HomeMy WebLinkAboutPSD-011-19Clarftwn
Planning Services
Public Meeting Report
If this information is required in an alternate accessible format, please contact the Accessibility
Coordinator at 905-623-3379 ext. 2131.
Report To: Planning and Development Committee
Date of Meeting: February 19, 2019
Report Number: PSD -011-19 Resolution: PD -017-19
File Number: ZBA2018-0029 By-law Number:
Report Subject: An application by 2411 Baseline Limited to amend the Zoning By-law
to permit the development of a commercial property for a variety of
uses
Recommendations:
That Report PSD -011-19 be received;
2. That the proposed application for Zoning By-law Amendment ZBA 2018-0029 continue
to be processed including the preparation of a subsequent recommendation report;
3. That staff consider the public comments received in the further processing of the Zoning
By-law Amendment application submitted by 2411 Baseline Limited to permit the
commercial development; and
4. That all interested parties listed in Report PSD -011-19 and any delegations be advised
of Council's decision by the Department.
Municipality of Clarington
Report PSD -011-19
Report Overview
Page 2
The Municipality is seeking public input on a proposed commercial development at 2411 and
2415 Baseline Road. The owner, 2411 Baseline Limited, has submitted an application for
rezoning to allow the development, which comprises 3,643 square metres of commercial
floor area for uses including restaurants, retail, offices and a daycare. The application also
seeks reduced parking standards for this development.
The purpose of this report is to provide information on the proposal and receive public
comments at the Public Meeting. The proposed Zoning By-law amendment would replace
the "Holding — Light Industrial ((H)M1) Zone" and "Environmental Protection (EP Zone" with
an appropriate zone to permit the development.
1. Application Details
1.1 Owner/Applicant
1.2 Agent:
1.3 Proposal:
1.4 Area:
1.5 Location:
1.6 Roll Numbers:
1.7 Within Built Boundary
2. Background
2411 Baseline Limited
D.G. Biddle & Associates Limited
To permit a commercial development comprising:
x 23 commercial units (4 restaurant units, 10 retail units, 9
office units)
x 1 day care
x 126 parking spaces
1.43 ha
2411 and 2415 Baseline Road, Bowmanville
181701002007220 and 181701002007100
Yes
2.1 On November 19, 2018, the Municipality received a Zoning By-law amendment
application from 2411 Baseline Limited. The application was deemed complete on
November 21, 2018.
2.2 The Municipality received the following reports in support of the application:
x Planning Justification Report
x Traffic Impact Study
x Functional Servicing and Storm Water Management Report
x Phase One and Two Environment Site Assessment
Municipality of Clarington Page 3
Resort PSD -011-19
x Environmental Impact Study
x Stage One and Two Archeological Report
3. Land Characteristics and Surrounding Uses
3.1 The subject site (Figure 1) is generally flat, with a gentle slope from Baseline Road south
and east to the stormwater management pond and Westside Creek. There is a detached
dwelling at 2415 Baseline Road (Figures 2 and 3), which would be demolished to allow
the development. A row of trees are located on the south and east sides of 2415 Baseline
Road.
[=Subject Property
Bottrell Street ,? J
n o,
5
m a Roser Crescent
S � i• a �
Proposed
0 a+
N
1 Storey
mMBuilding
Baseline Road
Baseline Road
Laneway �
• and �
Parking �
Proposed
2 Storey 5pice_r_Squ_are
Building
\ a- W ...
R
34
I C,
ZBA 2031$-0029 }_ ��►"-- ore
Figure 1: The subject site and the surrounding area
Municipality of Clarington
Resort PSD -011-19
3.2 The surrounding uses are as follows:
Page 4
North - Municipal open space across Baseline Road and single family homes.
South - Storm water management pond
East - Residential property and Westside Creek.
West - Storm water management pond and the Clarington Fields Facility
Figure 2: View of subject site looking southeast
Figure 3: View of 2411 Baseline Road looking southwest
Municipality of Clarington Page 5
Resort PSD -011-19
4. Provincial Policy
Provincial Policy Statement (2014)
4.1 The Provincial Policy Statement (PPS) identifies settlement areas such as Bowmanville to
be the focus of growth. Within settlement areas, the PPS states that planning authorities
shall promote the development of vacant or underutilized sites where feasible,
considering the availability of existing infrastructure. The PPS encourages municipalities
to promote long-term economic prosperity and support opportunities for economic
development. The PPS requires sensitive land uses such as day cares to ensure they are
appropriated designed, buffered and/or separated from major facilities.
