Loading...
HomeMy WebLinkAboutCOD-017-08 Cl~glOn REPORT CORPORATE SERVICES DEPARTMENT Meeting: General Purpose and Administration Committee Date: March 17,2008 Resolution #:!lPA-O?lla-08' Report #: COD-017-08 File#: By-law #: Subject: CL2008-8 DASHER BOARD REPLACEMENT - GARNET B. RICKARD RECREATION COMPLEX Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report COD-017-08 be received; 2. THAT Sound Barriers, Mississauga, Ontario with a total bid in the amount of $175,900.00 (Plus GST), being the lowest responsible bidder meeting all terms, conditions and specification of Tender CL2008-8 be awarded the contract for the Dasher Board Replacement on Pad A of Garnet B. Rickard Recreation Complex as required by the Community Services Department; 3. THAT the additional funds of $25,900.00 be funded from the Community Services Capital Reserve Fund; and 4. THAT total funds required be drawn from 2008 Community Services Capital Account #110-42-421-84214-7401. Submitted by: d- ~ d~rano, H.B.Sc., C.M.O. Director of Corporate Services Reviewed bye) ~~ Franklin Wu Chief Administrative Officer MM/JDB/sm REPORT NO.: COD-017-0B PAGE 2 BACKGROUND AND COMMENT Tender specifications were provided by Totten Sims Hubicki Associates, Whitby, Ontario for the Dasher Board Replacement for Pad A of Garnet B. Rickard Recreation Complex, as required by the Community Services Department. Tenders were advertised in local papers, as well as electronically. Subsequently, tenders were received and tabulated as per Schedule 'A' attached - Bid Summary. The lowest compliant bidder was Sound Barriers, Mississauga. Due to Budget constraints the optional pricing requested in the tender document was not taken into consideration for the award of this project. The total estimated project cost is $175,900.00 (excluding applicable G.S.T.). The funds will be drawn from Community Services 2008 Capital Account #110-42-421-84214-7401 with the additional funds of $25,900.00 to be financed from the Community Services Capital Reserve Fund. The low bidder has provided services at the Municipality of Clarington however not to the extent which this project requires. However, a review of the references provided by Sound Barriers for similar projects are positive. The Director of Finance has reviewed the funding requirements and concurs with the recommendation. Queries with respect to department needs, specifications, etc., should be referred to the Director of Community Services. After further review and analysis of the bids by the Community Services Department, Totten Sims Hubicki Associates, Whitby (letter attached as Schedule 'B') and Purchasing, it was mutually agreed that the low bidder, Sound Barriers, Mississauga, Ontario be recommended for the contract for the Dasher Board Replacement at Garnet B. Rickard Recreation Complex. Attachments: Attachment 1 - Bid Summary Attachment 2 - Schedule "B", Letter from Totten Sims Hubicki CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1 C 3A6 T (905)623-3379 F (905)623-6506 Schedule 'A" q{J!#Jgtoo Municipality of Clarington SCHEDULE "A" BID SUMMARY Tender CL2008-8 DASHER BOARD REPLACEMENT I BIDDER I TOTAL BID I (GST Excluded) Sound Barriers $175,900.00 Mississauqa, ON Sport Systems Unlimited Corp. $187,770.00 Waterloo, ON RAITA SPORT $195,000.00 "Division of THE WELMAR GROUP" Guelph, ON SCHEDULE "B" . 11M I 01:":1 S,m~ lltll>l..!,1 ,\~~l,\i.iHt.~ 11';;:1, \10TrbOt\ Ul1\r:_ SUHt' ,102 Otl-:J\~il Om(lfl(l, C311<:I(.1a K~H ilSI) (f.I.jl~:i)~828: F~\ i6!3132(I.R~3~ l..mal: ,'ll::ma (/l~b ca \\WW Ish C::l engineers architects planners March 11. 2008 George Acorn Facility Manager Cnrporalion orthc Municipality ofClaringlon 40 Temperance Street Bowmanville.Onlario LIe 3A6 RE: Garnet B. Rickard Complex Dasherboard Tender Review Further to your request TSH has reviewed the tender submissions and documentation provided by Clarington in regards to the Dasherboard Replacement at the Garnet Rickard Complex. The following comments are made. . The three low bidders included Sound Barrier. Sport Systems and Raila Sports. . All three bidders have met the technical requirements of the tender. . The low bid or$175.'lOO is slightly higher than anticipated but considered within acceptable values. . The three low bids are within 9.7% of each other indicating competitive bidding. . TSII have been involved in previous projects with the low bidder Sound Barriers and found their quality of workmanship 10 be acceptable. . ('he itemized separate costs provided in Sound Barrier's tender are considered excessive and signiticantly higher than the second low bid submitted by Sports Systems. Please do not hesitate to contact the undersigned should you have any questions or concerns. Yours very truly. /,' C?~~- Tom Kara P. Eng. Project Manager TSH Phone: Cell: Associate 1-905-668-9363 1-905-767-1890 Fax: Email: 1-905-668-0221 www.tkararii1tsh.ca [;\PROJECfS\2Z-P/Qj_\2Z-I4472\6-TENDER\6-IDOC&A\Tender Review lettEr Mar 10, ZOOS.doc 11M