will not eliminate the problem", "the installation of the barrier will not serve its .. intended function, but only additional concerns for the local community in Burketon". The ability to enforce the law is much clearer when a violation occurs •• on public property. When a violation occurs on private property, as will happen if people go around the barrier, the ability to lay charges becomes a more •• complicated matter. As was made clear by the summary statements reported by the East Cross Forest Task Force, this area is "a dumping ground for abandoned vehicles", and as the Durham Regional Police have indicated, many of these vehicles are set on fire before they are abandoned. Emergency access into the trails then is a very real concern. Police, Fire and Ambulance have all highlighted the importance of maintaining timely access into the trails. 705 . .r Report#EGD-44-04 Page 6 RESPONSE TO A REQUEST FOR THE INSTALLATION OF A BARRIER STRUCTURE AT THE WESTERLY TERMINUS OF BOUNDARY ROAD IN BURKETON A final point to consider is the fact that snowmobile clubs have had agreements .r in place with the Township of Scugog for almost thirty years and provisions must be made to allow this to continue. Therefore the barrier design we have been looking at, is a gated structure that can be opened during the winter season to allow snowmobile access but closed during the warmer months to prevent off- road vehicular traffic. There is concern that this changing accessibility could be confusing for drivers who perhaps use this trail one week only to find it closed the next. This could increase the potential for personal injury and liability. Inventory of Permitted Uses and Design Considerations • Pedestrian access • Horseback riding • Snowmobile trails • Wheelchair access • Bicycles .. • Property access • Emergency and Police personnel 4.0 RECOMMENDATIONS & CONCLUSION Dealing with the issue of ATVs is surprisingly more complex than might be •"" initially understood. The problem stems from and results in a broad spectrum of challenges which include but are not limited to, a lack of awareness of the laws, ""• enforcement issues, necessary changes to legislation, environmental damage, property damage, personal safety, liability, noise, and much more. The closer "i you get to the issue the more aware you become of the potential domino effect that any one solution could have if it is not implemented as part of a comprehensive strategy. r The government of New Brunswick was one of the first provinces to recognize that to effectively respond to such a broad range of issues a response must come from the provincial level. On November 30, 2000 the Honourable Milton Sherwood, Public Safety Minister for New Brunswick, announced the 706 .. Report #EGD-44-04 Page 7 RESPONSE TO A REQUEST FOR THE INSTALLATION OF A BARRIER STRUCTURE AT THE WESTERLY TERMINUS OF BOUNDARY ROAD IN •• BURKETON aw establishment of an All-Terrain Vehicle (ATV) Task Force to respond to the "increased number of deaths, unauthorized use of all-terrain vehicles, concerns +� about damage to the environment, greater exploitation of fish and wildlife, the threat to sensitive areas, endangered species and/or their habitat, increased opportunities for incidents of crime, trespass on private property and confrontations with private landowners and other recreational users." All of them issues that we in Clarington, we in the Durham Region, and we in the Province of Ontario are currently facing. It is our position that a great deal can be done to ensure that this very popular aw sport is managed responsibly. An effective strategy would include the passing of appropriate laws to make enforcement more effective and requiring that ATV ow owners take a safety course prior to obtaining a permit to use their vehicle, much as was done with boating licenses. Part of the course curriculum could focus on ,, where it is and is not legal to ride an ATV in Ontario because lack of awareness of the laws is a huge part of the problem. Media campaigns focusing on public an awareness and safety should be developed along with well managed trail systems which offer people a place to ride away from residential communities an and highly sensitive natural areas. r At the municipal level our ability to respond effectively to these very real concerns is far too limited. We are simply not in a position to effect the types of changes that are needed to solve the problems. Rather than suggest that there are quick and easy solutions to the problems we see our role in this matter as being one of advocacy in moving this issue to the level of government which can realistically be expected to respond to the concerns. We believe that the most appropriate next step in dealing with this growing sport is not to minimize the issue but to continue to work towards having it recognized as one that deserves a more comprehensive review. - 707 ..r Report #EGD-44-04 Page 8 RESPONSE TO A REQUEST FOR THE INSTALLATION OF A BARRIER STRUCTURE AT THE WESTERLY TERMINUS OF BOUNDARY ROAD IN r BURKETON am The Municipality of Clarington has been working and will continue to work with staff at the Region of Durham to help establish a regional committee that will r' bring each municipality to the table to determine a position on the issue. Once we have a clearer picture and a strong enough voice it is our recommendation that this Regional Committee approach the Province to take the lead role in managing the sport. Clarington staff will work with residents and interested stakeholders to improve things at the local level as much as is possible. Realistically however, we expect that these efforts will be limited. At this time it is our recommendation that initiatives such as the Burketon barrier not be implemented until such time as the appropriate provincial framework is in place to ensure that one isolated remedy does not make things more difficult. List of Interested Parties: 1) Burketon Resident's Circulation List (as were circulated for comment) 2) East Cross Forest Task Force Members 3) Durham Regional Police Services r 708 ' trr • VAN Clarineton Leading the Way REPORT ENGINEERING SERVICES DEPARTMENT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE elm Date: Monday, September 20, 2004 Resolution #: Report#: EGD-45-04 File #: By-law #: No Subject: MONTHLY REPORT ON BUILDING PERMIT ACTIVITY FOR AUGUST, 2004. ift Recommendations: .. It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report EGD-45-04 be received for information. Submitted by: Reviewed by: A. S. Cannella, C.E.T. Franklin Wu Director of Engineering Services Chief Administrative Officer ASC*RP*bb September 9, 2004 CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T (905)623-3379 F (905)623-6506 709 REPORT NO.: EGD-45-04 PAGE 2 1. BACKGROUND: ad 1.1 With respect to the Building Permit Activity for the month of August 2004, Staff wish to highlight the following statistics for the information of Committee and Council. MONTH OF YEAR TO YEAR TO CHANGE AUGUST 2004 DATE 2004 DATE 2003 OF VALUE YTD 04-03 Permits Issued 1 68 1 1000 774 29.2% VALUE OF CONSTRUCTION Residential $6,677,572 $123,801,498 $83,472,386 48.3% Industrial $12,000 $1,894,569 $191,186 891.0% Government $1,800,000 $4,025,000 $10,000 40150.0% r„ Commercial $145,500 $8,072,844 $1,343,311 501.0% Institutional $48,000 $20,133,525 $389,000 5075.7% Agricultural $552,156 $1,204,402 $443,546 171.5% Ontario Hydro $0 $80,000 $1,000,300 -92.0% Miscellaneous $63,000 $99,900 $159,000 -37.2% TOTAL $9,298,228 $159,311,738 $87,008,729 83.1% The following is a historical comparison of the building permits issued for the month of "AUGUST" and "YEAR TO DATE" for a three year period. Historical Data for Month of"August' Historical Data"YEAR TO DATE" $180,000,000 $35,000,000 $160,000,000 $30,000,000 $140,000,000 $25,000,000 $120,000,000 $100,000,000 $20,000,000 $80,000,000 rail $15,000,000 $60,000,000 $10,000,000 $40,000,000 $5,000,000 $20,000,000 $0 $0 2004 2003 2002 2004 2003 2002 ®value $9,298,228 $10,791,649 $29,964,013 113valu e $159,311,738 1 $87,008,729 1 $94,223,712 w� �rl 710 as REPORT NO.: EGD-45-04 PAGE 3 go The following is a comparison of the types of dwelling units issued for the month of"AUGUST" and "YEAR TO O DATE". Im Dwelling Unit Type"AUGUST 2004" Dwelling Unit Type "YEAR TO DATE No 0 85 2004" 17 0 Townhouse Apartment Townhouse Apartment am 0% 0% 12% 2% 16 300 , : 328 ,,. 18 Single Semi- Detached Semi- Single Detached 47% Detached Detached 41% 45% r 53% ®Single Detached 16 ®Single Detached 328 0 Semi-Detached 18 19 Semi-Detached 300 13 Townhouse 0 0 Townhouse 85 ,,. E3 Apartment 0 EM Apartment 17 r. 1.2 With respect to building permit activities (over $250,000) and large residential building permit activities, the details are provided as follows: r. APPLICANT CONSTR TYPE LOCATION VALUE Municipality of Clarington Fire Hall 2611 Trulls Rd $1,800,000 Dutchmaster Nurseries Farm Equipment Bldg 1696 Regional Rd 3 $250,929 Attachment#1 — Monthly Building Permit Activity Report Attachment#2— Historical Comparison of Building Permit 711 Municipality of Clarington Building Services - Monthly Activity Report August 2004 „ » .�� a �' ,�✓y4� a�s3�'�"tss _ �pv+„ .����p�.��' '?qc,,�" 'r,� Y k,Y� a.�%°�.s 'trE""�;^,%�n�s, ,J?,°'v'�k "a� 2004 2003 Type of Construction August Year to Date August Year to Date Residential: Single Detached 16 328 26 276 Semi-Detached 18 300 16 198 Townhouse 0 85 0 10 Apartment 0 2 2 4 Other Construction 15 166 24 164 Sub Total 49 881 68 652 Industrial: New Building 1 3 1 2 Addition/Alteration 1 8 2 3 Sub Total 2 11 3 5 Government: New Building 1 3 0 1 Addition/Alteration 0 1 0 0 Sub Total 1 4 0 1 Commercial: New Building 1 12 0 4 Addition/Alteration 2 24 0 21 .rr Sub Total 3 36 0 25 Institutional: New Building 0 2 1 1 Addition/Alteration 2 9 2 5 Sub Total 2 11 3 6 Agricultural: New Building 5 21 3 14 .r Addition/Alteration 0 2 1 2 Sub Total 5 23 4 16 Ontario Hydro: New Building 0 0 3 3 „r Addition/Alteration 0 1 0 3 Sub Total 0 1 3 6 HVAC,Plumbing&Miscellaneous: 4 20 5 40 Demolition: 2 13 3 23 TOTALS 68 1000 89 774 ,rr 2004 2003 August Year to Date August Year to Date Residential: $6,677,572 $123,801,498 $10,537,075 $83,472,386 Industrial: $12,000 $1,894,569 $74,274 $191,186 Government: $1,800,000 $4,025,000 0 $10,000 Commercial: $145,500 $8,072,844 0 $1,343,311 Institutional: $48,000 $20,133,525 $67,000 $389,000 Agricultural: $552,156 $1,204,402 $30,200 $443,546 Ontario Hydro: $0 $80,000 $13,300 $1,000,300 Miscellaneous: $63,000 $99,900 $69,800 $159,000 TOTALS $9,298,228 $159,311,738 $10,791,649 $87,008,729 August 2004 y6 REVENUES 3 r 2004 2003 August Year to Date August Year to Date PERMIT FEES $50,612 $1,055,553 $72,757 $591,138 �� 1NSPEC 'ION*SER�TCE mac, 2004 2003 August Year to Date August Year to Date Building Inspections 902 5630 510 3859 Plumbing Inspections 635 4040 419 3262 TOTALS 1537 9670 929 1 7121 EIt:OF W.TIES EN � �1�: 2004 2003 .�. August Year to Date August Year to Date Single Detached 16 328 26 277 Semi-Detached 18 300 16 197 Townhouse 0 85 0 10 Apartments 0 17 37 39 TOTALS 34 730 79 523 YEAR: 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 r. AREA (to month) Bowmanville 426 468 345 312 188 184 313 423 217 229 406 Courtice 127 180 133 129 231 296 254 295 331 170 388 Newcastle 129 123 131 76 110 78 4 5 3 4 Wilmot Creek 17 29 38 24 19 21 33 21 16 16 10 Orono 2 1 1 1 2 r• Darlington 13 13 17 47 102 31 14 20 17 21 11 Clarke 7 16 15 9 17 17 12 20 10 7 8 Burketon 1 1 1 1 1 2 2 to Enfield 3 Enniskillen 1 2 5 7 6 3 7 3 1 an Hampton 3 1 1 1 2 1 2 2 1 Haydon 1 1 2 Kendal 1 3 2 1 an Kirby 1 Leskard 1 1 Maple Grove 1 1 "' Mitchells Corners 1 Newtonville 4 3 3 3 1 2 2 Solina 1 3 1 1 1 aw Tyrone 3 9 3 TOTALS 730 1843 1701 1609 679 1640 636 1801 601 447 834 w 713 • �l11 11 REPORT (Le ading the Way �. ENGINEERING SERVICES aw Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE Date: September 20, 2004 «. Report#: EGD-46-04 File #: By-law #: Subject: CONCESSION STREET WEST, BOWMANVILLE TRAFFIC AND PARKING CONCERNS RECOMMENDATIONS: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report EGD-46-04 be received; 2. THAT requests for additional all-way stops on Concession Street West at both Beech Avenue and Centre Street intersections be denied; 3. THAT traffic by-law 91-58 be amended to provide a general provision for parking restrictions which would, when deemed necessary by the Director of Engineering Services, be implemented near any form of traffic calming device in Clarington; 4. THAT the proposed by-law attached to report EGD-46-04 be approved; 5. THAT the interested parties listed within this report be provided with a copy of this report and Council's decision. Submitted by: Anthony Cannella, C.E.T. Reviewed by: Franklin Wu, Director of Engineering Services Chief Administrative Officer ASC* RDB*JB September 14, 2004 CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T 905-623-3379 F 905-623-9282 714 REPORT NO.: EGD-46-04 PAGE 2 1.0 BACKGROUND r 1.1 Traffic has been a concern for the residents of the Old Bowmanville Neighbourhood on Concession Street for many years. To assist the neighbourhood the Municipality worked , through a long process of public meetings and engineering designs to create a traffic calmed neighbour. By introducing a series of islands, a pavement narrowing and texture change, the Municipality was successful in keeping traffic speeds on Concession Street much lower than other conventional collector roadways in Clarington. The intent was to keep speeds low but not necessarily to divert traffic to adjacent local streets. As part of the realignment of Concession Street at Horsey Street an additional all-way stop was .r installed one block west of Elgin Street which was an existing all-way stop. .rr Despite the apparent success of the traffic calming project from the Municipality's perspective, some residents of Concession Street West feel it has not had enough of an .rr impact and want the original requests for all-way stop controls implemented in the hopes of further reducing traffic speeds and volume on this collector roadway. 