Provincial Growth Plan (2017)
4.2 The Provincial Growth Plan directs development to settlement areas and promotes
development within the Built Boundary, which the subject site is. The Growth Plan
encourages the development of underutilized land and efficient use of existing services
and infrastructure in built-up areas. The Growth Plan directs retail and office uses to
locations that support active transportation and have existing or planned transit. The
proposed commercial development proposes development of underutilized and vacant
land where the necessary infrastructure for active transportation and transit are already
available.
5. Official Plans
Durham Region Official Plan
5.1 The subject site is located within the "Living Area" designation of the Durham Official
Plan. Limited office development and limited retailing of goods and services is permitted
in this designation.
Clarington Official Plan
5.2 The Clarington Official Plan (COP) designates the subject lands as Gateway Commercial
and Environmental Protection Area. Gateway Commercial areas are intended to serve
the specialized needs of residents and attract visitors to the Municipality.
Permitted uses can include:
x Retail and service commercial uses including hotels, warehouse -style stores
(excluding department stores and grocery stores) and home furnishing uses
x Financial institutions
x Business, professional and medical offices
x Restaurants
Municipality of Clarington Page 6
Resort PSD -011-19
x Limited small retail and personal services
• Community facilities.
5.3 Environmental Protection Areas include the natural heritage and hydrologically sensitive
features that comprise the natural heritage system as well as those lands within the
regulatory flood plain of a watercourse. The Westside Creek watercourse, its floodplain
and associated natural heritage system is located immediately east of this property.
Mitigations measures may be incorporated into a development to protect adjacent
Environmental Protections Areas from adverse impacts. Recommended measures come
from studies completed to support a development application.
6. Zoning By-law
6.1 The subject lands are zones as follows:
x 2411 Baseline Road: "Holding - Light Industrial ((H)M1) Zone" and "Environmental
Protection (EP) Zone"
2415 Baseline Road: "Environmental Protection (EP) Zone"
6.2 A zoning by-law amendment is required to bring into conformity the "Holding - Light
Industrial ((H)M1) Zone" exception of the zoning by-law with the Gateway Commercial
designation and to permit the proposed development and refine the location of the
"Environmental Protection (EP) Zone".
7. Summary of Background Studies
The applicant submitted the following studies in support of the rezoning application:
Planning Justification Report (October, 2018)
7.1 The Planning Justification Report identifies the site as being suitable for the proposed
commercial development. Some of the potential benefits identified by the applicant
include:
x Development of an underutilized site within the existing built-up area, consistent with
the Municipality's objectives for growth;
x Use of existing municipal services;
x Compatible with and complementary to nearby recreational and residential uses; and,
Supports both active and public transportation to and from the site by locating directly
across the road from a bus stop, bike lanes on Baseline Road and direct connection to
existing sidewalk and trail network to the north and west.
Municipality of Clarington Page 7
Report PSD -011-19
7.2 The Planning Justification Report provides a broad overview of the development proposal
and its general conformity with the Clarington Official Plan. However, more information is
still required to justify the requested Zoning By-law amendments. For example, the
Planning Justification Report has not yet provided a rationale for reduced parking
requirements, building location and location of a sensitive land use (e.g. daycare) from a
major facility.
Traffic Impact Study (October, 2018)
7.3 The Traffic Impact Study ("TIS") recommends:
x Monitoring traffic patterns at the Baseline Road and Green Road intersection to adjust
traffic signal timing to accommodate peak hour directional traffic volumes.
x A westbound left turn lane on Baseline Road at the site entrance across from
Westside Drive.
x Monitoring traffic patterns at the site entrance at West Side Drive and Baseline Road
for improvements which may be required to mitigate the length of delay for outbound
turning vehicles onto Baseline Road from the site and Westside Drive.
Planning for future signalization of the West Side Drive/Baseline Road and the site
entrance should be built into the design of the entrance driveway.
7.4 The Functional Servicing Report identifies how the development can be serviced. The
report has the follow recommendations:
x Sanitary sewer and watermain on Baseline Road will be used to service the
development.
x On-site storm sewers to be sized as per Clarington standards.
