Report To: General Government Committee
Date of Meeting: May 27, 2019
Report Number: COD -008-19 Resolution: GG -360-19
File Number: CL2019-10 By-law Number:
Report Subject: Prospect Street Reconstruction
Recommendations:
That Report COD -008-19 be received;
2. That Eagleson Construction with a total bid amount of $2,171,275.20 (Net HST Rebate)
being the lowest compliant bidder meeting all terms, conditions and specifications of
Tender CL2019-10 be awarded the contract for the Prospect Street Reconstruction, as
required by the Engineering Services Department;
3. That the funds required for this project in the amount of $3,009,600.00 (Net HST
Rebate) which includes the construction cost of $2,171,275.20 (Net HST Rebate) and
other costs such as design, property acquision, soil testing, utility relocation, inspection,
contract administration, permit fees and contingency of $838,324.80 (Net HST Rebate)
be funded by the Municipality from the approved budget allocations as follows:
Prospect St. Reconstruction (2019 Budget)
(O'Dell St to Fourth St.) 110-32-330-83242-7401 $1,040,000.00
Prospect St. Reconstruction (2017 Budget) (utility relocations and property
acquisition) 110-32-330-83242-7401 $ 150,000.00
Prospect St. and Lambs Lane Area Design
(2014 Budget) 110-32-330-84242-7401
Municipal Capital Works
Reserve Fund 511-00-000-00000-7418
Prospect St. Reconstruction (O'Dell St. to Fourth St.)
Region of Durham Recovery 110-32-330-83242-7402
$ 106,076.09
$ 124,823.91
$1,588,700.00
4. That all interested parties listed in Report COD -008-19 and any delegations be advised
of Council's decision by the Corporate Services Department.
Municipality of Clarington
Report COD -008-19
Report Overview
Page 2
To request authorization from Council to award the contract for the completion of the
reconstruction of Prospect St., Second Street, and Veterans Avenue to an urban standard
including underground servicing, concrete curb and gutter, new road base, and base
asphalt. This project is being completed in coordination with the Region of Durham who are
replacing the existing sanitary sewer and watermain as detailed in the tender document and
as required by the Municipality of Clarington's Engineering Services Department.
1. Background
1.1 Tender specifications were prepared by the Engineering Services Department and
CIMA and provided to the Purchasing Services Division.
1.2 Tender CL2019-10 was issued by the Purchasing Services Division and advertised
electronically on the Municipality's website. Notification of the availability of the
document was also posted on the Ontario Public Buyer's Association website.
Seventeen (17) Companies downloaded the tender document.
1.3 The Tender closed April 30, 2019.
2. Analysis
2.1 Three (3) bids were received in response to the tender call. The Bids were reviewed
and tabulated by the Purchasing Services Division (see Attachment 1). All submission
received were deemed compliant.
2.2 The results were forwarded to the Engineering Services Department for their review and
consideration.
2.3 After review and analysis of the submissions by the Engineering Services Department
and the Purchasing Services Division, it was mutually agreed that the low bidder,
Eagleson Construction be recommended for the award of contract CL2019-10 (see
Attachment 2).
2.4 Eagleson Construction has successfully completed work for the Municipality in the past.
2.5 Based on the 2017 Budget allocation for the project as well as for continuity, cost
efficiencies, and maintaining project schedule, CIMA+ will continue to provide the
inspection and contract administration required for this project. It is important to have
the design consultant available during construction to address any changes that may be
required and to provide stamped as -constructed drawings at the completion of the
project.
Municipality of Clarington
Resort COD -008-19
Page 3
2.6 It is of mutual interest and importance to Engineering Services, the Municipality of
Clarington, and its residents that the project award be reviewed, processed, and
approved for the issuance of the award of the Prospect St. Reconstruction project
contract expeditiously in order to grant the Contractor sufficient time to complete the
complex and onerous nature of the project. This will assist in ensuring that the
Municipality is provided with a high quality end product, minimize risk of cost overruns in
building aspects of the project in unfavorable weather conditions, minimize risk of
premature road deterioration, and minimize disruptions and project duration experienced
by the Municipality's residents.
