THE CORPORATION OF THE TOWN OF NEWCASTLE
REPORT
Meeting:
GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
File # ~\Yt .:=3Q,<6~. G-l::.
Res. #Gct0rl-bCll-:i~
Date:
NOVEMBER 2, 1992
By-Law #
Report #:
(,S-36-92 File #:
Subject:
COMMUNITY SERVICES DEPARTMENT CAPITAL PROJECT UPDATE
PARKS AND CEMETERIES
Recommendations:
It is respectfully recommended that the General Purpose and
Administration Committee recommend to Council the following:
1. THAT Report No. CS-36-92 be received for information.
1.0 BACKGROUND:
1.1 Council approved in the 1992 Capital Budget, $562,300 for
equipment and projects for the Parks and Cemeteries Division
of the Community Services Department. In addition, $110,000
was carried forward for Orono Ball Diamond Lights project from
1991 and Council approved a reallocation of funds in the
amount of $175,000 related to the Bowmanville Yard midway
through 1992. Attachment I of this report deals specifically
with the seven pieces of equipment and ten projects of the
1992 Capital Budget and the two additional projects.
2.0 HIGHLIGHTS:
2.1 One of the key problems experienced in park maintenance is the
ability to provide water to turf, trees and shrubs at critical
times in order to keep grass in active growth and to keep
newly planted trees and shrubs in a heal thy condi tion.
Staff, after looking at irrigation solutions in other
Municipalities, have designed and developed a portable
irrigation system which utilizes fire hydrants or other
sources of water. This system will put a large amount of
water on a park over a short period of time. Sports fields
.. /2
901
RECVCLED~PAPIER
PAPER '<:!:1 RECVCLE
THIS IS PRINTEDON RECYCLED PAPER
REPORT NO. CS-36-92
- 2 -
NOVEMBER 2, 1992
will be better able to recover from their daily use and tree
loss over extended drougnts will be reduced. The portable
irrigation system is a reasonable alternative and will save
in capital expenditure.
2.2 The Orono Park upgrading of ball diamond lights was approved
by Council and the contract awarded in 1991. The lights were
subsequently installed in the Spring of 1992. Due to the wet
season and the unusually soft ground conditions, it was
decided to postpone the final aiming of the lights until late
November or December when ground conditions would be suitable
to avoid damaging the turf. The upgrading of the lights for
this field will reduce the likelihood of personal injury and
improve the quality of play.
2.3 Council, in addressing Report CS-27-92, authorized staff to
terminate their existing lease and relocate the Parks Depot
at the Bowmanville Yard. In addition to other items, council
authorized the replacement of the fuel tanks and pumps, the
replacement and relocation of the perimeter fence along Lake
and Liberty Street frontages and the screening and upgrading
of the Yard.
2.4 A commercially produced precast portable chemical storage
building will be installed this Fall in the Bowmanville Yard.
Central Lake ontario Conservation Authority has expressed no
objection. The storage building will comply with the ontario
Building Code and ontario Pesticide Act for the storage of
flammable and noxious chemicals. This important improvement
will safeguard property and employees.
2.5 Council, through the 1992 Capital Budget deliberation,
directed staff to take the necessary steps to secure a long
term use of a portion of the Central Lake ontario Conservation
Authority's land in Hampton known as Elliott Park. Staff,
upon approval of the budget proceeded to initiate action with
.. /3
902
REPORT NO. CS-36-92
- 3 -
NOVEMBER 2, 1992
the Central Lake Ontario Conservation Authority to transfer
the Park to the Town. A suitable agreement satisfactory to
all parties is progressing, but slower than planned. The
project will by necessity be deferred to 1993 for development.
Upon completion of negotiations, a lease agreement and report
will be brought to Council for approval.
2.6 The Parks and Cemetery Division has purchased two important
pieces of equipment, a disc spreader/seeder and a top dresser,
which will allow the Division to upgrade or restore the turf
in existing parks and active areas. Parks with insufficient
top soil, worn out sports fields or rough turf areas will be
rejuvenated on an ongoing basis.
2.7 The Bowmanville Memorial Park wading pool has experienced
leaking through its expansion joints. Each year, staff re-
caulked the joints to seal the bowl. A permanent solution
using an expanding grout was proposed, however, final
quotations far exceeded earlier estimates. It was decided to
continue to provide annual repairs for the short term or until
conditions require another alternative.
3 . 0 COMMENTS:
3.1 The Community services Department's Parks and Cemetery
Division, in recognizing the necessary financial restraint,
has had a full and productive year. staff are pleased with
the success and accomplishments achieved with available
resources. A final review of our Park Development Program
will be available to Council through the 1993 Budget
deliberations.
Respectfully submitted, Recommended for presentation
to the Committee,
. auLiLt4-~
P. Caruana, Director
rtment of Community services
:JDC:dm
,.-
Officer
903
PROJECT
&
J;k.
~
Ih.
~
~
~
!L.
h
;L..
EQUIPMENT
Riding Mower
Tractor/Loader
Disc. Spreader/Seeder
Top Dresser
Vacuum Mulcher
Photocopier
Hedge Trimmer
Misc. Tools
CEMETERY
storage Building
PARK FURNITURE
benches, trash
receptacles
BUDGET
$ 17,500
$ 25,000
$ 20,000
$ 16,000
$ 3,000
$ 3,000
$ 500
$ 4,300
$ 25,000
$ 15,000
SIDNEY B. RUTHERFORD WOODS WALK PARK
pathway and dam $ 25,000
STUART PARK
tennis courts, $146,000
homerun fence, lights
a long walkway, irriga-
tion etc.
BOWMANVILLE MEMORIAL PARK
wading pool repairs $
walkway $
PARK DEPOT
chemicals storage
building
PARK SIGNS
bylaw signs
IRRIGATION
portable system
PENNFOUND PARK
water chamber
3,000
3,000
$ 7,500
$ 10,000
$ 14,500
$ 11,000
904
ATTACHMENT 1
TO REPORT CS-36-92
PAGE 1 OF 2.
STATUS
ACTUAL
EXPENDITURE
COMPLETE
COMPLETE
COMPLETE
COMPLETE
COMPLETE
COMPLETE
COMPLETE
COMPLETE
$ 17,000
$ 21,200
$ 8,000
$ 18,000
$ 2,600
$ 2,900
$ 500
$ 4,150
IN PROGRESS
o
COMPLETE
$ 14,300
COMPLETE
$ 24,700
COMPLETE
$144,500
CANCELLED
COMPLETE
o
$ 3,000
IN PROGRESS
o
COMPLETE
$ 8,000
COMPLETE
$ 11,500
IN PROGRESS
o
.. /2
- 2 - PAGE 2 OF 2.
ACTUAL
PROJECT BUDGET STATUS EXPENDITURE
!L. FOXHUNT PARK
water chamber $ 11,000 IN PROGRESS 0
k PARKS DEPOT
fuel tank $115,000 IN PROGRESS 0
fence replacement
landscape screening
lL.. ELLIOTT PARK
walkway playground $ 70,000 DEFER 0
park furniture
!L.. FORMER BOWMANVILLE MEMORIAL ARENA SITE
master plan $ 12,000 COMPLETE $ 12,000
underground servicing $ 78,000 DEFER 0
~ BOWMANVILLE RECREATION COMPLEX
2 ball diamonds $ 10,000 COMPLETE $ 9,800
timers
90.5;