HomeMy WebLinkAboutCOD-046-07
Cl~-il]glon
REPORT
CORPORATE SERVICES DEPARTMENT
Meeting:
GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
~\vJ1011-!t(1PA-~~-0l
Date:
Tuesday, September 4th, 2007
Report #: COD-046-07
File#_
By-law #J ()O7-1 ~ 7
Subject:
TENDER AWARDS SUMMER COUNCIL BREAK
Recommendations:
It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
1. THAT Report COD-046-07 be received;
2. THAT the attached By-law, marked Schedule "B" authorizing the Mayor and Clerk to enter
into the necessary agreement be approved; and
3. THAT the Purchasing By-law be waived and the Manager of Purchasing be authorized to
invite bids from the five bidders on Tender CL2007-35, Supply Delivery and Installation of
Gas Furnace Replacement.
$,bmilled byU-Vo .
Marie Marano, H.B.Sc., C.M.O.
Directofflf Corporate S rvic
/
Reviewed bYC~)~ Uk.
Franklin Wu,
Chief Administrative Officer
MM\JB\km
Attachments:
Attachment 1 - Schedule "A", Memo RE: Stevens Rd Culvert Construction & Stream Realignment
TSH Letter
Attachment2 - Schedule "B", By-law
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1 C 3A6 T (905)623-3379 F (905)623-4169
REPORT NO.: COD-046-07
PAGE 2
BACKGROUND AND COMMENT
In accordance with Purchasing By-law 2006-127, the following contracts were awarded during
the July I August Council Break:
1. CL2007-35, Supply Delivery and Installation of Gas Furnaces - Hampton
Operations Depot; and
2. CL2007-36, Stevens Road Culvert Construction & Stream Alignment
With respect to Tender CL2007-35; Gas Furnaces at the Hampton Depot, shortly after
receiving approval to proceed with the award, staff discovered that the tender mistakenly
called for the replacement of five furnaces, when only four were required. The fifth furnace
had been replaced early in 2007 as a result of an emergency requirement. To correct this
situation, the project has been cancelled and it is recommended that a revised tender will be
issued inviting the original five bidders to submit new tenders on a revised scope of work.
On completion of this process a report will be provided outlining the results of the invited
tender and providing a recommendation for award.
REPORT NO.: COD-046-07
PAGE 3
1. CL2007-35, SUPPLY DELIVERY AND INSTALLATION OF GAS FURNACES-
HAMPTON OPERATIONS DEPOT
In view of the fact there are no Council meetings scheduled until September 10, 2007,
authorization is requested to award the above noted contract to Vic' Mechanical Contracting,
Toronto, Ontario. The total project amount is $137,322.53 which includes the total bid price of
$117,600.00, excluding GST, detailed design, contract administration fees and site refurbishments.
This tender CL2007 -35 covers the supply and installation of four (4) new gas furnaces required to
replace existing obsolete furnaces at the Hampton Operations Depot and the total project cost of
$137,322.53 is within the approved Capital Budget amount of $152,000.00 (2005 Capital Budget -
$72,000.00 and 2007 Capital Budget - $80,000.00).
Tenders were advertised on the Clarington and OPBA Website and advertised in the Canadian
Statesman. A tabulation of bids received on the above noted tender is as follows:
BIDDER
TOTAL BID
EXCLUDING G.S.T.
Vic's Mechanical Contracting
Toronto
Crozier Mechanical
Orono
Canadian Tech Air Systems
Scarborou h
Advantage Air Tech
Pickerin
Mutual Mechanical
Oshawa
$117,600.00
$127,200.00
$131,660.00
$140,000.00
$142,000.00
After review and analysis of the bids by the Operations Department and the Purchasing Division, it
is mutually agreed that the low bidder, Vic's Mechanical Contracting, Toronto, Ontario, be
recommended for the supply and installation of the four (4) gas fired furnaces as required by the
Municipality of Clarington. The required funds will be drawn from Capital Account #110-32-370-
83631-7401 Hampton Centre which has an approved budget for 2005 and 20070f $152.000.00
leaving a surplus of $15,249.47.
Vic's Mechanical Contracting has performed satisfactory work for the Municipality of Clarington in
the past.
The Director of Finance has reviewed the funding requirements and concurs with the
recommendation.
Written authorization is requested for this contract.
NOTE:
Recommendation #3 provides for re-tender of the above project due to a change in
requirements.