2.0 COMMENT 2.1 Requested All-way stop at Concession Street and Beech St The CTMAC at its June 17, 2004 meeting approved a motion to recommend that an all- -++ way stop be installed at the intersection of Concession Street West at Beech Ave. Although this motion was passed by the CTMAC by a majority of members, Engineering staff cannot agree with the motion for the following reasons: �+ • It does not meet provincial warrants for a collector roadway with disproportionately light traffic volume on the side streets. • It would be ineffective as a way of reducing traffic volume on a street which already has drivers accustomed to 2 all-way stops over a short distance a no alternate route. CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T 905-623-3379 F 905-623-9282 715 '" REPORT NO.: EGD-46-04 PAGE 3 • This decision should have been delayed, as suggested by some members of the CTMAC and evaluated after completion of the Longworth Bridge. The bridge is due for completion in November 2004, which will offer some motorists a viable alternative to Concession Street. • All-way stops are not intended as a speed control device and redundant when average operating speeds are already below the legal speed limit. • This motion is inconsistent with previous motions by the CTMAC and the Heritage District discussions are a separate issue. • The pedestrian activity to the school is already accommodated at either the signalized intersection at Liberty St. or the existing all-way stop at Elgin St with a sidewalk linking directly to Central Public School. • Intersection safety will be improved when the two municipal trees on the south east „r corner are limbed. • Newly planted boulevard trees would need to be removed or relocated to accommodate sightlines to the requested new stop signs. ... 2.2 Other Concession Street Concerns The CTMAC did not support an all-way stop at the intersection of Concession Street and �• Centre Street while the issues of parking complaints and municipal trees were referred back to Engineering Services to resolve. 2.3 Operational Safety Review �• Speed Although residents feel traffic moves too quickly on Concession Street, a number of speed checks by the municipality have shown that average operating speeds are well below the posted speed and about 10 km/hr less than most other typical collector streets. The residents have been offered use of the municipal radar units on a number of occasions to verify operating speeds but they have opted not to obtain this first hand information. Staff are pleased with operating speeds on Concession Street West and feel the traffic calming measures were a success and can stand on their own merit. 716 .w REPORT NO.: EGD-46-04 PAGE 4 .d Volume Volumes on Concession Street are typical of an urban residential collector roadway and an important link between Liberty Street and Scugog Street. At peak periods of the day Liberty Street and King Street are congested, and it is unlikely that any traffic would rw divert over to those streets. The completion of the Longworth bridge in late 2004 linking Regional Rd 57 to Liberty Street and in the future to Mearns Avenue will provide some motorists with a better way of reaching their destinations. This is expected to relieve some of the traffic pressures on Concession Street, Liberty Street and King Street from the existing and future north end residents. Parking During 2002 there were two collisions where vehicles backing from driveways backed into parked vehicles. In 2004 there was a collision west of Liberty Street when a westbound and eastbound vehicle approached the island at the same time and one ,r moved towards the right but hit a parked vehicle. There have been a number of complaints to the by-law department from motorists concerned with residents parking on both sides of Concession Street especially near the traffic calming features which they feel unreasonably obstructs and frustrates traffic, rather than calming it. The intent of some of our traffic calming features was to bring two passing vehicles closer together so as to create the feeling that vehicle speeds should be reduced. Unfortunately due to repeated complaints of abuse, it appears it is now important to prohibit and sign "no parking" close to the traffic calming features to reduce potential conflicts between more vehicles on this important collector roadway. Sections of the Traffic by-law 91-58 , gives the Director of Engineering Services the ability to authorize no parking or no stopping signs near hazards such as intersections, curves and hills to improve public safety in accordance with provisions of the by-law without the do necessity of listing each small area in the bylaw schedules. .r 717 w. REPORT NO.: EGD-46-04 PAGE 5 Under General Provisions Section 3 (2) (A)The Director of Engineering Services is authorized to place or erect and to maintain such authorized and official signs as are required to give effect to the provisions of this by-law. Example 1: Under General Provisions section 4 - GENERAL PARKING AND STOPPING REGULATIONS No person shall on any highway stop any vehicle: 4 (1) Alongside or across the highway from any excavation or obstruction in the roadway where the free flow of traffic would thereby be impeded. Example 2: Under General Provisions Section 4 - GENERAL PARKING AND .. STOPPING REGULATIONS (8) Where official signs to that effect are displayed, no person shall on any highway stop any vehicle: (C) So as to interfere with the movement of traffic by obstructing a travel or turn lane ww which is clearly defined by pavement markings. Although the above two provisions could give the Director the ability to post signs in traffic calmed areas Staff, wish to include an amendment to specifically give the Director flexibility to introduce no parking signage near areas of traffic calming devices to improve public safety. It is not safe to park a vehicle in or approaching a narrowing such as a hamlet gateway or an urban narrowing where it could impede or obstruct traffic more than the intended design of the traffic calming feature. Where such enforcement is to be carried out, signs would be posted to ensure motorists know how close they may park. w., "" 718 fl REPORT NO.: EGD-46-04 PAGE 6 a .m Attachments: Attachment 1 - Key Map ' Attachment 2 - Proposed by-law amendment Interested parties to be advised of Council's decision: Inspector Tom Cameron Bowmanville Community Office Durham Regional Police 77 Centre Street North Oshawa, ON L1 G 4137 Clayton Morgan, Chair Clarington Traffic Management Advisory Committee 31 Parkway Crescent Bowmanville, ON L1 C 1 B9 Old Bowmanville Neighbourhood Association lei we no .w .r 719 • Concession Rd.3 DDD m rr 0 m V 'o w N wr t m D � J Q' + Cb St.Elizabeth Future Extension Separate School a � aa Longworth Av . Extension m D �a a a$oo ■r �J O� a / LEGEND i Existing y All-Way Stop 5 o �• Requested N a` ow All-Way Stop D Concession St.W. BOWMANVILLE r Concession Rd.3 ri � 0 uUa E s El �. ❑ 9 U r �U❑00 L� s DAT �ap \ DRAWN BY.E.L. E.Sept. 14,2004 REPORT EGD-46-04 - QQ �Qp�QQa KEY MAP ATTACHMENT NO. 1 ,� 720 rw .r THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON .r BY-LAW 2004- Being a By-law to amend By-law 91-58, as amended, being a By-law to Regulate Traffic on Highways, Municipal and Private Property in the Municipality of Clarington. + WHEREAS the Council of the Corporation of the Municipality of Clarington deems it desirable to amend By-law 91-58; NOW THEREFORE the Council of the Corporation of the Municipality of Clarington hereby enacts as follows: 1) General Provisions of By-law 91-58 Section 4, GENERAL PARKING AND STOPPING REGULATIONS is amended under subsection 9 Where official signs to that effect are displayed no person shall park any vehicle: + by adding the following reference: (1) beside, across from or approaching any traffic calming feature where such parking would interfere with the movement of traffic. 2) This By-law shall come into force and take effect on the date approved by Council and when signs to the effect are erected. BY-LAW read a first and second time this 27th day of September, 2004. BY-LAW read a third time and finally passed this 27th day of September, 2004. John Mutton, Mayor Patti L. Barrie, Municipal Clerk 7 2.0 1 .ri ' Leading_the Way 1 REPORT ' EMERGENCY AND FIRE SERVICES Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE Date: SEPTEMBER 20, 2004 ' Report#: ESD-012 -04 File # 10.12.6 By-law# Subject: MONTHLY RESPONSE REPORT—JUNE — SEPTEMBER,J ER, 2004 Recommendations: ' It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: t1. THAT Report ESD-012 -04 is received for information. Submitted by: Reviewed by:d- ' Go on VVeir, AMCT, CMM111 Franklin Wu, M.C.I.P. Acting Director Emergency& Chief Administrative Officer Fire Services ' MGC:sr CORPORATION OF THE MUNICIPALITY OF CLARINGTON ' 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T(905)623-3379 F (905)623-6506 901 REPORT NO.: ESD-012-04 PAGE 2 BACKGROUND AND COMMENT , 1. BACKGROUND 1.1 Our report covers the months of June to September 2004. It is our intent to provide ' Committee with information relevant to this department, in a timely manner. 2. REPORT 2.1 The department responded to 750 calls during this period and recorded total fire loss at $1,026,070. A breakdown of calls responded to follows in the tables attached. 1 ! 1 ! ! 1 902 1 1 t CLARINGTON EMERGENCY & FIRE SERVICES ACTIVITY REPORT �eriod: June 1, 2004 00:00:00hrs to June 30, 2004 23:59:59hrs CALL TYPES -VOLUME BY STATION STATION 1 STATION 2 STATION 3 STATION 4 STATION 5 TOTALS CALL TYPEs`lowinat ill Ne�ncasOr C u ROPERTY FIRE CALLS 1 2 0 6 1 10 cludes structure, chimney,vehicle, miscellaneous e. .. Furniture, clothing, etc UNAUTHORIZED BURNING 3 2 1 2 1 9 urning complaints) ALSE FIRE CALLS 23 4 2 11 1 41 in alarm activations-accidental//maclicisous, human- ercieved, emer enc s, check calls e.g. investigate an odor UBLIC HAZARD CALLS 1 14 1 1 1 0 1 6 1 0 21 cludes propane/natural gas leaks, fuel/chemicals ills, powerlines down/arcing, C.O. leaks etc. RESCUE CALLS 17 1 5 1 3 1 7 1 1 33 cludes vehilce extricationslaccidents, commerical/industrial accidents, home/residential accidents, water/ice rescues EDICAL ASSIST CALLS 52 3 1 31 —5 ----F 92 ISCELLANEOUS CALLS 21 3 2 18 2 46 incidents not found, assistance not re 'd by other agencies, call cancelled on route, etc. TOTALS 131 20 1 9 81 1 11 1 252 DOLLAR LOSS of Fire Calls 1 2 0 6 1 10 ollar Loss$ $0 $160,000 $0 $137,700 $5,000 $302,700 VOLUNTEER STANDBY RESPONSES o -Calls 11 0 0 4 0 15 #of Standbys -Training 1 0 1 0 0 0 0 0 2004 MONTHLY CALL VOLUME BY STATION Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. I Oct. Nov. Dec. ATION 1 114 111 103 105 98 131 0 0 0 0 0 0 662 ATION 2 35 29 27 31 24 20 0 0 0 0 0 0 166 STATION 3 18 17 12 13 14 9 0 0 0 0 0 0 83 ATION 4 74 57 70 69 1 57 81 1 0 0 0 0 0 0 408 ATION 5 1_14 7 1 9 1 9 11 1 0 1 0 0 1 0 1 0 0 47 TOTALS 248 218 1 219 1 227 1 202 252 1 0 1 0 0 1 0 0 0 1366 2003 MONTHLY CALL VOLUME BY STATION Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec. ATION 1 138 105 107 118 115 98 134 111 89 124 102 115 1356 ATION 2 34 34 16 25 34 24 33 43 30 26 27 36 362 STATION 3 33 23 10 28 25 15 21 15 28 13 11 24 246 kATION 4 53 66 60 69 64 1 74 70 76 62 55 50 67 766 ATION 5 9 11 9 15 7 15 7 16 8 14 13 13 137 TALS 267 239 202 255 245 1 226 265 1 261 217 232 203 1 255 1 2867 903 CLARINGTON EMERGENCY & FIRE SERVICES ACTIVITY REPORT Period: July 1, 2004 00:00:00hrs to July 31, 2004 23:59:59hrs CALL TYPES -VOLUME BY STATION ' STATION 1 STATION 2 STATION 3 STATION 4 STATION 5 TOTALS CALL TYPE g > ow��C! nv��1e���': Newcastle ���'Orott. =r� ,,�ourtic PROPERTY FIRE CALLS 5 1 0 6 4 16 'includes structure, chimney, vehicle, miscellaneous e.g.. Furniture, clothing, etc UNAUTHORIZED BURNING 7 4 0 1 3 1 15 'burning complaints) FALSE FIRE CALLS 24 8 1 7 1 41 'includes alarm activations-accidental//maclicisous, human- ercieved, emer enc s, check calls e.g. investigate an odor DUBLIC HAZARD CALLS 1 9 1 9 1 1 1 5 1 5 29 'includes propane/natural gas leaks, fuel/chemicals ills, powerlines down/arcing, C.O. leaks etc. RESCUE CALLS 1 10 1 6 1 4 1 12 1 4 36 'includes vehilce extrications/accidents, commerical/industrial accidents, home/residential accidents, water/ice rescues VIEDICAL ASSIST CALLS 37 12 2 31 4 1 86 MISCELLANEOUS CALLS 13 0 2 9 1 25 incidents not found, assistance not re 'd by other agencies, call cancelled on route, etc. TOTALS 105 1 40 1 10 1 73 20 248 ' DOLLAR LOSS ' R of Fire Calls 5 1 0 1 6 4 16 )ollar Loss$ $43,000 $0 $0 1 $2,450 $370,500 $415,950 VOLUNTEER STANDBY RESPONSES t of Standbys-Calls 18 0 0 13 0 31 t of Standbys-Training 1 0 0 0 0 0 0 2004 MONTHLY CALL VOLUME BY STATION Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec. >TATION 1 114 111 103 105 98 131 105 0 0 0 0 0 767 iTATION 2 35 29 27 31 24 20 40 0 0 0 0 0 206 iTATION 3 18 17 12 13 14 9 10 0 0 0 0 0 93 ' iTATION 4 74 57 70 69 57 81 73 0 0 0 0 0 481 iTATION 5 7 4 7 9 9 11 0 0 1 0 0 0 0 47 'OTALS 248 218 219 227 202 252 248 0 1 0 0 0 0 1614 ' 2003 MONTHLY CALL VOLUME BY STATION Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec. 