THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
BY-LAW 2007-167
Being a By-law to authorize a contract between the
Corporation of the Municipality of Clarington and Fernview
Construction Limited, Bolton, Ontario for the Green Road and
Stevens Road Reconstruction.
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY ENACTS AS
FOLLOWS:
1. THAT the Mayor and Clerk are hereby authorized to execute, on behalf of the
Corporation of the Municipality of Clarington and seal with the Corporation Seal, a
contract between, Fernview Construction Limited, Bolton, Ontario, and said
Corporation; and
2. THAT the contract attached hereto as Schedule "A" form part of this By-law.
By-law read a first and second time this 25th day of June, 2007.
By-law read a third time and finally passed this 25th day of June, 2007.
c::::l~
~thY, IV~
~ ,/') '"
/' . --... ,,' L.~
/Patti . arri ,Municipal Clerk
'-
1
l
I
l
L
l
l
l
L'
L
L
L
L
L
i
L'
L"
L
",'
c
,
TENDER DOCUMENTS
GREEN ROAD RECONSTRUCTION
STEVENS ROAD CONSTRUCTION
CONTRACT NO: CL2007-27
CORPORATION OF THE MUNICIPALITY OF CLARINGTO.N
MAY 2007
..
-
AGREEMENT
-
THIS AGREEMENT made in quadruplicate.
-
BETWEEN: FERNVIEW CONSTRUCTION LIMITED
-
of the Region Municipality of Durham
-
hereinafter called "Contractor"
..
THE PARTY OF THE FIRST PART
..
- and -
..
the CORPORATION OF THE MUNICIPALITY OF CLARINGTON
-
hereinafter called the "Purchaser"
..
THE PARTY OF THE SECOND PART
.
..
WITNESSETH, that the party of the first part, for and in consideration
of the payment or payments specified in the tender for this work hereby agrees to
furnish all necessary machinery, tools, equipment, supplies, labour, and other
means of construction and, to the satisfaction of the Engineer, to do all the work as
described hereafter, furnish all the materials except as herein otherwise specified,
and to complete such works in strict accordance with the plans, specifications and
tender therefore, all of which are to be read herewith and form part of this present
agreement as fully and completely to all intents and purposes as though all the
stipulations thereof have been embodied herein.
.
.
.
..
Page 1 of 3
..
..
..
CONTRACT AGREEMENT
CONTRACT NO: CL2007-27
-
DESCRIPTION OF THE WORK AND LIST OF DOCUMENTS
-
Tender for Contract No. CL2007-27, Green Road Reconstruction from Highway No.2 to proposed Stevens
Road and Stevens Road Construction from Clarington Boulevard to Green Road.
..
B.
TENDER FORM
General Page 1 to 2
Itemized Bid
Bidders Experience Page 3
List of Subcontractors Page 4
Agreement to Bond Page 5
Schedule of Tender Date Page 6
CORPORATION OF THE MUNICIPALITY
OF CLARINGTON STANDARD TERMS Pages 1 to 8
SPECIAL PROVISIONS Pages 1 to 24
A.
..
-
..
C.
D. CONTRACTOR SAFETY POLICY AND PROCEDURE
..
E. PROVISIONS (SP) - Detailed Tender Items
..
F.
STANDARD SPECIFICATIONS
-
It shall be the Contractor's responsibility to obtain those editions current at the time of tendering, of
the Ontario Provincial Standard Specifications (OPSS) and if applicable the Region of Durham
Standard Specifications, where mentioned in the Contract Documents.
..
H.
..
I.
..
G. GENERAL CONDITIONS OPSS General Conditions of Contract (September 1999) although not
attached are considered part of this Tender.
STANDARD SPECIFICATIONS & DRAWINGS Region of Durham Specifications for Regional
Services, although not attached are considered
part of the Tender.
GEOTECHNICAL INVESTIGATION
All plans and documents referred to in the Specifications.
..
The Contractor further agrees that he will deliver the whole of the works completed in accordance with
this Agreement.
..
IN CONSIDERATION WHEREOF said party of the second part agrees to pay to the Contractor for
all work done, the unit prices on the Tender.
.
-
This agreement shall enure to the benefit of and be binding upon heirs, executors, administrators and
assigns of the Contractor and on the heirs and successors of the Purchaser.
Page 2 of 3
-
..
..
..
IN WITNESS WHEREOF, the Contractor and the Purchaser have hereunto signed their names
'III and set their seals on the day first above written.
..
..
SIGNED and seals by the Contractor:
)
)
)
) 11
)
)
! 0rA It
~ -::1 c.I 1...'-' '1, ~7
Date / '
-
..
..
..
In the presence of
......
..
SIGNED and sealed by the Purchaser: CORPORATION OF THE MUNICIPALITY OF CLARINGTON
In the presence of
)~
l _ _ Jim Ab y, Mayor
Date
)
)
)
)
)
)
)
)
..
..
.
-
..
Date
.
..
Page 3 of 3
..
..
l
1
L
l
L
L
L
L
L
L
L
L
I
I
I
&
l
L
1
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
CONTRACT 'NO. CL2007 -27
GREEN ROAD RECONSTRUCTION
STEVENS ROAD CONSTRUCTION
..
PROJECT:
..
..
AUTHORITY:
..
CONTRACT ADMINISTRATOR:
..
..
TENDER:
..
..
..
..
..
..
..
..
TENDERS RECEIVED BY:
.
.
UNTIL:
..
..
..
TENDER FOR CONTRACT NO: CL2007 -27
GREEN ROAD RECONSTRUCTION
STEVENS ROAD CONSTRUCTION
CORPORATION OF THE MUNICIPALITY
OF CLARINGTON
D.G. BIDDLE & ASSOCIATES LIMITED
CONSULTING ENGINEERS & PLANNERS
96 KING STREET EAST
OSHAWA, ONTARIO, L1H 1B6
TELEPHONE: (905) 576-8500
FAX: (905) 576-9730
FERNVIEW CONSTRUCTION LIMITED
Contractor's Name
P.O. BOX 33
Contractor's Address
BOLTON, ONTARIO L7E 5T1
(905) 794-0132
Contractor's Telephone
(905) 794-1313
Contractor's Fax
enzo@fernview.ca
Contractor's E-Mail
FERNANDO VELOCCI
Name of Person Signing for Firm
PRESIDENT
Position of Person Signing for Firm
Ms. Pattie Barrie, Clerk
Corporation of the Municipality of Clarington
40 Temperance Street
Bowmanville, Ontario, L 1 C 3A6
Telephone: (905) 623-3379
Frida~June15,2007
2:00:00 p.m. Local Time
1
..
...
...
...
..
...
..
-
...
..
...
..
..
..
..
..
...
..
...
TENDER
CONTRACT NO: CL2007 -27
TO: The Mayor and Members of Council,
The Corporation of the Municipality of Clarington
40 Temperance Street
Bowmanville, Ontario, L 1 C 3A6
Mayor and Members of Council:
The Contractor has carefully examined the Plans, Provisions, Specifications and Conditions
described herein as part of the work to be done under this Contract. The Contractor
understands and accepts the said Plan, Provisions, Specifications and Conditions, and, for
prices set forth in this Tender, hereby offers to furnish all machinery, tools, apparatus and
other means of construction, furnish all materials, except as otherwise specified in the
Contract, and to complete the work in strict accordance with the said Plans, Provisions,
Specifications and Conditions.
The Contractor understands and accepts that the quantities shown are approximate only,
and are subject to increase, decrease or deletion entirely of found not required.
Attached to this Tender is a bid bond in the amount of specified in Clause 3, Special
Provision - Information to Bidders, made payable to the Authority. This shall constitute a
deposit which shall be forfeited to the Owner, if the successful Contractor fails to file with the
Owner a 100% Performance Bond and a 100% Labour and Material Payment Bond of the
nature satisfactory to the Owner within ten (10) days from the date of receipt of Notice of
Acceptance of the Tender.
Notification of Acceptance may be given and delivery of the Form of Agreement made by
prepaid post, addressed to the Contractor at the address contained in this Tender.
2
..
GREEN ROAD RECONSTRUCTION
STEVENS ROAD CONSTRUCTION
MUNICIPALITY OF CLARINGTON
FERNVIEW CONSTRUCTION LIMITED
CONTRACT NO. CL 2007-27
1/6
...
..
TENDER RESULTS JUNE 15, 20007
SUMMARY
-
TOTAL PART A - GENERAL
$66,193.00
TOTAL PART B - GREEN ROAD RECONSTRUCTION
$802,928.36
..
TOTAL PART C - STEVENS ROAD CONSTRUCTION
$843,554.17
$1,712,675.53
..
Sub Total
6% G.S.T.
$102,760.53
..
$1,815,436.06
TOTAL TENDER AMOUNT
..
..
..
..
Tenderer's G.S.T. Registration No. R101784585
..
..
..
..
..
..
..
..
..
GREEN ROAD RECONSTRUCTION
STEVENS ROAD CONSTRUCTION
MUNICIPALITY OF CLARINGTON
FERNVIEW CONSTRUCTION LIMITED
CONTRACT NO. CL 2007 -27
2/6
..
..
IN ACCORDANCE WITH THE FIRST PARAGRAPH OF THIS TENDER, THE CONTRACTOR HEREBY OFFERS TO
COMPLETE THE WORK SPECIFIED FOR CONTRACT NO. CL 2007-27 FOR THE FOLLOWING UNIT PRICES
..
ESTIMATED UNIT TOTAL
ITEM DESCRIPTION UNIT QUANTITY PRICE COST
1.0 GENERAL
1.1 100% performance bond I.s. 1.00 $19,800.00 $19.800.00
1.2 100% labours and material bond I.s. 1.00 $4,674.00 $4,674.00
1.3 Liability insurance I.s. 1.00 $14494.00 $14.494.00
1.4 Mobilization and demobilization I.s. 1.00 $7 425.00 $7,425.00
1.5 Construction lavout I.s. 1.00 $17 600.00 $17,600.00
1.6 Pre-condition survey I.s. 1.00 $2,200.00 $2,200.00
TOTAL PART A $66,193.00
2.0 REMOVALS
2.1 Clearina and arubbing I.s. 1.00 $6,930.00 $6,930.00
2.2 Remove existinQ fences I.s. 1.00 $600.00 $600.00
2.3 Remove existina culverts each 4.00 $180.00 $720.00
2.4 Remove existing asphalt m2 2200.00 $4.38 $9636.00
2.5 Topsoil removal off site m3 1800.00 $10.25 $18450.00
2.6 Excavation and Qradina m3 2850.00 $5.46 $15,561.00
Sub Total $51,897.00
3.0 STORM SEWERS
3.1 300mm DIA DR35 PVC pipe - CL 'P' bedd I.m. 6.00 $155.00 $930.00
(S-401) to DI CB 2
3.2 300mm DIA DR35 PVC pipe - CL 'P' bedd I.m. 12.00 $155.00 $1,860.00
'5-401) to DI CB 3
3.3 450mm DIA CL 65D concrete pipe CL 'B' bedd I.m. 38.41 $177.00 $6,798.57
C-108) MH 3 to 4
3.4 600mm DIA CL 65D concrete pipe CL 'B' bedd I.m. 96.05 $229.00 $21,995.45
C-108) MH 2 to 3
3.5 825mm DIA CL 65D concrete pipe CL 'B' bedd I.m. 88.83 $681.00 $60,493.23
C-108) MH 1 to MH 2 - include all restoration
from MH 1 to stat. 2 + 762.724
3.6 825mm DIA CL 65D concrete pipe CL 'B' bedd I.m. 32.30 $1,732.00 $55,943.60
I (C-108) from existina MH to MH 1 - include
all restoration
3.7 825mm DIA CL 65D concrete pipe CL '8' bedd I.m. 22.6 $402.00 $9,085.20
(C-108) MH 2 to MH 9
3.8 1200mm precast concrete MH 4 C-101 I.s. 1.00 $4,413.00 $4,413.00
3.9 1200mm precast concrete MH 3 C-101 I.s. 1.00 $4,271.00 $4,271.00
3.10 1500mm precast concrete MH 1 C-102 I.s. 1.00 $7,904.00 $7 904.00
Include all restoration
..
..
..
.
..
..
..
..
..
..
..
..
..
..
..
..
GREEN ROAD RECONSTRUCTION
STEVENS ROAD CONSTRUCTION
MUNICIPALITY OF CLARINGTON
FERNVIEW CONSTRUCTION LIMITED
CONTRACT NO. CL 2007 -27
3/6
..
..
ESTIMATED UNIT TOTAL
ITEM DESCRIPTION UNIT QUANTITY PRICE COST
STORM SEWERS - Continued
3.11 1800mm precast concrete MH 2 (C-102) I.s. 1.00 $8 265.00 $8,265.00
3.12 1800mm precast concrete MH 9 (C-102) I.s. 1.00 $8,111.00 $8,111.00
3.13 Sinole catch basin (C-104) each 3.00 $1 901.00 $5.703.00
3.14 Double catch basin (C-105) each 2.00 $3 780.00 $7,560.00
3.15 Ditch inlet catch basins (OPSD 705.030) each 2.00 $2 857.00 $5,714.00
3.16 200mm DIA DR35 PVC catch basin connection I.m. 19.30 $129.00 $2,489.70
3.17 250mm DIA DR35 PVC catch basin connection I.m. 11.70 $146.00 $1,708.20
3.18 Break into existinQ manhole and rebench I.s. 1.00 $14,855.00 $14,855.00
Green Road South & Hwy #2)
3.19 Television inspection I.m. 333.00 $5.00 $1.665.00
Sub Total $229,764.95
4.0 WATERMAIN AND APPURTENANCES
Regional Municipalitv of Durham Standard Specifications
4.1 150mm DIA DR18 PVC pipe I.m. 5.80 $86.00 $498.80
4.2 200mm DIA DR18 PVC pipe I.m. 5.80 $105.00 $609.00
4.3 400mm DIA concrete pressure pipe I.m. 283.00 $377.00 $106,691.00
4.4 150mm gate valve and box each 1.00 $884.00 $884.00
4.5 200mm Qate valve and box each 1.00 $1 245.00 $1,245.00
4.6 400mm Qate valve and box each 1.00 $6212.00 $6,212.00
4.7 150mm flanQe, valve, box and hydrant each 3.00 $3,526.00 $10,578.00
4.8 50mm blowoff each 2.00 $1 500.00 $3,000.00
4.9 25mm DIA Tvpe 'K' copper water service I.m. 70.00 $59.00 $4,130.00
4.10 25mm curb stop and box each 2.00 $152.00 $304.00
4.11 400mm CPP - field closure at Hwy #2 - I.s. 1.00 $9886.00 $9,886.00
connect to existing
4.12 19mm test point bypass each 1.00 $1.500.00 $1 500.00
Sub Total $145,537.80
5.0 ROAD WORK AND MISCELLANEOUS
5.1 Fine grading m2 7562.00 $0.60 $4537.20
5.2 Supply and place Qranular 'B' (450mm) m3 1517.00 $22.81 $34,602.77
5.3 Supply and place Qranular 'A' (150mm) m3 414.00 $37.32 $15,450.48
5.4 100mm underdrain (C-301) I.m. 514.00 $11.79 $6060.06
5.5 Concrete curb and Qutter (C-302) I.m. 378.00 $47.00 $17766.00
5.6 Concrete curb and gutter median (OPSD 600.080) I.m. 89.00 $60.00 $5,340.00
5.7 HL8 asphalt (80mm) m2 2675.00 $17.22 $46,063.50
5.8 Interlockina brick - island m2 145.00 $86.00 $12,470.00
5.9 HL3A asphalt - 50mm - driveway m2 65.00 $20.00 $1,300.00
5.10 Concrete sidewalk (C-307) m2 850.00 $49.00 $41,650.00
5.11 Grade ditches (imoorted) I.m. 100.00 $28.00 $2800.00
5.12 100mm toosoil on boulevards m2 3960.00 $3.94 $15,602.40
5.13 Sod on boulevard m2 3960.00 $4.27 $16909.20
5.14 Temoorarv line oainting I.s. 1.00 $2,500.00 $2,500.00
5.15 Traffic, street and directional siQns each 5.00 $400.00 $2,000.00
5.16 Boulevard trees - Skvline Honev Locust each 12.00 $427.00 $5.124.00
Sub Total $230,175.61
..
..
..
..
..
..
..
..
.
..
.
..
..
..
..
..
..
GREEN ROAD RECONSTRUCTION
STEVENS ROAD CONSTRUCTION
MUNICIPALITY OF CLARINGTON
FERNVIEW CONSTRUCTION LIMITED
CONTRACT NO. CL 2007-27
4/6
..
..
ESTIMATED UNIT TOTAL
ITEM DESCRIPTION UNIT QUANTITY PRICE COST
6.0 ROAD CONTINGENCIES
6.1 Subexcavate subarade m3 200.00 $6.00 $1 200.00
6.2 Provide and place granular 'B' m3 200.00 $28.00 $5.600.00
Sub Total $6,800.00
7.0 STREET LIGHT AND WIRING
7.1 50mm DIA HDPE duct work - street light cable I.m. 550.00 $16.00 $8.800.00
7.2 100mm duct work - road crossinas I.m. 175.00 $21.00 $3,675.00
7.3 Supply street light cable 2C No.4 + 1 No.6 Grd. I.m. 600.00 $17.00 $10,200.00
7.4 Power pedestal with base each 1.00 $2,020.00 $2,020.00
7.5 Street light pole base each 14.00 $924.00 $12,936.00
7.6 Single luminaire light standard - 150 watt each 14.00 $4,723.00 $66,122.00
Sub Total $103753.00
PART B - GREEN ROAD NORTH RECONSTRUCTION
2.0 REMOVALS $51,897.00
3.0 STORM SEWERS $229 764.95
4.0 WATERMAIN AND APPURTENANCES $145537.80
5.0 ROAD WORK AND MISCELLANEOUS $230,175.61
6.0 ROAD CONTINGENCIES $6 800.00
7.0 STREET LIGHT AND WIRING $103753.00
8.0 PROVISIONAL SUM $35,000.00
TOTAL PART B $802.928.36
9.0 REMOVALS
9.1 Clearina and arubbina I.s. 1.00 $6,930.00 $6,930.00
9.2 Remove existing fence I.s. 1.00 $1 500.00 $1,500.00
9.3 Relocate existina liaht standard I.s. 2.00 $3,000.00 $6,000.00
9.4 Remove existing concrete curb I.m. 35.00 $24.00 $840.00
9.5 Remove existing concrete sidewalk m2 40.00 $24.00 $960.00
9.6 Coldplane existing asphalt - 40mm m2 100.00 $31.00 $3,100.00
9.7 Topsoil remove off site m3 2100.00 $10.25 $21,525.00
9.8 Excavatina and aradina - remove off site m3 6200.00 $10.20 $63.240.00
9.9 Excavating and grading - on site m3 800.00 $5.46 $4,368.00
Sub Total $108,463.00
..
..
..
..
..
..
.
.
..
.
.
..
..
..
..
..
..
GREEN ROAD RECONSTRUCTION
STEVENS ROAD CONSTRUCTION
MUNICIPALITY OF CLARINGTON
FERNVIEW CONSTRUCTION LIMITED
CONTRACT NO. CL 2007 -27
5/6
..
-
ESTIMATED UNIT TOTAL
ITEM DESCRIPTION UNIT QUANTITY PRICE COST
10.0 STORM SEWERS
10.1 200mm DIA DR35 PVC pipe - CL 'P' bedd (S-401) I.m. 21.01 $569.00 $11,954.69
CBMH 8 to existina DiDe - include restoration
10.2 300mm DIA CL 100D cocnrete DiDe - CL 'B' bedd I.m. 79.24 $157.00 $12,440.68
(C-108) MH 7 to MH 6
10.3 300mm DIA CL 100D concrete Dipe - CL 'B' bedd I.m. 7.10 $157.00 $1,114.70
(C-108) MH 6 to stub
10.4 450mm DIA CL 65D concrete oioe - CL 'B' bedd I.m. 11.87 $177.00 $2100.99
(C-108) - include insulation MH 5 to DICB 1
10.5 450mm DIA CL 65D concrete DiDe - CL 'B' bedd I.m. 75.87 $177.00 $13,428.99
I(C-108) MH 3 to MH 5
10.6 1200mm Drecast concrete MH 7 (C-10ff I.s. 1.00 $3,439.00 $3,439.00
10.7 1200mm precast concrete MH 6 (C-101) I.s. 1.00 $3.828.00 $3 828.00
10.8 1500mm Drecast concrete MH 5(C-102) I.s. 1.00 $4,940.00 $4,940.00
10.9 1200mm precast concrete catch basin MH 8 (C-101 I.s. 1.00 $3 439.00 $3 439.00
10.10 Cut in 300 x 300 x 200 concrete tee - existing pipe I.s. 1.00 $6,412.00 $6,412.00
ClarinQton Boulevard
10.11 Sinale catch basins each 7.00 $1,901.00 $13,307.00
10.12 Ditch inlet catch basins (OPSP - 705.030) each 1.00 $2.857.00 $2,857.00
10.13 200mm DIA DR35 PVC catch basin connection I.m. 42.00 $129.00 $5,418.00
10.14 200mm DIA DR35 PVC catch basin connection - I.m. 8.80 $215.00 $1,892.00
include insulation
10.15 Inlet control device each 1.00 $310.00 $310.00
10.16 Television insDection I.m. 239.00 $5.00 $1,195.00
Sub Total $88,077.05
11.0 SANITARY SEWERS
11.1 450mm DIA DR35 PVC DiDe - CL 'P' bedd (S-401 I.m. 107.21 $392.00 $42 026.32
MH S 1 to MH S2 - include restoration
11.2 450mm DIA DR35 PVC DiDe - CL 'P' bedd (S-401) I.m. 125.00 $244.00 $30,500.00
MH S2 to MH S3
11.3 450mm DIA DR35 PVC DiDe - CL 'P' bedd (S-401) I.m. 113.78 $274.00 $31,175.72
MH S3 to MH S4
11.4 450mm DIA DR35 PVC DiDe - CL 'P' bedd (S-401) I.m. 34.50 $275.00 $9,487.50
MH S4 to MH S5 - Green Road
11.5 200mm DIA DR35 PVC DiDe CL 'P' bedd (S-401) I.m. 30.77 $139.00 $4,277.03
MH S4 to MH S6
11.6 1200mm precast concrete MH S2 OPSD 701.010 I.s. 1.00 $4 556.00 $4,556.00
11.7 1200mm precast concrete MH S3 OPSD 701.010 I.s. 1.00 $4.556.00 $4,556.00
11.8 1200mm Drecast concrete MH S4 OPSD 701.010 I.s. 1.00 $6.487.00 $6,487.00
11.9 1200mm precast concrete MH 55 OPSD 701.010 - I.s. 1.00 $4,557.00 $4,557.00
Green Road - include safetv arate
11.10 1200mm precast concrete MH 56 (OPSD 701.010) I.s. 1.00 $6 642.00 $6,642.00
11.11 1500mm precast concrete MH St (OPSD 701.011) - I.s. 1.00 $26,375.00 $26 375.00
include restoration - Clarinaton Boulevard
11.12 Drop structure - Type 'A' - S-107 I.s. 1.00 $1 940.00 $1,940.00
11.13 Television inspection I.m. 412.00 $5.00 $2,060.00
Sub Total $174639.57
..