REPORT NO.: COD-046-07
PAGE 4
2. CL2007-36, STEVENS ROAD CULVERT CONSTRUCTION & STREAM ALIGNMENT
In view of the fact there are no Council meetings scheduled until September 10,2007,
authorization is requested to award the above noted contract to Dave Boyle Excavating Lim~ed,
Bowmanville, Ontario. The total project amount is $356,000.00 which includes the total bid price of
$205,480.00, excluding GST, a 6% contingency, detailed design, contract administration fees,
environmental studies and utility relocations. This tender CL2007-36 is Phase One - Culvert
Construction & Stream Realignment for the Stevens Road capital project and the total project cost
of $356,000.00 is within the approved 2006 Capital Budget amount of $413,000.00. Phase Two for
Stevens Road is in the 2007 Capital Budget in the amount of $1 ,320,000.00.
Tenders were advertised on the Clarington and OPBA Website and advertised in the Daily
Commercial News and the Canadian Statesman. A tabulation of bids received on the above noted
tender is as follows:
BIDDER
BID AMOUNT
Dave Boyle Excavating Limited
Bowmanville
Ron Robinson Limited
Bowmanville
Elirpa Construction and Materials Limited
Pickerin
F.D.M. Contracting Company Limited
Thornhill
*Extension Error
$205,480.00*
$245,122.30
$362,549.13
$423,015.00
After review and analysis of the bids by Totten Sims Hubicki Associates, Engineering Services
Department and the Purchasing Division, it is mutually agreed that the low bidder, Dave Boyle
Excavating Limited, Bowmanville, Ontario, be recommended for the Stevens Road Culvert
Construction and Stream Realignment contract as required by the Municipality of Clarington.
The required funds will be drawn from Capital Account #110-32-330-83296-7401 Phase One-
Culvert and Creek Realignment which has an approved budget for 2006 and 20070f $1 ,733,000.00
leaving a surplus of $1,377,000.00. The Engineering Services Department requests that the
$1,377,000.00 surplus be allocated to Phase Two of the construction project.
Dave Boyle Excavating Limited has performed satisfactory work for the Municipality of Clarington.
The Director of Finance has reviewed the funding requirements and concuns with the
recommendation.
A copy of the recommending memos from Engineering Services Department and Totten Sims
Hubicki Associates are attached as Schedules "A" and "B" respectively, are attached.
Written authorization is requested for this contract.
Attachment 1
CI!Jlmgron
MEMO
TO: Jerry Barber, Purchasing Manager
FROM: Bruno Bianco, P. Eng., Design Engineer
DATE: July 25,2006
SUBJECT: Stevens Road Culvert Construction & Stream Realignment
Contract No. CL2007-36
Our File No: CRC.StevensRd.2
The Engineering Services Department has reviewed the recommendation provided by TSH and
offers the following comments concerning the culvert construction and creek realignment of
Stevens Road.
This project is phase one of a two phase project. The second phase of the project will involve
the construction of the road section above the culvert from Regional Road 57 to Clarington Blvd.
The overall project budget for the both projects is $1,733,000.00 and entirely funded through
development charges.
We concur with the recommendation to award the contract to Dave Boyle Excavating Limited in
the amount of $205,480.00 exclusive of G.S.T. Due to our current knowledge of the site, a
contingency amount of 6% is carried forward for the project. Therefore, including detailed
design, contract administration fees, environmental studies, and utility relocations, the
engineering department advises the following Municipal breakdown for phase one of the above
referenced project;
Account
Phase One - Culvert and Creek
Reali nment
11032330832967401
Total Pro'ect Amount
Approved Budget
Amount(2006&2007)
Estimated Bud et Surplus
$356,000.00
$1,733,000.00
$1,377,000.00
The Engineering Services Department therefore requests that the remaining $1,377,000.00 of
the approved Municipal budget funds be allocated to phase two of the construction project.
Attachment No.1
4
I{
(
We recommend staff award based on the above apportionments. Attached for
your files is the recommendation provided by TSH. Should you have any further
question, please feel free to contact the undersigned.
Regards,
Bruno M. Bianco, P. Eng.
Design Engineer
BB/al
Cc: William McCrae, P. Eng., Totten Sims Hubicki
Nancy Taylor, Director of Finance
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T(905)623-3379
.
