HomeMy WebLinkAboutCOD-019-08Leading the Way
STAFF REPORT Ijl
REPORT
CORPORATE SERVICES DEPARTMENT
Meeting: Council
Date: April 7th, 2008
Report #: COD-019-08
File #
By-law # ~~~ ~~~
Subject: CL2008-7, NEWCASTLE BRANCH LIBRARY
Recommendations:
It is respectfully recommended to Ccuncil the following:
1. THAT Report COD-019-08 be received;
2. THAT Garritano Bros Ltd., Oshawa, Ontario with a total bid in the amount of $2,444,700.00 (Excluding
G.S.T.), being the lowest responsible kidder meeting all terms, conditions, and specifcations of
Tender CL2008-7, be awarded the contract for the construction of the Newcastle Branch Library as
required by the Clarington Library Board;
3. THAT the funds required for the construction project in the amount of $2,648,895.00 ($2,444,700.00
plus constructon contingency) be drawn from Account #110 42 440 85510 7401;
4. THAT David Caplan, Minister of Public Infrastructure Renewal be thanked for the one-time grant
announced on March 28, 2008 under the Municipal Infrastructure Investment Initiative in the amount
of $2,365,780 for this project;
5. THAT the attached By-law marked Schedule "A" authorizing the Mayor and the Clerk to
Execute the necessary agreement be approved;
6. THAT Council express its intent to fund this project debenture repayments and financing costs to the
extent allowable from future development charges.
7. THAT the Director of FinancefTreasurer be authorized to make application to the Region of Durham
for a debenture in the amount of $1,084,267.00 plus debenture costs to finance the eligible net growth
related costs of the Newcastle Branch Library; and
8. THAT the attached By-law marked "Schedule B" authorizing the debenture
and Clerk be apprgve¢.
Submitted by: G~ 7ilL~-' Reviewed by:
arie Marano, H.B.Sc., C.M.O.,
Dir of Corporal ervi s / ~
cy ayl r, .A.; /(UPI S'
D' char /V~9`i'./N-~~
MMJBUVn
Clarington Public Library
R.eso~~-h~,~ ~-iey-og
by the Mayor
AdminisVative Officer
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOW MANVILLE, ONTARIO L1C 3A6 T(905)623-3379 F (905)623-4169
REPORT NO.: COD-019-08 PAGE 2
BACKGROUND AND COMMENT
In the latter part of 2007, the municipality invited tenders from pre-qualified contractors for the
construction of the Newcastle Branch Library. Bids received in response to the tender call at that time
were signficantly over budget and a subsequent report to Council recommended that the facility design
be re-scoped to reduce cost and allow for the re-tendering in the early part of 2008 at the beginning of the
construction season when pricing would be more competitive. With Council's approval, the consultant
and the project team identified twenty-one design and component changes to reduce the construction
cost of the building without significantly affecting the functionality and appearance, yet maintaining the
efficient "green' building. Council authorized application to the Ministry of Public Infrastructure Renewal
under the Municipal Infrastructure Investment Initiative on February 13, 2008. A letter confirming that the
application was successful in the amount of $2,365,780 was received March 28, 2008.
Tenders were invited from the original list of pre-qualified contractors in February and tenders closed on
March 13, 2008. Subsequently, tenders were received and tabulated as per Schedule "B" attached.
As a result of the reduction/changes in the scope of the project and the timing of the tender call bid
submissions were received from five of the original seven pre-qualified bidders and prices received are
far more competitive then those submitted on the original 2007 tender.
Council approved funding for the above project at a construction budget of $2,648,895.00. The funding
source is the provincial grant funding referenced above with the balance from the Library Development
Charges. The actual cost to construct the Branch Library, including the optional cost of the radiant heating
is $2,444,700.00, well within the approved budget. Accordingly, it is recommended that the project
proceed at the all-inclusive price of $2,444,700.00 with the remaining $204,195.00 as a contingency for
the project.
The above results confirm the committee's strategy to re-tender the project achieved desired results.
The Total project is $3,450,047.00. Of this, $1,084,267.00 will be financed through development charges.
A debenture of this amount plus debenture costs over a period not to exceed 15 years will be required.