'TATION1 138 105 107 118 115 98 134 111 89 124 102 115 1356 NATION 2 34 34 16 25 34 24 33 43 30 26 27 36 362 NATION 3 33 23 10 28 25 15 21 15 28 13 11 24 246 NATION 4 53 66 60 69 64 74 70 76 62 55 50 67 766 NATION 5 9 11 9 15 7 15 7 16 8 14 13 13 137 'OTALS 267 239 202 255 245 226 265 261 217 232 203 255 2867 904 I CLARINGTON EMERGENCY & FIRE SERVICES ACTIVITY REPORT leriod: August 1, 2004 00:00:00hrs to August 31, 2004 23:59:59hrs CALL TYPES -VOLUME BY STATION STATION 1 STATION 2 STATION 3 STATION 4 STATIONS TOTALS CALL TYPE B'owma, �ille�;;� Newcas.l' Oxon Cou`rl 1(includes OPERTY FIRE CALLS 6 3 3 6 1 19 cludes structure, chimney, vehicle, miscellaneous e.g.. Furniture, clothing, etc NAUTHORIZED BURNING 4 3 0 5 1 13 tSE nin complaints) FIRE CALLS 21 6 2 5 3 37 alarm activations-accidental//maclicisous, human- ercieved, emer enc s, check calls e.g. investigate an odor BLIC HAZARD CALLS 14 2 A 1 7 1 25 cludes propane/natural gas leaks, fuel/chemicals ills, powerlines down/arcing, C.O. leaks etc. ESCUE CALLS 1 8 1 3 1 6 1 13 1 5 35 cludes vehilce extrications/accidents, commerical/industrial accidents, home/residential accidents, water/ice rescues EDICAL ASSIST CALLS 41 11 11 28 4 95 ISCELLANEOUS CALLS 11 3 -2 9 1 26 incidents not found, assistance not re 'd by other agencies, call cancelled on route, etc. TOTALS 105 31 25 73 1 16 250 DOLLAR LOSS Hof Fire Calls 6 3 3 6 1 1 19 Ilar Loss$ $266,500 $16,000 $14,000 $3,420 $7,500 $307,420 VOLUNTEER STANDBY RESPONSES of Standbys -Calls 20 0 0 7 0 27 #of Standbys -Training 0 0 0 0 0 0 2004 MONTHLY CALL VOLUME BY STATION Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec. ATION 1 114 111 103 105 98 131 105 105 0 0 0 0 872 ATION 2 35 29 27 31 24 20 40 31 0 0 0 0 237 STATION 3 18 17 12 13 14 9 10 25 0 0 0 0 118 ATION 4 74 57 70 69 57 81 73 73 0 0 0 0 554 ATION 5 7 4 7 9 9 11 0 16 0 0 0 0 63 TOTALS 248 218 219 227 202 252 248 1 250 0 1 0 1 0 0 1864 2003 MONTHLY CALL VOLUME BY STATION Jan. Feb. Mar. Apr. May. Jun. Jul. Aug. Sep. Oct. Nov. Dec. ATION 1 138 105 107 118 115 98 134 111 89 124 102 115 1356 ATION 2 34 34 16 25 34 24 33 43 30 26 27 36 362 STATION 3 33 23 10 28 25 15 21 15 28 13 11 24 246 ATION 4 53 66 60 69 64 1 74 70 76 62 55 1 50 67 766 ATION 5 9 11 9 15 7 15 7 16 8 -14--1 13 13 1 137 TALS 1 267 239 202 255 245 1 226 265 261 217 232 1 203 255 1 2867 905 Leading the Way REPORT CORPORATE SERVICES DEPARTMENT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE Date: September 20,2004 Report#: COD-047-04 File# By-law# Subject: REQUEST FOR PROPOSAL RFP2004-7 SUPPLY AND INSTALLATION OF PLAYGROUND EQUIPMENT Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report COD-047-04 be received; 2. THAT Henderson Recreation Equipment Limited, Simcoe, Ontario, with a total bid amount of$119,461.42 (excluding G.S.T.), being the lowest responsible bidder meeting all terms,conditions and specifications of Request for Proposal RFP2004-7, be awarded the contract for the Supply and Installation of Playground Equipment;and 3. THAT the funds expended be provided from the 2004 Operations Capital Account#110- 36-325-83644-7401. Submitted by: Reviewed b . ane Marano, HBSc., C.M.O. Franklin Wu, Director of or Services Chief Administrative Officer F MR, RRFA Direct r of Operations nc Ta r, B. A. Director of Fna MM/LAB/Id CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE,ONTARIO L1 C 3A6 T(905)623-3379 F(905)623-3330 1201 REPORT NO.: COD-047-04 PAGE 2 BACKGROUND AND COMMENT A request for proposal was publicly advertised and issued with bids being submitted as per Schedule"A" attached. The Request for Proposal specifications included evaluation criteria as follows: • Durability • Warranty • Compliance with instructions • Pricing • References • Creativity • Number of users accommodated • Delivery/installation time frames • Number of play events • Appearance • Quality • Safety Upon review of the bids, it is staffs recommendation that the bid from Henderson Recreation be recommended for the supply and installation of playground equipment of Parts A, B and C for a total amount of $119,461.42 (excluding G.S.T.). Due to the current available funds, it is recommended that Optional Part D not be awarded at this time. The required funds will be drawn from the Operations Capital Account #110-36-325-83644-7401 as identified in the 2004 Capital Budget and are within the total budget allocation of$126,215.00. The Director of Finance has reviewed the funding requirements and concurs with the recommendation. Queries with respect to department needs, specifications, etc. should be directed to the Director of Operations. The low bidder has provided satisfactory service to the Municipality in recent years. 1202 Schedule "A" ciffl-E Leading the Way Municipality of Clarington BID SUMMARY r� =� RFP2004-7, SUPPLY AND INSTALL PLAYGROUND EQUIPMENT Henderson Recreation Equipment $39,765.33 $33,548.36 $46,147.73 $119,461.42 $28,139.98 Limited Simcoe, Ontario Little Tikes Paris,Ontario $36,070.75 $30,913.99 $53,842.74 $120,827.48 $21,162.84 Belair Recreation Products Inc. Paris, ON $41,648.87 $29,297.82 $50,506.94 $121,453.63` $27,663.60 ABC Recreation Ltd. $72,555.15 $34,192.68 $52,067.87 $158,815.70 $34,187.70 Paris.Ontario "not all items bid r k LeQatngrhe way REPORT FINANCE DEPARTMENT fi. „ Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE Date: MONDAY, SEPTEMBER 20, 2004 Resolution #: Report#: FND-019-04 File #: By-law #: Subject: CASH ACTIVITY— SECOND QUARTER OF 2004 ir.. Recommendations: 4 It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report FND-019-04 be received; 2. THAT in accordance with provision of Chapter 25, Section 286 of the Municipal Act, S.O. 2001, the Treasurer reports the cash position of the Municipality of Clarington for the second quarter of the year 2004, as shown on the attached schedule; and 3. THAT Part "A" of the expenditures for the second quarter of the year be confirmed. Submitted by: Vr Reviewed by. Nancy Tay r, B.B. ., ., Franklin Wu, Director of Financ . Chief Administrative Officer. NT/LB/hjl 1301 d REPORT NO.: FND-019-04 PAGE 2 BACKGROUND AND COMMENT: The attached schedules indicate the Corporation of the Municipality of Clarington's cash transactions for the second quarter of 2004, the cash investment position, the taxes receivable position, statistical information and transit revenue and expenditure for the month ending June 30,2004 and the comparative information for the month ending June 30, 2003. The attached schedules for the development charges information is for the months of April, May and June, 2004. Attachments: Attachment A—Analysis of Revenue and Expenditures—Second Quarter of 2004 Attachment B — Continuity of Taxes Receivable—As at June 2004 Attachment C— Statistical Information —As at June 2004 - Transit Revenue and Expenditure—As at June 2004 Attachment D— Investments Outstanding —As at June 2004 Attachment E - Development Charges Information —April 2004 Attachment F - Development Charges Information — May 2004 Attachment G - Development Charges Information -June 2004 CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L'1 C 3A6 T(905)623-3379 F(905)623-4169 1302 CORPORATION OF THE MUNICIPALITY OF CLARINGTON PART'A7 Analysis of Revenue and Expenditures for the Second Quarter of the Year 2004 Second Quarter Second Quarter 2004 2003 REVENUE RECEIVED FOR GENERAL OPERATING D RESERVE FUND PURPOSES: TAX/GENERAL PAYMENTS RECEIVED 38,438,175 18,765,076 LINEAR PROPERTIES 177,911 1,862,692 DURHAM REGION-PROVINCIAL OFFENCES ACT 192,206 0 CANADIAN WASTE-RENT AND ROYALTIES 13,969 0 PROVINCE-COMMUNITY REINVESTMENT FUND 58,000 29,000 BOWMANVILLE HERITAGE BOOK SALES 60 60 DEVELOPMENT CHARGES-MUNICIPAL 3,817,584 1,808,922 INTEREST 682,814 801,827 DEVELOPMENT CHARGES-SCHOOL BOARD 544,227 205,829 DEVELOPMENT CHARGES-REGION 4.900.094 1 981 112 46,823,040 25,254,518 USE OF FUNDS: PAYROLL 4,653,869 3,643,252 REGION LEVY 11,085,122 7,881,950 SCHOOL BOARD LEVIES 6,561,507 5,499,586 GENERAL.-INCLUDING CAPITAL EXP." 10,880.049 15.540.562 33,1W,347 32 W5,350 NET CASH PROVIDED(USED) 13,642,693 (7,310,832) BANK NET CASH E:E::i:E::::::i:i: BANK BALANCE PROVIDED BAL.ANC [LoTALSl AL POSITION: MAR.31 2004 / USED ? : '. M€�t7: JUN.30 200 RAL FUND 9,034,476 13,761,787 ' ? 7$9 6,459,381 RVE FUND 1,675,554 2,520,468 ;? 1;j3 ; 1,096,316 CIPAL BOND INVESTMENTS 2,495,304 27,102 ;?; 2,410,237 COMMUNITY FUND IN TRUST 10,000,000 0 ? ;'il1pQ; Q? 10,000,000 TMENTS(GENERAL+RESERVE FUNDS) 54,360,473 (2,666.664)::::::::::::::::::'y: E 55 748 803 77 565 807 13842 693 ': ` ?':'.sel: EiE)` 75 714 737 Jrs BANK BALANCES AS AT: APR.30 2004 APR.30 2003 MAY 31 2004 MAY 31 2003 GENERAL FUND 25,398,179 4,179,530 13,387,749 4,805,051 RESERVE FUND 2,138,787 2,404,093 3,117,998 788,813 MUNICIPAL BOND INVESTMENTS 2,504,173 2,390,656 2 513 451 2 400 782 NOTE A. Difference in comparison between years due to timing difference in receipt of funds. s 1303 ff, k CORPORATION OF THE MUNICIPALITY OF CLARINGTON PART"B" Continuity of Taxes Receivable r the Second Quarter of the Year 2004 March 31,2004 JUNE BEGINNING BALANCE INTEREST TAXES PAYMENTS ` bi34iE 2003 RECEIVABLE ADDED BILLED BALANCE /ADJUST.— Note 2 CURRENT YEAR TAXES (2,531,019) 42,381,687 39,850,668 (31,326,393) ; l9gt 2,352,447 PENALTY AND INTEREST 17.673 106 888 124,341 53 805 E: 84.613 FIRST PRIOR YEAR TAXES 3,037,397 0 3,037,397 (745,443) 2,631,631 PENALTY AND INTEREST 209,593 102.619 312,212 95 477 ::i:E:: 1 .... : 238.5471 SECOND PRIOR YEAR TAXES 1,376,959 0 1,376,959 (411,593) 1,133,533 PENALTY AND INTEREST 2D4.529 46.972 251,501 (82.682)'ilili E> 152 094 HIRD&PRIOR YEARS TAXES 1,427,381 0 1,427,381 (354091) ;`?`#,4f7f1 1,281,528 PENALTY AND INTEREST 608,065 48 779 656,844 (52:378) 811 759 OTAL 4,350,558 305 038 42,381.687 47.0 283 33121 862 ,i;a'$$}i1i' 8 488 150 Indudes refunds,write-offs,4Ws,etc. NOTE 1: Tax payments do not tie Into Part A due to timing differences since Part A Is on a cash basis(le.difference due to outstanding deposits) OTE 2: 2004 AND 2003 Interim Installment months: February and April. 2004 Final Installment months: June and September 2003 Final Installment months: July and September t ! Y 1304 CORPORATION OF THE MUNICIPALITY OF CLARINGTON PART "C" STATISTICAL INFORMATION FOR THE MONTH OF JUNE 2004 YEAR TO DATE Tax Certificates 38 339 Number of Properties eligible for Tax Registration see Note 1 100 '*see Note 2 Accounts Payable Cheques Issued 63781 to#064406 626 3,269 Transit Total Adult Ridership 2,753 18,321 Transit Total Student Ridership 5,315 42,824 Transit Total Sr./Child Ridership 788 4,858 Transit Total Ridership Across Region (Durham"D 37 792 ransit Total Transfers 501 3,462 Number of Births Registered o 2 Number of Deaths Re istered 1 52 246 Note 1: Only includes those properties whose arrears are greater than$10,000. Note 2: Number of eligible properties for tax registration not applicable for year-to-date comparison. TRANSIT REVENUE AND EXPENDITURE FOR THE MONTH OF JUNE 2004 YEAR TO DATE d REVENUE TRANSIT REVENUE 10,370 97,525 EXPENSES MISCELLANEOUS OPERATING 1,159 18,404 TRANSIT CONTRACT 54,154 333,306 ire OPERATING LOSS /GAIN 44,943 254,184 CAPITAL EXPENDITURES 0 0 1305 f CORPORATION OF THE MUNICIPALITY OF CLARINGTON INVESTMENTS OUTSTANDING PART"0" AS AT JUNE 30,2004 FINANCIAL INVESTMENT INTEREST #OF DAYS MATURITY MATURITY INSTITUTION COST RATE O/S VALUE DATE GENERAL FUND TOTAL GENERAL FUND Q00 RESERVE FUND RBC * 1,450,000.00 4.00% 366 1,450,000.00 Dec. 1/04 RBC 1,425,999.88 5.11% 1913 1,851,467.00. June 1/06 RBC 1,683,100.32 5.15% 2019 2,221,035.00 Sept.15/0 6 RBC * 2,653,000.00 4.00% 365 2,653,000.00 May 25/05 RBC 1,855,574.20 5.15% 1913 2,414,000.00 June 1/06 RBC 372,440.00 4.40% 1826 461,912.00 May 28/09 RBC 495,186.85 4.00% 1171 561,500.00 Jun. 6/06 RBC 1,379,343.53 4.65°x6 2085 1,787,409.00 Dec. 1/08 RBC 970,000.00 3.20% 366 970,000.00 Mar. 19/05 RBC 1,566,467.00 5.45% 1826 2,042,463.00 Jan.29/06 04 RBC * 1,480,000.00 4.10% 366 1,480,000.00 Feb. 5/05 RBC * 400,000.00 3.50°x6 365 400,000.00 Aug.22/08 TD 1,802,021.75 2.01% 30 1,805,000.00 Jul.29/04 RBC * 481,878.00 4.45% 1827 599,072.41 Mar.4/0 RBC * 2,465,000.00 4.00% 366 2,465,000.00 Jul.23/ RBC 500,000.00 3.25% 1827 595,239.37 June 21/08 RBC 1,815,962.00 5.00% 1825 1,906,760.10 Feb. 7/07 RBC 601,664.00 5.30°x6 1461 739,720.00 Feb. 5/05 RBC * 1,482,702.57 5.50% . 1825 1,487,000.00 Feb. 13/06 RBC * 643,000.00 4.00% 366 643,000.00 Sept 16/04 RBC 500,000.00 7.00% 1825 683,408.84 June 21/05 RBC 500,000.00 6.25% 1460 614,956.91 June 21/05 RBC * 380,000.00 4.00% 365 380,000.00 June 15/05 RBC 1,566,466.88 5.30% 1386 1,904,519.00 Nov. 15/04 RBC 1,081,662.88 3.24% 635 1,143,286.00 Sept. 15/04 RBC 519,255.00 3.30% 649 550,000.00 Oct. 1/04 RBC 868,578.00 4.10% 1098 979,853.00 Apr.3/06 TD 1,000,000.00 4.15% 1096 1,129,738.22 Apr. 9/06 RBC 638,000.00 5.40% 1598 638,000.00 June 1/05 RBC 534,782.00 3.30% 730 570,660.00 Dec.23/04 RBC 499,999.38 4.00% 1182 567,343.00 Jul.26/06 TD 5,809,747.79 2.00% 29 5,819,000.00 Jul.8/04 TD 5,562,476.37 2.00°x6 28 5,571,000.00 Jul. 16/04 TD 1,500,000.00 5.50% 1694 1,500,000.00 Dec. 20/07 RBC 1,520,617.00 5.35% 1826 1,973,297.00 Mar.15/07 RBC 208,000.00 4.35°x6 1769 257,351.00 Mar. 12/08 RBC 118,693.50 5.10% 1976 155,297.00 Oct. 15/04 RBC 1,000,000.00 4.45% 1827 1,243,203.49 Aug. 09/07 HSBC 1,556,190.66 2.25% 366 1,591,300.88 Mar.2/05 RBC* 806,000.00 3.50% 1827 806,000.00 Jul.9/08 ITOTAL RESERVE FUND $gp0g?