Loading...
HomeMy WebLinkAboutCOD-051-07 Cl!Jl-ilJgron REPORT CORPORATE SERVICES DEPARTMENT Date: General Purpose and Administration Committee September 17, 2007 Resolution #:(3 (J/1 ~S,')3~D1 Meeting: Report #: COD-051-07 File#: By-law #: Subject: CL2007-44 4th FLOOR RENOVATION - MUNICIPAL ADMINISTRATIVE CENTRE Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report COD-051-07 be received; 2. THAT Nubuild Construction Ltd., Concord, Ontario with a total bid in the amount of $104,954.55 (Plus GST), being the lowest responsible bidder meeting all terms, conditions and specification of Tender CL2007-44 be awarded the contract for the 4th Floor Renovations as required by the Operations Department; 3. THAT funds required in the amount of $120,000.00 (which includes $104,954.55 tendering, consulting and contingencies) be drawn from 2007 Operations Capital Account #110-36- -83601-7401. Submitted by: , Reviewed b . .t~ Franklin Wu Chief Administrative Officer Horvath, RDMR, RRFA Operations MMIJDBlgj Attachments: Allachment1 - Schedule "A", Memo from Operations & Letter from Shoalts and Zuback REPORT NO.: COD-051-07 PAGE 2 BACKGROUND AND COMMENT Tender specifications were provided by Shoalts and Zaback Architects Ltd., for the 4th Floor Renovations, as required by the Operations Department, for the construction of an additional offices at the Municipal Administration Centre. Tenders were advertised in local papers, as well as electronically. Subsequently, tenders were received and tabulated as per the letter from Shoalts and Zaback Architects Ltd., Schedule "A" attached. The total estimated project cost, including project administration fees and contingencies is $120,000.00 and is within the 2007 budget allocation. The funds will be drawn from Operations 2007 Capital Account #110-36-370-83601-7401 in the amount of $120,000.00. The low bidder has not provided any services at the Municipality of Clarington to date. However, a review of the references provided by Nubuild Construction Ltd., are positive. The Director of Finance has reviewed the funding requirements and concurs with the recommendation. Queries with respect to department needs, specifications, etc., should be referred to the Director of Operations. After further review and analysis of the bids by the Operations Department, Shoalts and Zaback Architects Ltd., and Purchasing, it was mutually agreed that the low bidder, Nubuild Construction Ltd., Concord, Ontario be recommended for the contract for the 4th Floor Renovation. CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T (905)623-3379 F (905)623-6506 ClMlJgtoH MEMO TO: Jerry Barber, Purchasing Manager FROM: Fred Horvath, Director of Operations DATE: September 12, 2007 RE: CL2007-44 4th FLOOR RENOVATION, MUNICIPAL ADMINISTRATIVE CENTRE Shoalts and Zaback Architects Ltd. have reviewed the above mentioned tender, and I agree with their recommendation to award the contract to the low bidder, NuBuild Construction in the amount of $104,954.55 plus G.S.T. Please prepare the necessary report for the next General Purpose and Administration Committee Meeting. i Thank you.. ~~/r FWath' Director of Operations . CORPORA nON OF THE MUNICIPALITY OF ClARINGTON MAILING ADDRESS: 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T(905)623-3379 F (905)623-6506 OPERATIONS DEPARTMENT LOCATION. 2320 TAUNTON ROAD, BOWMANVILLE, ONTARIO T(905)263-2291 F(905)263-4433 Shoalts and Zaback Architects Ltd. September 11, 2007 The Municipality of Clarington 40 Temperance Street Bowmanville, Ontario L 1 C 3A6 Via Fax: 905-263-4433 & Email: fhorvath(fj)clarinaton.net Attention: Fred Horvath, Property Manager Fourth Floor Renovation Municipal Administration Centre Municipality of Clarington Project No. 0720 Re: Tender Review Dear Sir: We have completed our review of the tenders received for the fourth floor renovation in the Municipal Administration Centre, Municipality of Clarington. Six (6) valid bids were received. They are summarized below. Bidder Total Bid NuBuild Construction Ltd. Samson Management and Solutions Ltd. Jeffrey Wallan Construction Ltd. D & G General Contractors Inc. Kraco Carpentry Services Ltd. Garritano Bros. Ltd. $104,954.55 $143,000.00 $148,350.00 $157,575.00 $173,000.00 $195,700.00 N.B. All of the above numbers exciude G.S.T. The low bid is complete and in order. We reviewed the references included with the low bid. We contacted all three (3) references listed. We have to date received one call back. This reference, which is from a well respected architect, was very positive. The low bid is clearly very competitive. We recommend award to the low bidder, NuBuild Construction, for $104,954.55, pius G.S.T. hi'~ Gerry Shoalts, OM, MRAIC c.c. Jerry Barber, Municipaiity of Clarington, jbarber@clarington.net Rob Groen, Town Hall, rgroen@clarington.net Jamie Rickard, Shoalts and Zaback Architects Ltd. S:\A.II Data\2007 Projacts\0720 - 4th Floor Renovation, MAC, ClaringlonlContract AdministrationlCor\Mamos and Letters\lelter F. Horvath ~ Tender Review.doc Gerald Shoalts ' Raymond Zaback 4 Cataraqui Street, Suite 206, Kingston, Ontario K7K 127 Associates: . Susan Croswell . Eric Riddell . Todd Storms e-mail: mail@szarch.com Tel: (613) 541 0776 Fax: (613) 5410804