3. Financial
3.1 The funds required for this project in the amount of $3,009,600.00 (Net HST Rebate)
which includes the construction cost of $2,171,275.20 (Net HST Rebate) and other costs
such as design, property acquisition soil testing, utility relocation, inspection, contract
administration, permit fees and contingency of $838,324.80 (Net HST Rebate) be funded
by the Municipality from the approved budget allocations as follows:
Prospect St. Reconstruction (2019 Budget)
(O'Dell St to Fourth St.) 110-32-330-83242-7401 $1,040,000.00
Prospect St. Reconstruction (2017 Budget) (utility relocations and property
acquisition) 110-32-330-83242-7401 $ 150,000.00
Prospect St. and Lambs Lane Area Design
(2014 Budget) 110-32-330-84242-7401
Municipal Capital Works
Reserve Fund 511-00-000-00000-7418
Prospect St. Reconstruction (O'Dell St. to Fourth St.)
Region of Durham Recovery 110-32-330-83242-7402
$ 106,076.09
$ 124,823.91
$1,588,700.00
3.2 The value of the total project cost is over the allocated budget from the various funding
sources and is utilizing the Municipal Capital Works Reserve Fund to make up the
deficit. The deficit is attributed to the high estimated cost of the gas main relocation
works that was provided by Enbridge. We anticipate that this item will come in under
the estimated cost. The contract contains provisional items totaling 9.2% of the contract
value plus 5.8% of construction contingency.
3.3 The use of the Municipal Capital Works Reserve Fund is appropriate given the nature of
this capital project. The project is not Development Charges related and therefore
excess funding must come from a non -development charges related source.
3.4 The Engineering Department has identified several projects which are anticipated to
come in under budget; however as these projects are not yet finalized it is not financially
prudent to reallocate these funds from said projects. Once completed, excess funds
from the completed capital projects will be transferred to the appropriate reserve funds
(including the Capital Works Reserve Fund) in order to replenish the reserve fund.
Municipality of Clarington Page 4
Report COD -008-19
4. Concurrence
This report has been reviewed by the Director of Engineering Services who concurs with
the recommendations.
5. Conclusion
It is respectfully recommended that Eagleson Construction being the lowest compliant bid
be awarded the contract for the Prospect Street Reconstruction with all work being
completed in accordance to all terms, conditions, specifications and drawings of Tender
CL2019-10.
6. Strategic Plan Application
Not applicable.
Submitted by: Reviewed by:
Marie Marano, H.B. Sc., C.M.O., Andrew C. Allison, B. Comm, LL.B
Director of Corporate Se ' es CAO
Trevor Pinn, CPA, CA.
Director of Finance/Treasurer
Staff Contact: David Ferguson, Purchasing Manager, 2209 or dfergusion@clarington.net
Attachments:1 - Bid Summary
2 - Engineering Recommendation Memo
List of interested parties to be notified of Council's decision is on file in the Corporate Services
Department.
Attachment 1 to
Municiaality of Clarinaton Resort COD -008-19
Bid Summary
CL2019-10 — Prospect Street Reconstruction
BIDDER
Total Bid
(including HST)
TOTAL BID
(Net HST Rebate)
Eagleson Construction
$2,411,105.52*
$2,171,275.20
Hard -Co Construction Ltd.
$2,623,491.63
$2,362,535.47
Blackstone Paving & Construction Ltd.
$3,725,178.63 *
$3,354,638.74
Note: Bids with an "' denotes an addition error within the submission.
0
aron $WWDFRHW8:
I.Eff IM40il
C14 Memo
If this information is required in an alternate format, please contact the Accessibility
Co-ordinator at 905-623-3379 ext. 2131
To:
David Ferguson, Purchasing Manager
From:
Robert Brezina, Capital Works Engineer
Date:
May 17, 2019
Subject:
CL2019-10 ❑ Prospect St. Reconstruction
File:
CRC.Prospect St.1
The Engineering Services Department has reviewed the submissions for CL2019-10
and offers the following comments.
Road
Limits
Description
Prospect St.,
Prospect St. ❑) LW 12 11EHUB VAR❑
Reconstruction of the roads
Second St.,
Fourth St.
inclusive of sanitary sewer
Veterans Ave.