..
..
..
..
..
..
..
..
..
..
.
..
.
..
..
.. GREEN ROAD RECONSTRUCTION 6/6
STEVENS ROAD CONSTRUCTION
MUNICIPALITY OF CLARINGTON
- FERNVIEW CONSTRUCTION LIMITED
CONTRACT NO. CL 2007-27
.. ESTIMATED UNIT TOTAL
ITEM DESCRIPTION UNIT QUANTITY PRICE COST
12.0 ROAD WORK AND MISCELLANEOUS
.. 12.1 Fine oradino m2 7000.00 $0.60 $4.200.00
12.2 Suoolv and place oranular 'B'(450mm) m3 1664.00 $22.81 $37.955.84
12.3 Suoplv and place aranular 'A' (150mm) m3 468.00 $37.32 $17,465.76
.. 12.4 100mm underdrain C-301) I.m. 635.00 $11.79 $7,486.65
12.5 Concrete curb and autter (C~30i) I.m. 635.00 $47.00 $29,845.00
12.6 HL8 asphalt (80mm) m2 3115.00 $17.22 $53.640.30
12.7 Concrete sidewalk (C-302) (OPSD 310.020) m2 1280.00 $49.00 $62.720.00
.. 12.8 Retainino wall - north prooertv line m2 184.00 $220.00 $40.480.00
12.9 100mm topsoil on boulevards (imported) m2 2400.00 $3.94 $9.456.00
12.10 Sod on boulevards m2 2400.00 $4.27 $10,248.00
.. 12.11 Traffic, street name and directional sians each 2.00 $400.00 $800.00
12.12 Autumn Blaza Maple - boulevard trees each 15.00 $427.00 $6,405.00
12.13 Green Mountain Silver Maple - boulevard tree each 14.00 $427.00 $5,978.00
12.14 Redmond Linden - boulevard trees each 12.00 $427.00 $5,124.00
..
Sub Total $291.804.55
.. 13.0 ROAD CONTINGENCIES
13.1 Subexcavate subarade m3 200.00 $6.00 $1,200.00
13.2 Provide and place oranular 'B' m3 200.00 $28.00 $5 600.00
..
Sub Total $6,800.00
14.0 STREET LIGHT AND WIRING
.. 14.1 50mm DIA HDPE duct work - street Iiaht cable I.m. 840.00 $16.00 $13,440.00
14.2 100mm duct work - road crossinos I.m. 200.00 $22.00 $4,400.00
14.3 Suoplv street Iioht cable - 2C No.4 + 1 No.6 Grd. I.m. 900.00 $17.00 $15,300.00
.. 14.4 Power pedestal with base each 1.00 $2020.00 $2,020.00
14.5 Street light pole base each 18.00 $926.00 $16,668.00
14.6 Sinale luminaire lioht standard each 18.00 $4 728.00 $85,104.00
14.7 Directional bore - 2 - 50mm ducts under Clarinton BI I.s. 1.00 $1,838.00 $1,838.00
..
Sub Total $138,770.00
.. PART C - STEVENS ROAD CONSTRUCTION
9.0 REMOVALS $108,463.00
10.0 STORM SEWERS $88,077.05
.. 11.0 SANITARY SEWERS $174,639.57
12.0 ROAD WORK AND MISCELLANEOUS $291,804.55
13.0 ROAD CONTINGENCIES $6.800.00
14.0 STREET LIGHT AND WIRING $138,770.00
.. 15.0 PROVISIONAL SUM $35,000.00
TOTAL PART C $843,554.17
..
..
-
..
BIDDERS EXPERIENCE
CONTRACT: CL2007 -27
..
The bidder shall supply a record of experience for similar work completed within the past three (3)
years.
DATE
JUNE 2006
VALUE ($) 5,000,000.00 +/-
..
DESCRIPTION
NAPE VALLEY SUBDIVISION, PHASE 4
BA YWOOD HOMES
KEVIN DWYER
TELEPHONE (905) 686-6402
..
OWNER
CONTACT PERSON
..
DATE
JUNE 2004
VALUE ($) 6,000,000.00 +/-
DESCRIPTION
FOLKSTONE SUBDIVISION, PHASE 3
L1ZA HOMES
LARRY TRACEY
TELEPHONE (905) 576-8500
..
OWNER
CONTACT PERSON
..
III
DATE
DESCRIPTION
OWNER
CONTACT PERSON
VALUE ($)
TELEPHONE
..
DATE
VALUE ($)
..
DESCRIPTION
OWNER
CONTACT PERSON
TELEPHONE
..
DATE
VALUE ($)
..
DESCRIPTION
OWNER
CONTACT PERSON
TELEPHONE
..
..
DATE
VALUE ($)
DESCRIPTION
OWNER
..
CONTACT PERSON
BIDDERS SIGNATURE
TELEPHONE
..
Company Name:
FERNVIEW CONSTRUCTION LIMITED
..
(This form must be completed and attached to the Tender submission)
3
..
III
..
LIST OF SUBCONTRACTORS
CONTRACT: CL2007 -27
..
The bidder shall supply a list of subcontractors proposed for this contract.
..
..
DURAKRETE
CONSTRUCTION
BOLTON, ONTARIO
CONCRETE WORK
-
VISSORS SOD
HAMPTON, ONTARIO
TOPSOIL I SOD
..
OWN FORCES
REST OF WORK
-
-
..
..
.
..
..
..
BIDDERS SIGNATURE
.
Company Name: FERNVIEW CONSTRUCTION LIMITED
-
(This form must be completed and attached to the Tender submission)
-
4
.
..
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
CONTRACT NO: CL2007-27
GREEN ROAD RECONSTRUCTION
STEVENS ROAD CONSTRUCTION
B. STANDARD TERMS AND CONDITIONS
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
STANDARD TERMS AND CONDITIONS
The Municipality of Clarington's "Standard Terms and Conditions" shall apply to this
Contract except where noted below.
{o} Clause 8 of the "Standard Terms and Conditions" shall be superceded by
Clause 33, "Payments" of the "Special Provisions - General" Section of the
Contract.
{o} Clause 15 of the "Standard Terms and Conditions" shall be superceded by
Clause 12, "Guaranteed Maintenance" of the "Special Provisions - General"
Section of the Contract.
{o} Clause 16 of the "Standard Terms and Conditions" is valid with the exception of
'to award by item, or part thereof, groups...submitting identical bids as to price'.
{o} Clause 23 of the "Standard Terms and Conditions" shall be superceded by
Clause 6.03.02 of the OPS General Conditions of Contract (September 1999)
which requires a $5,000,000.00 liability coverage. Municipality of Clarington
must be included as additional insured.
{o} Clause 26 of the "Standard Terms and Conditions" shall be superceded by
Clause 26, "Workplace Hazardous Materials Information System (WHMIS)" of
the "Special Provisions - General" Section of the Contract.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
STANDARD TERMS AND CONDITIONS
INDEX
PART B - STANDARD TERMS AND CONDITIONS
1. DEFINITIONS
2. SUBMISSION OF BID
3. CONTRACT
4. CLARIFICATION OF THE DOCUMENT
5. PROOF OF ABILITY
6. DELIVERY
7. PRICING
8. TERMS OF PAYMENT
9. PATENTS AND COPYRIGHTS
10. ALTERNATES
11. EQUIVALENCY
12. ASSIGNMENT AND SUBCONTRACTING
13. FINANCING INFORMATION REQUIRED OF THE COMPANY
14. LAWS AND REGULATIONS
15. CORRECTION OF DEFECTS
16. BID ACCEPTANCE
17. DEFAULT BY COMPANY
18. CONTRACT CANCELLATION
19. QUANTITIES
20. SAMPLES
21. SURETY
22. WORKPLACE SAFETY AND INSURANCE BOARD
23. INSURANCE
24. LIABILITY
25. VISITING THE SITE
26. SAFETY
27. UNPAID ACCOUNTS
28. SUSPENSION OF WORK
29. CHANGES IN THE WORK
30. CONFLICT OF INTEREST
31. MUNICIPAL FREEDOM OF INFORMATION AND PROTECTION OF PRIVACY
ACT (MFIPPA)
32. CRIMINAL BACKGROUND CHECK
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
AGREEMENT TO BOND (to be completed by Bonding Company)
CONTRACT NO: CL2007-27
WE, the Undersigned, HEREBY AGREE to become bound as Surety for
In a Performance Bond totalling ONE HUNDRED PERCENT (100%) of the Total Tender
amount, and a Labour and Material Payment Bond totalling ONE HUNDRED PERCENT (100%)
of the Total Tender amount, and conforming to the Instruments of Contract attached hereto, for
the full and due performance of the works shown or described herein, if the Tender for Contract
No. CL2007 -27 is accepted by the Authority.
IT IS A CONDITION of this Agreement that if the above mentioned Tender is accepted,
application for a Performance Bond and a Labour and Material Payment Bond must be made to
the Undersigned within TEN (1 0) DAYS of Notice of Contract Award, otherwise the Agreement
shall be null and void.
DATED AT
this
day of
2007
Name of Bonding Company
(BONDING COMPANY SEAL)
Signature of Authorized Person
Signing for Bonding Company
Position
(This Form shall be completed and attached to the Tender Submitted)
5
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SCHEDULE OF TENDER DATA
CONTRACT NO: CL2007.27
The work specified in the Contract shall be performed in strict accordance with the following schedule:
** ADDENDUM NO. _0_ to _0_
A. TENDER FORM
General
Itemized Bid
Bidders Experience
List of Subcontractors
Agreement to Bond
Schedule of Tender Data
Page 1 t02
Page 3
Page 4
Page 5
Page 6
Pages 1 to 8
Pages 1 to 24
B. CORPORATION OF THE MUNICIPALITY
OF CLARINGTON STANDARD TERMS
C. SPECIAL PROVISIONS -
D. CONTRACTOR SAFETY POLICY AND PROCEDURE
E. PROVISIONS (SP) - Detailed Tender Items
F. STANDARD SPECIFICATIONS
It shall be the Contractor's responsibility to obtain those editions current at the time of tendering, of the
Ontario Provincial Standard Specifications (OPSS) and if applicable the Region of Durham Standard
Specifications, where mentioned in the Contract Documents.
G. GENERAL CONDITIONS OPSS General Conditions of Contract (September 1999) although not
attached are considered part of this Tender.
H. STANDARD SPECIFICATIONS & DRAWINGS - Region of Durham Specifications for Regional Services,
although not attached are considered part of the Tender
I. GEOTECHNICAL INVESTIGATION
The Contractor by this Tender offers to complete the Contract in strict accordance with the terms contained
herein. By my/our signature hereunder, IIwe identify this as th chedule of Tender Data, Plans,
Specifications for Contract No: CL2007-27 executed by bearing the d te 15th day 0 N
SIGNATURE
WITNESS
POSITION IN FIRM PRESIDENT
NAME OF COMPANY FERNVIEW CONSTRUCTION LIMITED
This is Page 6 of 6 Pages to be submitted as Tender Submission for Contract No: CL2007-27.
"The Tenderer shall insert here the number of Addenda received by him durin9 the tendenn9 period and taken into account
by him in preparing his tender.
6
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SCHEDULE (B) STANDARD TERMS AND CONDITIONS
1. DEFINITIONS
Municipality - The Corporation of the Municipality of Clarington, its successors and assigns.
Bidder - The person, firm or corporation submitting a bid to the Municipality.
Company - The person, contractor, firm or corporation to whom the Municipality has awarded the contract, it
successors and assigns.
Contract - The purchase order authorizing the company to perform the work, purchase order alterations, the
document and addenda, the bid, and surety.
Subcontractor - A person, firm or corporation having a contract with the company for, or any part of, the
work.
Document - The document(s) issued by the Municipality in response to which bids are invited to perform the
work in accordance with the specifications contained in the document.
Bid - An offer by a Bidder in response to the document issued by the Municipality.
Work - All labour, materials, products, articles, fixtures, services, supplies, and acts required to be done,
furnished or performed by the company, which are subject to the Contract
2.
SUBMISSION OF BID
Bid invitation shalt be in accordance with the Municipality of Clarington Purchasing By-law #2006-127 and will
apply for the calting, receiving, and opening of bids. The Municipality will be responsible for evaluating bids,
awarding and administering the contract in accordance with the Purchasing By-law.
The bid must be submitted on the form(s) and in the envelope supplied by the Municipality unless otherwise
provided herein. The envelope must not be covered by any outside wrappings, i.e. courier envelopes or other
coverings.
The bid must be signed by a designated signing officer of the Bidder.
If a joint bid is submitted, it must be signed on behalf of each ofthe Bidders.
The bid must be legible, written in ink, or typewritten. Any form of erasure, strikeout or over-writing must be
initialed by the Bidde~s authorized signing officer.
The bid must not be restricted by a covering letter, a statement added, or by alterations to the document
unless otherwise provided herein.
Failure to return the document or invitation may result in the removal of the Bidder from the Municipality's
bidde~s list
A bid received after the closing date and time wilt not be considered and wilt be returned, unopened.
Should a dispute arise from the terms and conditions of any part of the contract, regarding meaning, intent or
ambiguity, the decision of the Municipality shalt be final.
H:\FORMS\TENDER-QU-RFP-FORMS\STAND TERMS & COND - MARCH 2006.doc
I
SCHEDULE (C) STANDARD TERMS AND CONDITIONS continued
I
3.
CONTRACT
I
The contract consists of the documents aforementioned.
The contract and portions thereof take precedence in the order in which they are named above,
notwithstanding the chronological order in which they are issued or executed.
I
The intent of the contract is that the Company shall supply work which is fit and suitable for the Municipality's
intended use and complete for a particular purpose.
None of the conditions contained in the Bidder's standard or general conditions of sale shall be of any effect
unless explicitly agreed to by the Municipality and specifically referred to in the purchase order.
I
4.
CLARIFICATION OF THE DOCUMENT
I
Any clarification of the document required by the Bidder prior to submission of its bid shall be requested
through the Municipality's contact identified in the document. Any such clarification so given shall not in any
way alter the document and in no case shall oral arrangements be considered.
I
Every notice, advice or other communication pertaining thereto will be in the form of a written addendum.
I
No officer, agent or employee of the Municipality is authorized to alter orally any portion of the document.
5. PROOF OF ABILITY
The bidder may be required to show, in terms of experience and facilities, evidence of its ability, as well as
that of any proposed subcontractor, to perfomn the work by the specified delivery date.
I
6.
DELIVERY
I
Unless otherwise stated, the work specified in the bid shall be delivered or completely perfomned by the
Company as soon as possible and in any event within the period set out herein as the guaranteed period of
delivery or completion after receipt of a purchase order therefore.
I
A detailed delivery ticket or piece tally, showing the exact quantity of goods, materials, articles or equipment,
shall accompany each delivery thereof. Receiving by a foreperson, storekeeper or other such receiver shall
not bind the Municipality to accept the work covered thereby or the particulars of the delivel)' ticket or piece
tally thereof.
I
Work shall be subject to further inspection and approval by the Municipality.
The Company shall be responsible for arranging the work so that completion shall be as specified in the
contract.
I
Time shall be of the essence of the contract.
I
7. PRICING
Prices shall be in Canadian Funds, quoted separately for each item stipulated, F.O.B. destination.
I
Prices shall be firm for the duration of the contract.
Prices bid must include all incidental costs and the Company shall be deemed to be satisfied as to the full
requirements of the bid. No claims for extra work will be entertained and any additional work must be
authorized in writing prior to commencement. Should the Company require more information or clarification
on any point, it must be obtained prior to the submission of the bid.
I
Payment shall be full compensation for all costs related to the work, including operating and overhead costs
to provide work to the satisfaction of the Municipality.
I
I
H:\FORMSITENDER-QU-RFP-FORMS\STAND TERMS & COND - MARCH 2006.doc
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SCHEDULE (C) STANDARD TERMS AND CONDITIONS continued
All prices quoted shall include applicable customs duty, exase tax, freight, insurance, and all other charges of
every kind attributable to the work. Goods and Services Tax and Provincial Sales Tax shall be extra and not
shown, unless otherwise specified herein.
If the Bidder intends to manufacture or fabricate any part of the work outside of Canada, it shall arrange its
shipping procedures so that its agent or representative in Canada is the importer of record for customs
purposes.
Should any additional tax, duty or any variation in any tax or duty be imposed by the Government of Canada
or the Province of Ontario become directly applicable to work specified in this document subsequent to its
submission by the Bidder and before the delivery of the work covered thereby pursuant to a purchase order
issued by the Municipality appropriate increase or decrease in the price of work shall be made to compensate
for such changes as of the effective date thereof.
8.
TERMS OF PAYMENT
Where required by the Construction Lien Act appropriate monies may be held back until 60 days after the
completion of the work.
Payments made hereunder, including final payment shall not relieve the company from its obligations or
liabilities under the contract.
Acceptance by the company of the final payment shall constitute a waiver of claims by the company against
the Municipality, except those previously made in writing in accordance with the contract and still unsettled.
The Municipality shall have the right to withhold from any sum otherwise payable to the company such
amount as may be sufficient to remedy any defect or deficiency in the work, pending correction of it.
Payment may be made 30 days after delivery pursuant to the Bidder submitting an invoice, contract
requirements being completed and work being deemed satisfactory.
9.
PATENTS AND COPYRIGHTS
The company shall, at its expense, defend all claims, actions or proceedings against the Municipality based
on any allegations that the work or any part of the work constitutes an infringement of any patent, copyright or
other proprietary right, and shall pay to the Municipality all costs, damages, charges and expenses, including
its lawyers' fees on a solicitor and his own client basis occasioned to the Municipality by reason thereof.
The company shall pay all royalties and patent license fees required for the work.
If the work or any part thereof is in any action or proceeding held to constitute an infringement, the company
shall forthwith either secure for the Municipality the right to continue using the work or shall at the company's
expense, replace the infringing work with non-infringing work or modify it so that the work no longer infringes.
10.
ALTERNATES
Any opinion with regard to the use of a proposed alternate determined by the Municipality shall be final. Any
bid proposing an alternate will not be considered unless otherwise specified herein.
11.
EQUIVALENCY
Any opinion determined by the Municipality with respect to equivalency shall be final.
12.
ASSIGNMENT AND SUBCONTRACTING
The company shall not assign or subcontract the contract or any portion thereof without the prior written
consent of the Municipality.
H:IFORMSITENDER-QU-RFP-FORMSISTAND TERMS & COND - MARCH 2006.doc
I
SCHEDULE (C) STANDARD TERMS AND CONDITIONS continued
I
13.
FINANCING INFORMATION REQUIRED OF THE COMPANY
I
The Municipality is entitled to request of the Company to furnish reasonable evidence that financial
arrangements have been made to fulfill the Company's obligations under the Contract.
14.
LAWS AND REGULATIONS
I
The company shall comply with relevant Federal, Provincial and Municipal statutes, regulations and by-laws
pertaining to the work and its performance. The company shall be responsible for ensuring similar
compliance by suppliers and subcontractors.
I
The contract shall be governed by and interpreted in accordance with the laws of the Province of Ontario.
15.
CORRECTION OF DEFECTS
I
If at any time prior to one year after the actual delivery date or completion of the work (or specified
warranty/guarantee period if longer than one year) any part of the work becomes defective or is deficient or
fails due to defect in design, material or workmanship, or otherwise fails to meet the requirements of the
contract, the company, upon request, shall make good every such defect, deficiency or failure without cost to
the Municipality. The company shall pay all transportation costs for work both ways between the company's
factory or repair depot and the point of use.
I
16.
BID ACCEPTANCE
I
The Municipality reserves the right to award by item, or part thereof, groups of items, or parts thereof, or all
items of the bids and to award contracts to one or more bidders submitting identical bids as to price; to accept
or reject any bids in whole or in part; to waive irregularities and omissions, if in so doing, the best interests of
the Municipality will be served. No liability shall accrue to the Municipality for its decision in this regard.
I
Bids shall be irrevocable for 90 days after the official closing time.
I
The placing in the mail or delivery to the Bidder's shown address given in the bid of a notice of award to a
bidder by the Municipality shall constitute notice of acceptance of contract by the Municipality to the extent
described in the notice of award.
I
17. DEFAULT BY COMPANY
a.
If the company: commits any act of bankruptcy; or if a receiver is appointed on account of its
insolvency or in respect of any of its property; or if the company makes a general assignment for the
benefit of its creditors; then, in any such case, the Municipality may, without notice: terminate the
contract.
I
I
b.
If the company: fails to comply with any request, instruction or order of the Municipality; or fails to
pay its accounts; or fails to comply with or persistently disregards statutes, regulations, by-laws or
directives of relevant authorities relating to the work; or fails to prosecute the work with skill and
diligence; or assigns or sublets the contract or any portion thereof without the Municipality's prior
written consent; or refuses to correct defective work; or is otherwise in default in carrying out its part
of any of the temns, conditions and obligations of the contract, then, in any such case, the
Municipality may, upon expiration of ten days from the date of written notice to the company,
terminate the contract.
I
I
c.
Any temnination of the contract by the Municipality, as aforesaid, shall be without prejudice to any
other rights or remedies the Municipality may have and without incurring any liability whatsoever in
respect thereto.
I
I
I
H:\FORMS\TENDER-QU-RFP-FORMS\STAND TERMS & COND - MARCH 2006.doc
I
I
I
I
I
I
I
I
I
I
I
20.
I
I
I
I
21.
I
I
I
I
I
SCHEDULE (C) STANDARD TERMS AND CONDITIONS continued
d.
If the Municipality tennninates the contract, it is entitled to:
i) take possession of all work in progress, materials and construction equipment then at the
project site (at no additional charge for the retention or use of the construction equipment),
and finish the work by whatever means the Municipality may deem appropriate under the
circumstances;
ii) withhold any further payments to the company until the completion of the work and the
expiry of all obligations under the Correction of Defects section;
iii) recover from the company loss, damage and expense incurred by the Municipality by
reason of the company's default (which may be deducted from any monies due or
becoming due to the company, any balance to be paid by the company to the Municipality).
18.
CONTRACT CANCELLATION
The Municipality shall have the right, which may be exercised from time to time, to cancel any uncompleted or
unperformed portion of the work or part thereof. In the event of such cancellation, the Municipality and the
Company may negotiate a settlement. The Municipality shall not be liable to the Company for loss of
anticipated profit on the cancelled portion or portions of the work.