€ 11TOTAL INVESTMENTS * Investment interest paid on a monthly/semi-annual/annual basis 1306 i H W CORPORATION OF THE PART"E" MUNICIPALITY OF CLARINGTON APRIL 2004 Building Name of Owner/Applicant 's € Development Charges Education Permit No. Construction Address € oils Munici I R ion En lish Separate English Public 04.0062 J.Knox °' $ 0.00 3,841.00 0.00 0.00 6585 Enfield Rd.,Darlington Con:6 Lot:30 03.1123-28 Aspen Springs West Ltd. ssss $ IiOOQ 46,122.00 66,498.00 1,956.00 4,224.00 Bannister St., Bowmanville 40M-1816 Pt Lot: Blk 82-87 03.1031-3,35-46,88-91 Vermont Village Homes Ltd. ? j! M'i 270,454.00 365,771.00 12,062.00 26,N8.00 196-98,200-1,255-6 Various, Bowmanville ' 40M-2172 Pt Lot:Blk 93-1tol5,10,17L&R, 18L&R,21-3,29-30,34L&R,38L&R,45L&R, 47-8,55-6,67,76 04.01374 Veltri&Son Limited s€s 15 Q 15,374.00 18,622.00 652.00 1,408.00 Trudeau Dr.,Bowmanville 40M-2107 Pt Lot: 19L&R 04.0195 Leondaro Santos sss'#II 7,687.00 8,226.00 326.00 704.00 4588 Paynes Cres.,Bowmanville 40M-22135 Part:6 04.0298-301 H.L.Gay Family Homes Limited ssss'FZOs 30,748.00 44,332.00 1,304.00 2,816.00 Various,Courtice 40M-2113 Pt Lot:26,42,45,102 04.0205-6 511060 Ontario Ltd. AS$ 10` 15,374.00 18,622.00 652.00 1,408.00 Trudeau Dr.,Bowmanville 40M-2107 Pt Lot: 17L&R 03.1211-2,39-48,77-8 St.Stephen's Estates } BEliai 107,618.00 130,354.00 4,564.00 9,856.00 Hutton PI.,Bowmanville 40M-2133 Pt Lot:39,41-46L&R W C� 00 CORPORATION OF THE MUNICIPALITY OF CLARINGTON APRIL 2004 PART"E" Building Name of Owner/Applicant Develo ment Charges Education Permit No. Construction Address Munici 1 Region En lish Se rate En lish Public 04.0147-8 Clamew Developments �9; Qgtti 15,374.00 22,166.00 652.00 1,408.00 Harmer/Laking Dr., Newcastle 40M-2166 Pt Lot:54,104 03.1084-9, 1183-6 1532746 Ontario Inc./Kaitlin Group €s $R3tllf 92,244.00 111,732.00 3,912.00 8,448.00 04.0296-7 Millburn Dr.,Bowmanville 40M-2185 Pt Lot:45-46L&R,56-59L&R 04.0012-3 Crossland Homes ':' 3rx16sls 15,374.00 18,622.00 652.00 1,408.00 Rafton St., Newcastle 40M-2166 Pt Lot: 100L&R 04.0395-6 Cleary Homes 15,374.00 22,166.00 652.00 1,408.00 Fenning Dr.,Courtice 40M-2113 Pt Lot:84,92 04.0359 Ford&Marian Frank `€ nis. 7,687.00 3,841.00 326.00 704.00 4566 Concession Rd.4, Clarke 10R-205 Part: 1 04.0237-8 Aspen Springs West Ltd. 81,072.00 111,732.00 3,912.00 8,448.00 Millburn 40M-2185 Pt Lot: Blk:81to83-1to4 03.1187-8,272-7,290-5 Kaitlin Group Ltd. A21@ 184,488.00 223,464.00 7,824.00 16,896.00 Millburn Dr.,Bowmanville 40M-2185 42-44L&R,47-55L&R 04.0338-40 Clamew Developments Inc. €': 4 �0 23,061.00 33,249.00 978.00 2,112.00 Harmer Dr./Laking Dr.,Newcastle 40M-2166 Pt Lot:34,36,75 -./ W CC CORPORATION OF THE PART"E" MUNICIPALITY OF CLARINGTON APRIL 2004 Building Name of Owner/Applicant Development Charges Education Permit No Construction Address Munici al Re ion English Se rate English Public 04.0029 Bob 8 Kathy Stewart ii5$r?fl 7,687.00 3,841.00 326.00 704.00 10120 Murphy Rd.,Darlington Con: 10 Lot:3 02.0083 Shawn Linkie ' $1> 1A[ 7,687.00 11,083.00 326.00 704.00 3424 Tooley Rd.,Courtice Con: 3 Lot:33 04.0149,51-3,60-7,228 Aspen Springs West Ltd. 245,984.00 354,656.00 10,432.00 22,528.00 316-334 Millburn Ln., Bowmanville 40M-2185 Pt Lot: 1-4,11-19,20-27,68-78 04.0185 Greg Chaffey ': s1 ? l 7,687.00 8,226.00 326.00 704.00 Con 2 Pt Lot:7;Now RP 1 OR3546 Part 2 04.0416-8,21 Ridge Pine Park Inc. "s2QQ ' 0.00 0.00 1,304.00 2,816.00 Various,Wilmot Creek,Newcastle Pt Lot: 174,247,308,954 04.0349-52 H.L.Gay Family Homes Limited 30,748.00 44,332.00 1,304.00 2,816.00 Montague/Corinsh Dr.,Courtice 40M-2113 Pt Lot:48,100,115,116 04.0365-73 ? Prestonvale Heights Ltd. € 9 i<$ lQ 69,183.00 99,747.0.0 2,934.00 6,336.00 Beckett Cres.,Coutice 40M-2148 Pt Lot:62-70 04.0229-36,50-53 Aspen Springs West Ltd. sltxy1 87,828.00 121,043.00 4,238.00 9,152.00 Bannister St.,Bowmanville 40M-2185 Pt Lot:Blk 79to84-1to4,84-5 TOTALS '.,, $'IsI6 11384,855.00 1 846166.00 61 614.00 133 056.00 C� Ij O CORPORATION OF THE MUNICIPALITY OF CLARINGTON APRIL 2004 TRIBUTIONS-CASH-IN-LIEU OF PARKLAND PART"E" 69 Ontario Inc-SPA99-026 5,568.00 A 2002/002,ZBA 2002/004 2,255.00 -LD071/2003 1,250.00 I Cash-in-Lieu of Parkland CONTRIBUTIONS-ENGINEERING AND INSPECTION FEES Dunbury Homes Total Engineering and Inspection Fees Contributions -ROADS Roads Contributions 36,960.81 11 1 II a Fi W CORPORATION OF THE PART"F" MUNICIPALITY OF CLARINGTON MAY 2004 Building Name of Owner/Applicant Develo ment Cha es Education Permit No. Construction Address Munici I Re ion English Separate English Public 04.0202-3 Vermont Village Homes Ltd. 'it '►1 #�) =zZimmemazz 30,748.00 37,244.00 1,304.00 2,816.00 04.192-3 Brooking St.Bowmanville 40M-2172 Pt Lot:46L&R 04.0315 W.TerlouwQQ 0.00 3,841.00 326.00 704.00 6360 Solina Rd.Darlington 40M-1897 Pt Lot: 1 04.0310 Clamew Developments Inc. J8QQQ 7,687.00 11,083.00 326.00 704.00 39 Cutler Dr.Newcastle 40M-2166 Pt Lot: 16 04.0394 Kenning Construction Ltd. €' 40-4 0.00 3,841.00 326.00 704.00 10 Limmiman Crt.,Solina 40M-1897 Pt Lot:37 04.0413,28,29,31 Grajen Homes ; ' $ fll 30,748.00 40,788.00 1,304.00 2,816.00 Harmer Dr.,Newcastle 40M-2166 Pt Lot:80,81 L&R,49 04.0382 Stonefield Homes Inc. € l $ Q 7,687.00 829.00 326.00 704.00 22 Decoe Crt.,Courtice 40M-2104 Pt Lot:6 104.0154-9 Port of Newcastle Homes Ltd. 'Ii841r0 46,122.00 66,498.00 1,956.00 4,224.00 Millburn Dr.,Bowmanville 40M-2185 Pt Lot:5-10 04.0105-8,112-115,166 Port of Newcastle Homes Ltd. 13 ?ii 92,244.00 117,048.00 3,912.00 8,448.00 175-6 40M-2161 Pt Lot:27, 10L&R,2L,23L&R, 26L&R,12,22,9L&R 04.0432-5 H.L.Gay Family Homes Limited 30,748.00 44,332.00 1,304.00 2,816.00 Cornish Dr.,Courtice 40M-2113 Pt Lot:95,96, 101, 105 I I-i F� CORPORATION OF THE MUNICIPALITY OF CLARINGTON MAY 2004 PART"F" Building Name of Owner/Applicant Developm ent arges Education Permit No. Construction Address Munici 1 Region English Separate English Public 04.0077 Jim Coombesjp 7,687.00 3,841.00 326.00 704.00 4675 Bethesda Rd.,Darlington Con:4 Lot 6 04.0407 John Pavicic '•. sal 7,687.00 829.00 326.00 704.00 26 Decoe Crt.,Courtice 40M-2104 Pt Lot:7 04.0412,27 Grajen Homes ( #1Q 15,374.00 22,166.00 652.00 1,408.00 Harmer Dr.,Newcastle 40M-2166 Pt Lot:46,48 04.0223 Crossland HomesJfQpp ' 7,687.00 11,083.00 326.00 704.00 31 Rafton St.,Newcastle 40M-2166 Pt Lot:99 04.0214 Alan&Susan Pears s's $ j0 7,687.00 3,841.00 326.00 704.00 4571 Concession Rd.4,Clarke Con: 3 Lot:7 04.0363-4 1331074 Ontario Inc. itiio1 15,374.00 18,622.00 652.00 1,408.00 Rafton St., Newcastle 40M-2166 Pt Lot:94L&R 04.0438 Maddalena Rocchio Tim Cole i . .... 7,687.00 0.00 326.00 704.00 3301 Trulls Rd.,Courtice 10R-780 Part: 1 02.0331,04.0426 Vintage Homes ` ' i $i�„1 15,374.00 18,622.00 652.00 1,408.00 Mann St., Bowmanville H-50077 Con:2 Lot 9 Pt Lot: 11 L&R 04.0436 Storybook Homes ' ': € tQ ?0 7,687.00 11,083.00 326.00 704.00 78 Auburn Ln.,Courtice 40R-21385 Part:4,21 L"Wo { irrrr N W t-i W CORPORATION OF THE PART"F" MUNICIPALITY OF CLARINGTON MAY 2004 Building Name of Owner/Applicant Develo ment Charges Education Permit No. Construction Address '':':':€'tkal:'' € :: Municipal Region English Se rate English Public 04.0184,6,187,218-22 Lizjan Developments :''' : iatciQi : 46,122.00 66,498.00 1,956.00 4,224.00 Stephens Gulch Dr.,Bowmanville 40M-2096 Pt Lot: 131k 130-2, 34-6 04.0358 John Krezanowski j ( }#1l 0.00 0.00 326.00 704.00 3265 Courtice Rd.,Courtice 10R-1934 Part: 1 04.0186-7 Lizjan Developments Inc. :: ( Qs 15,374.00 22,166.00 652.00 1,408.00 Stephens Gulch Dr.,Bowmanville 40M-2096 Pt Lot:BLK 129. 133 03.0578 Ken Cole ; $$fp0 7,687.00 3,841.00 326.00 704.00 4180 Courtice Rd.,Courtice 40R-19170 Part:2 04.0398 Cleary Homes 0: 7,687.00 11,083.00 326.00 704.00 2 Aylesworth Ave.,Courtice 40M-2113 Pt Lot:59 04.0404 Dean Churchill : ?:QQ 7,687.00 829.00 326.00 704.00 21 Decoe Crt.,Courtice 40M-2104 Pt Lot:9 04.0423 Kevin Foster € € ; I >#1A 7,687.00 8,226.00 326.00 704.00 4592 Paynes Cres., Newcastle 40R-22135 Part:7 04.0109-11, 171-4 Port of Newcastle Homes Ltd. €€ ;19iBi 53,809.00 65,177.00 2,282.00 4,928.00 Rosemeadow Cres.,Newcastle 40M-2161 Pt Lot:2R,3-5L&R 04.0473-4,77-78 Clamew Developments Inc. ( ? )0 30,748.00 44,332.00 1,304.00 2,816.00 Cutler Dr.,Newcastle 40M-2166 Pt Lot: 13, 17,20,39 W l-s CORPORATION OF THE MUNICIPALITY OF CLARINGTON MAY 2004 PART"F" Building Name of Owner/Applicant Develop ment Charges Education Permit No. Construction Address € Tij€ €€€€ € Munici 1 R ion En lish Se rate En lish Public 04.0399 Frank Hiemstra 0.00 0.00 326.00 704.00 11 Piggot Ln.,Orono RP 40R21260 Parts 1-2,4 04.0400 Marc Ladouceur ''? EQ: ik 7,687.00 8,226.00 326.00 704.00 4568 Paynes Cres., Newtonville 40R-22135 Part:3 04.0039-58 City Homes Q 153,740.00 186,220.00 6,520.00 14,080.00 Goodwin Ave., Bowmanville 40M-2152 Pt Lot: 14-23 L&R 104.0518-20,27 Cleary Homes € JQgQ 30,748.00 44,332.00 1,304.00 2,816.00 Aylesworth Ave/Southfield Ave.,Courtice 40M-2113 Pt Lot:64-5,71-2 04.0209-10, 130 Tetra Valley Homes Inc. `:`s 3?€( a 23,061.00 33,249.00 978.00 2,112.00 Waverly Rd.,Bowmanville 40R-19164 Part:2-5,7 04.0507-9, 15-16 H.L.Gay Family Homes Limited ':€ 3ibi31Q€ 38,435.00 55,415.00 1,630.00 3,520.00 Various,Courtice 40M-2113 Pt Lot:29,43-4,47, 121 03.1049-67,91,95,98 Vermont Village Homes 152,356.00 211,930.00 7,172.00 15,488.00 Various,Bowmanville 40M-2172 Pt Lot:52,63,70,72,131k 9516 to 33 04.0268-71 Vermont Village Homes € J;i;tllij` 30,748.00 44,332.00 1,304.00 2,816.00 Scottsdale Dr., Bowmanville 40M-2066 Pt Lot:24-27 04.0513 BCR Construction < $ 'ti ? f'•. 0.00 3,841.00 326.00 704.00 6320 Solina Rd.,Darlington 0M-1897 Pt Lot:3 r-- V V- CORPORATION OF THE PART"F" MUNICIPALITY OF CLARINGTON MAY 2004 Building Name of Owner/Applicant Develo ment Charges Education Permit No. Construction Address `'::::Tidal `:€` Munici al Re ion English Separate English Public 04.0521 Clamew Developments Inc. _ ( )11EI 7,687.00 11,083.00 326.00 704.00 74 Harmer Dr.,Newcastle 40M-2166 Pt Lot:32 04.0419 James&Julie Rossiter $ 13700 #IM 0.00 3,841.00 326.00 704.00 Stapleton Rd.,Clarke Con:3 Lot: 13/14 04.0390 Traugott Construction LimitedM'•. Q 8,018.54 11,683.10 614.50 1,061.36 2383 Highway 2,Bowmanville 40R-17063 Part:1,2,6to23,Pt 5 Pt, RP17180 967,509.54 1,251,895.10 43,972.50 94,693.36 F-t W GTt W F—t C� CORPORATION OF THE MUNICIPALITY OF CLARINGTON MAY 2004 PART"F" rRIBUTIONS-CASH4N-LIEU OF PARKLAND Mortgage Assistance Ltd. 1,300.00 ew Development-SPA 99/021 6,300.00 Cash-in-Lieu of Parkland 7.600.00 -ENGINEERING AND INSPECTION FEES Engineering and Inspection Fees Contributions 0.0011 F� CORPORATION OF THE PART"G" MUNICIPALITY OF CLARINGTON JUNE 2004 Building Name of Owner/Applicant Development Cha es Education Permit No. Construction Address €€ i1?':': Munici I Region English Separate En lish Public 04.0447 Dom's Auto Parts Ltd €i 3,589.65 0.00 0.00 0.00 1604 Baseline Rd.,Courtice Con: 1 Lot 32 04.0522 Clamew Developments Inc 1R?$#1Q 7,687.00 9,311.00 326.00 704.00 206 Edward St.,Newcastle Plan:40M-2038 Pt Lot: 14L 04.0523 Clarnew Developments Inc 7,687.00 9,311.00 326.00 704.00 208 Edward St.,Newcastle Plan:40M-2038 Pt Lot: 14R 04.0506 H.L.Gay Family Homes Limited ': €€f $(3Q1 `: 7,687.00 11,083.00 326.00 704.00 23 Frank Wheeler Av.,Courtice Plan:40M-2113 Pt Lot:25 04.0511 H.L.Gay Family Homes Limited l }>? 7,687.00 11,083.00 326.00 704.00 35 Frank Wheeler Av.,Courtice Plan:40M-2113 Pt Lot:28 03.1158 Dunbury Homes(Newcastle)Ltd ':'' 18,241.82 27,205.53 1,431.75 2,472.29 361 King Av.,Newcastle Con: 1 Lot 26 Dunbury Homes(Newcastle)Ltd 04.0481 40 William Jose Ct,Newcastle ? p41 7,687.00 11,083.00 326.00 704.00 Plan:40M-2038 Pt Lot:BLK 139 Plan:40R-20610 Part:6, 12 03.1257,03.1258 St.Stephens Estates Inc 15i„ i 15,374.00 18,622.00 652.00 1,408.00 Hutton Pi, Bowmanville Plan:40M-2133 Pt Lot:BLK 69-12 R&L W 00 CORPORATION OF THE MUNICIPALITY OF CLARINGTON JUNE 2004 PART"G" Building Name of Owner/Applicant Develo m arg es Education Permit No. Construction Address Municipal Region En lish Se rate English Public 04.0288 Tom&Donna Christie 7,687.00 3,841.00 326.00 704.00 2,121 Regional Rd 3, Darlington Con:7 Lot 21 04.0409,04.0411 Grajen Homes 11 15,374.00 22,166.00 652.00 1,408.00 Harmer Dr.,Newcastle Plan:40M-2166 Pt Lot:41,45 04.0500,04.0503 Eventel Enterprises Inc. 15,374.00 22,166.00 652.00 1,408.00 Squire Fletcher Dr,Bowmanville Plan:40M-2094 Pt Lot:25,24 04.0501 Eventel Enterprises Inc. `':sJiQQr00'. 7,687.00 11,083.00 326.00 704.00 38 Dadson Dr, Bowmanville Plan:40R-22729 04.0502 Eventel Enterprises Inc. 0' 7,687.00 7,687.00 11,083.00 326.00 704.00 42 Dadson Dr, Bowmanville Plan:40R-22729 04.0208 Mod-Tri Developments :` $l $ 1 7,687.00 9,311.00 326.00 704.00 87 Trudeau Dr,Bowmanville Plan:40M-2107 Pt Lot: 18R 04.0207 Mod-Tri Developments ':`:sl?8#1tI 7,687.00 9,311.00 326.00 704.00 85 Trudeau Dr,Bowmanville Plan:40M-2107 Pt lot: 18L 03.1231 St Marys Cement € I1 ? 5 1,172.35 0.00 0.00 0.00 410 Waverley Rd,Bowmanville CON BF PT LOT 14 to 17 and;See note W CD CORPORATION OF THE PART"G" MUNICIPALITY OF CLARINGTON JUNE 2004 Building Name of Owner/Applicant Develo ment Charg es Education Permit No. Construction Address Munici al Region English Separate English Public 03.1253,03.1254,04.02 St Stephens Estates Inc 184,488.00 223,464.00 7,824.00 16,896.00 04.0212,04.0439-04.04 Various,Bowmanville 04.0444,04.0445,04.04 Plan:40M-2133, Pt Lot:Various 04.0466 04.0470 Kingsway Arms(Clarington)Holdings t3 $ 1,690.23 0.00 129.53 223.72 65 Clarington Bv,Bowmanville Plan:40M-2142 Pt Lot:Blk 1 04.0392 938372 Ontario LtdlAloise Homes 51i$i 7,687.00 3,841.00 326.00 704.00 1684 Taunton Rd,Mitchell Comers Con: 5 Lot 30 04.0226,04.0227 St Stephens Estates Inc 15,374.00 22,166.00 652.00 1,408.00 Sprucewood Cr,Bowmanville Plan:40M-2048 Pt Lot:Blk 84-2&3 04.0213 St Stephens Estates Inc € ': $ 1;1 7,687.00 11,083.00 326.00 704.00 18 Sprucewood Cr, Bowmanville Pain:40M-1977 Pt Lot:99 04.0558-04.0560 Prestonvale Heights Limited QQ l 23,061.00 33,249.00 978.00 2,112.00 Partner Dr&Huntington Cr,Courtice Plan:40M-2148 Pt Lot:90,91, 113 04.0568-04.0571,04.05 Vermont Village Homes € € 4Q`: 122,992.00 163,152.00 5,216.00 11,264.00 04.0577,04.0579-04.05 Various, Bowmanville Plan:40M-2172 Pt Lot:Various 04.0475,04.0599 Dunbury Homes(Newcastle)Ltd 15,374.00 22,166.00 652.00 1,408.00 Cutler&Harmer Dr,Newcastle Plan:40M-2166 Pt Lot: 19,52 F-L C� i� CORPORATION OF THE MUNICIPALITY OF CLARINGTON JUNE 2004 PART"G" Building Name of Owner/Applicant Develo ment Charg es Education Permit No. Construction Address € `4til €€ € Municipal R ion English Separate English Public 03.1082,03.1083,04.05 1532746 Ontario Inc,Aspen Springs s€ ? 71f 184,488.00 223,464.00 7,824.00 16,896.00 04.0550 Various,Bowmanville Plan: 40M-2185 Pt Lot:Various 04.0476,04.0480, Prestonvale Heights Limited 87,828.00 121,043.00 4,238.00 9,152.00 04.0482-04.0492 Beckett Cr,Courtice Plan:40M-2148 Pt Lot:Blk Various 04.0443 Trinity United Church 0.00 0.00 140.42 242.54 116 Church St,Bowmanville Plan Hanning Bik X Lot 7 04.0633 Max Mazzotta 7,687.00 3,841.00 326.00 704.00 2620 Solina Rd, Darlington Con:2 Lot 25 04.0528 Bill Qualtrough € f558 ? €. 7,687.00 3,841.00 326.00 704.00 5909 Main St,Orono Con: 5 Lot 28 04.0562 Marianna Developments € 1iRi € PP 0.00 0.00 326.00 704.00 31 Water St, Kendal Plan: 10R-1182 Part: 1 04.0586 Crossland Homes `: `:s 9 Q >#1. 7,687.00 11,083.00 326.00 704.00 12 Rafton St, Newcastle Plan:40M-2166 Pt Lot:93 04.0643-04.0647 Cleary HomesJiIEI )0 38,435.00 55,415.00 1,630.00 3,520.00 Fenning Dr&Southfield Av,Courtice Plan:40M-2113 Pt Lot:80,81,89,90,139 04.0604 Waste Management of Canada Corp ':': ':.