Second St. From Prospect St. to
and watermain replacements,
Lambs Lane
storm sewer installation, utility
Veterans Ave. F1 From Prospect St.
relocations, property
to Lambs Lane
acquisitions, etc.
The low bidder on this contract was Eagleson Construction. Based on past experience
with this contractor, we recommend award of the contract to Eagleson Construction in
the amount of $2,411,105.52 inclusive of HST, or $2,171,275.20, net of HST rebate.
A total contingency amount of approximately 15.0% of construction costs is required for
this project, based on past experience. The tender includes provisional items that equal
approximately 9.2% of the construction cost, so 5.8% of construction costs have been
carried to bring the contingency to the required 15.0%. Therefore, including other costs
such as design, property acquisition, soil testing, utility relocation, inspection and
contract administration, permit fees, contingencies, and net HST costs, the Engineering
Department advises of the following funding:
Page 11
The Corporation of the Municipality of Clarington
40 Temperance Street, Bowmanville ON L1 C 3A6 1905-623-3379
File No.: CRC.Prospect St.1
Construction (net of HST) (Based on Low Bid)
$2,171,275.20
Other costs (net of HST)
$838,324.80
Total Project Value
$3,009,600.00
Budget Amount:
3 RVSHFVM W5 FFR \NVT - 2 [Ei HUB VW RXM[6 W7
$1,040,000.00
(2019 budget)
110-32-330-83242-7401
3 RvSHFVM W5 F-FRdWA*-W\❑V IEI HUB WK) RXM16 WIREE
$150,000.00
utility relocations and property acquisition)
(2017 budget)
110-32-330-83242-7401
Prospect St. and Lambs Lane Area Design (2014 budget)
$106,076.09
110-32-330-83242-7401
Municipal Capital Works Reserve Fund
$124,823.91
511-XX-XXX-XXXXX-7418
3 RvSFFVB W5 WfRAANTM-12 [ID HUB WFRI) RXAU16 W1
$1,588,700.00
Region of Durham Recovery
110-32-330-83242-7402
Total
$3,009,600.00
* A more detailed breakdown to be provided to Finance to provide necessary
information for tracking of Tangible Capital Assets (TCA).
Based on the 2017 Budget allocation for the project as well as for continuity, cost
efficiencies, and maintaining project schedule, CIMA+ will complete the inspection and
contract administration. This is important to have the design consultant available during
construction to address any changes that may be required and to provide stamped as -
constructed drawings at the completion of the project.
Considering all project costs, there is sufficient funding available and the Engineering
Department recommends that the Purchasing Department move forward with award of
the contract based on the above apportionments. Should you have any further
questions, please feel free to contact the undersigned.
The Corporation of the
40 Temperance Street, Bowmanville ON
Page 12
Municipality of Clarington
L1 C 3A6 1905-623-3379
File No.: CRC. Prospect St.1
Regards,
Robert Brezina
Capital Works Engineer
Pc: Trevor Pinn, Director of Finance
Marie Marano, Director of Corporate Services
A.S. Cannella, Director of Engineering Services
R. Albright, Assistant Director of Engineering Services
Page 13
The Corporation of the Municipality of Clarington
40 Temperance Street, Bowmanville ON L1 C 3A6 1905-623-3379
File No.: CRC.Prospect St.1
'���r .. �� . • IIIIIIIIIIIIIIIIIIIC ���� " �� ��I'�:
I�i�111�� • � �1l11\\
`��, �`��� 1111111111111111���;
� . • - ���� ii��i 1�1= -��■ C11111l1!!1 11111��
RE_mill
`i 11rrII111111iii11
Milli
11111_
VIII ��= �: ��.�- � �� .. - . ■
. - SIZE =- �,•���.�� 111111111.
_���■ I� � � ��j . .����1lilllll F
i / ■ � �� ■ •• �r►� IIS
KEY MAP
N.T.S.
Page 14
The Corporation of the Municipality of Clarington
40 Temperance Street, Bowmanville ON L1 C 3A6 1905-623-3379