19.
QUANTITIES
Unless otherwise specified herein, quantities are shown as approximate, are not guaranteed to be accurate,
are furnished without any liability on behalf of the Municipality and shall be used as a basis for comparison
only.
Payment will be by the unit complete at the bid price on actual quantities deemed acceptable by the
Municipality.
SAMPLES
Upon request, samples must be submitted strictly in accordance with instructions. If samples are requested
subsequent to opening of bids, they shall be delivered within three (3) working days following such request,
unless additional time is granted. Samples must be submitted free of charge and will be returned at the
bidder's expense, upon request, provided they have not been destroyed by tests, or are not required for
comparison purposes.
The acceptance of samples by the Municipality shall be at its sole discretion and any such acceptance shall in
no way be construed to imply relief of the company from its obligations under the contract.
Samples submitted must be accompanied by current Material Safety Data Sheets (MSDS) where applicable.
SURETY
The successful tenderer shall, if the Municipality in its absolute discretion so desires, be required to satisfy
surety requirements by providing a deposit in the form of a certified cheque, bank draft or money order or
other form of surety, in an amount detennnined by the Municipality. This surety may be held by the
Municipality until 60 days after the day on which all work covered by the contract has been completed and
accepted. The surety may be returned before the 60 days have elapsed providing satisfactory evidence is
provided that all liabilities incurred by the company in carrying out the work have expired or have been
satisfied and that a Certificate of Clearance from the WSIB - Workplace Safety Insurance Board has been
received.
The company shall, if the Municipality in its absolute discretion so desires, be required to satisfy fidelity
bonding requirements by providing such bonding in an amount and form determined by the Municipality.
Failure to furnish required surety within two weeks from date of request thereof by the Municipaiity shall make
the award of the Contract by the Municipality subject to withdrawal.
H:IFORMSITENDER-QU-RFP-FORMSISTAND TERMS & COND - MARCH 2006.doc
I
SCHEDULE (C) STANDARD TERMS AND CONDITIONS continued
I
22.
WORKPLACE SAFETY AND INSURANCE BOARD
I
All of the Contractor's personnel must be covered by the insurance plan under the Workplace Safety and
Insurance Act, 1997, or must provide an identification number from the WSlB verifying their status as an
"Independent Operator". Upon request by the Municipality, an original Letter of Good Standing from the
Workplace Safety and Insurance Board shall be provided prior to the commencement of work indicating all
payments by the Company to the board have been made. Prior to final payment, a Certificate of Clearance
must be issued indicating all payments by the Company to the Board in conjunction with the subject Contract
have been made and that the Municipality will not be liable to the Board for future payments in connection with
the Company's fulfilment of the contract Further Certificates of Clearance or other types of certificates shall be
provided upon request.
I
I
For Independent contractors I Owners I Operators who do not have WSIB coverage, the following shall be
provided upon request by the Calling Agency:
I
Single Independent Contractors I Owners I Operators shall provide a letter from the Workplace Safety &
Insurance Board confirming independent operator status and identification number. To obtain this,
contractors must complete the form "Determining worker/Independent Operator status", issued by the
Workplace Safety & Insurance Board. (For more information, please contact your local Workplace Safety &
Insurance Board Office and refer to this clause.)
I
Single Independent Contractors I Owners I Operators must also provide a certificate from the Workplace Safety
& Insurance Board confirming they have purchased the optional WSIB coverage.
I
23.
INSURANCE
I
The Municipality of Clarington has the right to reject any bid it deems to provide insufficient coverage.
The company shall maintain and pay for Comprehensive General Liability insurance including premises and
all operations. This insurance coverage shall be subject to limits of not less than $3,000,000.00 inclusive per
occurrence for third party Bodily Injury and Property Damage or such other coverage or amount as may be
requested.
I
The policy shall include the Municipality as an additional insured in respect of all operations performed by or
on behalf of the Company. A certified copy of such policy or certificate shall be provided to the municipality
plior to commencement of the work. Further certified copies shall be provided upon request
I
24.
liABiliTY
I
The company agrees to defend, fully indemnify and save harmless the Municipality from all actions, suits,
claims, demands, losses, costs, charges and expenses whatsoever for all damage or injury including death to
any person and all damage to any property which may alise directly or indirectly by reason of a requirement
of the contract, save and except for damage caused by the negligence of the Municipality or its employees.
I
The Company agrees to defend, fully indemnify and save harmless the Municipality from any and all charges,
fines, penalties and costs that may be incurred or paid by the Municipality if the Municipality or any of its
employees shall be made a party to any charge under the Occupational Health and Safety Act in relation to
any violation of the Act alising out of this contract
I
25.
VISITING THE SITE
I
The Company shall carefully examine the site and existing building and services affecting the proper
execution of the work, and obtain a clear and comprehensive knowledge of the existing conditions. No claim
for extra payment will be allowed for work or difficulties encountered due to conditions of the site which were
visibie or reasonably inferable, prior to the date of submission of Tenders. Bidders shall accept sole
responsibility for any error or neglect on their part in this respect.
I
I
I
H:IFORMSITENDER-QU-RFP-FORMSISTAND TERMS & COND - MARCH 2006.doc
I
I
I
I
26.
SCHEDULE (C) STANDARD TERMS AND CONDITIONS continued
SAFETY
I
I
I
I
27.
I
I
28.
I
I
29.
I
I
30.
I
I
I
I
I
I
The Company shall obey all Federal, Provincial and Municipal Laws, Act, Ordinances, Regulations, Orders-in-
Council and By-laws, which could in any way pertain to the work outlined in the Contract or to the Employees
of the Company.
Without limiting the generality of the foregoing, the Company shall satisfy all statutory requirements imposed
by the Occupational Health and Safety Act and Regulations made thereunder, on a contractor, a Constructor
andlor Employer with respect to or arising out of the performance of the Company's obligations under this
Contract.
The Company shall be aware of and conform to all governing regulations including those established by the
Municipality relating to employee health and safety. The Company shall keep employees and subcontractors
informed of such regulations.
The Company shall provide Material Safety Data Sheets (MSDS) to the Municipality for any supplied
Hazardous Materials.
UNPAID ACCOUNTS
The company shall indemnify the Municipality from all claims arising out of unpaid accounts relating to the
work. The Municipality shall have the right at any time to require satisfactory evidence that the work in
respect of which any payment has been made or is to be made by the Municipality is free and clear of liens,
attachments, claims, demands, charges or other encumbrances.
SUSPENSION OF WORK
The Municipality may, without invalidating the contract, suspend performance by the company from time to
time of any part or all of the work for such reasonable period of time as the Municipality may determine.
The resumption and completion of work after the suspension shall be governed by the schedule established
by the Municipality.
CHANGES IN THE WORK
The Municipality may, without invalidating the contract, direct the Company to make changes to the work.
When a change causes an increase or decrease in the work, the contract price shall be increased or
decreased by the application of unit prices to the quantum of such increase or decrease, or in the absence of
applicable unit prices, by an amount to be agreed upon between the Municipality and the Company. All such
changes shall be in writing and approved by the Municipality.
CONFLICT OF INTEREST
No employee or member of Council of the Municipality shall sell goods or services to the Municipality in
accordance with the Municipality of Clarington Policy or have a direct or indirect interest in a Company or own
a Company which sells goods or services to the Municipality.
31.
MUNICIPAL FREEDOM OF INFORMATION AND PROTECTION OF PRIVACY ACT (MFIPPA)
All correspondence, documentation, and information provided to staff of the Municipality of Clarington by every
offerer, including the submission of proposals, shall become the property of the Municipality, and as such, is
subject to the Municipal Freedom of Information and Protection of Privacy Act, and may be subject to release
pursuant to the Act.
Offerers are reminded to identify in their proposal material any specific scientific, technical, commercial,
proprietary, or similar confidential information, the disclosure of which could cause them injury. Complete
proposals are not to be identified as confidential.
H:IFORMSITENDER-QU-RFP-FORMSISTAND TERMS & COND - MARCH 2006.doc
I
SCHEDULE (C) STANDARD TERMS AND CONDITIONS continued
I
32.
CRIMINAL BACKGROUND CHECKS
I
"The successful selVice provider covenants and agrees to provide the Municipality of Clarington, or such
other entity as the Municipality may designate, with written consent to perfoml a criminal background check
including Criminal Code (Canada) convictions, pardoned sexual offences, records or convictions under the
Controlled Drugs and Substances Act, Narcotics Control Act and Food and Drugs Act and all outstanding
warrants and charges for every individual who may come into direct contract with youth or who are permitted
entrance to private or restricted areas or residences. This will be done at no cost to the Municipality and any
such requested document will be submitted to the Municipality in its true form in advance of commencement
of work.
I
I
The Municipal issued identification card must be worn when individuals are at a site where there is direct
contact with youth or where access to any private or restricted area is anticipated. The Municipal
identification card is valid for the term of the contract only or a one year term, whichever comes first. Under
the terms of the contract, the Municipality has the sole and unfettered discretion \0 prohibit an individual from
coming into direct contact with youth or entering a private or restricted area on a regular basis and to
terminate the contract if the bidder/partner fails to obtain or renew the Municipal identification cards
according to Municipal policy and procedure.
I
I
The Municipality of Clarington reserves the right to cancel andlor suspend the contract immediately and
unilaterally and without penalty to the Municipality should the service provider fail to provide the required
documentation or otherwise adhere to this procedure. "The Chief Administrative Officer has the final say in
determining any final action."
I
I
I
I
I
I
I
I
I
I
I
H:\FORMSITENDER-QU-RFP-FORMS\STAND TERMS & COND - MARCH 2006.doc
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CONTRACT NO: CL2007-27
GREEN ROAD RECONSTRUCTION
STEVENS ROAD CONSTRUCTION
C. SPECIAL PROVISIONS
- General -
Information to Bidders
Construction
Page 1 to 12
Page 12 to 22
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SPECIAL PROVISIONS GENERAL
CONTRACT NO: CL2007-27
INDEX
INFORMATION TO BIDDERS
1. GENERAL
2. BLANK FORM OF TENDER
3. BID I TENDER DEPOSITS
4. BONDS
5. LIABILITY INSURANCE
6. RIGHT TO ACCEPT OR REJECT TENDERS
7. RIGHT TO NEGOTIATE
8. UNACCEPTABLE TENDERS
9. ABILITY AND EXPERIENCE OF BIDDERS
10. ORDER OF PRECEDENCE
11. EXECUTE CONTRACT
12. GUARANTEED MAINTENANCE
13. LOCATION
14. SOILS INFORMATION
15. TENDERERS TO INVESTIGATE
16. INQUIRIES DURING TENDERING
17. AWARD OF THE CONTRACT
18. CONTRACT TIME AND LIQUIDATED DAMAGES
19. CONSTRUCTION AND PAYMENT SCHEDULE
20. PLAN QUANTITY ITEMS
21. DEFINITION OF OWNER I AUTHORITY AND ENGINEER I
CONTRACT ADMINISTRATOR
22. CONTRACTOR'S AUTHORIZED REPRESENTATIVE
23. OCCUPATIONAL HEALTH AND SAFETY ACT 1991
24. WORKPLACE HAZARDOUS MATERIAL INFORMATION SYSTEM(WHMIS)
25. CONFINED SPACES
26. CONTRACTOR'S HOURS OF WORK
27. SUNDAY AND STATUTORY HOLIDAY WORK
28. PROVINCIAL SALES TAX
29. GOODS AND SERVICES TAX (GST)
30. PAYMENTS
1
1
2
2
2
3
3
3
3
4
4
4
5
5
5
5
5
5
6
7
7
7
7
7
8
8
8
8
8
8
I
I
I 31.
I 32.
33.
34.
I 35.
36.
37.
38.
I 39.
40.
41.
I 42.
43.
44.
I 45.
46.
47.
I 48.
49.
50.
I 51.
52.
53.
54.
I 55.
56.
57.
I 58.
59.
I 60.
61.
62.
I
I
I
I
I
I
SPECIAL PROVISIONS GENERAL
CONTRACT NO: CL2007-27
PROPERTY OWNER'S RELEASE OF PRIVATELY OWNED LAND
USED BY THE CONTRACTOR I PROERTY OWNER'S RELEASE FORM 9-10
LAYOUT 11
TRAFFIC CONTROL AND MAINTENANCE 11
CONTRACTOR'S SUPPLY OF CONSTRUCTION SIGNS 12
MAINTENANCE OF TRAFFIC 12
REGION - POLICE TRAFFIC CONTROL 12
NOTIFICATION OF POLICE, FIRE, AMBULANCE, SERVICES, ETC. 13
TRAFFIC AND STREET SIGNS 13
EMERGENCY AND MAINTENANCE MEASURES 13
DAMAGE PREVENTION 13
GARBAGE COLLECTION 13
SPILLS REPORTING 14
UTILITIES 14
DUST AND MUD CONTROL 14
DISPOSAL OF SURPLUS MATERIAL 15
RESTRICTIONS ON OPEN BURNING 15
TREE PROTECTION 15
APPLICABLE STANDARD SPECIFICATIONS 16
SUPPLY OF MATERIALS 16
ASPHALT AND CONCRETE MIX DESIGNS 16
ASPHALT PRICE INDEX - UNIT PRICES 17
AMENDMENT TO OPSS 102 17
AMENDMENT TO OPSS 1820; CONCRETE PIPE 17
DRAINAGE DITCHES AND STORM SEWERS 18
PROVISIONAL ITEMS 18
CONTRACTOR TO ASSIST INSPECTOR ON PIPE 18
COMPACTION TEST FOR TRENCHES 18
REGIONAL MUNICIPALITY OF DURHAM CONTINGENCIES 18
REGIONAL MUNICIPALITY OF DURHAM CONTRACT CHANGE 18
DIRECTIVES
PRE-SCREENED OF PROPOSED FILL SITES BY C.L.O.C. 19
TEMPORARY STEEL PLATES 19
REGIONAL MUNICIPALITY OF DURHAM GENERAL 19
REQUIREMENTS - SANITARY SEWER AND WATERMAIN
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SPECIAL PROVISIONS - GENERAL
CONTRACT NO. CL2007-27
1. GENERAL
SEALED Tenders, plainly marked "Contract No: CL2007-27" will be received until:
2:00:00 P.M., LOCAL TIME, Friday, June 15th, 2007
and shall be addressed to:
Ms. Pattie Barrie, Clerk
Corporation of the Municipality of Clarington
40 Temperance Street
Bowmanville, Ontario, L 1C 3A6
The tender for this project is based on a preliminary budget estimate, subject to the approval of
Council. The tender award, therefore, will be dependent on receiving this approval.
2. BLANK FORM OF TENDER
One copy of the Tender, on the forms provided, shall be submitted in the envelope provided.
All information requested shall be shown in the tender, in the space provided. Late tenders will
not be accepted and will be returned unopened.
Tenders will be opened at a public Tender opening meeting held at 2:15:00pm.
The use of the mail or courier services for delivery of a Tender will be at the risk of the Bidder.
The Tender must come into the possession of the above mentioned representative of the
Municipality of Clarington before the deadline for submissions or the Tender will be returned to
the Bidder unopened.
The Municipality of Clarington's Purchasing Policy and Procedures will apply for calling,
receiving, and awarding of the tender document.
1
SPECIAL PROVISIONS - GENERAL
CONTRACT NO. CL2007-27
3. BID / TENDER DEPOSITS
All tender submissions shall be accompanied by a Bid Deposit in the form of a certified
cheque, bank draft, money order or cash, payable to the Corporation of the Municipality of
Clarington in the amount specified in the table below:
JotaIJe[ltlerArno@t
$ 20,000.00 or less
20,000.01 to 50,000.00
50,000.01 to 100,000.00
100,000.01 to 250,000.00
250,000.01 to 500,000.00
500,000.01 to 1,000,000.00
1,000,000.01 to 2,000,000.00
2,000,000.01 and over
$ 1,000.00
2,000.00
5,000.00
10,000.00
25,000.00
50,000.00
100,000.00
200,000.00
NOTE: Bid bonds issued by a surety approved by and in a form containing terms satisfactory
to the Municipality's Treasurer will be accepted for tenders valued over $50,000.00.
Bid deposit must be enclosed in the enveiope with your tender.
All tender deposits will be returned to the respective bidders within ten (10) days after the
Tenders have been opened except those of the two (2) low bidders, which shall be retained by
the Municipality of Clarington until the successful bidder has executed the Contract.
4. BONDS
Prior to the Commencement of the work, the Contractor is required to provide a Performance
Bond and a Labour and Materials Bond, each in an amount equal to 100% of the tender sum
as accepted, to guarantee his faithful performance of this Contract and his fulfilment of all
obligations in respect of payment for labour and materials used on this work. Bonds shall be
issued by a Guarantee Surety Company, licensed to issue such instruments in the Province of
Ontario, having been properly executed and in other respects acceptable to the Municipality of
Clarington. The expiration period of the bond shall be consistent with the specified
maintenance period. Where the tender is extended for a subsequent year(s) additional
bonding in accordance with the above shall be provided for the extension. If this option is
chosen, bidders must provide, with their submission, a signed Agreement to Bond, attached,
from their Surety company.
5. LIABILITY INSURANCE
Pursuant to the Municipality of Clarington's Standard Terms and Conditions, Item 23-
Insurance, the Contractor shall maintain and pay for Comprehensive General Liability
Insurance including premises and all operations. The limit of liability coverage shall be in
accordance with OPS General Conditions of Contract GC6.03.02.01. OPS GC6.03.02.01, 02
shall be amended in that General Liability shall include all operations performed by or on
behalf of the Contractor.
The Contractor shall, throughout the term of this contract, obtain and maintain in force, vehicle
liability insurance (for all licensed vehicles and equipment) in a combined amount of not less
than $2,000,000.00 per occurrence, against claims for bodily injury and/or property damage
including claims against the Contractor under any hold harmless or indemnity provisions of the
contract in respect of motor vehicles owned or leased by the Contractor which are required by
law to be licensed.
2
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SPECIAL PROVISIONS - GENERAL
CONTRACT NO. CL2007-27
6. RIGHT TO ACCEPT OR REJECT TENDERS
The Corporation of the Municipality of Clarington reserves the right to:
1. Cancel the tender at any time prior to acceptance of a bid;
2. Evaluate submissions based on past performance, timely project completion,
appropriate manpower, equipment and facilities;
3. Reject any or all bids;
4. Cancel any order if the goods or services are unsatisfactory;
5. Reject any tender where satisfactory evidence of sufficient capital, plant capacity and
experience to successfully prosecute and complete the work in the specified time, is
not furnished by the bidder.
6. Not consider a bidder who has been terminated by the Municipality of Clarington or has
been deemed to have provided unsatisfactory performance on any previous or current
contract, or based on previous dealing between the Municipality of Clarington and the
bidder.
7. Not consider a bidder or a subcontractor of a bidder who is currently involved or
responsible to litigation of any kind against the Municipality of Clarington.
8. Not accept the lowest or any tender.
9. A bidder owes money including, but not limited to outstanding property taxes owed to
the Corporation.
10. A bidder is not in compliance with the Corporation's Corporate Policies and by-laws
including Property Standards By-Law.
Without limiting the generaiity of the foregoing, any tender which is incomplete, illegible,
obscure, or which contains alterations not called for, or irregularities of any kind, may be
rejected.
7. RIGHT TO NEGOTIATE
Procedures to be used if Bid exceeds budget:
In the event that all Bids received exceed the Owner's budget, the Owner may negotiate
changes in the scope of the work with the bidder submitting the lowest acceptable Bid. If
the negotiations result in a Contract Price acceptable to both parties, no re-bidding of the
project will be undertaken by the Owner. Contract may be awarded at the negotiated
price.
If negotiations fail to produce a Contract Price acceptable to both parties, or if, in the first
instance, the changes contemplated result in a value excess of 15% of the Owner's
budget, the Bid Documents may be amended and invitations to re-bid will be restricted to
the three (3) lowest acceptable Bids on the original Bid Call.
8. UNACCEPTABLE TENDERS
Each item in the Tender Fonm shall be a reasonable price for such item. Under no
circumstances will an unbalanced tender be considered. The Authority and the Engineers will
be the sole judge of such matters, and should any tender be considered to be unbalanced,
then it will be rejected by the Authority.
9. ABILITY AND EXPERIENCE OF BIDDERS
The Authority reserves the right to reject the tender of any bidder who does not furnish
satisfactory evidence of sufficient capital, plant and experience to successfully prosecute and
complete the work in the specified time.
3
SPECIAL PROVISIONS - GENERAL
CONTRACT NO. CL2007-27
10. ORDER OF PRECEDENCE
Pursuant to OPS General Section GC2.02 the order of precedence shall be amended as
follows:
In the event of any inconsistency or conflict in the contents of the following documents, such
documents shall take precedence and govern in the following order:
(a) Agreement
(b) Addenda
(c) Special Provisions
(d) Contract Drawings
(e) Standard Specifications
(f) Form of Tender
(g) Municipality of Clarington Standard Terms and Conditions
(h) Supplemental General Conditions
(i) General Conditions
U) Working Drawings
Later dates shall govem within each of the above categories of documents.
11. EXECUTE CONTRACT
Tenders shall be open for acceptance for a period of 90 days after the closing date. After this
time the tender may only be accepted with the consent of the successful bidder.
The successful bidder is required to provide the following documentation as part of the
execution of the Contract Documents:
1. Performance Bond
2. Labour and Materials Bond
3. Insurance Certificate
4. Clearance Certificate of Workplace Safety and Insurance Board
5. Corporate Safety Policy
6. 2 Year Safety Record History
The successful bidder shall commence work at the site within 7 calendar days of the official
commencement date as specified in the written order issued in accordance with Section
GC7.01.02 of the General Conditions.
Failure by the successful bidder to meet the above requirements will entitle the Authority to
cancel the award of the Contract and to retain the tender deposit as compensation for
damages sustained due to the successful Bidder's default. The Authority may then award the
Contract to one of the other Bidders or take such other action as he chooses.
12. GUARANTEED MAINTENANCE
The Contractor shall guarantee and maintain the entire work called for under this Contract for a
period of twenty-four (24) months in accordance with Section GC7.15.01 of the General
Conditions. Guaranteed maintenance period will begin on the date upon which all deficiencies
are rectified as determined by the Authority and the Contract Administrator.
The Contractor shall make good in a permanent manner, satisfactory to the Authority, any and
all defects or deficiencies in the work, both during the construction and during the period of
maintenance as aforesaid. The Contractor shall commence repairs on any work identified as
defective under this clause within 48 hours of receipt of notice from the Authority or the
Engineer.
4
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SPECIAL PROVISIONS - GENERAL
CONTRACT NO. CL2007-27
The decision of the Authority and the Engineer shall be final as to the necessity for repairs or
for any work to be done under this Section.
