Loading...
HomeMy WebLinkAboutCOD-032-08 Cl!![illgton REPORT CORPORATE SERVICES DEPARTMENT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE Monday, June 2nd, 2008 'Kesolu-\iOYl-#e PA- 3bO- O~ Date: Report #: COD-032-08 File#_ By-law # Subject: TENDER CL2008-19, SUPPLY AND HAULING GRANULAR MATERIAL Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report COD-032-08 be received; 2. THAT Robert E. Young Construction Limited, Peterborough, Ontario, with a total bid price of $241,322.85 (excluding G.S.T.), being the lowest responsible bidder meeting all terms, conditions and specifications ofTender CL2008-19, be awarded the contract for the Supply and Hauling of Granular Material; and 3. THAT the funds expended be drawn from the Department of Operations, various 2008 Operations Road intenance and Construction budget. Submitted by: Reviewed by: /~- Franklin Wu, Chief Administrative Officer arie Marano, H.B.Sc., C.M.O., Director of Corporate Services cYgk ~ nl\. Nancy Taylor, B.BA, CA, {U Director of i c Fred 0 DMR, RRFA, Director of Operations MM\JDBIBH CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T(905)623-3379 F (905)623-4169 REPORT NO.: COD-032-08 PAGE 2 BACKGROUND AND COMMENT Tenders were publicly advertised and called for the Supply and Hauling of Granular Material as required by the Operations Department. Subsequently, four tenders were received and tabulated as per Schedule "A" attached. The total funds required for Tender CL2008-19, Supply and Hauling of Granular Material are included in the Operations Department 2008 Operations Road Maintenance and Construction accounts. The account numbers are outlined in the recommendation letter from Totten Sims Hubicki Associates. For the information of Council, the average of the unit prices per tonne represent an approximate 6.65% increase over those bid for 2007. The references for Robert E. Young Construction Limited have been contacted and are satisfactory . After review and analysis of the bids by Purchasing, Operations and Totten Sims Hubicki Associates, it was mutually agreed that the bid from, Robert E. Young Construction Limited, Peterborough, Ontario be recommended for the contract for the Supply and Hauling of Granular Material. The Finance Director has reviewed the funding requirements and concurs with the recommendation. Queries with respect to department needs, specifications, etc., should be referred to the Director of Operations. Attachments: Attachment 1 - Schedule "A", Bid Summary Attachment 2 - Schedule "B", Recommendation Letter from Totten Sims Hubicki Associates REPORT NO.: COD-032-08 PAGE 3 Schedule "A" Bid Summary Tender Cl2008-19 BIDDER , , C.D.R. Young's Aggregates Inc. Pontypool, ON $241,711.55 Westone Aggregate Inc. Omemee, ON $249,806.07 lafarge Canada Inc. Stouffville, ON $275,397.35 Robert E. Young Construction LId Peterborough ON $241 32285 REPORT NO.: COO-o32-08 PAGE 4 Schedule "8" Recommendation Letter from Totten Sims Hubicki Associates Tender CL2008-19 II TIH SCHEDULE "B" Totten Sims Hubicki Associates 300 Water Street Whitby, Ontario, Canada l1N 9J2 (905) 668-9363 Fax: 19051 668-0221 E-mail: tsh@tsh.ca www.tsh.ca engineers architects planners May 13, 2008 Mr. Larry Postill, Supervisor Operations Department Municipality of Clarington 40 Temperance Street BOWMANVILLE, Ontario LlC 3A6 Dear Sir: Re: Supply and Hauling Granular Material Tender No. CL2008-19, Municipality of Clarington TSH Project No. 42-65106 Bids for the Municipality of Clarington Tender No. CL2008-19, were received and opened on Tuesday, April 29th, 2008. The following is a summary of the four (4) tenders received: BIDDER TOTAL BID (Excludin2 GST) Robert E. Young Construction Ltd Peterborough, ON $241,322.85 C. D. R. Young's Aggregates Inc. $241,7ll.55 Pontypool, ON Westone Aggregate Inc. Omemee, ON $249,806.07 Lafarge Canada Inc. Stouffville, ON $275,397.35 We examined the three (3) lowest tender submissions and found the two lowest tenders to be arithmetically correct and complete, complying with the general tendering requirements. The third low bid did not include PST in the unit rates as required by the tender, and instead applied the PST in the amount shown as the pre-GST sub-total. Further, we analyzed unit prices tendered by the three (3) low tenderers and found the unit prices bid to be reasonable without evidence of unbalancing of the tender bids. Municipality of Clarington Mr. Larry Postill, Supervisor May 13,2008 SCHEDULE "B" 2. Funds for this project will be supplied from a number of accounts. The breakdown is as follows: ACCOUNT NAME & NUMBER BUDGET RATEI TONNES TOTAL TONNE COST Culvert 100-36-380-10205-7112 $40,000 $11.25 1,300 $14,625 Entrance Culverts 100-36-380-10225-7112 $23,000 $11.25 1,000 $11,250 Sidewalk Mtce. 100-36-380-10733-7112 $40,000 $11.25 200 $ 2,250 Guide Rail 100-36-384-10310-7112 $ 8,000 $11.25 200 $ 2,250 Ditch/Shoulder Mtce 100-36-380-10240-7112 $26.000 $11.25 -lli $ 1.688 SUB-TOTAL $137,000 2,850 $32,063 Gravel Resurfacing 100-36-382-10280-7112 $210,000 $209.259.85 TOTAL $241,322.85 We recommend acceptance ofthe low tender and award ofa contract to Robert E. Young Construction Ltd, Peterborough, in the amount of$241,322.85 exclusive ofGST. Please advise if you require additional information to supplement the above. Should you require any additional information, please do not hesitate to contact the undersigned. Yours very truly, cJ Ian Rage, .Eng. Project Manager IBR pc: Mr. Jerry Barber, CPPO, Municipality ofClarington C:\Documents and Settingsldhoath\My Documents\IBR\CL2008_19 Teoder Report May 9th 200B.doc