The proposed stormwater quantity control ensures that post -development peak flow
does not exceed pre -development peak flow from the site to Westside Creek.
Stormwater quality control is proposed to be via use of an oil/grit separator.
Phase One and Two Environmental Site Assessment (August, 2012)
7.5 The Phase One Environmental Site Assessment (`ESA") identified risk of contamination
from the historical use of the site as an orchard where certain pesticides could have been
used. The consultant conducted a Phase Two ESA on August 22, 2012, as
recommended in the Phase One ESA report. Shallow soil samples were collected and
analyzed for arsenic and lead contamination. Concentrations were found to be below the
Ontario threshold standard. Based on these findings, the consultant did not recommend
any additional testing.
Municipality of Clarington Page 8
Resort PSD -011-19
Environmental Impact Study (September, 2018)
7.6 The Environmental Impact Study ("EIS") states that there will be no net loss of natural
heritage features as a result of the development. The study report provides
recommendations to address potential impacts to adjacent natural heritage features
and/or their functions during the site preparation, construction and post -construction
periods. Recommended mitigation measures will be implemented through Site Plan
Approval for the proposed development.
Stage One and Two Archeological Report (October, 2018)
7.7 The Stage One research indicated high archaeological potential at the site due to
proximity to water sources, archaeological sites, and historic roadways. Stage Two
testing on this property therefore took place at a high potential (5 meter) interval. This
assessment did not result in the discovery of any material of cultural significance and no
further assessment is required.
8. Public Notice and Submissions
8.1 Public notice was given by mail to each landowner within 120 metres of the subject site
and one notice sign was installed on the site facing Baseline Road (Figure 4). Public
notice was also posted on the Clarington website and published in the Planning Services
Department e -update newsletter.
` A
DEVELOPMENT PROPOSAL
aPPlam
5%G =m.d
__ •�` �,.
s
Figure 4: Public Notice sign
Municipality of Clarington
Resort PSD -011-19
Page 9
8.2 As of the writing of this report, one resident inquired about the possibility of traffic lights at
the Baseline Road and West Side Drive intersection if this project is built. This will be
reviewed as part of the Traffic Impact Study.
9. Agency Comment
Regional Municipality of Durham
9.1 The Durham Planning Department state the proposed use is consistent with Provincial
planning policies and conforms to the Durham Official Plan.
9.2 The Region has reviewed the Stage One and Two Archaeological Report, which states
that no further site assessment is required. The applicant must submit the Report to the
Ministry of Tourism, Culture and Sports (MTCS) for their clearance letter, which must be
forwarded to the Region once received. No soil disturbance can take place until the
clearance letter is issued by MTCS.
9.3 The Region has reviewed the Phase One and Two ESA reports submitted in support of
the application. The Ministry of Environment, Conservation and Parks (MECP) Brownfield
Regulation and the Region of Durham Council adopted Site Contamination Protocol,
require that all ESA reports be Record of Site Condition (RSC) compliant and are valid for
up to 18 months from completion. Since the report was prepared in 2012 and is not RSC
compliant, the Region requires a current Phase One ESA that is RCS compliant to be
completed. An RSC compliant Phase Two ESA may be required depending on the
results of the Phase One ESA.
9.4 A Noise Impact Study is required to determine impact from traffic noise on Baseline Road
to the proposed daycare, which is identified as a noise -sensitive use by the MECP.
Attenuation measures and warning clauses for the development may be required.
9.5 The Durham Works Department states that water supply and sanitary sewer are available
at the site. Some changes to the site servicing plan are required in order to satisfy the
Works Department. Existing water and sewer connections at 2415 Baseline Road must
be shown on the plan to be disconnected and abandoned.
9.6 Based on the Region's right -turn lane guidance for a 2 -lane Type A arterial road
(Baselined Road), the Region would expect an eastbound right -turn taper lane to be
provided west of the site entrance. The TIS provides no analysis of the need for auxiliary
turn lanes at Baseline Road and the site access / West Side Drive intersection. The
Region would also expect the need for a westbound left -turn lane to be discussed in the
TIS.