13. LOCATION
The work is located at Green Road and Highway No.2 in Bowmanville
14. SOILS INFORMATION
A geotechnical information investigation has been undertaken on behalf of the Authority by Soil
Engineers Limited and is included in the contract documents. The information is for guidance
only and is not guaranteed by the Authority. It shall remain the Contractor's responsibility to
interpret, review and confirm existing ground conditions and/or recommendations as may be
outlined in the geotechnical report prepared by Soil Engineers Limited.
Each Bidder shall visit the site of the work before submitting his Tender and satisfy himself by
personal examinations to the local conditions to be met during the construction and conduct of
the work. He shall make his own estimate of the facilities and difficulties to be encountered
including the nature of the subsurface materials and conditions. He is not to claim, at any time
after submission of this Tender that there was any misunderstanding of the terms and
conditions of the Contract relating to site conditions.
15. TENDERS TO INVESTIGATE
Tenderers must satisfy themselves by personal examination of the site and by such other
means as they may prefer as to the actual conditions and requirements of the work.
The Tenderer shall carefully examine all plans and profiles so that the unit prices tendered are
commensurate with the nature of the work.
It shall be the Tenderer's responsibility to thoroughly inspect the site of the proposed works,
determine the location of any buried or obstructing services and make satisfactory
arrangements for interference with such service with the proper jurisdictional agency.
The Contractor shall not claim, at any time after submission of this Tender that there was any
misunderstanding of the terms and conditions of the Contract relating to site conditions.
16. INQUIRIES DURING TENDERING
Tenderers are advised that inquiries regarding the interpretation of the plans or specifications,
shall be directed to:
Ms. Lou Ann Birkett
Mr. Larry Tracey, Construction Manager
Municipality of Clarington
D.G. Biddle & Associates Ltd.
905-623-3379
905-576-8500
17. AWARD OF THE CONTRACT
The award of this contract is subject to the approval of the Corporation of the Municipality of
Clarington and the Regional Municipality of Durham.
Commencement of construction is subject to the Municipality having received all the necessary
approvals and permits from all affected Authorities and Agencies.
18. CONTRACT TIME AND LIQUIDATION DAMAGES
(1) Time Time shall be the essence of this Contract.
For purposes of this Contract, GC1.04 of the General Conditions is revised, in that
5
SPECIAL PROVISIONS - GENERAL
CONTRACT NO. CL2007-27
in Clause GC1.06.
(2) Progress of the Work and Contract Time
The Contractor shall accomplish completion of this Contract as defined in GC1.06 of
the General Conditions within ELEVEN (11) weeks of the official date to commence
work.
If the contract time above specified is not sufficient to permit completion of the work by
the Contractor working a normal number of hours each day or week on a single
daylight shift basis, it is expected that additional and/or augmented daylight shifts will
be required throughout the life of the contract to the extent within the contact time
specified. Any additional costs occasioned by compliance with these provisions will be
considered to be included in the prices bid for the various items of work and no
additional compensation will be allowed therefore. The Contractor shall not abandon
the site to complete work outside this contract without the penmission of the Contract
Administrator.
(3) Liquidated Damages
It is agreed by the parties to the contract that in case all the work called for under the
contract is not complete by the date specified, or as extended in accordance with
Section GC3.07 of the General Conditions, a loss or damage will be sustained by the
Authority. Since it is and will be impracticable and extremely difficult to ascertain and
determine the actual loss or damage which the Authority will suffer in the event of and
by reason of such delay, the parties hereto agree that the Contractor will pay to the
Authority the sum of One Thousand Dollars ($1000.00) as liquidated damages for each
and every calendar day's delay in achieving completion of the work beyond the date
prescribed. It is agreed that this amount is an estimate of the actual loss or damage to
the Authority which will accrue during the period in excess of the prescribed date for
completion.
The Authority may deduct any amount under this paragraph from any monies that may
be due to payable to the Contractor on any account whatsoever. The liquidated
damages payable under this paragraph are in addition to and without prejudice to any
other remedy, action or other alternative that may be available to the Authority.
19. CONSTRUCTION AND PAYMENT SCHEDULE
The Contractor shall provide a detailed construction Schedule of the work(s) to be undertaken
integral to the project setting out Parts of the Contract or major work components/items as
identified in the tender form and referencing calendar dates, work weeks by number, etc., in a
format acceptable to the Authority.
The Contractor shall be responsible for providing time table requirements for the various work
components/items of Contemplated Expenditures. This shall also be illustrated in a weekly
format with the understanding that the payments will be processed within thirty (30) days of
receipt of payment certificate in accordance with terms and conditions of the Contract and/or
OPSS.
The contractor is required to provide this full documentation, including contemplated
Expenditures Time Table, and Construction Schedule, within ten (10) days of the Notice of
Award of Contract.
Failure to provide the entire documentation as indicated in the foregoing may result in delay
and/or withholding of Payment Certificate NO.1 until such documentation is provided to and
accepted by the Authority.
6
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SPECIAL PROVISIONS - GENERAL
CONTRACT NO. CL2007-27
20. PLAN QUANTITY ITEMS
Measurement for payment of the items designated (P) in the itemized bid is by plan quantity,
as may be revised by adjusted plan quantity.
21. DEFINITION OF OWNER/AUTHORITY AND ENGINEER/CONTRACT ADMINISTRATOR
The foilowing definitions shail be used in addition to those contained in OPS General
Conditions, Clause GC1.04:
Wherever the word "Owner" or "Authority" or "Corporation" appears in this Contract, it shail be
interpreted as meaning the "Corporation of the Municipality of Clarington."
Wherever the word" Ministry", "M.T.C." or "M.T.O." appears it shail be deemed to mean the"
Ministry of Transportation of Ontario", or the "Corporation of the Municipality of Clarington".
Wherever the word "Engineer" or "Contract Administrator" appears in this Contract it shail be
deemed to mean the Consultants, D.G. Biddle & Associates Limited, or such other officers, as
may be authorized by the Authority to act in any particular capacity.
Wherever the word "Region" appears in this Contract it shail be interpreted as meaning the
Regional Municipality of Durham and its representative(s).
"C/O" shail mean the Regional Municipality of Durham's Standard Specifications for the
Construction of Sanitary Sewers and Water Mains (Schedules C & D), latest edition.
22. CONTRACTOR'S AUTHORIZED REPRESENTATIVE
Authorized representative as referenced in GC7.01.09 is defined as an employee of the
Contractor.
23. OCCUPATIONAL HEALTH AND SAFETY ACT 1991
The Contractor shail obey ail Federal, Provincial and Municipal Laws, Acts, Ordinances,
Regulations, Orders-in Council and By-Laws, which could in any way pertain to the work
outlined in the Contract or to the Employees of the Contractor. Without limiting the generality
of the foregoing, the Contractor shail satisfy ail statutory requirements imposed by the
Occupational Health and Safety Act and Regulations made thereunder, on a Contractor, a
Constructor and/or Employer with respect to or arising out of the performance of the
Contractor's obligations under this contract.
The Contractor shail be aware of and conform to ail governing regulations, including those
established by the Municipality, related to employee health and safety. The Contractor shail
keep employees and subcontractors informed of such regulations.
24. WORKPLACE HAZARDOUS MATERIAL INFORMATION SYSTEM (WHMIS)
Prior to the commencement of work the Contractor shail provide, to the Authority, a list of
those products controiled under WHMIS, which he expects to use on this Contract. Related
Material Safety Data Sheets shail accompany the submission. Ail containers used in the
application of products controiled under WHMIS shail be labeled.
The Contractor shail notify the Authority of changes to the list in writing and provide the
relevant Material Safety Data Sheets.
7
SPECIAL PROVISIONS - GENERAL
CONTRACT NO. CL2007-27
25. CONFINED SPACES
If applicable to this contract, the Contractor shall provide the Authority with a copy of its
Confined Space Entry Procedures and, in the event that the Contractor does not have defined
procedures, the said Contractor shall abide by the Occupational Health and Safety Act and
regulations made thereunder and any Procedures of the Municipality of Clarington.
26. CONTRACTOR'S HOURS OF WORK
On a Friday, prior to any long weekend, the Contractor will be required to have a 2:00 p.m.
shutdown. All work is to be completed and off all roads. In case of an emergency. work may
be carried out only with written permission from the Director of Engineering Services, and only
to such extent as he may judge to be necessary. Under the Municipality of Clarington noise by-
law, the Contractors hours of work will be restricted between the hours of 7:00 a.m. and 8:00
p.m.. The contractor must obtain written permission from the Director of Public Works to carry
out work beyond these hours.
27. SUNDAY AND STATUTORY HOLIDAY WORK
No work will be permitted on Sundays. In the case of an emergency, work may be carried out
only with written permission from the Director of Engineering Services, and only to such extent
as he may judge to be necessary.
The Contractor shall refrain from work on Statutory Holidays recognized by the Municipality of
Clarington. Under special circumstances, approval may be given for work on Statutory
Holidays, at the discretion of the Director of Engineering Services. The contractor must submit
written notification at least four (4) days in advance of the Statutory Holiday on which he
desires to work, indicating the location and nature of the work to be performed. The Contractor
must obtain written permission from the Director of Engineering services authorizing work on a
speCific Statutory Holiday.
28. PROVINCIAL SALES TAX
Provincial Retail Sales Tax shall be included in tendered prices for material supplied under this
Contract.
29. GOODS AND SERVICES TAX (GST)
The Goods and Services Tax (GST) is considered an applicable tax for the purposes of this
Contract. Section GC8.02.08.01 is amended in that the Tenderer shall NOT include any
amount in his bid prices for the said GST. The GST will be shown as a separate amount on
the tender bid submission. The GST will be shown on each payment certificate and will be
paid to the Contractor in addition to the amount certified for payment
30. PAYMENTS
Payments under this Contract will be made in accordance with Section GC8.02.03 of the
General Conditions.
Notwithstanding the provisions of the General Conditions respecting certification and payment,
the Authority may withhold 2 Y. percent of the total value of work performed beyond the
expiration of 45 days from the date of completion of the work as established by the Completion
Certificate, to enable the Contract Administrator to produce the final detailed statement of the
value of all work done and material furnished under the Contract. As a condition of holdback
reduction to 2 Y. percent, the Contractor shall supply a Statutory Declaration as defined in
GC8.02.03.07 03)(b) and publish the Certificate of Substantial Performance per GC8.02.03.04
(03).
8
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SPECIAL PROVISIONS - GENERAL
CONTRACT NO. CL2007-27
The completion Payment Certificate to include statutory holdback release, will be issued within
120 days after the date for the completion as specified under GC1.06. The date for interest
due to late payment shall commence following 180 days after the date of completion of the
work.
As a condition of the final hold back payment, the Contractor shall provide the required
Property Owner's Releases as specified elsewhere, where appropriate.
The Contractor shall include in his price bid, the cost of publication of the Certificate of
Substantial Performance. Publication is mandatory whether the Contractor requests
Substantial Completion or not.
31. PROPERTY OWNER'S RELEASE OF PRIVATELY OWNED LAND USED BY THE
CONTRACTOR
Prior to the use of any privately owned lands by the Contractor, the Contractor shall provide to
the Contract Administrator two (2) copies of a written agreement signed by the property owner
outlining the proposed use(s) of the land, responsibility for any permits, duration of use,
restoration and compensation as applicable.
Upon completion of the Contract, the Contractor shall provide the Authority with two (2) copies
of a fonm of release signed by each property owner, upon whose land he has entered for any
purpose in conjunction with the Contract.
Final payment will not be released to the Contractor until all applicable fonms of release have
been signed by the property owners and received by the Authority.
9
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SPECIAL PROVISIONS - GENERAL
CONTRACT NO. CL2007-27
PROPERTY OWNER'S RELEASE OF PRIVATELY OWNED LAND USED BY THE
CONTRACTOR
Upon completion of the Contract, the Contractor shall provide the Authority with two (2)
copies of a form of release signed by each Owner, upon whose land he has entered for
purposes associated with the Contractor's operations but not for the purpose of
undertaking works stipulated in the Contract.
Date:
To: Mr. A.S. Cannella, C.E.T.
40 Temperance Street
Bowmanville, Ontario, L 1C 3A6
Re: Contract No. CL 2007-27
Dear Sir:
I hereby certify that
(Name of Contractor)
have fulfillled the terms of our Agreement and have left my property in a satisfactory
condition.
I have accepted their final payment and release
and the
(Name of Contractor)
from further obligations.
Yours very truly,
Signature
Property Owner's Name......................................... Lot ...................Concession..............
Municipality of .............................................................. ............
(Please complete above in printing)
10
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SPECIAL PROVISIONS - GENERAL
CONTRACT NO. CL2007-27
Final payment will be released to the Contractor until all the applicable forms of release
have been signed by the property Owners and received by the Authority.
32. LAYOUT
Contractor shall be responsible for the setting out of the work including all lines, grades,
elevations, etc., required to construct the work in strict accordance with this Contract, Plans
and Specifications.
The Contractor shall deliver to the Engineer copies of all grade sheets, field notes, calculations
and other layout records that are normally kept, including a iist and description of benchmarks
used during construction.
The Contractor shall be responsible for layout which shall be subject to periodic checking by
the Engineer. The checking procedure is intended as a form of review and must not be
construed as relieving the Contractor of his responsibilities for the accuracy of the work.
In order to assist the Contractor in laying out and setting out of the work, the Engineer will
provide a reasonable number of paper prints of pertinent drawings, such as engineering
drawings and detail drawings. The Engineer will also provide the Contractor with a
benchmark, but the Contractor shall be responsible to check the accuracy of this benchmark.
The Contractor is to make his own arrangements and shall borne his own cost for obtaining the
survey plans from the legal surveyor.
The Contractor shall protect all of the standard iron bars as indicated on the drawings and/or
located in the field. If damage occurs to the standard iron bars due to the negligence of the
Contractor, then it shall be the Contractor's sole responsibility to replace those bars. In areas
where the bars may fall within the excavation, the Engineer will arrange those bars to be
replaced when it is reasonable to do so at no cost to the Contractor, however, the Contractor
shall at his cost assist the Engineer or the surveyor, including labour and machines as required
to prepare the areas prior to the replacement of the standard iron bars.
Prior to the completion of work and issuance of the final payment certificate, the Contractor
shall submit one set of paper prints of drawing marked "as constructed". The aforementioned
unit prices shall include costs to obtain "as constructed" sewer inverts and horizontal sewer
distances measured from the centre of manhole base. Any deviation to the proposed design
must be also shown on the "as constructed" drawings.
33. TRAFFIC CONTROL AND MAINTENANCE
Traffic Control Flagging
Flagging for traffic control on this Contract shall be in conformance with the procedure outlined
in the pamphlet entitled "Correct Methods for Traffic Control" issued by the Construction Safety
Associations of Ontario. Copies of this pamphlet may be obtained by request from the Ministry
of Transportation and Communications' District Office.
Each flagman shall, while controlling traffic, wear the following:
4.
1.
2.
3.
an approved fluorescent blaze orange or fluorescent red safety vest, and
an approved fluorescent blaze orange or fluorescent red arm band on each arm, and
an approved fluorescent blaze orange or fluorescent red hat.
11
SPECIAL PROVISIONS - GENERAL
CONTRACT NO. CL2007-27
34. CONTRACTOR'S SUPPLY OF CONSTRUCTION SIGNS
In accordance with Section GC7.06 of the General Conditions, the Contractor is responsible
for the supply, erection, maintenance and subsequent removal of all temporary traffic controls,
including signs, lights, barricades, delineators, cones, etc., required on the work.
Traffic controls shall be provided in general accordance with the latest edition of the "Ontario
Traffic Manul Book 7, Temporary Conditions".
The Contractor shall provide, to the Authority for approval, a plan of action for the control and
maintenance of traffic, in accordance with the above noted manual, at least seven (7) days
prior to construction. Installation of all traffic controls will not commence until the Contractor
has received approval from the Authority.
Traffic controls shall be operational before work affecting traffic begins.
35. MAINTENANCE OF TRAFFIC
The Contractor will be permitted to close Green Road to through traffic for the duration of
construction. The Contractor shall, at all times, must maintain access for emergency vehicles
and delivery vehicles.
All pedestrian traffic within the Contract limits must be maintained at all times during
construction. The Contractor shall supply and place ramps to provide access for pedestrians
to houses, and other locations as required by the Engineer, if normal access has been blocked
as a result of construction.
Advanced detour signs for detouring through traffic movement around the construction site will
be supplied, erected and maintained by the Contractor as directed by the Engineer.
The Contractor shall completely enclose, using snow-fence and lights, all open excavations at
the end of the each day's operation. The Contractor shall also erect suitable barricades, signs,
snow-fence, etc., along traveled traffic (pedestrian or vehicular) lanes if construction is
proceeding adjacent to the traveled lanes.
No extra compensation shall be paid to the Contractor under this Contract for performing work
in accordance with the requirements described under the heading "Maintenance of Traffic".
36. REGION - POLICE TRAFFIC CONTROL
Contractor to supply paid duty police officer(s) and police cruiser for traffic control in
intersections as required. No extra compensation shall be paid to the Contractor under this
Contract for performing work in accordance with the requirements described under the heading
"Region - Police Traffic Control".
Contractor to submit detailed traffic control plan no later than two weeks prior to the
commencement of construction activities and material deliveries.
All traffic control, signing and staging costs in accordance with Special Provisions - General
Requirements, Clauses 3 and 5, and Ontario Traffic Manual, March 2001. This shall include
all mobilization and demobilization required due to staging of the work.
Coordination and communication with abutting property owners to minimize impacts on use of,
and access to, these properties.
All costs related to traffic control and staging for roadway work operations. No additional
payment will be made for multiple traffic control set-ups due to staging requirements.
12
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SPECIAL PROVISIONS - GENERAL
CONTRACT NO. CL2007 -27
37. NOTIFICATIONS TO POLICE, FIRE, AMBULANCE, SERVICES, ETC.
The Contractor shall notify the Police, Fire Department and Ambulance Services before closing
any roadway to traffic and in the case where the roadway is used as a bus route, the
appropriate authority shall also be notified.
It shall be the Contracts's responsibility to notify the Clarington Fire Department on a daily
basis to advise of the locations where construction work is to be undertaken and the extent to
which the roadway{s) will be restricted to vehicular traffic movements.
The Clarington Fire Department shall also be advised of changes to the proposed daily
construction working operations which will affect vehicular traffic movements.
38. TRAFFIC AND STREET SIGNS
Before commencing work on the Contract, the Contractor shall ensure all traffic and street
signs are adjusted for construction to the satisfaction of the Municipality of Clarington.
Upon completion of the Contract work, the Contractor shall notify the Traffic Section that street
and traffic signs can be re-erected or reinstated. Traffic Section approval must be given prior to
installation.
Regulatory signs such as "Stop" and "Yield" must be maintained throughout.
39. EMERGENCY AND MAINTENANCE MEASURES
Whenever the construction site is unattended by the general superintendent, the name,
address and telephone number of a responsible official of the contracting finn, shall be given to
the Contract Administrator. This official shall be available at all times and have the necessary
authority to mobilize workmen and machinery and to take any action as directed by the
Contract Administrator in case emergency or maintenance measures are required regardless
whether the emergency or requirement for maintenance was caused by the Contractor's
negligence, act of God, or any cause whatsoever.
Should the Contractor be unable to carry out immediate remedial measures required, the
Authority will carry out the necessary repairs, the costs for which shall be charged to the
Contractor.
40. DAMAGE PREVENTION
The Contractor is responsible to prevent the damage of the project, building, landscaping,
fencing, or other surface or sub-surface/features, and to prevent accidents to persons, whether
employed on the project or not. The Engineer may order precautionary measures, although
this does not relieve the Contractor of his responsibility to prevent damage.
41. GARBAGE COLLECTION
The Contractor will be responsible for ensuring that garbage collection, including recyclables,
is maintained and when necessary, the Contractor shall make arrangements directly with the
collecting agency, to permit and coordinate pick-up. If necessary, the contractor shall be
responsible for moving the garbage and recyclables outside of the construction area for pick-
up by the collecting agency.
13
SPECIAL PROVISIONS - GENERAL
CONTRACT NO. CL2007-27
42. SPILLS REPORTING
Spills or discharges of pollutants or contaminants under the control of the Contractor, and spills
or discharges of pollutants or contaminants that are a result of the Contractor's operations that
cause or are likely to cause adverse effects shall forthwith be reported to the Engineer. Such
spills or discharges and their adverse effects shall be as defined in the Environmental
Protection Act. R.S.O. 1980.
All spills or discharges of liquid, other than accumulated rain water, from luminaries, internally
illuminated signs, lamps and liquid type transformer under the control of the Contractor, and all
spills or discharges from this equipment that are a result of the Contractor's operations shall,
unless otherwise indicated in the contract, be assumed to contain PCB's and shall forthwith be
reported to the Engineer.
This reporting will not relieve the Contractor of his legislated responsibilities regarding such
spills or discharges.
43. UTILITIES
Sections GC2.01 and GC7.12 of the General Conditions are deleted in their entirety and are
replaced by the following:
The Contractor shall be responsible for the protection of all utilities at the job site during the
time of construction.
The Authority will be responsible for the relocation of utilities where required. However, no
claims will be considered which are based on delays or inconvenience resulting from the
relocation to being completed before the start of this Contract.
The location and depth of underground utilities shown on the Contract drawings, are based on
the investigations made by the Authority. It is, however, the Contractor's responsibility to
contact the appropriate agencies for further information in regard to the exact location of all
utilities, to exercise the necessary care in construction operations and to take such other
precautions as are necessary to safeguand the utilities from damage. The contractor will not
hinder the operations of the utilities or their agents in the relocation of affected utility plant and
will provide free and clear access to all operations.
44. DUST AND MUD CONTROL
As a part of the work required under Section GC7.06 of the General Conditions, the Contractor
shall take such steps as may be required to prevent dust nuisance resulting from his
operations either within the right-of-way or elsewhere or by public traffic where it is the
Contractor's responsibility to maintain a roadway through the work.
Where the work requires the sawing of asphalt or the sawing/grinding of concrete, wet type
blades and grinders shall be used together with sufficient water to prevent the incidence of
dust, wherever dust would affect traffic or wherever dust would be a nuisance to residents of
the area where the work is being carried out.
The cost of all such preventative measures shall be borne by the Contractor except where the
application of dust suppressants either water and/or calcium chloride is used to reduce the
dust by traffic on a roadway which is the Contractor's responsibility to maintain for public traffic.
The cost of such water and/or calcium chloride as is authorized by the Contract Administrator
to restrict to acceptable levels of all such preventative measures shall be paid for by the
Authority at the contract prices for Application of Water of Application of Calcium Chloride.