The exact repayment amounts to be funded from the Library Development Charges Reserve Fund will be
determined at the time of the debenture issuance by the Region of Durham.
The Director of Finance has reviewed the funding requirements and concurs with the recommendation.
Queries with respect to department needs, specifications, etc., should be referred to the Director of
Corporate Services.
REPORT NO.: COD-018-08
PAGE 3
After further review and analysis of the bids by the Clarington Public Library Building Committee, Shoalts
Zaback Architects Ltd., Kingston, Ontario and Purchasing, it was mutually agreed that the low bidder,
Garritano Bros. Ltd., Oshawa, Ontario, be recommended for the contract for the construction of the
Newcastle Branch Library.
Attachments:
Attachment 1 -Schedule "A", By-law
Attachment 2 -Schedule "B", By-law
Attachment 3 -Schedule "C", Bid Summary
Schedule "A"
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
BY-LAW 2008-
Being a By-law to authorize a contract between the Corporation
of the Municipality of Clarington and Garritano Bros. Ltd., Oshawa,
Ontario, to enter into agreement for the construction of the Newcastle
Branch Library.
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY ENACTS AS
FOLLOWS:
THAT the Mayor and Clerk are hereby authorized to execute, on behalf of the
Corporation of the Municipality of Clarington and seal with the Corporation Seal, a
contract between, Garritano Bros. Ltd., Oshawa, Ontario, and said Corporation;
and
2. THAT the contract attached hereto as Schedule "A" form part of this By-law.
By-law read a first and second time this day of , 2008.
By-law read a third time and finally passed this day of , 2008.
Jim Abernethy, Mayor
Patti L. Barrie, Municipal
Schedule "B"
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
BY-LAW 2008
Being a By-Law to authorize the debenturing of $1,084,267
Plus debenture costs to assist in the construction of the
Newcastle Branch Library located at
Pt. Lot 27, Concession 2, Clarke Township
in the Municipality of Clarington.
WHEREAS Section 403 of the Municipal Act, 2001, S.O. 2001, provides that By-Laws may be passed to allow
for borrowing for the purpose of the Corporation and the issuance of debentures thereof;
WHEREAS the Council of the Corporation of the Municipality of Clarington wishes construction to proceed on
the Newcastle Branch Library;
WHEREAS the Council of the Corporation of [he Municipality of Clarington has approved Report COD-019-08
at its meeting of April 7, 2008, for the Newcastle Branch Library;
WHEREAS the Director of Finance/Treasurerhas updated the Municipality's annual debenture limit and this
limit has not been exceeded, therefore, the Ontario Municipal Board approval is not required;
NOW THEREFORE, Be [t Enacted and It is Enacted as a By-law of the Corporation of the Municipality of
Clarington as follows:
THAT the Municipality proceed with the construction of the Newcastle Branch Library, located at Pt.
Lot 27, Concession 2, Clarke Township, in the Municipality of Clarington;
2. THAT the sum of $1,084,267, plus debenture casts, be debentured over a period not to exceed fifteen
QS) years; and
3. THAT the funds to repay the principal and interest of the debenture be raised through a tax levy on the
ratepayers and~or to the extent possible through future development charges.
By-Law read a first and second time this 7th day of April, 2008.
By-Law read a third time and fmally passed this 7th day of April, 2008.
Jim Abernethy, Mayor
Patti L. Barrie, Municipal Clerk
w
Leading the Way
Municipality of Clarington
SCHEDULE"C"
BID SUMMARY
TENDER CL2008-7, CONSTRUCTION OF THE
NEWCASTLE BRANC LIBRARY
BIDDER BASE BID SEPARATE
PRICE
RADIANT
HEATING REVISED
TOTAL
Garritano Bros. Ltd.
Oshawa, ON $2,373,700.00 $71,000.00 $2,444,700.00
Gerr Construction
Oshawa, ON $2,390,000.00 $58,000.00 $2,448,000.00
Struct-Con Construction
Bram ton $2,432,000.00 $81,359.00 $2,513,359.00
Pre-Eng Contracting
Concord, ON $2,520.000.00 $70,000.00 $2,590,00.00
J.J. McGuire General Contractors Inc.
Pickerin , ON $2,615,000.00 $65,000.00 $2,680,000.00