TIM
Attachment No.1
(
i(
engineers
architects
planners
T(men Sims HubiGki Associates
513 Division Street.
Cooolirg, Onlaria, CanClda 1(9A 5G6
i9051372.2121 Fox: (905) 372 3621
E.rn.lil: cobourg@t5h.ca www.tsh.ca
July 24, 2007
Mr. A.S. Caonella, C.E.T.
Director of Engineering Services
Corporation of the Municipality of Clarington
40 Temperance Street
BOWMANVILLE, Ontario. L] C 3A6
Dear Mr. Cannella:
Re: Stevens Road Culvert Construction and Stream Realignment, Bowmanvllle
Contract No. CL2007-36, Municipality of Cia ring ton
TSH Project No. 12-29561
Tenders for the above project were opened at the Municipal offices on Monday, July 16, 2007 at
2: 15:00 p.m. The bids received, excluding OST, are summarized as follows:
BIDDER
Dave Boyle Excavating Limited, Bowmanville, ON
Ron Robinson Ltd., Bowmanville, ON
Elirpa Construction and Materials Limited, Pickering. ON.
F.D.M. Contracting Company Limited, Thornhill, ON
· Extension Error
TOTAL BID
$205,480.00 .
$245,122.30
$362,549.13
$423,015.00
TSH has reviewed all bids accepted by the Clarington Purchasing Department and have confirmed the bid
values noted above. Dave Boyle Excavating Limited has recently completed replacement of the Oeo. A.
Stephen Bridge, Cedar Park Road Bridge and Concession Road 6 Culvert for the Municipality of
Clarington and administered by TSH, under Contract No. CL2006-29 and is currently completing
Contract No. CL2006-53, Green Road and Baseline Road Reconstruction. Contract No. CL2006-29 was
completed and Contract No. CL2006-53 is progressing in a satisfactory manner. They have alsocarriec!_
.-------DUtot!ler projects iII-the-areainetuding- wu,k at Ontario PowetGeneration Darlington mil numerous
construction projects at Durham College. All references contacted assessed Dave Boyle Excavating
Limited's performance to be satisfactory.
Estimated project costs based on Dave Boyle Excavating Limited's low bid are provided below:
Construction
Preliminary and Detailed Design,
Class EA Environmental Assessment
(to June 30, 2007)
Contract Administration
Utility Relocation
Contingencies
Total
$205,480.00
$ 99,907.62
$ 21,000.00
$ 8,936.38
$ 20.676.00
$356,000.00
Mr. A. S. CaMella C.E.T.
July 24, 2007
2.
(
(
Attachment No.1
The above Design and Environmental Assessment costs are for the entire Stevens Road extension
between Clarington Boulevard and Regional Road 57 and also include required improvements on
Regional Road 57. The remainder of the road works will be tendered later this summer pending approval
ofworXs on Regional Road 57 by Region of Dum am Staff.
The Municipality ofClarington's share of Contract No. CL2007-36 is projected to be on budget based on
a budget amount of$4l3,OOO.OO from Account # 110-32-330-83296-7401.
We recommend that the tender in the amount of$205,480.00 (exclusive ofG.S.T.) be awarded to Dave
Boyle Excavating Limited ofBowmanville, Ontario.
Deposit cheques or bid bonds shall be retained for the low and second low bids until the contract has been
executed.
Should you require any further information, please contact the undersigned.
Yours truly,
~
Ron Albright, P. En
Proj ect Engineer
RAlcg
P:\J2-2956l\ConupW32J.dK
pc: Mr. Bruno Bianco, P.Eng., Municipality ofClarington
TIN
By-law read a first and second time this
day of
day of
,2007.
,2007.
Attachment 2 - Schedule "B"
THE CORPORATION OF THE MUNICIPALITY OF ClARINGTON
BY-LAW 2007-
Being a By-law to authorize a contract between the Corporation of the
Municipality of Clarington and Dave Boyle Excavating Limited,
Bowmanville, Ontario, to enter into an agreement for the Stevens Road
Culvert Construction & Stream Alignment.
THE COPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY ENACTS AS
FOllOWS:
1. THAT the Mayor and Clerk are hereby authorized to execute, on behalf of the
Corporation of the Municipality of Clarington and seal with the Corporation Seal, a
contract between Dave Boyle Excavating Limited, Bowmanville, Ontario and said
Corporation; and
2. THAT the contract attached hereto as Schedule "A" form part of this By-law.
By-law read a third time and finally passed this
Jim Abernethy, Mayor
Patti L Barrie, Municipal Clerk