14
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SPECIAL PROVISIONS - GENERAL
CONTRACT NO. CL2007 -27
The Contractor shall be responsible for all dirt and mud that is tracked onto the roadways from
vehicles entering or leaving the job site. The cost of this work shall be borne by the
Contractor. The Contractor shall immediately commence clean-up work upon notification from
the Contract Administrator. Failure to comply with this order within a reasonable time, or to
complete the work to the satisfaction of the Contract Administrator, or in the event of an
emergency, the Town will undertake all associated costs charged to the Contractor.
45. DISPOSAL OF SURPLUS MATERIAL
The Contractor shall be responsible for the disposal of materials which are surplus to or
unsuitable for incorporation in the work. Disposal sites shall be provided by the Contractor at
his expense.
The Contractor shall obtain written permission from any property owner, other than lands
owned by the Authority, for the disposable of all surplus material from this Contract. A copy of
this permission shall be provided to the Authority two weeks in advance of the commencement
of such work. The Contractor is responsible for obtaining a suitable site including agreements
and permits for the disposal of excess materials from this contract.
The Contractor shall be responsible for controlling dust and for cleaning and removal of any
materials tracked onto roadways at the disposal sites or on the routes thereto as a result of his
operations.
The Contractor shall provide the Authority with a completed copy of the Property Owner's
Release, which is included in the contract documents, upon completion of such work.
The Contractor shall comply with the requirements of M.O.E.E. and M.T.O.
46. RESTRICTIONS ON OPEN BURNING
Open fires will not be permitted within the limits of this Contract. Brush and debris may as an
alternative to buming, be disposed of outside the Contract Limits and in compliance with the
requirements specified elsewhere for Disposal of Surplus Material.
47. TREE PROTECTION
Whether tree protection is required on this contract, or not, during construction the Contractor
shall not:
1. Stockpile construction or excavated material in lawn areas under trees.
2. Re-fuel construction equipment in the vicinity of trees. All re-fueling and repairs to
equipment shall be undertaken in designated areas.
3. Care shall be taken as to not allow contaminant fluids, liquids or solids to enter the
ground within the drip line of trees to be saved.
Where tree protection is specified in the contract the contractor shall undertake the following
work as directed by the Contract Administrator or Project Arborist:
1. Install snow fencing on steel T-rails around the drip line of each tree to be preserved.
The Contractor is advised that no buttress/(f1are)/roots shall be permitted to be cut during
construction for any reason.
Injury to above ground portion of trees caused by the Contractor's operations will be treated as
directed by the project arboristlhorticulturist appointed by the Authority, with acceptable wound
treatment by the Authority or a commercial tree care expert at the Contractor's expense.
15
SPECIAL PROVISIONS - GENERAL
CONTRACT NO. CL2007 -27
Any large (7 to Bcm diameter) roots cut, excavated or injured during construction are to be
properly cut and painted with orange shellac, as directed by the project arborist.
48. APPLICABLE STANDARD SPECIFICATIONS
Ontario Provincial Standard Specifications (OPSS) governing the work of this Contract shall be
as listed in the 'Schedule of Tender Data', Section E, with the applicable date of issue as
indicated for each specification.
With the exception of OPSS 127, these specifications shall remain in effect throughout the
duration of this Contract, whether or not they be modified or re-issued by the responsible
agency subsequent to the tender advertising date.
The issue of OPSS 127 which is current at the time that extra work may be performed, shall
govern for such work.
49. SUPPLY OF MATERIALS
All materials necessary for the proper completion of the work shall be supplied by the
Contractor, except as specifically noted, and the payment provided in the Contract shall be
deemed to include full compensation for the supply of such materials.
50. ASPHALT AND CONCRETE MIX DESIGNS
Asphalt Mix Designs
The Contractor shall be responsible for the provision of current mix designs for all hot mix
asphalt required for the work, or for having the necessary mix designs prepared by a certified
laboratory. The mix designs proposed for use by the Contractor shall be submitted in writing to
the Engineer for his approval and no work shall commence until the design mixes are
approved. Hot mix designs shall conform to the requirements of OPSS 1150. All hot mix shall
be Performance Graded Asphalt Cement (PGAC) in compliance with AASHTO Designations
MP1 and PP6. Performance Grade Asphalt Cement shall also conform to the MTO Non-
Standard Special Provision Amendment to OPSS 1101.
Steel slag and blast furnace slag are not acceptable for use as aggregate in the asphalt mix.
All costs associated with the provision of approved mix designs shall be borne by the
Contractor.
Concrete Mix Designs
The Contractor shall be responsible for the provision of current mix designs for all concrete
required for the work, or for having the necessary mix designs prepared by a certified
laboratory. The mix designs proposed for use by the Contractor shall be submitted in writing to
the Engineer for his approval and no work shall commence until the design mixes are
approved. Concrete shall conform to the requirements of OPSS 1350. Concrete supply plants
will not require certification by RMCAO.
All costs associated with the provision of approved mix designs shall be borne by the
Contractor.
16
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
51. ASPHALT PRICE INDEX - UNIT RATES
Bid prices shall be F.O.B. delivered. Unit prices shall be firm and shall include all federal
excise tax duty, freight and shall be subject to Goods and Services Tax and Provincial Sales
Tax. Applicabie taxes shall be shown in the spaces provided on the Tender form.
52. AMENDMENT TO OPSS 102
Accuracy of Weighing Devices
Section 102.03 of OPSS 102 is amended by the addition of the following:
Limits of Error: The In-Service Limits of Error contained in the Government of Canada Weights
and Measures Act.
Sub-Section 102.08.01 of OPSS 102 is amended by the addition of the following:
Scale accuracy tolerances and limits of error are defined as follows:
SCALE ACCURACY TOLERANCES FOR PERFORMANCE TEST
LIMITS OF ERROR
PORTABLE SCALE
PERMANENT SCALE
ACCEPTANCE
0.15%
0.075%
30 DAYS AFTER REPAIR
0.15%
0.075%
IN-SERVICE
0.20%
0.10%
% OF INDICATED LOAD
NOTES:
"Indicated" load refers to the weight of the vehicle used in conducting the performance
test when measured at the centre of the platform.
"Acceptance" Limits of Error are used for the original approval of the design of the
device or at the time of its first use in trade and for 30 days after the device has
undergone repairs.
53. AMENDMENT TO OPSS 1820; CONCRETE PIPE
Production methods shall conform to the requirements of CSA A257.1 and CSA A257.2.
1820.07.02 Pipe for Sewers up to and including 900mm designated internal diameter.
Pipe for use in sewers up to and including 900mm designated internal diameter shall be pipe of
the size and class required, and shall conform to the M.O.E. Pre-qualification Requirements for
Concrete Sewer Pipe Plants.
The plant shall have a valid Pre-qualification Certificate at the time of production and delivery of
the pipe.
1820.07.03 Marking
Marking shall conform to the requirements of CSA Standard A257.1 M or A257.2M.
Pipe conforming to the M.O.E. Pre-qualification Requirements for Concrete Sewer Pipe Plants
shall bear the letters "M.O.E.".
Jacking Pipe shall be marked with the words "Jacking Quality".
17
Section 1820.10, Designated Sources Requirements of OPSS 1820 is deleted.
54.
DRAINAGE DITCHES AND STORM SEWERS
Any and all ditches, drainage channels and/or storm sewer systems, which may be affected by
construction shall have their flows maintained at all times during construction. unless
permission to the contrary has been obtained from the Contract Administrator. No extra cost
shall be incurred for this work.
The Contractor shall make allowance in his prices for any problems that may be encountered
as a result of ditch flows or storm sewer flows. If found necessary then the Contractor shall
adequately divert or pump at his expense, the storm water to avoid construction problems.
Drainage shall not be impeded nor shall blockages or water backups be permitted. Any
damage as a result of water or flooding shall be the responsibility of the Contractor.
55.
PROVISIONAL ITEMS
Where it occurs in this document, the notation "Provisional" shall be understood to mean that
the inclusion in the contract of items so described, shall be at the discretion of the Authority and
no claims for ex1ra payment due to the exclusion of any or all of these items will be accepted by
the Authority.
56.
CONTRACTOR TO ASSIST INSPECTOR ON PIPE
In order to comply with the requirements of the Occupational Health and Safety Act, the
Contractor shall provide at reasonable times experienced workers, equipped with the required
safety equipment in order to assist the inspector to carry out intermediate in pipe inspections
during the progress of the work and also at the time of completion.
57.
COMPACTION TEST FOR TRENCHES
After the Contractor has completed his compaction, compaction tests will be taken randomly on
all facets of the required Contract. Any areas, where the tests do not meet the specified
degree of compaction, shall be re-excavated and re-compacted at the Contractor's expense.
Native materials shall be compacted to 95% Standard Proctor maximum dry density unless
otherwise specified. Refer to geotechnical report by AMEC.
The Town may, at its discretion and with the agreement of the Contractor, conditionally accept
the work and extend the guaranteed maintenance period.
58.
REGIONAL MUNICIPALITY OF DURHAM CONTINGENCIES
Reference: RMDSS Section 01021
Tenderers shall reference the Schedule of Contingency Unit Prices for Sanitary Sewer and
Watermain work. These unit prices shall be used for all work included in the Schedule.
Reference CD Section 01021 for details of work covered under individual items. All extra work
requested or required by the Contract Administrator, including work covered by items in the
Schedule of Contingency Unit Prices, shall be paid by Contract Change Directive.
59.
REGIONAL MUNICIPALITY OF DURHAM CONTRACT CHANGE DIRECTIVES
All Regional ex1ra work not covered under Part II and Part III Tender Items shall be paid by
Contract Change Directive. Payment for such additional work shall be made as follows:
(a) at unit price given in Schedule of Contingency Unit Prices, if applicable
(b) at a negotiated price, agreed upon by the Contract Administrator and the Owner,
18
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
pursuant to General Conditions, Clause GC3.14, or
(c) on a Time and Materials basis as per General Conditions, Clause GC8.02.04.
01005 - General Instructions. For the purpose of this contract, Section 02630 shall be deieted
and repiaced with the appropriate Town of Whitby and/or OPS specifications as specified
elsewhere.
60.
PRE-SCREENING OF PROPOSED FILL SITES BY C.L.O.C.A
The Contractor shall consider the location of any proposed fill/dump sites with respect to
Central lake Ontario Conservation Authority (C.L.O.CA) Fill Placement regulations.
Where the Contractor is considering the use of a fill/dump site within the jurisdiction of the
C.l.O.CA, it is recommended that he have the proposed site pre-screened by the C.L.O.C.A.
for the purpose of determining if the site is subject to C.L.O.C.A. regulations on the placement
offill.
61.
TEMPORARY STEEL PLATES
The use of temporary steel plates will be permitted for use in this Contract.
The steel plates will be used solely at the intersections along the work zone to permit the
intersections to perform beyond the normal hours of work.
62.
REGIONAL MUNICIPALITY OF DURHAM GENERAL REQUIREMENTS -
SANITARY SEWER AND WATERMAlN
NATIVE BACKFILL
1.
.1 All native materials used for backfilling shall be satisfactory to the Contract Administrator.
Payment shall be included in the unit price per metre for in-ground services - except where
native material is deemed as unsuitable for backfill.
.2 Native backfill shall be compacted to 95% Standard Proctor Density in uniform lifts not to
exceed 300 mm compacted depth.
2.
GENERAL
Reference: Geotechnical Investigation Report and Pre-Construction Dig-Up Report.
Include the following, where applicable, in all unit prices bid:
.1 Environmental considerations.
.2 Maintenance of traffic.
.3 Protection and temporary/permanent support of all in-ground and above ground services
and utilities. Reference Special Provisions - General Requirements, Clause 7 - Work in
the Vicinity of Gas Lines.
.4 Saw-culling of existing asphalt in parallel straight lines and disposal of excess asphalt
off site. Preparation for restoration of disturbed asphalt roadways and shoulders shall
include:
19
. Saw-cut existing asphalt full depth in neat, straight, parallel lines at min.
450mm from the edge of the trench in accordance with Detail S-514. Saw-cuts
shall, without exception, encompass any asphalt overbreak, trench wall
sloughing, asphalt undermining and variations in trench width such that saw-
cuts are straight and parallel for the full length of the trench restoration. No extra
or additional payment will be made for multiple saw-cuts.
Note: Trench width shall be as required by the Occupational Health and Safety Act
and Regulations and existing soils conditions.
Where the edge of the asphalt restoration in accordance with Detail S-514 falls within
1.0 m of the existing edge of pavement, remove all asphalt to the said edge of
pavement.
Compaction of granular road base materials to 100% Standard Proctor Density.
Sweep all saw-cut asphalt edges to ensure a clean vertical face.
Tack coat all asphalt faces with SS-1 emulsion.
.5 Vertical trenching as required to minimize road restoration and as indicated on Contract
Drawings.
.6 Trench support systems in accordance with OPSS 538 and as required by the Ministry of
Labour for the soil conditions encountered.
Note: Prefabricated and hydraulic support systems are not permitted where Type 4 soil is
encountered.
.7 Design and implementation of an "engineered support system" where trench exceeds 6 m
in depth and/or 3.6 m in width. This shall also include submission of two copies of the
design drawings and specifications for such support system to the Ministry of Labour
nearest to this project and two copies of same to the Contract Administrator.
.8 Maintenance of existing ditch flows, sewage flows and residential water supply.
Reference RMDCS Section 01510, Subsections 3.02 and 3.03.
.9 Dewatering both inside and outside trenches in accordance with RMDCS Section 02240
and OPSS 517.
Note: All pipe shall be placed in dry conditions. The Contractor shall dewater to 1.0
metre below pipe invert.
.10 All water ordered by the Contract Administrator for dust control.
.11 Temporary surface restoration as per RMD RMDSD S-514.
3.
OCCUPATIONAL HEALTH AND SAFETY ACT AND CONSTRUCTION REGULATIONS
.1 The following extracts of the Occupational Health and Safety Act of Ontario and
Construction Regulations are included for the information of the Contractor.
.1 Duties of Constructor
23. (1)
A constructor shall ensure, on a project undertaken by the constructor
that,
(a)
(b)
(c)
the measures and procedures prescribed by this Act and the
regulations are carried out on the project;
every employer and every worker performing work on the project
complies with this Act and the regulations; and
the health and safety of workers on the project is protected.
37. (1)
An employer,
(a) shall ensure that all hazardous materials present in the workplace
are identified in the prescribed manner;
20
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
(b) shall obtain or prepare, as may be prescribed, an unexpired
material safety data sheet for all hazardous materials present in
the workplace; and
(c) shall ensure that the identification required by clause (a) and
material safety data sheets required by clause (b) are available in
English and such other ianguages as may be prescribed.
.2
Construction Regulations
17. (1)
A constructor shall establish for a project written procedures to be
followed in the event of an emergency and shall ensure that the
procedures are followed at the project.
A worker shall be adequately protected by a guardrail system that
meets the requirements of subsections 26.3 (2) to (8).
An employer shall ensure that a worker who may use a fall protection
system is adequately trained in its use and given adequate oral and
written instructions by a competent person.
26.1 (1)
26.2 (1)
27. (1)
A worker who may drown shall wear a Iifejacket. OReg. 213/91, s.27
(1).
(2)
(a)
(b)
(c)
If a worker may drown at a project,
at least two workers trained to perform rescue operations shall be
available to perform rescue operations;
rescue equipment shall be provided in a suitable location on or
near the project; and
all workers on the project shall be advised of the rescue
procedures to be followed and their role, if any, in carrying out a
rescue.
52. (1)
Fire extinguishing equipment shall be provided at readily accessible
and adequately marked locations at a project.
If a worker at a project on a highway may be endangered by vehicular
traffic unrelated to the project, the project shall make use of as many of
the following measures as is necessary to adequately protect the
worker:
67. (2)
1. Barriers. 2.
3. Delineators. 4.
5. Warning signs. 6.
7. Flares. 8.
9. Blocker trucks. 10.
11. Sign trucks. 12.
13. Longitudinal buffer areas.
(3) In addition to the measures listed in subsection (2) but subject to
section 68, a worker may be used to direct traffic.
Barricades.
Lane control devices.
Flashing lights.
Traffic control devices.
Crash trucks.
Speed control devices.
(4) Every empioyer shall develop in writing and implement a traffic
protection plan for the employers' workers at a project if any of them
may be exposed to a hazard from vehicular traffic.
234. (1) The walls of an excavation shall be supported by a support system that
complies with sections 235, 236, 237, 238, 239 and 241.
21
2.
If a support system is used for the walls of an excavation, a iadder for
access to or egress from the excavation shall be placed within the area
protected by the support system.
A support system for the walls of an excavation shall extend at least 0.3
metres above the top of the excavation unless otherwise permitted or
required by this section.
Designated Substances
I
I
I
I
240.
241. (1)
.1 In accordance with the requirements of Section 30(1) of the Occupational
Health and Safety Act, the Bidder is hereby advised that the designated substances
as listed hereunder are or may be present on the site and within the limits of this
Contract:
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
,Oesi nated:S.utisntnce;
,g ". ". .". .
m_ ........"..,.'...'....""""__...,....,__......,
crylonitrile
No
No
No
No
oke Oven Emissions
thylene Oxide
socyanate
ead
No
No
No
No
No
No
No
ercury
inyl Chloride
.2
The Contractor shall comply with the governing Ministry of Labour Regulations
respecting protection of workers, removal, handling and disposition of any Designated
Substances encountered in carrying out the Work proposed on this contract. Further,
the Contractor shall comply with the Region of Durham Health and Safety Policies,
Procedures and Practices and the Region's Construction Safety Program. Copy(ies) of
the Region's Health and Safety Policies, Procedures and Practices manual and the
Construction Safety Program are available from the Region's Safety Office.
.3
Prior to commencement of this work, the Contractor shall provide written
notification to the Ministry of the Environment at their York-Durham District Office,
230 Westney Rd. S., 5th floor, Ajax, Ontario L 1S 7J5, of the location(s) proposed
for disposal of Designated Substances. A copy of the notification shall be provided
to the Contract Administrator a minimum of two weeks in advance of work starting.
.4
In the event that the Ministry of the Environment has concerns with any proposed
disposal location, further notification shall be provided until the Ministry of the
Environment's concerns have been addressed.
.5
The Contractor is reminded of the requirement under OPSS 180 to submit a Waste
Quantity Report (Form OPSF 1805) for all Solid Non-Hazardous Waste.
22
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
.6 All costs associated with the removal and disposition of the Designated
Substances herein identified, shall be deemed to be included in the appropriate
tender items.
.7 Should a Designated Substance not herein identified be encountered in the work,
then management of such substance shall be treated as Extra Work
4.
PROTECTION OF OPEN TRENCHES AND EXCAVATIONS
Reference:
RMDCS Sections 02315 and 02318
RMDSD S-516
.1 In addition to the provisions of RMDCS Sections 02315 and 02318 and Ontario Regulation
213/91 made under the Occupational Health and Safety Act, and In particular Part 111_
Excavations, the Contractor shall employ the following protection measures for trenches
and excavations left open at the end of the work day or where, during any work day, a
trench or excavation is left unattended by the Contractor.
.2 Where the public has access to the perimeter of an excavation, a barrier at least 1.1 m
high shall be installed around the complete perimeter of the excavation. The vertical
supports will be secure, have a spacing of not more than 1.1 m and shall be a minimum
distance of 300 mm from the top of the wall of the excavation. The barrier shall include a
fencing fabric, with openings not exceeding 100 mm, securely attached to the vertical
supports at the top, center and bottom. If the excavation is greater than 0.3 m in depth, a
toe board shall be installed with the fencing fabric securely fastened to it to prevent
persons from slipping under the fabric and into the excavation. If an excavation is adjacent
to a sidewalk or an area commonly used by the public as a walkway or recreation area, the
fencing fabric shall be a metal mesh.
.3 Where an excavation is greater than 1.0 m in depth, and the public has access to the
perimeter, signs shall be posted indicating "Danger Due to Excavation".
.4 The Contractor shall ensure the barriers are in good condition and stable prior to vacating
the project at the end of each work day.
.5 A Crowd Control Barrier meeting the requirements of RMDSD S-516 will be deemed an
acceptable barrier for this purpose provided the barriers are satisfactorily secured to the
ground so that they cannot be moved.
5.
PRIVATE PROPERTY SITE USE AGREEMENTS AND RELEASES
Reference: OPSS 180
.1 The Contractor shall enter into a written agreement with all respective private property
owners for the use of any private lands outside the limits of the contract for the purpose of
stockpiling materials, locating field offices and trailers and for disposal of excess material.
The Contractor shall provide the Contract Administrator with a copy of all such written
agreements before the use of such sites is commenced. Use OPSF Forms 1800 and 1801
to notify the Contract Administrator of all agreements for "Management as Disposable Fill"
and "Materials Stockpiling".
.2 Upon termination of the use of such sites, the Contractor shall obtain a written release from
the respective private party property owners and two (2) copies of each release shall be
provided to the Contract Administrator. The release shall be in the form provided in the
Supplementary General Conditions, Appendix G. The Contract Administrator reserves the
23
right to withhold an appropriate amount from the Contractor's Progress Payments if the
Contractor fails to provide such releases and reasonably satisfy his obligations to the
private property owner.
6.
PRE-SCREENING OF PROPOSED FILL SITES BY C.L.O.C.A.
7.
.1 The Contractor shall consider the location of any proposed fill/dump sites with respect to Central
Lake Ontario Conservation Authority (C.L.O.CA) fill placement regulations.
.2 Where the Contractor is considering the use of a fill/dump site within the jurisdiction of the
C.L.O.C.A., it is recommended that he have his proposed site pre-screened by the
C.L.O.C.A. for the purpose of determining if the site is subject to C.L.O.CA regulations on
the placement of fill.
WORK IN THE VICINITY OF UTILITIES
.1 The Contractor shall comply with TSSA's "Guidelines for Excavations in the Vicinity of Gas
Lines" dated November 2004, Electrical Safety Authority's "Guideline for Excavating in the
Vicinity of Distribution Lines" and Bell Canada's "Guidelines for Excavation in the Vicinity of
the Bell Canada Network".
.2 The Contractor will be required to expose all buried gas lines prior to excavating or boring
in the vicinity of gas lines.
.3 Where gas mains are identified on Contract Drawings, the Contractor shall expose the gas
main at all crossings. Further, the Contractor shall expect to find and be required to
expose gas service pipes for every adjacent property.