Municipality of Clarington Page 10
Resort PSD -011-19
9.7 Although it may not be warranted, the Region strongly recommends that a westbound left -
turn lane be provided as part of this development. This would enable westbound and
eastbound left -turns to be centred rather than off -set at the Westside Drive intersection.
The taper length and deceleration lane should be planned based on the design speed of
Baseline Road.
9.8 While the TIS concludes that signalization of Baseline Road and West Side Drive would
not be warranted within the 5 -year horizon, it may be prudent to plan for future
signalization at the time of development. Durham Works and Transit recommend that
the intersection of Westside Drive and Baseline Road include a marked pedestrian
crosswalk connecting the development to the bus stop across Baseline Road.
Central Lake Ontario Conservation Authority
9.9 CLOCA has reviewed the application at a high level and has no objection in principle to
the proposed rezoning, however detailed comments pertaining to the Stormwater
Management Report and the EIS are in progress. The detailed comments will address
whether the proposed limits of development are acceptable, which will establish the
Environmental Protection Zone boundary between the development and the most
extensive feature and its associated setback or buffer.
10. Departmental Comments
Clarington Engineering Services Department
10.1 The Engineering Services Department has reviewed the application and object to the
proposal as submitted. They do not endorse a zoning change to allow 126 parking spaces
instead of the required 145 parking spaces. A lack of on-site parking will lead to parking
offsite in the vicinity of the development. Parking on Baseline Road is not permitted.
Some on -street parking is available on West Side Drive adjacent to West Side Park,
however this would require pedestrians to cross Baseline Road.
10.2 The Department has reviewed the TIS. The traffic count used for the intersection of West
Side Drive and Baseline Road was completed adjacent to a holiday and is not accepted
as a reliable data source. The TIS indicates that a traffic signalization warrant will be
realized for the intersection of Baseline Road and West Side Drive in the near future post
development, however specific timing must be provided. The study must make
recommendations on all intersection improvements or modifications required to install
traffic signals at this intersection. Further, the proposed main entrance driveway on the
site is too short in length to be compatible with either a signalized intersection or an
unsignalized intersection. The TIS must be amended to make a specific recommendation
regarding the minimum length for the main entrance driveway to ensure compatibility with
a signalized intersection. Further discussion regarding all aspects of the TIS is required
between the Municipality and the applicant.
Municipality of Clarington Page 11
Report PSD -011-19
10.3 The Engineering Services Department has reviewed the Grading Plan, Servicing Plan
and Stormwater Management Report in support of this application. The proposed
retaining wall located along the east boundary of the site is undesirable. The wall is
located on the higher side of the property line and perpetual maintenance will be
extremely difficult. An engineering design and detail must be provided for the proposed
wall. The applicant must provide cross sections which clearly illustrate that the proposed
wall can be constructed clear of the property line. The Grading Plan must be amended to
illustrate any areas that are subject to ponding under the 100 year storm condition. The
storm water drainage works and facilities necessary for this development must be
constructed in accordance with the West Side Creek Master Drainage Study.
10.4 There are several existing utility conflicts with the proposed site plan concept including
the emergency warning siren for Darlington OPG. The applicant will be required to
resolve all utility conflicts, in principle, prior to development approval.
10.5 The applicant proposes to purchase property from the Municipality to accommodate the
site entrance directly opposed to West Side Drive. It may be necessary for the applicant
to acquire more land than is currently depicted on the site plan to accommodate the
entrance. The property acquisition must take place prior to approval of the subject
application.
10.6 The proposed easterly site entrance is unsuitable. The entrance radius projects across
the east property line of the subject site. The entrance must be modified to a standard
symmetrical configuration. Future submissions will not be accepted if this issue is not
resolved. The suitability of locating a second entrance to the site in proximity to a
signalized intersection will be subject to further review and discussion.
10.7 An 8 metre road widening across the frontage is required to be dedicated to the
Municipality.
Clarington Emergency and Fire Services
10.8 The Emergency and Fire Services Department has no objection to the approval of this
application, provided their comments are implemented at the site plan approval stage
should the rezoning application be approved.
Clarington Operations Department
10.9 The Operations Department is not satisfied with the proposed merger of the existing
access to the stormwater pond south of this site with access to proposed development.
The Operations Department also provided comments that can be implemented at the site
plan approval stage should the rezoning be approved.