# � 32,656.20 2,762.56 2,502.58 4,322.46 1 McKnight Rd,Courtice Con:BF Lot 25 1 CORPORATION OF THE PART"G" MUNICIPALITY OF CLARINGTON JUNE 2004 Building Name of Owner/Applicant Develo ment Charges Education Permit No. Construction Address ?i1'ss Municipal Reg on English Separate English Public 04.0510,04.0615 H.L.Gay Family Homes Limited t(€jji 15,374.00 22,166.00 652.00 1,408.00 1 &39 Montague Av,Courtice Plan: 40M-2113 Pt Lot:40&49 04.0602 Clamew Developments Incl $QQ#> 7,687.00 11,083.00 326.00 704.00 166 Harmer Dr,Newcastle Plan:40M-2166 Pt Lot:55 04.0629,04.0627,04.06 Fridel Limited €€' Eiliri 46,122.00 55,866.00 1,956.00 4,224.00 04.0617,04.0616,04.06 Townline Rd S,Courtice Plan:40R-22592&10R-2708 Part:2,3&23-25 04.0630 Fridei Limited €':' $(Q1i 7,687.00 11,083.00 326.00 704.00 11 Townline Rd,Courtice Plan:40R-22582 Part:4 04.0642 Lizjan Developments Inc ? this 7,687.00 11,083.00 326.00 704.00 301 Longworth Av,Bowmanville Plan:40M-2096 Pt Lot: 1 04.0609,04.0610,04.06 Prestonvale Heights Limited 38,435.00 55,415.00 1,630.00 3,520.00 04.0612,04.0613 Various,Courtice Plan:40M-2148 Pt Lot:53,60,88,100,101 03.0439 Glenn Stapleton 7,687.00 3,841.00 326.00 704.00 2091 Regional Rd 18,Newtonville con 2 Pt Lot 8;Now RP 10R314 Part 1 03.0724 David Durbin s561 7,687.00 3,841.00 326.00 704.00 118 West Beach Rd,Bowmanville Plan 198 Lot 47,48 04.0746 Grajen Homes €fti>1 ?3 7,687.00 11,083.00 326.00 704.00 114 Harmer Dr,Bowmanville Plan:40M-2166 Pt Lot:42 CORPORATION OF THE MUNICIPALITY OF CLARINGTON JUNE 2004 PART"G" Building Name of Owner/Applicant Developm nt Charges Education Permit No. Construction Address . ...... ...... Mun!S!el Region English Separate English Public 04.0661,04.0660 H.L.Gay Family Homes Limited up�q. 5,374.00 22,166.00 652.00 1,4081.00 118&122 Harmer Dr, Newcastle Plan:40M-2166 Pt Lot:43&44 04.0690,04.0691, Dunbury Homes(Newcastle)Ltd 7 30,748.00 37,244.00 1,304.00 2,816.00 04.0597,04.0692 Laking Dr,Newcastle Plan:40M-2166 Pt Lot:69R&L,66R&L 04.0731,04.0732, Dunbury Homes(Newcastle)Ltd 30,748.00 44,332.00 1,304.00 2,816.00 04.0733,04.0730 Cutler Or&Harmer Dr,Newcastle Plan:40M-2166 Pt Lot:24,40,56, 14 03.1115,04.0663,04.0 Grajen Homes 23,061.00 27,933.00 978.00 2,112.00 Harmer Dr, Newcastle Plan:40M-2166 Pt Lot:83L,86 R&L 04.0635 Kevin Jackson .8-0 687.00 3,841.00 326.00 704.00 Plan: 10R-3174 Part:2 04.0747 Grajen Homes Ako! 7,687.00 11,083.00 326.00 704.00 146 Harmer Dr,Bowmanville Plan:40M-2166 Pt Lot:50 04.0011 Vermont Village Homes Ltd 7,687.00 11,083.00 326.00 704.00 10 Stephens Gulch Dr, Bowmanville Plan:40M-2172 Pt Lot:69 04.0686,04.0685 Vermont Village Homes Ltd 15,374.00 18,622.00 652.00 1,408.00 125&121 Brooking St,Bowmanville Plan:40M-2172 Pt Lot:92 R&L 03.1116 Grajen Homes 7,687.00 9,311.00 326.00 704.00 71 Harmer Dr,Newcastle Plan:40M-2166 Pt Lot:83R ........... F-� W i\r W CORPORATION OF THE PART"G" MUNICIPALITY OF CLARINGTON JUNE 2004 Building Name of Owner/Applicant Develo ment Charges Education Permit No. Construction Address T2i1 ':. ? Municipal Re ion English Separate English Public 04.0680,04.0679,04.06 Vermont Village Homes Ltd ': `:':'{Q8t168 46,122.00 55,866.00 1,956.00 4,224.00 04.0677,04.0676,04.06 Scottsdale Dr, Bowmanville Plan:40M-2172 Pt Lot:39R&L,8R&L,5R&L 04.0669-04.0674 Vermont Village Homes Ltd 69,183.00 99,747.00 2,934.00 6,336.00 04.0665-04.0667 Scottsdale&Brooking,Bowmanville Plan:40M2172 Pt Lot:Various 04.0688,04.0689,04.06 Vermont Village Homes Ltd € €7i #i 30,748.00 37,244.00 1,304.00 2,816.00 04.0682 Eldad&Brooking, Bowmanville Plan:40M-2172 Pt Lot:35R&L,44R&L 04.0142 Norman Gyaltsan 81,715.16 74,904.00 5,216.00 11,264.00 97 King Ave,Newcastle 04.0598,04.0596,04.06 Dunbury Homes(Newcastle)Ltd 23,061.00 29,705.00 978.00 2,112.00 Harmer&Cutler Dr, Newcastle Plan:40M-2166 Pt Lot:59L&R,21 04.0694 Claret Investments Limited 'i!!' 11 ) $s 28,594.71 43,300.62 2,278.95 3,936.20 1656 Nash Rd,Clarington Plan:40R-17387 Part: 1-4,6-8 04.0614 Rotman,Carl/C.Rotman Taxi f 2,871.69 2,960.00 220.07 380.10 7345 Thompson Rd,Clarke Con:7 Lot 8 TOTALS € 31i '14 1 5 218.80 1 1 802 032.71 67 665.30 143,225.31 F-� rC► CORPORATION OF THE MUNICIPALITY OF CLARINGTON JUNE 2004 PART"G" CONTRIBUTIONS-CASH-IN-LIEU OF PARKLAND Kevin Amitage 1,750.00 Total Cash-in-Lieu of Parkland 1,750.00 3UTIONS-ENGINEERING AND INSPECTION FEES ;ement Storm Sewer 1,620.00 Developments-Phase 5B 26,309.23 Engineering and Inspection Fees Contributions 27 3UTIONS-ROADS Develpments-Phase 5B Roads Contributions 6,650.05 11 Leading the WO REPORT FINANCE DEPARTMENT r.. 4 Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE Date: MONDAY, SEPTEMBER 20, 2004 Resolution #: Report#: FND-020-04 File#: By-law #: Subject: ANNUAL LEASING REPORT -2003 Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report FND-020-04 be received for information. ir Submitted by: Reviewed b `�a,_kJ2 � N nc Ta I B.B. > C.A Franklin Wu Director of Finance. Chief Administrative Officer. NT/hjl E 1323 REPORT NO.: FND-020.04 PAGE 2 BACKGROUND: Under Ontario Regulation 266/02, the Treasurer is required to report annually to Council details of existing material leases confirming that they comply with the lease policy, a summary of material leases, estimated cost of the material leases and the impact of these leases on the financing arrangements and debt servicing levels of the Municipality. As required by the Municipal Act, 2001, Council adopted a Statement of Lease Financing Policies and Goals in report FND-021-03, on Monday, September 8, 2003. To-date, Clarington has typically chosen to purchase or debenture (if necessary), rather than to use financial leases with the exception of small office equipment and a limited number of computers. All existing leases are immaterial according to Council policy and therefore have no impact on long term financing or debt service levels of the Municipality. The total of all of Clarington's minor leases do not exceed the threshold for a single lease to be material. CONCLUSION: At this time, the Municipality of Clarington does not have any material leases. It is recommended that this annual lease report be received for information in compliance with Ontario Regulation 266/02. CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T(905)623-3379 F (905)623-4169 1326 HANDOUTS/CIRCULATION S GPA la�i� n Leading the Way REPORT PLANNING SERVICES Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE Date: Monday, September 20, 2004 Report #: PSD-114-04 File #: PLN 1.1.5.1, PLN 1.1.10 By-law#: Subject: PLACES TO GROW: A GROWTH PLAN FOR THE GREATER GOLDEN HORSESHOE, DISCUSSION PAPER, SUMMER 2004 RECOMMENDATIONS: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report PSD-114-04 be received and endorsed as the Municipality's comments on the Discussion Paper for "Places to Grow" — A Growth Plan for the Greater Golden Horseshoe. 2. THAT Report PSD-114-04 be forwarded to the Ministry of Public Infrastructure Renewal and the Region of Durham Planning Department. Submitted by: Reviewed by: Da id�iJ..Crome, MCIP, R.P.P. Franklin Wu, Directo`F of Planning Services Chief Administrative Officer FL/DJC/df 9 September 2004 CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T(905)623-3379 F (905)623-0830 REPORT NO.: PSD-114-04 PAGE 2 1.0 BACKGROUND 1.1 In July, 2004 the province released a discussion paper for growth management for the Greater Golden Horseshoe area entitled "Places to Grow". The discussion paper is the initial step of the Province in developing a growth plan for the Greater Golden Horseshoe that will shape land use planning policy, infrastructure priorities adn investment by the Province and a new regulatory/fiscal environment for municipalities. Comments are to be submitted by September 24, 2004. 1.2 The release of the growth management discussion paper for the Greater Golden Horseshoe is supported by other initiatives announced as part of the Province's strong communities agenda. This includes the Strong Communities Act (Bill 26); the Greenbelt Protection Act (Bill 27), which has led to the reports of the Greenbelt Task Force. In addition, the 3 discussion papers on Planning Reform Initiatives addressed in reports PSD-105-04 and PSD-106-04 apply. 1.3 The major issues that the series of discussion papers and proposed legislation attempt to address are growth and growth management, especially in the GTA/Greater Golden Horseshoe Area, what the roles of local and provincial decision-making should be and new tools to achieve the policy framework. All the discussion papers propose to comprehensively bring together reforms proposed by the government for land-use planning; as such, they cannot be read in isolation from each other. 1 .4 In preparing our comments, staff has attended the stakeholder sessions hosted by the Ministry of Public Infrastructure Renewal and other information meetings. The Director attended a stakeholder meeting with the Ontario Association of Chief Planning Officials. Staff have provided comments to the Region for their report (Attachment 1). 2.0 SUMMARY OF DISCUSSION PAPER 2.1 The proposed Growth Plan for the Greater Golden Horseshoe is the first time since the early 1970's for the Province to develop a blueprint for growth in the Toronto Region, an area recognized as the economic engine of Canada. Over the past decade there has been a growing recognition that the status-quo is not working and that sprawl will overwhelm the area unless significant action is taken. Business-as-usual over the next 30 years will consume 1,000 sq. km of farmland, gridlock will worsen and our environment will suffer. 2.2 A summary of the Discussion Paper is contained in Section 2 of the Region's report. The growth plan addresses three key areas: Where and how we should grow • What critical infrastructure we need to support growth; and • What are the most valuable things we need to protect The emerging growth plan also begins to develop ways to implement the strategy through coordinated decision-making and prioritized infrastructure investments. The REPORT NO.: PSD-114-04 PAGE 3 growth plan is to be integrated with the 10 year infrastructure plan that the Province is developing. 2.3 Some of the key highlights of the Plan relative to Clarington are as follows: • Oshawa "Downtown" is identified as a Priority Urban Centre while no urban center in Clarington is identified as even an emerging urban center. Priority and emerging urban centers were selected on the basis of criteria including being major employment centers, having employment activities of provincial or national significance; having high population and high employment densities; having or being borderline transit supportive densities; having infrastructure or redevelopment capacity and providing broad regional level public services, such as hospitals, colleges or universities, social services, etc. • With the exception of some lands north of Courtice, no lands are identified as potential Future Growth Area, that is lands to be assessed for future growth beyond the current urban boundary limits • The growth plan will promote economic development by making the Greater Golden Horseshoe an attractive place for business and workers to invest their skills, by improving transportation efficiency, ensuring a diversity of employment lands are available and serviced, supporting vibrant downtowns and urban areas and by supporting and build on the strength of local industry clusters. • Small towns and rural communities are to be strengthened not through large- scale growth and development but by such means as ensuring sufficient population and employment growth to sustain local economies, maintaining and renewing infrastructure, and by supporting the revitalization of downtowns, waterfronts and brownfields. • Urban transit will be the focus of provincial infrastructure investment, mostly in larger urban centers including Toronto, Mississauga and York Region. It is unlikely that Clarington will see any significant urban transit investment over the next 30 years. • GO Rail capacity is to be built and ridership increased an average of 3% per year. However, the extension of GO Rail service to Bowmanville is not one of the identified investments. • A new inter-regional transit link is schematically identified from Peterborough to Bowmanville. • Highway 407 extension to Highway 35/115 is identified as a priority • Protecting high quality aggregate areas, such as those lands around Regional Road 20 and Highway 35/115 2.4 The Province's vision for Clarington is in keeping with the principles and policies articulated in Clarington's Official Plan. Specifically Places to Grow supports the themes of sustainable development, healthy communities and growth management, the overarching principles of the Official Plan. REPORT NO.: PSD-114-04 PAGE 4 3.0 COMMENTS ON "PLACES TO GROW" 3.1 The Province should be commended for undertaking the task of addressing land use planning and growth management. There is a growing recognition that the problems of the GTA/Greater Golden Horseshoe can only be tabled by coordinated provincial and municipal initiatives. Combined with the other initiatives underway, the full package of solutions is being considered. 