24
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
CONTRACT NO: CL2007-27
GREEN ROAD RECONSTRUCTION
STEVENS ROAD CONSTRUCTION
D. MUNICIPALITY OF CLARINGTON
CONTRACT SAFETY POLICY AND PROCEDURE
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SCHEDULE
CONTRACTOR SAFETY
POUCY AND PROCEDURE
POUCY:
Contractors and Sub-contractors are responsible to ensure that their personnel are
updated on all safety concems of the workplace and are aware of the safety
requirements as required by the Contractor under the Occupational Health and Safety
Act. Safety performance will be a consideration in the awarding of contract. Under the
OCCUpational Health and Safety Act (Section 23 (1), (2}), it is the constructor's
responsibility to ensure that
. the measures and procedures prescnbed by the Occupational Health and Safety
Act and the Regulations are carried out on the proiect;
every employer and every worker performing work on the proiect complies with
the Occupational Health and Safety Act and the Regulations (under the Act); and
.
the health and safety of workers on the proiect is protected.
.
Where so prescribed, a constructor shall, before commencing any work on a
project, give to a Director notice in writing of the project containing such
information as may be prescribed.
DEFINmONS:
Contractor - any individual or firm engaged by the Municipality to do work on behalf of
the Municipality.
Project - means a construction project, whether public or private, including,
the construction of a building, bridge, Structure, industrial establishment, mining
plant, shaft tunnel, caisson, trench, excavation, highway, railway, street, runway,
parking lot, cofferdam, conduit, sewer, watermain, service connection, telegraph,
telephone or electrical cable, pipe fine, duct or well, or any combination thereof,
the moving of a building or structure, and
any work or undertaking, or any lands or appurtenances used in connection with
construction.
Construction - includes erection, alteration, repair, dismantling, demolition, structural
maintenance, painting, land dearing, earth moving, grading, excavating, trenching,
digging, boring, drilling, blasting, or concreting, the installation of any machinery or plant,
and any work or undertaking in connection with a project.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SCHEDULE
CONTRACTOR SAFETY
POLICY AND PROCEDURE Continued...
Constructor - means a person who undertakes a project for an owner and includes an
owner who undertakes all or part of a project by himself or by more than one employer.
Project Manager - means the municipal management representative who has
responsibility for a contract.
PROCEDURE:
The following items are required before any Contractors are hired by the Municipality.
a) Before beginning a project, the project manager or delegate must determine
whether any designated substanceslhazardous materials are (or will be) present
at the site and prepare a list of aD these substances.
b) The project manager or delegate must include, as part of the request for
tender/quotations, a copy of the above-mentioned lisl The list of designated
substances/hazardous materials must be provided to all prospective constructors
and/or contractors.
c) The request for tender/quotations will require prospective contractors to include a
list of the designated substancesJhazardous materials that will be brought onto
the work site and material safety data sheets.
d) Before awarding a contract, contractor(s) will be required to complete and sign
theHealtt1"!ncJ~fi!ty Practice Foon(Schedule "A")< The Purchasing OffICe will
maintain all contractors safety performance records.
e) As part of the tender/quotation conditions, before award of a contract, the
contractor will be required to provide proof that all workers involved with the
project have Ihe proper WHMIS training, as required by the Occupational Health
. and Safety Act.
f) As part of the tender/quotation cond'rtions, before award of a contract, the
contractor must provide details of Iheir Health and Safety program.
g) The project manager or delegate must provide the successful contractor with a
workplace orientation, which will include, but not limited to identifying known
potential hazards, hazardous material inventory and material safety data sheets
for the sites. A workplace orientation/Job Safety Instruction Checklist to be
completed (see Compfiance page 9).
h) Before the start of the assignment, the fo/lowing documentation WIll be provided
to the successful contractor, by Ihe project manager or delegate.
i) Copies of Ihe Municipal Corporate Health and Safety Program
ii) Departmental heallh and safety policies
iii) Workplace procedures regarding health and safety Practices.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SCHEDULE.
CONTRACTOR SAFETY
POLICY AND PROCEDURE Continued...
i) The contractor has the responsibility to provide any and all prescribed personal
protective equipment for their own workers, to indude as a minimum but not
limited to hard hats and safety boots. If a worker(s) fails to comply with any
program, policy, rule or request regarding health and safety. that person(s) is not
allowed on the site until the person(s) complies.
j) The Municipality will retain the right to document contractors for all health and
safety wamings and/or to stop any contractors' work if any of the previously
mentioned items are not in compliance. Similarly, the Municipality will have the
right to issue wamings andlor to stop work if there are any violations by the
contractor of the Occupational Health and Safety Act, Municipal Health and
Safety programs, policies, rules. and/or if the contractor creates an unacceptable
health and safety hazard. Written warnings and/or stop work orders can be given
to contractors using Contractor Health and Safety Waming/Stop Work Order
Form (Schedule "B").
k) Where applicable, the Municipality will retain the right to allow municipal
employees to refuse to work in accordance with the established policy and the
Occupational Health and Safety Act, in any unsafe conditions.
I) The Purchasing Department will maintain current certificates of dearance until all
monies owing have been paid to the contractor.
m) Responsibility for ensuring contractor compliance to this policy falls upon the
project manager or designate. This will include identification, evaluation and
control practices and procedures for hazards and follow-up and issuing of
Contractor Health and Safety Waming/Stop Work Orders.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SCHEDULE
CONTRAcTOR SAFETY
POLICY AND PROCEDURE Continued...
To Contractor(s):
HEALTH AND SAFETY PRACTICE FORM
The Municipality of Clarington is committed to a healthy and safe working environment for all
workers. To ensure the Municipal workplace is a healthy and safe working environment,
contractors, constructors and subcontractors must have knowledge of and operate in
compliance with the Occupational Health and Safely Act and any other legislation pertaining to
employee health and safely.
In order to evaluate your company's health and safety experience,pleaseprovide the
accidentlincident and/or Workplace Safely and Insurance Board (WSIB) information noted
below, where applicable. .
The New Experimental Experience Rating (NEER)
- The WSIB experience rating system for non-construction rate groups
ho. uu... no. n........ ............. on h..O.... _..... ...........0 unh... "'0' On.. ...._0
. The Council Amended Draft #7 (CAD-7) Rating
- The WSIB experience rating system for construction rate groups
"0...... On ""_0'_"" n ............ .__....... h. n ..._. ..0.... ono.......... on h"o... h_.
Injury frequency performance for the last two years
- This may be available from the contractor's trade association
...........n........................................................__......................
. Has the contractor received any Ministry of Labour warnings or orders in the last two
years? (If the answer is yes, please include the infraction).
. Confirmation of Independent Operator Status
- The WSIB independent operator number assigned:
(Bidders to include the letter confirming this status and number from WSIB with their bid
submission.)
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SCHEDULE
CONTRACTOR SAFETY
POLICY AND PROCEDURE Continued...
CONTRACTOR'S STATEMENT OF RESPONSIBILITY
As a contractor working for the Municipality of Clarington, Vwe will comply with all
procedures and requirements of the Occupational Health and Safety Act, Municipal
safety poficies, department and site Specific policies and procedures and other
applicable legislation or regulations. IIwe will work safely with skill and care so as to
prevent an accidental injury to ourselves, fellow employees and members of the public.
1. The contractor/successful tenderer certifieS that it, its employees, its
subcontractors and their employees,
a) are aware of their respective duties and obligations under the
Occupational Health and Safety Act, as amended from time to time, and
all Regulations thereunder (the "Act"); and
b) have sufficient knowledge and training to perform all matters required
pursuant 10 this contractltender safely and in compliance with the Act.
2. In the performance of all matters required pursuant to this conlractltender, the
contractor/sucoessful tenderer shall,
a) act safely and comply in all respects to the Act, and
b) ensure that its employees, it subcontractors and their employees act
safely and complying all respects with the Act.
3.
The contractor/successful tenderer shall rectify any unsafe act or practice and
any nolHXlmprlallcewith the Act at its expense immediately upon being notified
by any person of the existence of such act, practice or non-compfiance.
4.
The contractor/successful tenderer shall permit representatives of the
Municipality and the Health and Safety Committee on site at any time or times for
the purpose of inspection to determine compliance with this contractor/tender.
5.
No act or omission by any represenlalive of the Municipality shall be deemed to
be an assumption of any of the duties or obligations of the contractor/successful
tenderer or any of its subcontractors under the Act.
6.
The contractor/successful tenderer shall indemnify and save harmless the
Municipality,
a) from any loss, inconvenience, damage or cost to the Municipality which
may result from the contractor/successful tenderer or any of its
employees, its subcontractors or their employees failing to act safely or to
comply in all respects with the Act in the performance of any matters
required pursuant to this contractltender;
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SCHEDULE
CONTRACTOR SAFETY
POLICY AND PROCEDURE Continued...
b) against any action or claim, and costs related thereto, brought against the
Municipality by any person arising out of any unsafe act or practice or any
non-compliance with the Act by the contractor/successful tenderer or any
of its employees, its subcontractors or their employees in the
performance of any matter required pursuant to this contractltender; and
c) from any and all charges, fines, penalties, and costs that may be incurred
or paid by the Municipality (or any of its council members or employees)
shall be made a party to any charge under the Act in relation .to any
violation of the Act arising out of this contract/tender.
degA~~~;l~te'~'~~~:~;;J~~;;
u'"Tr!&nnn'uuuuuu'uulul
Si9U~trfc:t~r Date
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SCHEDULE
CONTRAClvR SAFETY
POLICY AND PROCEDURE Continued...
The PUrpose of this fann is to: (Issuer to check one of the following)
CONTRACTOR HEALTH AND SAFETY WARNING/STOP WORK ORDER
Provide warning to the contractor to immediately discontinue the unsafe work practice
described below
Direct the contractor to immediately cease all work being. performed under this contract
due to the unsafe work practice described below.
FAILURE TO COMPLY WITH THIS WARNINGlSTOP WORK ORDER SHALL CONSTITUTE A
BREACH OF CONTRACT.
PART "A" - DETAILS OF CONTRACT
CONTRACT/P.O. #
DESCRIPTION:
NAME OF FIRM:
PART "B" - DETAILS OF INFRACTION (TO BE COMPLETED BY ISSUER)
SCHEDULE
CONTRACTOR SAFETY
DATE & TIME OF INFRACTION:
DESCRIPTION OF INFRACTION INCLUDING LOCATION:
ORDER GIVEN BY MUNICIPALITY:
DID THE CONTRACTOR COMPLY WITH THIS ORDER?
DATE & TIME OF COMPLIANCE:
ISSUED TO:
. CONTRACTOR'S EMPLOYEE TITLE
ISSUED BY:
. MUNICIPAL EMPLOYEE, DEPARTMENT TITLE
. PART' - ADDITIONAL COMMENTS
. THIS SECTION IS TO BE USED INTERNALLY TO RECORD ADDITIONAL COMMENTS
SUBSEQUENT TO ISSUING THE WARNING/STOP WORK ORDER, I.E. DATE AND TIME
WORK RESUMED, FURTHER ACTION TAKEN, ETC.
.
.
.
. SlAdninlForms & SpecsfCIarington/PoIic-MQC
I
.
.
.
.
.
.
I
.
I
.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
CONTRACT NO: CL2007 -27
GREEN ROAD RECONSTRUCTION
STEVENS ROAD CONSTRUCTION
E. PROVISIONS
DETAILED TENDER ITEMS
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
DETAILED SPECIFICATIONS
1.0
GENERAL
1.1
1.2
1.3
100% PERFORMANCE BOND
100% LABOUR AND MATERIAL BOND
LIABILITY INSURANCE
The lump sum price in the Tender Form for this item, unless otherwise specified,
shall be compensation in full for the cost of Bonds and Liability Insurance in the
amount of $5,000,000.00 as outlined in the Contract Agreement and Special
Provision.
1.4
MOBILIZATION AND DEMOBILIZATION
The lump sum price stated in the Tender Form for this item, unless otherwise
specified, shall be compensation in full for the following:
a) Supply and erect all signs, barricades, flashers, delineators and such other
protection as may be required by the Contract Administrator to protect the
public during the course of the Contract.
b) Security protection of the Contractor's office, plant and stored materials
during the course of the Contract.
c) Supply a field office completely weatherproofed with a heat supply, hydro
power and telephone service for the use of the Contract Administrator.
d) Moving onto the site and setting up the Contractor's office, the field office for
the Contract Administrator's Inspector, complete with telephone, storage
facilities, plant, etc.
e) Provide all necessary access to the project including haul roads as required
and the restoration of the surface to the original condition after the haul
roads are removed.
f) Moving off the site and removal of the Contractor's office, field office, storage
facilities, plant, etc.
g) In accordance with the Special Provisions of the Contract, the Contractor
shall clean all existing sheets of mud and dust at the completion of each
working day to the satisfaction of the Contract Administrator.
h) The Contractor shall be allowed to close Green Road but must maintain two
way traffic at all times for Highway NO.2.
DETAILED SPECIFICATIONS
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1.4
MOBILIZATION AND DEMOBILIZATION CONTINUED
i) The Contractor shall construct temporary detour roads as required to
maintain traffic. The Contractor shall be responsible for all cost of installing
and removing any detour roads.
j) Letters to be delivered to all residents along the construction area which will
be directly affected. The letter must outline the purpose of the construction,
the Contractor's schedule, a clear sketch of the detour route, and the
Contract Administrator's and Contractor's contact persons and emergency
telephone numbers.
k) All public services are to be notified by telephone and with a copy of the
above noted letter (i.e. Police, Fire Department, Ambulance, School Boards,
Post Office, etc.)
I) Advance notice signs are to be erected seven (7) days prior to commencing
construction. All signing and delineation must be in place and approved by
the Contract Administrator prior to commencing.
m) Any request by the Contract Administrator to alter, add, or replace sighting,
delineation or protective fencing, etc., must be satisfied immediately.
n) Residents fronting the construction must be provided with reasonable access
at all times. This it to be achieved by limited the amount of asphalt removal
to that which is required to perform a given day's work, backfilling as close
to the pipe laying as is possible, and placing temporary gravel or limestone
access routes where required. This gravel or limestone shall be removed
upon road construction unless approved otherwise by the Town. Fire
protection must be maintained at all times. All work at Contractor's cost.
1.5 CONSTRUCTION LAYOUT
The Contractor shall be responsible for all layout as outlined in Clause 32 of the
Special Provisions - General.
Payment shall be made by a percentage of the lump sum price for the amount of
work completed to the date of payment.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
DETAILED SPECIFICATIONS
1.6
PRE-CONDITION SURVEY
Pre-Condition Survey shall be carried out to depict existing interior and exterior
conditions of building, utilities, monuments, bridges, structural improvements,
streets, driveways, sidewalks, within the area of influence of the work site and/or
specified distances.
The "area of influence" is that radius of distance adjacent to heavy construction,
within which structures and property are subject to possible damage.
The Pre-Condition Survey shall be completed on all structures, or part thereof,
within 30 metres of any work, at a minimum. Additional inspections may be
required, if deemed necessary by the Vibration & Noise Consultant commissioned
to carry out this work.
Qualitv Assurance
A Vibration and Noise Consultant (VNC) with over five (5) years experience in loss
control in urban areas shall be retained by the Contractor to complete this work.
The person in charge shall be a Professional Engineer registered in Ontario. The
Company shall carry Professional Errors & Omissions Insurance in the amount of
$1,000,000.00.
Procedure
Immediately upon notice to proceed, all pertinent available data relevant to those
applicable portions of the work and such other areas as deemed available to be
Pre-surveyed is obtained by the VNC.
Introduction & Notification
A Letter of Introduction is hand delivered to all properties within the "area of
influence". The letter contains pertinent information regarding the proposed work
and advises the identity, telephone number and name of contact person capable of
answering questions or addressing complaints.
This letter serves to acquaint residents with proposed construction in the area.
1.6
PRE-CONDITION SURVEY CONTINUED
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
DETAILED SPECIFICATIONS
Inaccessible Properties
Should access to a premises by the Inspector be prohibited for any reason, i.e.,
absent owner/lessor/manager; denial of authorization; vacant; safety hazard; in
such case, particulars of efforts made to gain entry are recorded on the Pre-
Condition Survey Summary Sheet as follows:
. Time and date(s) of contact
. Means of contact (in person or by telephone)
. Authority (owner/lessor/manager)
. Reason(s) for entry refusal or inaccessibility
Photoqraphic Documentation
Photographic equipment and materials used are capable of yielding high quality
negatives from which detailed enlargements may be made.
Pre-Condition Survev Report
Documentation of exterior and interior conditions of each property/item surveyed
includes, as a minimum:
. Vintage and type of construction
. Description/depiction/dimension of differential settlements (visible cracks in
walls, floors, ceilings) or any other apparent structural of cosmetic damage
or defect
Copies of I ntroduction Letters, Notification Letters and Refusal Letters are to be
included in the report. Completed Pre-Condition Survey data is to be assembled
in a formal comprehensive report, including Summary Sheet.
100% payment of this Item shall be made on the first Payment Certificate on proof
that the survey has been completed.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
DETAILED SPECIFICATIONS
2.0
REMOVALS & RELOCATIONS
The Contractor shall notify the Contract Administrator in writing of all off site
locations where the existing material and objects are to be disposed of.
ITEMS 2.1 TO 2.4
ITEMS 9.1 TO 9.6
The unit price tendered for these items shall include all plant, labour, equipment and
material to remove and dispose off site.
The unit price shall include all material required to leave all areas of removal in a
safe condition.
In addition to these items being detailed on the Contract Drawings, the unit price
tendered shall include the following:
The unit price for Item 2.1 and 9.1 shall include removal of all stumps, trees and
branches off site.
The unit price for Item 2.2 and 9.2 shall also include removal of any existing post
and wire fence.
The unit price for Item 2.3 shall include removal of all existing culverts.
The unit price for Item 2.4 shall include any saw cutting existing asphalt, as
required.
The unit price for Item 9.6 shall include grinding a minimum depth of 40mm of the
full width of existing Baseline Road within limits of the Contract. The work will be
completed in Spring/Summer 2007 and shall be coordinated with the Municipality
of Clarington. The asphalt grindings shall be disposed as determined by the
Contract Administrator.
9.5
RELOCATE LIGHT STANDARD
The unit price tendered shall include all plant, labour, equipment and material to
relocate the light standard on Clarington Boulevard to Stevens Road.
The unit price shall include removing the light standards from Clarington Boulevard
in the boulevard and island and temporary storing for re-installment.
9.5
RELOCATE LIGHT STANDARD CONTINUED
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
DETAILED SPECIFICATIONS
The u nit price shall include terminating, extending, and/or splicing the existing street
light cable.
Payment shall be made for the lump sum price.
2.5,9.6
2.6.9.7.9.8
TOPSOIL REMOVAL OFF SITE
EXCAVATION & GRADING
The unit price tendered includes all plant, labour, equipment and material to
excavate, place material and grade to subgrade as detailed on the Contract
Drawing and as directed by the Contract Administrator.
The unit price for Items 2.5 and 9.6 shall include excavating the topsoil for the
complete road allowances and removing off site.
The unit price for Item 9.8 shall include removing the surplus excavation off site.
The unit price shall include placing fill within the limits of construction to bring roads,
boulevards, etc. to subgrade.
The unit price shall include removal of any excavation not suitable for road
subgrade as determined by the Geotechnical Engineer.
The sub-excavation of deleterious materials and removed off site.
The excavation of boulevards and entrances.
The unit price shall include all fine grading required.
Topsoil and any organic material will be removed within the road allowance prior to
placing of any fill.
The fill will be placed in layers of 200mm maximum and compacted to 95% Proctor
Density.
No payment is made of excavation for the construction of catch basins, catch basin
connections, underdrains, or the removal of any obstacle. The unit price tendered
for all these items are intended to include the excavation.
The final quantity of excavation may vary considerably from that indicated on the
Form of Tender. The Contractor shall have no claim for additional compensation
because of an increase or decrease in the quantities.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
DETAILED SPECIFICATIONS
2.5,9.6
2.6.9.7.9.8
TOPSOIL REMOVAL OFF SITE
EXCAVATION & GRADING
CONTINUED
No extra payment will be made for excavation around pipes or obstructions. The
removal of Dixseal and/or asphalt concrete less than 75mm, the removal of
concrete or asphaltic concrete in driveways or boulevard areas.
All measurements of excavation shall be in cubic meters, measured and calculated
from cross-sections taken before execution and the theoretical cross-section and
grade indicated on the Contract Drawings.
Measurement of excavation of unsuitable material below subgrade or in areas to be
filled shall be calculated from cross-section taken before excavation or as
determined by the Contract Administrator.
3.0
STORM SEWERS
3.1 - 3.7,
10.1-10.5
3.8 - 3.12,
10.6 -10.9
STORM SEWER PIPE
SEWER MANHOLES
These items are detailed on the Contract Drawings and in the Municipality of
Clarington Standards and Specifications and OPSS, where applicable.
The manhole and catch basin rims shall set to base course asphalt.
For those sewer mains that are being constructed on existing streets, the unit price
tendered shall include the complete restoration of damaged services, boulevards,
roads, etc. to the satisfaction of the Contract Administrator.
The unit price for Items 3.5 and 3.6 shall include all restoration on Highway NO.2
as shown on the Contract Drawings.
The unit price for Item 10.1 shall include all restoration on Clarington Boulevard as
shown on the Contract Drawings.
The storm sewer construction in Highway NO.2 and Clarington Boulevard shall be
with vertical trench methods meeting Ministry of Labour criteria.
The unit price tendered for Item 3.0 and 10.0 shall include the cost for all
aroundwater control reauired to complete the works.
SEWER MANHOLES
CONTINUED
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
DETAILED SPECIFICATIONS
3.1 - 3.7,
10.1 -10.5
3.8 - 3.12,
10.6-10.9
STORM SEWER PIPE
The Contractor shall be responsible for ascertaining what method of groundwater
control, if any, is to be used.
The unit price included relocation of surplus trench excavation on site, as required.
The unit price tendered shall also include plugs, connections to existing manholes,
pipes, etc. to the satisfaction of the Contract Administrator.
The first pipe entering and exiting all storm manholes shall have a concrete cradle
and Class "A" bedding.
All manholes shall be backfilled with Granular 'C' material to a minimum distance
of 1.0m from the outside edge of the manhole.
The supply and placement of all beddinq required in accordance with the
Municipality of Clarington Standard for all trench conditions and/or as detailed on
the Contract Drawings.
Special attention is to be given to the proper compaction around manholes and
other sub-surface structures.
All storm sewer pipe and appurtenances shall be inspected by the Contract
Administrator prior to installations.
The supporting and/or removal and replacement of existing utility poles which may
be required outside the limits of a vertical trench.
All granular material used in the construction of storm sewer and/or appurtenances
shall be compacted to 100% standard Proctor density.
The backfill material shall be placed at a minimum depth of 1.0m above the crown
ofthe pipe initially, compacted and then placed and compacted in uniform layers not
exceeding 300mm to the top of the trench. The material shall be compacted to 95%
standard Proctor density with the use of a mechanical compactor satisfactory to the
Contract Administrator.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
DETAILED SPECIFICATIONS
3.1-3.7,
10.1 -10.5
3.8 - 3.12,
10.6 - 10.9
STORM SEWER PIPE
SEWER MANHOLES
CONTINUED
The Contract Administrator shall have the compaction tested by an independent
testing company at regular intervals. Where compaction is not to the specified
density, the Contractor shall excavate the material and backfill and re-compact. The
Contractor shall also pay for all tests which show inadequate compaction. The cost
for such tests will be deducted on the monthly payment certificates.