Municipality of Clarington Page 12
Resort PSD -011-19
Clarington Building Division
10.10 The Building Division has no objections.
11. Discussion
Proposed Commercial Development
11.1 The proposal represents a form of development encouraged for the most part by
Provincial, Regional and Municipal policies. It will add 3,643 square metres of commercial
floor space in Bowmanville, increasing job opportunities for the community and spurring
economic development. Figure 5 illustrates that solar panels would be included as a
sustainable design feature of this site, reducing electricity demand from outside sources
to serve this site.
Figure 5: Proposed development looking southwest from Baseline Road.
Parking Provisions
11.2 Policies of the Official Plan direct development to minimize land consumption and limit the
number of parking spaces based on available public transit and opportunities for shared
parking. The Planning Justification Report states that the development would include 126
parking spaces whereas 145 spaces are required by the Zoning By-law. The report fails
to justify the proposed decrease. Further discussion is required with the applicant to
determine an appropriate number of parking spaces.
Municipality of Clarington Page 13
Report PSD -011-19
Urban Design
11.3 This proposal is being reviewed against the urban design policies of the Official Plan,
which provide direction for development located within a Gateway Commercial Centre
and can be summarized within the following themes:
11.3.1 Building Design and Streetscape
x Proposed buildings will enhance the built environment with attention to massing,
building articulation, exterior cladding, architectural detail, the use of local
materials and styles;
x Have buildings sited near the street line to contribute to a sense of enclosure and
a strong street edge;
x Enhance the pedestrian environment with awnings, pedestrian scale lighting,
landscaping, benches and other street amenities;
x Create a consistent building setback from the road and a harmonious
architectural style; and
Provide safe, well-defined pedestrian walkways from the street to the store
entrance and between buildings.
11.3.2 Parking Areas and Landscaping Treatment
x Provide sufficient and convenient parking, screened through the use of effective
buffer planting;
x Mitigate the heat island effect of development by ensuring an appropriate use of
material and landscaping to provide shading; and
• Provide street trees and other landscaping as part of the development proposal
within the public right-of-way.
Sustainable Design
11.4 The Clarington Official Plan requires all new development to include sustainable design
features. The use of appropriate materials and landscaping to conserve energy and
water must be incorporated into the site design. While the proposal includes solar panels
to minimize the consumption of energy from the grid, additional green building design and
green infrastructure features must be included to comply with Official Plan. These
features can include pavements that infiltrate, native species plantings and additional
vegetated parking islands. Further, Low Impact Development measures must be used to
assist with on-site water infiltration, water quality treatment and energy savings.
Municipality of Clarington
Resort PSD -011-19
Traffic and the Pedestrian/Cyclist
Page 14
11.5 Policies of the Clarington Official Plan direct that new development must integrate access
to transit and active transportation modes. The site design must make it easy for
pedestrians and cyclists to access the sidewalk, road and transit network available at the
site. The design of the intersection of West Side Drive and Baseline Road must
contemplate a marked crosswalk connecting the development to the sidewalk, trail
network and bus stop across Baseline Road. The revised plan will also need to provide
clear connections through the site and incorporate bicycle racks in highly visible and
convenient locations.
11.6 Staff will continue to work with the applicant on site design to better align the proposed
development with Clarington's urban design and sustainable design policies, while
addressing the comments from various departments and agencies. The current proposal
does not address all of the relevant policies of the Clarington Official Plan.
12. Concurrence
Not Applicable.
13. Conclusion
The purpose of this report is to provide background information on the development
proposal submitted by 2411 Baseline Limited for the Public Meeting under the Planning
Act. Staff will continue processing the application including the preparation of a
subsequent report upon resolution of identified issues and receipt of the outstanding
items to be submitted by the applicant.
G �.r
Submitted by: Reviewed
Faye Langmaid, RPP, FCSLA
Acting Director of Planning Services
by:
Andrew C. Allison, B. Comm, LL.B
CAO
Staff Contact: Ruth Porras, Senior Planner/ Urban Designer, 905-623-3379 ext. 2412 or
rporras@clarington.net
List of interested parties to be notified of Council's decision is on file in the Planning Services
Department.
Ken Pasricha, 2411 Baseline Limited
Michael Fry, D.G.Biddle & Associates Limited