3.2 Support for the Region of Durham's recommendations on "Places to Grow" The Regional Staff report in Attachment 1 reflects a number of the comments provided by our staff. The Municipality of Clarington generally supports the Region of Durham's recommendations unless otherwise noted. This section of the report will not repeat what has been stated by the Region in its report to the Province. The comments and recommendations of the Municipality of Clarington set out below are intended to reinforce and expand on the Region's recommendations and not to detract from them. 3.3 Infrastructure Funding, in particular for transit, needs to occur in many growing areas outside of the Priority and Emerging Urban Centres While specific urban growth centres have been identified (e.g. Peterborough and Oshawa), the Province should be aware that infrastructure funding (especially transit) will have to be provided to areas not identified to address the growth in those communities as well. The creation of urban form and spaces throughout the Greater Golden Horseshoe area that are adaptable and flexible over the long term is the overall goal; any funding formula or incentives have to promote this type of thinking throughout the entire area. 3.4 The extension of GO Rail to Bowmanville is a critical infrastructure element to be identified in the Plan The Discussion Paper identifies the addition of new tracks to Oshawa as part of the GO Rail improvements. Both Durham and Clarington have identified Bowmanville as the eastern terminus for GO Rail in their respective Official Plans. The Grater Toronto Transportation Authority recently acquired a 13.6 acre site of a GO Rail station in Bowmanville. This significant acquisition should be accompanied by the investment in extending GO Rail service to Bowmanville within the 10 year timeframe of the infrastructure plan and the development of a transportation hub at its terminus. 3.5 A clear definition of intensification is required and the intensification objectives need to be undertaken on a regional not area municipal basis A clear definition of Intensification, common to all the Ministries needs to be articulated. Further intensification should take into account the existing servicing capacity of an area. The province will either have to be willing to provide incentives, funding or other regulations to ensure that the development and real estate industries offer a full complement of housing types. Currently the development and real estate industries respond to market trends and forces. The 40% target set out in Places to Grow is arbitrary and unrealistic for many municipalities, given the existing infrastructure and strong desire to protect historic downtowns and neighbourhoods. Intensification REPORT NO.: PSD-114-04 PAGE 5 objectives like to 40% target can only be met on a regional basis given the differing characteristics of each community. 3.6 The Province should recognize in Clarington a Special Employment Area for the emerging cluster of energy-related industries As part of the Province's plan for recognizing and supporting a diversity of economic activity and to meet the 2:1 ratio of population to employment growth, the Province will need to intervene in supporting economic development. In particular, Clarington is recognized as a major centre for the nuclear power industry. Building on this base, international recognition gained throughout the ITER process and the establishment of the University of Ontario Institute of Technology, Clarington is working to create a cluster of specialized energy research and development industries. Developing this of expertise centre will require provincial assistance. 3.7 The Province needs to carefully consider the relationship between the Greenbelt and the Growth Plan with respect to Future Growth Areas The Greenbelt Plan will be identifying lands in the GTA which are to be permanently protected. This includes natural heritage areas, aggregate extraction areas and prime agricultural lands. Prime agricultural lands which are not included in the Greenbelt may be considered as lands for future growth. While the Province may not have identified these lands for provincial protection through the Greenbelt, area municipalities may still want to retain these lands in an agricultural designation. 3.8 Future Urban Growth Areas should be policy driven and not mapped The Discussion Paper identifies "fuzzy peach" areas to indicate lands that may be considered for future urban development beyond the existing official plan boundaries and intensification. This will lead to land speculation and other economic forces that will push these lands to be designated for urban purposes. Rather than mapping additional lands, there should be a set of policy criteria that would assist in determining how new lands will be identified in years to come. 3.9 The Development Charges regime, income and sales tax policy and property assessment/taxation policy must support intensification and discourage greenfield development A number of provincial documents have indicated implementation ideas to encourage intensification and infilling through the provision of incentives, including the waiver or reduction of development charges. Provision of such incentives by the Municipality can only be offered if the Municipality is willing to assign a portion of growth-related costs to the tax base. Rather than funding incentives from the existing tax base, the development charges legislation should have a provision for a municipality to provide a surcharge on greenfield development to fund incentives for brownfield and greyfield development. This would not only provide a source for funding incentives but would be a strong economic incentive for the development industry to undertake the complicated and time-consuming processes required for infill development and intensification. Similar provisions to income tax, sales tax and property tax policy could provide incentives for infill or higher density development. REPORT NO.: PSD-114-04 PAGE 6 3.10 Amendments to other legislation to address alternative standards and foster intensification Amendments to other legislation could address the alternative standards that the Province is recommending. For example amendments to the Building Code to address energy efficiency standards, sustainability (green roof technology), fire suppression and more flexibility in renovation and re-use of heritage buildings would be beneficial. 3.11 The Municipality's need stronger tools to control the phasing of development in urban areas Implementation of the vision articulated in Places to Grow will in part be through the Planning Act and Provincial Policy Statements (PPS). In our previous comments on those discussion papers, we have asked the Province to reinforce the ability of municipalities to determine the timing of development through the efficient use of existing infrastructure (e.g. sunk costs) by limiting challenges to the OMB that open up new areas of development when existing areas could accommodate the proposed expansion or development. 3.12 Performance Measures should include both Provincial Ministries and Municipal Governments The performance measures suggested in this and other recent discussion papers focus on local and regional government indicators. To maintain the focus, the performance measures must include the policies and practices of all Ministries in achieving the vision set out, the determination of a "yardstick" and how to advance it over time through the continual improvement of the policy framework, legislation, incentive funding and infrastructure from the provincial government is a necessary to maintain the focus over the long term. 4.0 CONCLUSION 4.1 The Province should be commended for its recent initiatives to improve the planning system through this and other recently released discussion papers. The combination of the 3 discussion papers on Planning Reform and this growth management plan shows the Province is serious about providing the implementation tools, policies and provincial direction necessary to address how the Greater Golden Horseshoe will develop and look in the next 30 years. We trust that our comments in combination with those from the Region will be helpful to the Province in their efforts to manage growth and provide strong leadership for municipalities. 4.2 Should the General Purpose and Administration Committee support the recommendations of this report, in order to meet the September 24, 2004 deadline for comments, a copy will be forwarded to the Ministry of Public Infrastructure Renewal prior to Council consideration on September 27th, 2004 with appropriate qualifications. Attachments: Attachment 1 — Regional Planning Committee Report 2004 Attachment 2 — Places to Grow: A Growth Plan for the Greater golden Horseshoe (under separate cover) ATTACHMENT 1 The Regional Municipality of Durham To: The Planning Committee From: Commissioner of Planning _ Report No.: 2004-P-73 ' Date: September 14, 2004 SUBJECT: Province's Discussion Paper, Places to Grow: Better Choices. Brighter Future. A Growth Plan for the Greater Golden Horseshoe, File: 026-02-04 RECOMMENDATIONS: a) THAT the following comments and the contents of this report be forwarded to the Province as Durham Region's response to the Discussion Paper, Places to Grow: Better Choices, Brighter Future, A Growth Plan for the Greater Golden Horseshoes: i) The Greater Golden Horseshoe Growth Plan initiative should be integrated with other provincial initiatives, such as Planning Reform and Greenbelt Protection, to provide a comprehensive long-term vision for the Provincial Strong Communities agenda; ii) Municipalities face fiscal constraints and limited sources to generate revenue. Innovative and sustained funding sources, including options related to education property taxes and development charges will be required to implement the Growth Plan. Accordingly, the proposed fiscal tools need to be explored in much more detail; iii) The Provincial Policy Statement (PPS) should be amended to: • provide strong direction to permit municipal official plans to protect .'.<<�.frrL .�[�',erm SU Pi J 67-1P ,`r"a "t ,wE-ud: wr'�. • include effective policies requiring minimum affordable housing targets for low and moderate income households; iv) The identification of downtown Oshawa and Pickering as priority and emerging urban centres respectively, is supported. However, it is important for the Growth Plan to also recognize the surrounding urban Z Report No.: 2004-P-73 Page No. 2 area, consistent with the ROP (i.e. Whitby/Oshawa/Courtice Urban Area and Pickering/Ajax Urban Area), which are necessary to sustain the vitality of our "downtowns"; v) The Pickering airport should be recognized for its potential to become an employment hub and a key component of the transportation system; vi) Local circumstances must be considered in the development and application of performance standards and measures. The Province should work with municipalities to develop meaningful and measurable performance standards, and criteria for their application; vii) The requirement for a minimum of 40% of growth to be accommodated through intensification requires clarification to determine how it will be applied and measured, and whether it is feasible, given the diversity of communities in the Golden Horseshoe; viii) The realization of the balanced population and employment target of 1 job for every 2 persons can only be achieved in Durham with the completion of key structural elements identified in the Regional Official Plan including: the completion of Highway 407; widenings to Highway 401 through the Region; and the construction of the airport in Pickering. A provincial commitment to assist in achieving the employment target in Durham is essential; ix) Small towns and rural centres should be recognized as viable "communities" with assurance that they will continue to receive the necessary funding and tools to maintain their vitality; Yl The proposed aooroach to integrate priority provincial investment into a 10-year Strategic infrastructure Investment Plan must ensure that municipalities retain direct control and responsibility for infrastructure currently within their mandates (i.e. water, waste water, roads, solid waste, etc.). Municipalities must retain control over capital budget investment decisions related to infrastructure for which they are currently financially responsible, to ensure accountability; 2 Report No.: 2004-P-73 Page No. 3 A) The 407 through the Region has long been recognized as an important structural element of the ROP and critical to the Region's future. Accordingly, the Province must give priority for its immediate construction. Consideration should also be given to the extension of Highway 404 as a priority to support the economic vitality of the northern communities; xii) The extension of GO rail service to Bowmanville should be considered. Bowmanville should also be given serious consideration as a possible transit hub for the future interregional transit link between Durham and Peterborough; xiii) There should be a stronger commitment from the Province to champion and support broader Transportation Demand Management initiatives; xiv) The recommendations of the GTA Agricultural Action Plan, endorsed by Regional Council, provides a foundation for agricultural land protection and advancing farming as an industry, and thus should be recognized by the Growth Plan and incorporated in the PPS; and xv) The Province should consider building on its partnership with municipalities to gauge the success of, and advise on the evolution of the Growth Plan; b) THAT the Province also consider the previous submissions from the Region on the Provincial Planning Reform Initiatives, Bill 26 - the Strong Communities Act, Bill 27 - the Greenbelt Protection Act, Smart Growth, Brownfields, the draft Drinking Water Source Protection Act, and the GTA Agricultural Action Plan, as input to the Discussion Paper; and C) THAT a copy of Commissioners Report [ o. 2004-F-73 be torvrarded to tine Minister of Public Infrastructure Renewal, the Minister of Municipal Affairs and Housing, and the area municipalities in Durham. Report No.: 2004-P-73 Page No. 4 REPORT: 1. PURPOSE 1.1 On July 12, 2004, the province released a Discussion Paper entitled, Places to Grow: Better Choices. Brighter Future. A Growth Plan for the Greater Golden Horseshoe (Discussion Paper). Comments must be submitted to the Ministry of Public Infrastructure Renewal by September 24, 2004. 