If backfilling occurs in the winter, the backfill material must be free from frozen
lumps and the snow must be removed from trenches prior to backfilling.
Special attention is to be given to the proper compaction around manholes and
other sub-surface structures.
The Contractor shall be limited to 75 metres of open trench maximum. The
Contractor will be directed by the Contract Administrator's Representative to
complete service connections and backfill with proper compaction if climatic
conditions require.
The Contractor will be responsible for additional road base due to improper sewer
I service installation I backfill program.
All storm sewer pipe and appurtenances shall be inspected by the Contract
Administrator prior to installations.
Measurement for Payment
Storm Sewer Pipe
The length of sewer mains for payment shall be measured horizontally along the
centre line of the pipe at the finished ground level from the centre of the manhole
orfrom the point where the type of bedding changes or from connections to existing
sewers, as the case may be, to the centre of the next manhole or to the point where
the type of bedding changes.
Manholes
Payment for manholes shall be paid by the lump sump as determined by the
Contract Administrator.
3.13,3.14,3.15,10.11,10.12
3.16,3.17,10.13,10.14
10.15
CATCH BASINS
CATCH BASIN CONNECTIONS
CATCH BASIN INLET CONTROL DEVICE
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
DETAILED SPECIFICATIONS
These items are detailed on the Contract Drawings and in the Municipality of
Clarington Standard and Specifications and OPSS, where applicable.
The catch basin rim elevations shall be set as directed by the Contract
Administrator.
The unit price tendered for Items 3.13, 3.14 & 10.11 - Catch Basins, shall include
the asphalt filler around the catch basin as per Standard Drawing C-305.
The unit price for Item 10.15 shall be for installation of Catch Basin Inlet Control
Devices Ipex Type 'A' or equivalent, as per Municipality of Clarington Standards.
The ditch inlet catch basins, Items 3.15 & 10.12 shall be OPSD 705.030.
All single, double and rear lot catch basins will be paid according to the unit price
as shown on the Form of Tender.
The unit price for Item 10.14 - catch basin connection to CB 12 & 14 shall include
insulation as per Detail Drawing on the Contract Drawings.
The length of catch basin connections for payment under this item shall be
measured horizontally along the centre line of the pipe from the inside wall of the
catch basin to the centre of the sewer main, or manhole or to the inside wall of the
next catch basin as the case may be.
3.18
BREAK INTO EXISTING MANHOLE & REBENCH
The unit price tendered for this item shall include all plant, labour, equipment and
material required to break into and rebench the existing storm manhole.
The manhole shall be rebenched in accordance with Municipality of Clarington and
OPSD Standards.
The unit price shall include plugs, concrete, etc.
The unit price includes any appurtenances required to make the connection.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
DETAILED SPECIFICATIONS
3.19.10.16
TELEVISION INSPECTION
The unit price tendered for this item shall include all plant, labour, equipment and
material required to flush the storm sewer and perform a television inspection of
storm sewers installed under this Contract.
All catch basin connections, leads, and dead end stubs shall also be television
inspected.
The television inspection shall be performed by a company approved by the
Municipality of Clarington and the Contract Administrator. A video tape of the
inspection must be made in duplicate. The Contractor shall notify the Contract
Administrator 48 hours in advance of the television inspection.
The television inspection shall not be done until all underground services are
installed under the trench excavation backfilled and compacted to road subgrade
level or higher, but must be performed prior to completion of Granular '8' road base.
The Contractor shall be prepared to T.V. the storm sewers at separate times in
accordance with the Schedule of Works and as directed by the Contract
Administrator. The Contractor shall T.V. the existing sewer upon completion of
construction.
Payment for this item shall be made for the exact length of storm sewer pipe
inspected as determined by the Contract Administrator.
DETAILED SPECIFICATIONS
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
4.0
WATERMAINS
4.1, 4.2, 4.3
4.4, 4.5, 4.6
4.7
4.8
4.9,4.10
4.11
WATERMAIN PIPE AND APPURTENANCES
GATE VALVES
HYDRANT ASSEMBLY
50mm BLOW OFFS
WATERMAIN SERVICE CONNECTION AND CURB STOPS
CONNECT TO EXISTING PIPE
In addition to these items being detailed on the Contract Drawings and in the
Regional Municipality of Durham "Specification for the Construction of Water mains
and Sanitary Sewers". The unit prices tendered shall include the following:
Where PVC pipe is used for watermains and copper is used for water service
connections, the following shall apply:
a) All bedding required for PVC pipe shall be supplied and placed as per
Drawings S-423 and S-401 for all trench conditions.
b) Bedding for copper services shall be supplied and placed as per Drawing S-
428.
The unit price tendered for Item 4.0 shall include the cost for all qroundwater control
required to complete the works.
The Contractor shall be responsible for ascertaining what method of groundwater
control, if any, is to be used.
The supporting and/or removal and replacement of existing utilities and/or utility
poles which may be required within the limits of the trench.
The work must be completed within the time frame as indicated in the Schedule of
Works.
The unit price includes relocation of all surplus excavation off site, as required.
The unit price for the watermain items shall include cathodic protection in
accordance with Region of Durham Standards.
The unit price tendered shall include all vertical and horizontal bends, tees, plugs,
concrete thurst block, restrainers, etc.
The Contractor shall provide manufacturer Shop Drawings for 400mm CPP
watermain.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
DETAILED SPECIFICATIONS
4.1, 4.2, 4.3
4.4, 4.5, 4.6
4.7
4.8
4.9,4.10
4.11
WATERMAIN PIPE AND APPURTENANCES
GATE VALVES
HYDRANT ASSEMBLY
50mm BLOW OFFS
WATERMAIN SERVICE CONNECTION AND CURB STOPS
CONNECT TO EXISTING PIPE CONTINUED
The unit price for Item 4.11 shall include test pits dug to determine exact location,
elevation and orientation. The Contractor shall be responsible for field
measurement for connection to the existing watermain. The unit price shall include
any required deflections to construct the watermain in the correct location.
The unit price for watermain items shall include provisions for foam swabbing. The
foam swabbing shall only be performed by an experienced pipeline cleaning
company meeting the approval of the Region of Durham.
The unit price shall include the installation and removal of temporary flushing
hydrants as required.
The unit price for watermain items shall include provisions for the cost of pressure
testing, flushing and chlorination by the Region of Durham. The Region of
Durham's invoice or the above cost will be deducted from the final payment
certificate.
The Contractor shall supply the Contract Administrator with a list of manufacturers,
model no. and specifications for all watermain pipe, fittings and appurtenances prior
to shipping to site.
All watermain pipe and appurtenances shall be inspected by the Contract
Administrator prior to installation.
The backfill material shall be placed at a minimum depth of 1.0m above the crown
ofthe pipe initially, compacted and then placed and compacted in uniform layers not
exceeding 300mm to the top of the trench. The material shall be compacted to 95%
standard Proctor density with the use of a mechanical compactor satisfactory to the
Contract Administrator.
The Contract Administrator shall have the compaction tested by an independent
testing company at regular intervals. Where compaction is not to the specified
density, the Contractor shall excavate the material and backfill and recompact. The
Contractor shall also pay for all tests which show inadequate compaction. The cost
for such tests will be deducted on the monthly payment certificates.
11.0
SANITARY SEWERS
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
DETAILED SPECIFICATIONS
4.1, 4.2, 4.3
4.4, 4.5, 4.6
4.7
4.8
4.9,4.10
4.11
WATERMAIN PIPE AND APPURTENANCES
GATE VALVES
HYDRANT ASSEMBLY
50mm BLOW OFFS
WATERMAIN SERVICE CONNECTION AND CURB STOPS
CONNECT TO EXISTING PIPE CONTINUED
The Contractor shall be limited to 75 metres of open trench maximum. The
Contractor will be directed by the Contract Administrator's Representative to
complete service connections and backfill with proper compaction if climatic
conditions require.
The Contractor will be responsible for additional road base due to improper
watermain / service installation / backfill program.
4.12
TEST POINT
In addition to these items being detailed on the Contract Drawings and in the
Regional Municipality of Durham "Specification for the Construction of Watermains
and Sanitary Sewers", the unit price shall include:
Upon installation of the test point temporarily backfilling and maintaining in an
appropriate manner acceptable to vehicle and pedestrian traffic, as required.
Upon completion of all testing re-excavation, removal ottest point and re-placement
with brass plug and complete restoration as previously outlined.
11.1 -11.5
11.6 - 11.11
11.12
SANITARY SEWER PIPE
SANITARY MANHOLE
DROP STRUCTURE
In addition to these items being detailed on the Contract Drawings and in the
Regional Municipality of Durham's "Specifications for Sewers and Appurtenances",
the unit price tendered shall include the following:
The Regional Municipality of Durham "Specification for Construction of Water mains
and Sewers" shall apply only to sanitary sewers. The unit prices tendered shall
include the following conditions which shall supercede the requirements of the
Regional Municipality of Durham "Specification for Sewers and Appurtenances".
The unit price tendered for Item 11.0 shall include the cost for all qroundwater
control required to completed the works.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
DETAILED SPECIFICATIONS
11.1 - 11.5
11.6 -11.11
11.12
SANITARY SEWER PIPE
SANITARY MANHOLE
DROP STRUCTURE
CONTINUED
The Contractor shall be responsible for ascertaining what method of groundwater
control, if any, is to be used.
The unit price includes relocation of surplus trench excavation off site, as required.
The supporting and/or removal and replacement of utility poles which may be
required outside the limits of a vertical trench.
The supporting and/or removal and replacement of utilities which may be required
within the limit of the trench.
The manhole rim elevation shall be set to base course asphalt.
The supply and placing of any sewer pipe required to connect to existing pipes,
manholes, etc. to the satisfaction of the Contract Administrator.
The unit price shall include for pre-manufactured tees and plugs in accordance with
Region of Durham Standards.
The supply and placing of plugs, pre-manufactured tees, etc. as required within the
limits of the Contract.
The supply and placement of all beddinq required in accordance with the Region of
Durham Standards for all trench conditions and/or as detailed on the Contract
Drawings.
The complete restoration of damaged services, boulevards, roads, etc. as the case
may be to the satisfaction of the Contract Administrator.
The unit price for Items 11.1 & 11.11 shall include all restoration in Clarington
Boulevard as shown on the Contract Drawings. The Contractor must maintain two
way traffic on Clarington Boulevard.
The unit price for Item 11.11 shall include connecting to existing sanitary sewer and
maintaining the existing flows.
The granular material used in the construction of sanitary sewer and/or
appurtenances shall be compacted to 100% Standard Proctor density.
11.1 -11.5
11.6 -11.11
11.12
SANITARY SEWER PIPE
SANITARY MANHOLE
DROP STRUCTURE
CONTINUED
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
DETAILED SPECIFICATIONS
The backfill material shall be placed at a minimum depth of 1.0m above the crown
ofthe pipe initially, compacted and then placed and compacted in uniform layers not
exceeding 300mm to the top of the trench. The material shall be compacted to 95%
Standard Proctor density with the use of a mechanical compactor satisfactory to the
Contract Administrator.
The Contract Administrator shall have the compaction tested by an independent
testing company at regular intervals. Where compaction is not to the specified
density, the
Contractor shall excavate the material and backfill and recompact. The Contractor
shall also pay for all tests which show inadequate compaction. The cost for such
tests will be deducted on the monthly payment certificates.
The Contractor shall be limited to 75 metres of open trench maximum. The
Contractor will be directed by the Contract Administrator's Representative to
complete service connections and backfill with proper compaction if climatic
conditions require.
The Contractor will be responsible for additional road base due to improper
sewer I service installation I backfill program.
All manholes shall be backfilled with Granular 'C' material to a minimum distance
of 1.0m from outside edge of the manhole.
If backfilling occurs in the winter, the backfill material must be free from frozen
lumps and the snow must be removed from trenches prior to backfilling.
The frozen material and lumps placed on the lots from trench excavation shall be
graded and distributed upon thawing in accordance with the standard section for
rough grading the lots in this Contract.
The work must be completed within the time frame as indicated in the Schedule
of Works.
Special attention is to be given to the proper compaction around manholes and
other sub surface structures.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
DETAILED SPECIFICATIONS
11.1 -11.5
11.6 -11.11
11.12
SANITARY SEWER PIPE
SANITARY MANHOLE
DROP STRUCTURE
CONTINUED
All sanitary sewer pipe and appurtenances shall be inspected by the Contract
Administrator prior to installation.
Measurement for Payment
Sewer Pipe
The length of sewer mains for payment shall be measured horizontally along the
centre line of the pipe at the finished ground level from the centre of the manhole,
or from the point where the type of bedding changes or from connections to existing
sewers, as the case may be, to the centre of the next manhole or to the point where
the type of bedding changes.
Manholes
Payment by the lump sum as determined by the Contract Administrator.
11.13
TELEVISION INSPECTION OF SANITARY SEWERS
The unit price tendered for this item shall include all plant, labour, equipment and
material required to flush the sanitary sewer and perform a television inspection
of sanitary sewers installed under this Contract as detailed in the "Standard
Specifications for the Construction of Watermains and Sanitary Sewers".
The television inspection shall be performed by a company approved by the
Region and the Contract Administrator. A video tape of the inspection must be
made in duplicate. The Contractor shall notify the Contract Administrator 48
hours in advance of the television inspection.
The television inspection shall not be done until all underground services are
installed and the trench excavation backfilled and compacted to road subgrade
level or higher, but must be performed prior to completion of Granular '8' road
base.
5.0. 12.0
ROADS & MISCELLANEOUS
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
DETAILED SPECIFICATIONS
The Contractor shall be prepared to T.V. the sewers at separate times in
accordance with the Schedule of Works and as directed by the Contract
Administrator.
5.1.12.1
FINE GRADING
The unit price tendered under this item shall be considered to include all plant,
labour, equipment, and material required to fine grade the roads in accordance
with the Contract Drawings and as directed by the Contract Administrator.
The extent of the work under this item shall contain the fine grading of the road
to subgrade or subbase and boulevards as indicated on the Contract Drawings
and as directed by the Contractor.
The unit price includes relocating any surplus excavation on site to the satisfaction
of the Contract Administrator.
The Contractor shall grade the roads to eliminate any standing water during road
construction. Any additional road base required due to wet I ponding conditions
shall be the responsibility of the Contractor.
The unit price tendered under this item shall also include the adjustments to grade
of all Durham Regional water valve boxes to the subgrade of boulevards.
Payment for this item shall be made by the square metre for the area from property
line to property line within road allowance for the length required as measured by
the Contract Administrator.
5.2,12.2
5.3. 12.3
SUPPLY AND PLACE GRANULAR '8'
SUPPLY AND PLACE GRANULAR 'A'
The unit price tendered under these items shall include all plant, labour, equipment
and material required to construct the granular base course according to the
Contract Drawings and Specifications and as authorized by the Contract
Administrator.
The granular shall be as per OPSS 314.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
DETAILED SPECIFICATIONS
5.2, 12.2
5.3,12.3
SUPPLY AND PLACE GRANULAR 'B'
SUPPLY AND PLACE GRANULAR 'A' CONTINUED
The granular 'B', Type 1 material shall conform to the gradation requirements of
OPSS 1010, Table 2, with the following exceptions:
The unit price includes water for dust control and compaction
All granular material must be compacted to 100% Proctor density
5.4. 12.4
PERFORATED PIPE UNDERDRAINS
This item is detailed on the Contract Drawings and in the Municipality of Clarington
Standards and Specifications.
The unit price tendered under this item shall be considered to include all plant,
labour, equipment and material required to supply and install the pipe underdraings,
to supply, place and compact the filter media, breaking into catch basins, storm
sewers and/or storm sewer manholes, to supply and place the mortar to fill the
remaining portion ofthe existing or cut underdrain connection holes and the removal
and disposal of all excess material according to the plans and as authorized or
directed by the Contract Administrator.
The underdrains shall be installed with a track machine only. The use of rubber
tired equipment on the subgrade is prohibited.
The filter media shall be a granular 'A' material.
The underdrain shall be factory wrapped with separate filter clothe conforming to the
requirements of OPSD 1860.
Payment for this item will be made for the exact length, measured in metres,
following the grade of the road or pipe underdrain installed under this Contract and
as determined by the Contract Administrator.
5.5, 12.5
5.6
CONCRETE CURB & GUTTER - (FULL) C-302
CONCRETE CURB & GUTTER - MEDIAN
- OPSD - 600.080
These items are detailed in the Municipality of Clarington Standard Specification
and OPSD as well as on the Contract Drawings. The unit price tendered shall
include all plant, labour, equipment and material required to construct the concrete
curb and gutter according to the Contract Drawings and as directed by the Contract
Administrator.
5.5, 12.5
5.6
CONCRETE CURB & GUTTER - (FULL) C-302
CONCRETE CURB & GUTTER - MEDIAN
- OPSD - 600.080 CONTINUED
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
DETAILED SPECIFICATIONS
Only track type curb machines are acceptable. The use of rubber tired equipment
on the subgrade is prohibited.
Payment for this item will be made for the exact length installed measured in metres
as determined by the Contract Administrator.
5.7,12.6
5.9
ASPHALTIC CONCRETE BINDER COURSE
ASPHALT DRIVEWAYS
This item is detailed on the Contract Drawings and in the OPSS 310, 311 and 313
and in addition, the following shall apply:
The Contractor must be prepared to place asphaltic concrete pavement, as required
and specified by the Contract Administrator, and shall have no extra claim for
compensation due to construction in separate stages or for all extra work previous
laid asphalt work course, constructing extra joints, supplying and applying a "tack
coat", as required and doing other similar work, if so ordered by the Contract
Administrator.
The unit price tendered under this item shall also include the adjustments to grade
of all Durham Regional water valve boxes in order that they are flush with the
finished asphaltic concrete pavement surface.
5.8
INTERLOCKING BRICK PAVER - ISLAND
The unit price tendered under this item shall include all plant, labour, equipment and
material to install brick pavers in the island as shown on Contract Drawings.
The unit price includes:
. Supply and placing of natural grey brick pavers in running bond pattern with
a single soldiar course.
. Supply, place and compaction of 150mm of granular 'A' bedding with 50mm
of bedding sand.
Payment shall be made for the m2 of brick pavers installed.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
DETAILED SPECIFICATIONS
5.11
GRADE DITCHES
The unit price tendered shall include all equipment and labour to grade and match
existing ditches on Green Road as directed by the Contract Administrator.
The unit price shall include grading to subgrade and removal of surplus excavation
off site.
The ditches shall be topsoiled and sodded under other items.
5.10.12.7
CONCRETE SIDEWALK
The unit price tendered under this item shall include all plant. labour, equipment and
material necessary to construct concrete sidewalks and as shown on the Contract
Drawings, as detailed in the Municipality of Clarington Standards and Specifications,
as directed by the Contract Administrator and as outlined below:
. The sidewalk adjacent to curbs shall be OPSD 310.020
. The sidewalks shall be constructed in accordance with Standard C-307.
. The construction of sidewalk ramps as required.
. The concrete works shall include reinforcing, as outlined on the Contract
Drawings and Detailed Specifications.
. All concrete shall be 30MPa.
. Subgrade material to be well compacted, then dampened immediately prior
to pouring sidewalk.
. The Contractor shall be paid at the unit rate tendered for this item to do
whatever is necessary to reconnect, in kind all private walks to proposed
walks.
. Payment shall be made for the actual quantity of restoration required to
reconnect the walks, as determined by the Contract Administrator.
. The excavation of boulevards, fine grading of base and removal of surplus
material in preparation for sidewalk installation.
5.12.12.9
TOPSOIL (IMPORTED)
The unit price tendered shall include all equipment, labour and material to impact
and place screened topsoil as per Contract Drawings and the following:
Screened topsoil shall be placed to a minimum depth of 100mm.
5.12.12.9
TOPSOIL (IMPORTED)
CONTINUED
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
DETAILED SPECIFICATIONS
Subsection 570.05.01 of OPSS 570, August 1990 is amended by the addition of the
following:
The topsoil shall be tested to ensure there are no deficiencies with respect to fertility
levels. The soil shall consist of a minimum 4% organic matter. The phosphorous
level shall be 30ppm +/- 2ppm. The potassium level shall be 235ppm +/- 30ppm.
The soil shall have a base saturation of calcium of 75% +/- 10%. The base
saturation of sodium shall be a maximum of 0.5%. The pH level shall be between
6.0 and 7.0. A copy of the topsoil testing report shall be provided to the Contract
Administrator. Payment for this testing shall be included in payment under the
topsoil item.
If the topsoil does not meet all of the fertility elements, the soils shall be treated with
the required amendments as recommended by the topsoil analysis report.
5.13,12.10
SODINURSERY,UNSTAKED}
The unit price shall include all equipment, labour, material and plant to sod as per
Contract Drawings and the following:
Subsections 571.07.05, 571.08.01 and 571.08.02 of OPSS 571, November 2001
is amended by the following:
Replace "30 Consecutive Days" with "120 Consecutive Davs". Contractor should
note that forthe purpose of calculating consecutive days, the winter dormant period
shall be excluded (see Table No.1, OPSS 571). Clarington is considered to be in
the 'Southern Ontario' area and the winter dormant period is from November 1 to
April 30, inclusive.
Payment shall be made for 50% of the quantity placed once deficiencies have been
corrected from initial inspection and the remaining 50% shall be paid once all
deficiencies have been corrected following final inspection at the end of the
maintenance period.
The Contractor shall be responsible for the full cost of replacing deficient sod as
determined by the Contract Administrator.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
DETAILED SPECIFICATIONS
12.8
RETAINING WALL
The unit price tendered shall include all plant, labour, equipment and material to
supply and install the retaining wall as outlined on the Contract Drawings or
equivalent.
The retaining wall design must be certified by a Professional Engineer representing
the Manufacturer.
The Manufacturer must supply all detailed shop drawings for approval.
The unit price shall include the following:
. all excavation and relocation of surplus material on site, as directed;
. base for the retaining wall, as required by the Manufacturer;
. all granular backfill and filter clothe;
. all required tie backs;
. all perforated underdrains;
. all backfill required.
The Contractor must get approval of style and colour by the Municipality of
Clarington.
The unit price shall include a railing as per OPSD 980.101 with base plate
installation as detailed on the Contract Drawings.
Payment shall be made for the m2 of retaining wall.