1.2 The release of this Discussion Paper is another in a series of initiatives, which form part of the Province's "Strong Communities" agenda. The other initiatives include: • Provincial Planning Reforms; • Bill 26, the Strong Communities Act; • Bill 27, the Greenbelt Protection Act; • the Greenbelt Task Force Discussion Paper, Toward a Golden Horseshoe Greenbelt; and • Source Water Protection. Regional Council has commented on these initiatives through Commissioners' Reports: 2004-P-68; 2004-P-20; 2004-P-7; 2004-P-60; and 2004-COW-03, respectively. 1.3 Following the release of the Discussion Paper, Regional Planning staff attended a public information session hosted by the Province; convened a meeting of planning staff from the area municipalities to generate comments from a Region wide-perspective; and obtained comments from the Durham Agricultural Advisory Committee (DAAC) and the Durham Environmental 1.4 The purpose of this report is to review and provide comment on the Growth Plan Discussion Paper. 4 Report No.: 2004-P-73 Page No. 5 2. PLACES TO GROW, DISCUSSION PAPER Toward a Growth Plan for the Greater Golden Horseshoe 2.1 The Discussion Paper presents the Province's vision and strategy for managing growth in the Greater Golden Horseshoe (GGH) area, over the next 30 years. It is intended to stimulate discussion and input to the preparation of a Greater Golden Horseshoe Growth Plan (Growth Plan) that will guide decisions on a wide range of issues, including: land-use planning; urban development; housing; local services; transportation and environmental infrastructure and economic development. 2.2 The Vision for the GGH consists of the following elements: • a variety of choices for living in the area; • modern, well maintained infrastructure; • easy access to socio-cultural amenities (food, shelter, education, health- care, arts and recreation, and information technology); • an integrated transportation network; • a healthy natural environment; • protection for agricultural lands; and • compact settlement and development patterns offering diversity of opportunities for living, working and enjoying culture. These elements of the Vision are generally consistent with the fundamental principles of the Regional Official Plan (ROP). 2.3 To implement the Vision, the Province proposes to: areas, strengthening the transportation linkages among them, and encouraging more compact development in urban areas; • protect and manage valuable greenlands, natural systems and agricultural lands; and • utilize available tools to implement the above objectives. 5 Report No.: 2004-P-73 Page No. 6 Where and How to Grow 2.4 In determining where and how to grow, the Discussion Paper focuses on using existing urban land more efficiently. It presents five objectives that seek to maximize existing opportunities to accommodate growth, before considering new growth areas, including: • Intensification and Compact Development—to promote the efficient use of land and infrastructure resources, within existing designated urban areas; • Priority and Emerging Urban Centres —to support priority and emerging urban centres as residential and employment anchors; • Future Growth Areas —to manage the amount of land required to accommodate future growth through expansions to urban boundaries; • Economic Strength —to promote economic vitality and competitiveness; and • Small Towns and Rural Communities — to provide necessary tools to assist in addressing their unique growth pressures. Intensification and Compact Development 2.5 The concept of intensification and compact development in existing urban areas is consistent with the policy elements of the ROP. However, it must be recognized that intensification in centres and corridors (arterial roads) takes time to achieve. Incentives are required to attract development to these areas on an equal footing with greenfield development. Many locations that would be targeted for intensification may not have adequate infrastructure. Sustained funding will be required to support the infrastructure necessary required to accommodate intensification.. The P'ntl�R�`a3 �nQnecc tfJ tiscict ifsachieving intensification and CrJCnpaCt development through such measures as: ensuring that new development pays its fair share, through the Development Charges Act; accelerating brownfields redevelopment, through various funding mechanisms; and encouraging additional greyfield redevelopment, through incentives. While these initiatives may be helpful, further information is required on any changes to existing legislation, funding or incentive programs before the 6 Report No.: 2004-P-73 Page No. 7 implications on the Region can be fully assessed. Further, it must be recognized that the Region is already committed to fiscal strategies to ensure growth pays its fair share, through the imposition of Development Charges and water and sewer rates. The changes to these tools must ensure that any resulting incentives do not impact the revenue streams already available to municipalities. 2.7 The Province's proposal to identify and maintain a long-term supply of employment lands is supported. However, stronger provincial policies and implementation tools are needed to ensure the long-term protection of employment areas. Preserving these areas and protecting them from non- compatible uses should be a priority. The conversion of land from employment to residential use should be strictly controlled or prohibited. The Provincial Policy Statement (PPS) needs to provide strong direction to permit municipal official plans to protect a sufficient long-term supply of employment lands. 2.8 The Province also proposes to ensure that a wider range of affordable housing and a mix of housing types are built, through capital funding under the federal-provincial affordable housing program, and other fiscal tools and incentives. While the intent is supported, further details on these fiscal tools are required to assess the potential implications on the Region. In addition, the PPS should be strengthened to include policies requiring minimum affordable housing targets for low and moderate income households. Priority and Emerging Urban Centres 2.9 The Growth Plan intends to identify priority and emerging urban centres. Priority urban centres are recognized as hubs of employment and residential orowth that attract industrial and commercial activity, and public and private institutions. 2.10 The Discussion Paper recognizes priority urban centres as having the existing infrastructure, and the capacity to absorb further residential and employment growth in an efficient manner. Downtown Oshawa is identified as a priority urban centre. 7 Report No.: 2004-P-73 Page No. 8 2.11 Emerging urban centres are recognized as having some of the characteristics of priority urban centres, but not all. With time and investment they will become priority centres. Downtown Pickering is identified as an emerging urban centre. 2.12 Encouraging growth and development in established urban centres is supported, especially by identifying downtown Oshawa and Pickering as priority and emerging urban centres respectively. However, it is important for the Growth Plan to also recognize the surrounding urban area, consistent with the ROP (i.e. Whitby/Oshawa/Courtice Urban Area and Pickering/Ajax Urban Area), which are necessary to sustain the vitality of our "downtowns". 2.13 Further, the Discussion Paper recognizes that significant infrastructure investment is necessary for the Seaton lands before development can proceed. Accordingly, the Province must recognize that the development of Seaton can only proceed in compliance with the Regional policy of "growth must pay for growth and each phase of development must be financially sustainable". 2.14 The establishment of the Pickering Airport and its potential to become an employment hub in the eastern part of the GGH is recognized in the Discussion Paper. However, to increase its priority status, it is suggested that it be included on Map 3, "Priority and Emerging Urban Centres". 2.15 The proposed strategies to assist urban centres to attract growth, including: investments in infrastructure and provincial institutions; establishment of the Golden Horseshoe Greenbelt; development of new incentives and financial tools and standards and performance measures; preservation of employment lands; and streamlining the environmental assessment process are generally �!�ocorta 2.16 Additional and more flexible planning tools (i.e. conditional zoning, development permit system, Community Improvement Plans, density bonusing), which assist municipalities and support intensification and redevelopment are supported. The Region has recently commented on this through the Planning Reforms initiative lead by the Ministry of Municipal Report No.: 2004-P-73 Page No. 9 Affairs and Housing. Municipalities should have the flexibility to determine which tools work best, based on local conditions. 2.17 The proposal to streamline the environmental assessment (EA) process is supported. In the Region's previous comments on Planning Reforms, it was recommended that the Class EA process be amended to recognize projects dealt with through a comprehensive planning process (such as a secondary plan) as having achieved their Phase 2 approval status. Consideration should be made to exempt all major infrastructure projects within priority urban growth areas, such as transit projects on existing rights-of-way, from a full EA. 2.18 The Discussion Paper indicates that the Province will develop standards and performance measures for urban centres, including jobs, transit ridership, density targets and targets for a range of affordable and appropriate housing choices. While the concept of performance measures may have merit, the establishment of standards will be difficult. If standards are not met, will provincial funding be jeopardized? Standards and performance measures cannot be applied generically across the area. Communities are at various levels of maturity and are experiencing growth at different rates. Local circumstances must be considered in the development and application of standards and measures. The Province should work with municipalities to develop meaningful and measurable performance standards, and criteria for their application. Future Growth Areas 2.19 The Discussion Paper recognizes that it may be necessary to consider expansions to some urban areas to accommodate growth over the next 30 years. !t includes a conceptual map illustrating potential future growth directions contiguous to existing urban areas. The Pickering/Ajax and Whitby/Oshawa/Courtice urban clusters in Durham are identified as "areas that will be further assessed for their ability to accommodate additional growth beyond what is currently planned for...". Report No.: 2004-P-73 Page No. 10 2.20 The proposed criteria for considering expansions to urban boundaries over the next five years is generally supported. However: • the requirement for a minimum of 40% of projected growth to be accommodated through intensification (the ROP includes a target of 20%) requires further clarification as to how it will be applied and measured. Intensification takes time to achieve, particularly in emerging centres. 40% may not be achievable in all communities on an annual basis, if at all; and, • the realization of balanced population and employment growth of 1 job for every 2 persons (consistent with the target of the ROP) can only be achieved in Durham if current infrastructure deficits are resolved, in particular, the completion of Highway 407 and widenings to Highway 401 through the Region, and the construction of the airport in Pickering (Note: airports are recognized as infrastructure facilities in the Discussion Paper). Accordingly, a provincial commitment to assist in achieving the employment target in Durham is essential. 2.21 The Growth Plan would require Durham to prepare a Regional Growth Plan. On the basis of the Discussion Paper, it would appear that such a Regional Growth Plan would be consistent with the directions, policies and fiscal strategies already contained in the ROP, DC By-law, and yearly Servicing and Financing Studies. If this is the case, we question the need for such a Plan, when its elements already exist in other planning instruments. Economic Strength 2.22 The Growth Plan will promote economic development in the GGH by: • removing disincentives to development in urban centres and establishing urban economic development tools to attract investment (Tax Increment Financing, brownfield redevelopment incentives, and economic development corporations); • improving transportation efficiency; • improving efficiency of key infrastructure; and � Q Report No.: 2004-P-73 Page No. 11 • ensuring there is a diverse and readily available inventory of employment lands. 2.23 A Greater Golden Horseshoe economic strategy that would benefit the Region of Durham is supported. Small Towns and Rural Communities 2.24 Although the Growth Plan focuses mainly on making efficient use of land and resources in priority and emerging urban areas, it recognizes that there is a great deal of land outside these areas. It is intended that the Growth Plan will build upon the recommendations of the-Greenbelt Task Force and the Plan for Building Strong Rural Communities, to establish measures to support rural communities, including: • ensuring provincial infrastructure strategies support rural municipalities; • examining how fiscal and regulatory tools could be used to better support rural communities; and • promoting revitalization of downtown areas, waterfronts and brownfields. 2.25 It is important to recognize these areas as "communities" and ensure that they continue to receive the necessary funding and tools to maintain their vitality. Infrastructure to Support Growth 2.26 The Discussion Paper focuses on a new approach to infrastructure planning and investment by: " octimizino the use cf existing infrastructure: • identifying strategic infrastructure investments to support urban growth and development; • establishing a more integrated transportation network; and • coordinating long range provincial infrastructure plans in partnership with the municipal and federal governments and other partners. �. l Report No.: 2004-P-73 Page No. 12 Infrastructure and Investment 2.27 The Province proposes to integrate priority investment into a new 10-year Strategic Infrastructure Investment Plan that will focus infrastructure investment in priority urban centres. This approach can only be supported, if the funding is from the Province and the municipalities retain direct control and responsibility for infrastructure currently within their mandates (i.e. water, waste water, roads, solid waste, etc.). 2.28 Municipalities must retain control over capital budget investment decisions related to infrastructure for which they are currently financially responsible, to ensure accountability Integrated Regional Transportation Network 2.29 The Discussion Paper includes strategies for moving people and identifies Transit as a main priority, to achieve growth objectives, including: • building urban transit systems, including the 407 Transitway; • establishing new interregional transit services; • strengthening the GO Transit Rail System, including adding new tracks along the Lakeshore corridor through to Oshawa; and • building a network of high occupancy vehicle lanes. 2.30 While building the 407 Transitway in Durham is supported, ridership will not achieve desired levels without a system of local routes to feed this facility. Capital is urgently required to improve local transit services. The acquisition of costly rolling stock is paramount to achieving higher levels of service. For transit to work, a sustained funding commitment from the Province is essential. 2.31 Opportunities for implementing some transit priority facilities and intelligent transportation systems (i.e., transit priority signals, queue jump lanes, dedicated transit lanes, etc.) for transit should also be considered. 12 Report No.: 2004-P-73 Page No. 13 2.32 Durham Region faces a major physical impediment for connections to the west because of the Rouge Valley. More emphasis should be placed on rapid transit links to York Region, the City of Toronto and beyond, to ensure that Durham Region can achieve its full economic potential. 2.33 The Discussion Paper recognizes the proposed extension of Highway 407 easterly to Highways 35 and 115 as an economic corridor, providing a connection between the GTA and areas to the east. This facility has long been recognized as an important structural element of the ROP and critical to the Region's future. Accordingly, the Province must give priority for its immediate construction. Consideration should also be given to the extension of Highway 404 as a priority to support the economic vitality of the northern communities. 2.34 Strengthening of the GO Transit Rail System, particularly the addition of new tracks to Oshawa will benefit the Region. However, the extension of GO rail service to Bowmanville should also be given serious consideration. Bowmanville should be recognized as a possible transit hub for the future interregional transit link between Durham and Peterborough. Other links that need consideration include a lakeshore east link to Port Hope and Cobourg, and a possible link to Lindsay. 2.35 While mention is made of facilities to support carpooling and HOV lanes, there should be a stronger commitment from the Province to champion and support broader Transportation Demand Management (TDM) initiatives. Greater investment in TDM has the potential to optimize the use of existing and future (i.e., HOV lanes, carpool lots, and intelligent transportation systems) facilities. The Province should take this opportunity to acknowledge and support municipal TDM programs and the Smart Commute Initiative that the Region is involved in. 2.36 The Discussion Paper also includes strategies for moving goods. It recognizes significant components of the transportation system for the movement of goods including the 400 series highways, rail corridors,shipping ports and airports. It is suggested that the significance of a future airport in Pickering be recognized as a component of the transportation system. 13 Report No.: 2004-P-73 Page No. 14 2.37 The Discussion Paper proposes strategies to implement the proposed integrated transportation network including: • establishing the Greater Toronto Transportation Authority; • providing 2 cents per litre of provincial gas tax for public transit; • streamlining the EA process, particularly for the transit initiatives of the Growth Plan; and • providing incentives for transit-supportive development. 2.38 Streamlining the EA process, providing incentives for transit supportive land use, promoting alternative development standards, fast tracking development, and corridor protection are positive implementation objectives. However, the Discussion Paper provides very little detail of how these might be achieved. The key to implementation of transit is sustained funding. Two cents per litre of the provincial gas tax may not be enough to accomplish the goals of the Growth Plan. The mandate and function of the Greater Toronto Transportation Authority is not clear. Further information is required,before its value in supporting the Growth Plan, can be assessed. Sustainable Water and Wastewater Services 2.39 The Discussion Paper recognizes that the Sustainable Water and Sewage Systems Act will make it mandatory for municipalities to assess the full cost of providing their water and sewer services and to prepare long-term cost- recovery plans that consider all operating and capital costs; all sources of revenue; and the investment required to maintain and expand their system. Full cost recovery is intended to ensure that adequate funding is available for water and sewer infrastructure over the long term. 2.40 The Province has yet to pass regulations for the legislation. Therefore a comprehensive assessment of its implications on the Region cannot be made at this time. Particular details are required regarding potential funding and strategies to increase rates over time to reflect "the true costs of water and wastewater services". Report No.: 2004-P-73 Page No. 15 Protecting What is Valuable 2.41 Protecting and enhancing our resources is recognized as an important part of managing growth. The Growth Plan will recognize the protection of resources, including: Water Resources —through existing and proposed legislation; • Natural Heritage and Greenspace Systems—through the establishment of the Golden Horseshoe Greenbelt; • Agricultural Resources - by ensuring that urban boundary expansions onto farmland be considered only when justified and feasible, and through the establishment of the Golden Horseshoe Greenbelt; and • Mineral Aggregate Resources —through conservation, protecting high potential aggregate areas, and undertaking extraction and rehabilitation in a timely manner. 2.42 While the protection of our natural resources is consistent with the ROP, it is necessary that the Growth Plan and the PPS provide clarity on provincial priorities among the various competing policy areas (i.e. natural heritage features vis-a-vis agricultural lands and mineral aggregates). Water Resources 2.43 The Growth Plan relies on source water protection (SWP) legislation to protect water resources. However, SWP will only address local water issues. The Region has previously identified critical questions on the draft SWP legislation that requires resolution by the Province, including: • How source protection planning fits into a broader provincial source rrotection raolicv oroararn: and • How investment in source protection planning will be balanced with spending on infrastructure improvements or actions to deal with known threats to drinking water. 15 Report No.: 2004-P-73 Page No. 16 Natural Heritage and Greenspace Systems 2.44 The Discussion Paper calls for the integration of the Growth Plan with the Golden Horseshoe Greenbelt as the means of protecting the natural heritage and greenbelt systems. The integration of these initiatives is essential to a broader growth management approach. Agricultural Resources 2.45 The Province needs to consider the economic viability of agricultural operations in the planning of rural areas, while affording a higher level of protection for farmland. The Discussion Paper recognizes that the protection of prime agricultural areas will be undertaken within the context of establishing the permanent Greenbelt. The recommendations of the GTA Agricultural Action Plan, endorsed by Regional Council, provides a foundation for agricultural land protection and advancing farming as an industry, and thus should be recognized by the Growth Plan and be incorporated in the PPS. Aggregate Resources 2.46 The Discussion Paper promotes the conservation of aggregate resources through a focus on reuse and recycling of materials and by reducing demand. It also seeks to protect high potential aggregate areas, ensure timely extraction and rehabilitation, and explore ways to minimize the impact of transporting aggregates to market. The Paper, however, does not elaborate on how this will be accomplished. Implementation 2.47 The Discussion Paper recognizes that plans and policies are only as success ui as their implementation. it suggests that the implementation oi the Growth Plan will require: • Provincial Leadership and Partnership— by ensuring provincial programs and investments are based on the Growth Plan; 16 Report No.: 2004-P-73 Page No. 17 • Effective Implementation Tools —through the provision of regulatory and fiscal tools and programs; • Legislative Framework — may be required to ensure the implementation of clear roles and responsibilities, and consistency with other legislation; and • Monitoring and Review—to assess the impact on quality of life and the performance of communities. Provincial Leadership and Partnership 2.48 Strong leadership from the Province will be required to ensure the effective implementation of the Growth Plan, particularly as it relates to the coordination of all of the interrelated initiatives that have been initiated as part of the Province's Strong Communities agenda. The effectiveness or need for a blue ribbon panel, as another level of bureaucracy, to monitor and advise on the Growth Plan is questioned. The Province should consider building on its partnership with municipalities to gauge the success of, and advise on the evolution of the Growth Plan. Larger municipalities can offer specialized expertise in infrastructure planning and investment. Effective Implementation Tools 2.49 Various regulatory tools are proposed to assist in the implementation of the Growth Plan. The regulatory tools generally fall under the Planning Act and are covered under the on-going Planning Reforms initiative. While the proposed reforms are generally supported, as noted in previous submissions by the Region, additional actions and further revisions to existing legislation and the PPS are essential to strengthen the effectiveness of these tools. 2.50 The most important tools to facilitate the implementation of the Growth Plan grill he fiscal tools. yllhile the Discussion Pataer suooests the tvpes of tools that may be made available, the level of detail is insufficient to allow for an assessment of their potential implications on the Region. The fiscal tools need to be explored in much more detail. It must be recognized that municipalities face fiscal constraints and limited sources to generate revenue (i.e. property taxes, fees and development charges). Innovative and sustained funding sources, as well as options related to education property 17 Report No.: 2004-P-73 Page No. 18 taxes and development charges will be required to implement the Growth Plan. Legislative Framework 2.51 Provincial legislation may be enacted to ensure compliance and ongoing implementation of the Growth Plan. Should the Province decide to enact legislation it is recommended that it be implemented through regulation in order that it may be changed without the requirement to amend the legislation, similar to the Oak Ridges Conservation Plan. Further, any legislation should have the effect of defining the roles and responsibilities of the Province, as well as municipalities. Monitoring and Review 2.52 The monitoring and review of the Growth Plan is necessary to assess its effectiveness. It is unclear how this will be completed and by whom. As previously noted, a model based on a partnership between the Province and municipalities should be considered as a basis for this function. 3. CONCLUSION 3.1 The Province should be commended for initiating a broad management approach for the Greater Golden Horseshoe that will help to sustain the anticipated growth in population and employment in this area. The integration of this initiative with the other initiatives to achieve the Provincial Strong Communities agenda is an important step in maintaining the high quality of life and the competitive advantage of the area. ?.2 The Vision, directions and strategies in the Discussion Paoer are generally supported. However, further information on fiscal tools and incentives are required before the potential implications on the Region can be fully assessed. In addition, further enhancements to the Growth Plan as detailed in this report would assist in realizing Durham's growth management objectives. The comments in this report, as well as previous submissions by Report No.: 2004-P-73 Page No. 19 the Region, are provided to assist the Province in its efforts to achieve strong communities. 3.3 Should Planning Committee support the recommendations of this report, in order to meet the September 24, 2004 deadline for comments, a copy will be forwarded to the Ministry of Public Infrastructure Renewal prior to Council consideration on September 29, 2004, with appropriate qualifications. A.L. Georgieff, M.C.I.P., R.P.P. Commissioner of Planning RECOMMENDED FOR PRESENTATION TO COMMITTEE Garry H. Cubitt, M.S.W. Chief Administrative Officer Attachment: 1. Provincial Growth Plan, Discussion Paper (Under Separate Cover) H,\1-2\agendas\2004\09-14-04\Growth Plan.doc t