5.15.12.11
TRAFFIC. STREET & DIRECTIONAL SIGNS
This item is detailed in the Standard Contract Drawings and the unit price tendered
shall include plant, labour, and equipment necessary to install the signs as detailed
on the Contract Drawings, as per Municipality of Clarington and to the satisfaction
of the Contract Administrator.
Payment shall be for each sign installed in the Contract.
6.2. 13.2
PROVIDE & PLACE GRANULAR 'B'
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
DETAILED SPECIFICATIONS
6.0.13.0
ROAD CONTINGENCIES
6.1.13.1
SUB-EXCAVATE - SUBGRADE
The unit price tendered shall include all plant, labour, equipment and material to
sub-excavate the road subgrade as authorized by the Contract Administrator and
Soils Consultant.
The surplus excavation can be disposed of on-site.
The item is a contingency item only, the quantity may vary and may only be used
if specific authorization is received by the Contract Adminsitrator.
The unit price tendered shall include all plant, labour, equipment and material to
place granular'S' as additional road base, as authorized by the Contract
Administrator and Soils Consultant.
This item is a contingency item only, the quantity may vary and may only be used
if specific authorization is received by the Contract Administrator.
7.0. 14.0
STREET LIGHT AND WIRING
The items for street light installation, cable, and appurtenances are detailed on
Contract Drawings EL-1 and EL-2.
The unit price tendered shall include all plant, labour, equipment and material to
complete all underground street light cable and street lights to the satisfactions of
the Contract Administrator.
The Electrical Contractor is required to submit sealed drawings to Electrical Safety
Association (ESA) for review, approval and construction.
The Contractor is responsible for all permits and cost.
The connection and terminations will be completed by Hydro One.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
DETAILED SPECIFICATIONS
5.16,12.12,
12.13 & 12.14
BOULEVARD TREES
The items for supplying and placing boulevard trees are detailed on Contract
Drawings LS-1 and LS-2.
The unit price tendered shall include all plant, labour, equipment and material to
install the boulevard trees to the satisfaction of the Contract Administrator.
8.0. 15.0
PROVISIONAL SUM
The Contractor shall not be entitled to payment of any portion of the provisional sum
unless he has received specific authorization from the Contract Administrator or the
Municipality of Clarington to undertake any specified additional work.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
CONTRACT NO: CL2007-27
GREEN ROAD RECONSTRUCTION
STEVENS ROAD CONSTRUCTION
F . STANDARD SPECIFICATIONS (OPSS) (Municipality of Clarington)
It shall be the Contractor's responsibility to obtain those editions current at the time of
tendering, of the Ontario Provincial Standard Specifications (OPSS), and if applicable, the
Municipality of Clarington Standard Specifications, where mentioned in the Contract
Documents.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
1 All precast components to be from approved suppliers.,
2 Pipes must not enter at 0 manhole section joint.
3 Lift holes to be completely filled with mortar before backfilling.
4' Aluminum manhole steps as per OPSD 405.020.
5 Precast flat' top design only os approved.
6 For manhole depths greater than '5.0m safety grates required.
7 Max. spacing between safety grates is 4.5m.
8 For depths greater than 7.5m manhole to be custom
9 For benching detail see OPSD 701.021 (use pipe dia.
10 Compacted sand backfill within 1.0m of manhole.
11 Semi-cast manholes to be individuolly designed and approved.
J
4- 4~ 1(,"
r;d----
WIN, ONE AOJUS'11.IENT UNIT. MAX. 300mm
....
is
l:!
~
:l!
~
3Ot.tPa CONCRETE BENCHING
75mm OF' 19mm CRUSHER RUN
UMES!llNE (COMPACTED) ON
STRUCTURAU.Y SOUND GROUND
1480mm 'OIA.
All dimension. are In mllllmet,.. unle.. Dfherwl.. noted.
Cl
on
F1WlE AND COVER I>S PER C-I13
CONCRETE CNJ
I.IORTAR TOP AND BOl'TOM ROWS ONLY
<YANUFACTURER'S SE'AlANT TAPE BETWEEN ROWS)
DU1SIOE OF BRlCKWllRK TO RECEM: 1WO
COAlS Of BITUMINOUS PAINT WHEN MANHOLE
NOT lOCATED IN ROADWAY
46/ j
PRESS SEAL OR EQUIIIALDIT
RUBBER GASKET (WATERI1G1l1)
.a: ".
. : _I .,.4"
POURED CONCRETE
CRADLE TO 1 at: JOINT
:... ",
SEE NOTE
"
. ,I
.......~
'.
PRECAST
TOP
FLAT
designed.
+ 100mm for max hole size).
Services De artment
........NO.
-. D<IE
..- D<IE
APRL 2004
1200mm PRECAST CONCRETE MANHOLE
C-1 01
Il!.QIES
1 All precast components to be from approved suppliers.
2 Pipes must not enter at 0 manhole section joint.
3 Uft holes to be completely filled with mortar before backfilling.
4 Aluminum manhole steps os per OPSD 405.020.
5 For manhole depths greater than 5.0m safety grates required.
6 Max. spacing between safety grates is 4.5m.
7 For, depths greater than 7.5m, or where directed, manhole to be custom designed.
8 For benching detail see OPSD 701.021 (use pipe dia. + 100mm for max. hole size)
9 Compacted sand backfill within 1.0m from manhole.
10 Semi-precast manholes to be individually designed and approved.
I
I
L-
t.l1N. ONE ADJI.JS1'WENT UNFI'. MAX. 300 mm
"
I
"
~
I
I
I
.
"
1-.50
I
I
I
I
I
JOMPa CONCRETE BENCHING
PRECAST BASE
8
I
I
I
I
I
I
I
All dlm.nl:lons a,.. In mnUmetn. unl... otherwl.. not.d.
Clarin on
I
......
F'RAME AND COVER /IS PER C-,,3
CONCREIE CAP
l.tORTAR TOP AND BOTTOl.t ROWS ONLY
(l.tANUFACTURER'S SEAlANT TAPE BEtWEEN ROWS)
OUTSIDE OF BRICKWORK TO RECEIVE TWO COATS
OF BmJUINOUS PAINT WHEN MANHOLE
NOT lOCATED IN ROADWAY
PRECAST TRANSIIlON
SWl
'.,
PRESS SEAl. OR EOUIIIAlD/T
RUBBER GASKET (WATERTIGHT)
..
.~: " . '..
,"j .,.A-
. ,
....
POURED CONCRElE
CRADLE TO 11t JOM'
7Smm OF 19mm CRUSHER RUN
Ul.tESTONE (COI.IPACrnl) ON
S1RUCTURALlY SOUND GROUND
Services De artment
-....
-.....
1500 TO 3000mm
PRECAST CONCRETE MANHOLE
I
.......... :IE
APRIL 2004
C-102
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
115
840~
r-610~ r'15
~
CATC!< BASIN
I
'''~ ,~f~1 ~ '"
I
~..:
i;..
"4
"
'.~
.~.
"
tOOmm PERfORATED
SUSORAIN ,',
iD
'"
...-;
-;'"
,',
'..
200mm SOUD
WAlL P\IC PIPE: :~~
;.,'
.
..~
'"
,
'.
;:.
~:
'~.'
~> .
~., :
';"
'.
~. - ....
....,.
..'
...;......:"
:.', "..
"'.
; ~:: ~:~: "':'::~~.:':-:--~
.. .
.'
..~~ .
,--.-.
.: J.... ~', ..:..: ._..'
"
_ I
iii
75mm OF 19mm CRUSHER RUN
UIlESTONE (COMPACIED)
SECTION B-B
SECTION A-A
B
A
A
" .
I
I
NOTF~
1 All precast components to be from opproved suppliers.
2 Compacted sand backfill within 0.3m of catch basin.
3 Refer to C-109 and C-305 for additional details.
4 Invert of sub-drain and theobvert of catch basin lead ore to be level.
B
PLAN
5 ' Uft holes to be completley filled with mortar before backfilling,
All dlm_nelons are In mllllmetre. unl... otherwl.. noted.
Clarin ton
Services De artment
_NO.
--
.....
APRIL 2004
SINGLE CATCH BASIN
C-104
I
I
,
~ 1700 r
115 ~5'D II
M:::1
... '.
"
..>, ,..
.'
.;. -'.
','
'. ":"f.
. ;;..
_.- , 00mm PERfORATED
..:~. SUBDRAlNS
115
840
510
I
I
.:~.
:~~:
,.
'.
, .
.,
.
o.
m
'" ..
~ '.
".
~.'
~'. ~,
~:.
..Of'
I
SUB~
I
250mm SOUD WAU..
PYC PIPE
"
0,---
" \
, I
\ I
"..... /
--~ 250mm SOUD WAlL
F'\IC PIPE
".
r:
.:~,: .
"
-:..
;.
..
"
I
,:~;.,.
-"."
I
-j";..
.~.~::.;:.~:/~
""'~":" . .
>.'
".
....
I
"'~ \.., 0; : ".~-:t.,:,;..:.-.:~ .: 150 :':~.'" ',,;.- ,::".;:.: -:.;.:. .::.~..~ o':. .... ...~.. '" . , '-~:.':~..~>i:"~: ."~
~~. . III . aG:.--r . ... . -=..
.!:mbi! ! _ !N. I~. e
SECTION A-A l_ ~ ,_ _ ~ ~ SECllON B-B
UMESTONE (COMPACTED)
....
."c-.
~~,
:"."';
I
I
I
A
I
B
B
BEAM
I
I
A
NOTES PLAN
1 All . precast components to be from approved suppliers.
2 Compacted sand backfill within O.3m of catch basin.
3 Refer to C-109 and C-305 for odditional details.
4 Invert of sub-drain and the obvert of catch basin lead are to be same elevation.
5 Lifting hales to be completly filled with mortar before backfilling.
I
I
I
All dimension. aA In mUllmefnll unless otherwl.. nated.
Clarin ton
Services De artment
_NO.
....... ....
I
DOUBLE CATCH BASIN
I
____ DATE
APRIL 2004
C-105
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
COMPACTED 19 mm CRUSHER
RUN UI.IESTONE 91lX SPD
w
COIIPACTED SAHIJ
98X SPD
..-.....
. ~.",
....
. ....
,,"
~.:: .....;..,~~
",. :'f'
,.- .
..
", ........
",. :....
"..
.' '..
:".;'
'.~'"
.....
. .~;,.
. '.. ,.....' :<1
"~ ...._.., .. :.J...,:" &;'" 'i of
.~. . . ......;.
. ...... .":.; -'. ..",
.' .'
. j : ....~. ~~. ; . :.'
.:.'~oI.
CLASS B BEDDING
BEDDING AND CLEARANCE
INSIDE PIPE .DIAMETER
UP TO 900
1050 AND lARGER
d(....)
100
150
. (lllN)
300
SOD
All dlmenllons are In mUUmet.... un.... otherwl.. noted.
Clarin n
Services De artment
_NO.
STORM SEWER TRENCH BEDDING
I
3DO
d
I
- ....
C-108
I
I
I
I
IAANlJFACTURED SANCED P.V.C.
SLEEVE (WAmmGHT)
I
I
I
SCUD WALL P.V.C.
CATCH BASIN lEAD
(S.C.R. 35)
I
I
I
STORM
SEWER
19mm CRUSHER RUN UMESTONE TO
TOP OF PIPE, COWPACTED TO 9BX SPD
".
I
,"
.'
~ ........ 'II' .....d. '.
~.'
I
I
I
I
NOTES
1 Pipe to enter catch basin at right angle
2 250mm dia. lead for double catch basin.
3 200mm dia. lead for single catch basin.
I
I
All dlmen.lons an In mHllmetna unl... otherwise noted.
Clarington
P.V.C. STREET CATCH BASIN
CONNECTION
CATCH
BASIN
,"1,- ..'
(;.~.~::';.; ,
:;..~,..:: "!t
/~r?
,..~.~~.
~:~~~:
:~;'i~
. .::;:. ~
.A~ ,....
..~.; .r.
:'~:i:~'
"'"
,'~. .
"
E ineertng Sennces De arbnent
_NO.
--
I
I
C-109
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
FRAME PLAN
4.5mm \!AX.
ClEARANCE
5'
.7.
~
624
.578
I~ II
57.
867
900
SECTION A-A
"STORM"
YEAR OF
CONSTRUC110N
COVER PLAN
11 ,: MI ~.~I
,.-11- 27
.'3
SECTION B-B
I r
I=P
NOTES
, A1lowoble tolerance for dimensions of 300mm or less is :l: 3mm.
2 Allowable tolerance for dimensions greater than 300mm and up to 900mm i5 :!: 6mm.
3 The name of the manufacturer is to be distinctly cast in raised letters.
4 The designation "STORM" and year of construction are to be distinctly cast in raised letters.
ROUND MANHOLE
FRAME AND COVER
All dlm.Mlans are In munmetre. unl." otherwl.. noted.
Clarin on
- ....
APRIL 2004
Services De artment
_Ill.
_ D<IE
C-113
I
I -
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
r GALVANIZED METAl.. LOOP
/ / 0"'-75rnm
25rnm
A
~
8
,.,
0 T I 0
I I
I I
I I
I I
I I
I I
N
-= 0 0
-----------
o
o
~
SECTION A-A
<20
FRAME AND PLATE ELEVATION
NOTES
1 Scepter or opproved equivalent.
2 All angles. bars and plate to be PVC material.
3 Secure Yiith SOmm galvanized lag bolts with anchors.
4 All surfaces to be solvent welded, to be treated with PVC primer prior to application
of PVC solvent welding cement.
S Locate in catch basin with centre of opening at centre of outlet pipe.
6 Size of opening varies with flow requirements.
All dimensions are In mllllmetru unl... atherwl.. noted.
Mu Services De artment
........ -NO.
..... MlE
CATCH BASIN INLET CONTROL DEVICE
-- C-116
APRR. 2004
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CURS AND GUTTER
150 MIN.
GRANUlAR 'A'
a.cKFlLL OR
APPROVED
EQUIVALDlT
l00mm CORRUGATED, SLClTTEO PlAS1IC
PIPE WITH FACTORY INSTAll.fD
FILTER FASRJC.
~
1 Subdrains ore to run continuous on both sides of rood.
2 All subdrains sholl hove sufficient grode to droin into catchbasin.
3 Subdroins ore to be installed in 0 trench condition.
4 If odditional depth rood granulars used, subdroins must be lowered accordingly.
5 Proper connections ore to be used when splicing sections together.
M
All dlmenslone. are In millime"", unl... otherw18. noted.
Clarington
Serrices De arbnent
-...
PERFORATED PLASTIC SUBDRAINS
........ DQE
..
APRIL 2004
C-301
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
....
.
.......
17
25
DRIVEWAY DEPRESSION
25
v....,. .
," .-.. ..~. .....,. ;,;
;.~.'.<. .~:.':~..::. ..~..: ::.:. .~-~ .,": ~'...:. '~~': :"< '~1,'
. . -.', . -"\,,' ';., ..... ..-. .~..;. . ".'.",,, ~.'
". .,.... ~'.. ~:
3 0
,.... .....
.:..... ..
.~... ... .
. .
SIDEwALK LEDGE
(5EE NOTE .
STANDARD CURB AND GUTTER
R-2
DRNEWAY DEPRESSION
ASPHALT
.... .,"
:'" ~~'.:
. .......
.
....
~... ",.
.: .....
'.......,
.... ~.."." ....
":...
......
.
.Jl: .. '. ~~. .: :"".1 .'. ..
.- . ,..~..,
.' ..~ .. ". ..
",," '""." ",.,"
..~ :"~. .:",. 1~."
.'.
....:
.......: :. ....
. . .". ".~ '.' . . .:. ~
BARRIER CURB
NOTES
1 Concrete shall conform to OPSS specifications (30MPa, 7% :1:1.5% air).
2 Contraction joints every 3.0m (maximum). Saw-cuts to be 25% of total depth.
3 Curing compound is to be sprayed on within one hour of finishing.
4 Additional width required where curb is adjacent to sidewalk.
All dimensions are In mUll metres unless otherwl.. noted.
Services De artment
IItwSKlH,MO.
.............
STANDARD CURB AND GUTTER
""""""'''''''
APRIL 2004
C-302
I
I
I
I
I
\:
---'~-~
\ CB FRAlAE TO BE CORRECll:7
AUGNED WITH PRECISr
. I
r\1 I
[\L I
I
I
L_ -'
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
B
.
.
A
SEE
Non: 2
B
PLAN
'.
l"
.~:~
'.
,.<
."
..
SECTION A-A
--/1
I
~I
~SH~ AA~
[A
-1j
I
I
2
CURB ENOS TO BE t.lAOE: VERI1CA1. (FWSH)
AT T1WE OF POURING. TOP CURB TO BE
AUGNED ACCURAlELY WITH BASE CURS.
1.2m
FULL OEPTH
EXPANSION JOINT
..
.<
:~
"
"
.
'-,'
....
~~
;'"
~TOP_
EK7t1'OLf ROWS ONLY
'(WANUFAC'IIJRER'S SEALANT TAPE ;"
BETWEEN ROWS) ~;"
:',
,.
~f' .
,,',
SECTION B-B
NOTES
1 For grote specifications see OPSD 400.010.
2 Stage I - temporary asphalt filler around catch basin including full curb.
3 Stage II - remove asphalt filler and complete curb in one pour.
on
All dlmen.lon:s are In mllllmetras unl." otherwise noted.
Services De artment
....... NO.
....... """
-..'"
APRIL 2004
CURB AND GUTTER DETAIL
AT CATCH BASIN
C-305
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I PROI'ERTY u~
WJClM1J1.4 SPACING Of" 30m BETWEEN EXPANSION =\-
.JOINTS IHD WHERE: S1DEWAlJ( ABUTS N<< RIGID
STRUCTURE
- -
1.B
1.0
ISI
CONCRETE
INFlLL
OEPRESSED CURS
CONTRACTION JOINTS (TYP.)
1.0
...
!i
0.70
2lI:
I
':., ..
. .......
. ._. ,<II . '.~ ~ .
,
'I" ...... ;.....:. ....
.....
+ of.:,
~
COMPACTED NATIVE MA'IERIAL
(SEE NOTES 1 _ 2)
130mm
150mm AT DRIVEWAYS
!llQlli
1 USB 100mm compacted granular 'A' if native materiol is deemed unacceptable by the Municipality.
2 Subgrade materiol ta be well compacted, then dampBned immediatBly prior to pouring sidewalk.
3 Concrete sholl conform to OPSS specifications (30MPa, 7% :1:1.5% oir).
4 Curing compound to be sprayed on sidewalk within 1 hour of finishing.
5 Expansion joints to be be ploced full depth of sidewalk.
6 Contraction joints to be 25% of full depth af sidewalk.
7 Surface of sidewalk to hove a broom finish.
All dlmenelons are In metrn unl... otherwl.. noted.
Clarin on
Services De artment
_NO..
STANDARD CONCRETE SIDEWALK
.............,.,
C-307
APRIL 2004
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1
BASE ASPHALT JOINT
EXIST1NGSURFACE ASPHALT
TO BE REMOVED
PROPOSED PAvaAENT
'00
40mm HL.J
All. EDGES 10 BE
PAINTED W!TH A
BllUlllNOUS EIIUISION
SECTION A-A
All dimensions ani In mlDlmetres unle.. otherwl.e. noted.
M
TO BE REUOVED
EXIST1NG PAVDlENT
EXlSIING PAVEMENT
Serrices De arbnent
-...
-....,
-
APRIL 2004
SURFACE PAVEMENT JOINT TREATMENT
C-311
I
I
I
I
I
I
I
I
I
.'
I
I
I
I
I
I
I
I
I
CURB
CURB
2.0
2.0
o
,...:
x
o
CI::
<L
<C
CU B
URB
SIDEWALK
TYPIcAi:Si'GN
LOCATION.
~TYPICAL SIGN
w LOCATION.
z
I:J
Ii
C!
w
z
I:J
IB
::=
Vl
URBAN
WITHOUT SIDEWALK
URBAN
WITH SIDEWALK
CROSS MOUNTING
BRACKET
NOTES
SEE NOTE
co
ci
o
10
LO
"
c:i
Sign material blanks and reflective sheeting must meet or
exceed current Ministry of Transportation Ontario Specs. No
overlapping of refiective sheeting will be permitted.
POST
CAP
2 A sched.41ll:. of signs must be approved by the Municipality SEE NOTE 3
before dnt order is placed,
3 Ra1 on local road. Ra101 on collector road.
4
75mm~x 3.66m
3.5mm THICK
GALVANIZED
STEEL POST
5
Street signs at collector road junctions are to be 2DDmm.
Street signs at iocal road junctions are to be 15Dmm.
Contact Engineering Services for mare specifications
if required on specialty signs.
N
6
Where no curb and gutter exist, offset is to be
measured from edge of pavement.
o
10
7 All signs and hardware must be secure.
.
;.
.
~
z
~
~
E
'"
ci
.
-.0 ~.
'.
. ..~~:,
0.3
. All dimensions are In metres unle" otherwl.. noted.
Sernces De arbnent
"""""....
""""" .""
""""""
STREET SIGN DETAIL
"""""'" ....
APRIL 2004
C-402
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~'T
'" 1 I: (.)
~:;L - z
1ft..., ,-" - ," "..., r- ~
'" I ZOI: ,~
~ ~~ I ~
'"
-
co
D SOL I
r
"'
'"
E
EQ.
"'~
"'L
r
L
Ej:
EQ.
::G~
I SOL I
---r1
f<i <(
z
o
i=
(.)
Lr.J
~
I:Z9
1.S9
CD
-
"'
D I-ZI:
o <(
N
'"
'"
o
.cJ;;;
-1
"
"'
N
o
...
...
aJ
OZB
z
S
<(A.
LaJ
~
<(
a::
La..
I-!-
v91-
,,~
"' '"
'" co
"
-
Q. ,Lr.J
~ .,
Lr.J
E
E
~
-
J
:-r
Ol
z
o
i=
(.)
Lr.J
~
o c ij;
~ ~ a:::
o or.
- ., N
CO
I CD 0
o _~ 0
~ :t N
Q. ....
o l ~
.... z
or. 0
....
.i m
CD
g "E
-- ::l
....
(,) .,
co CD
~a ~
co ....
o CD
(,) ~
-= E
" co
c __
~
~
CD C
.0
Ol
o co
.... 0
o -iij
VJ co
Q. E
0__
cii "
LaJ
b
z
o
I
o
Z
o
i=
(.)
Lr.J
~
Ol
:2=
1-<
<[0
"'
o
t
o
N
o
ci
-
CO
"
co
c
I I
I I
I I
I I
I I
I I CJ
I I VI
I I Q.
I 10
I I
0::
0(1)
....."
I.&.J~
::J:I-Z
I-<(I.&.J
-0::0..
~"o
I.&.JCI.&.J
~I.&.JZ
<( :J: (".
e:!Qcii
I.&.JC"
O::I.&.JZ
<(0..-
=>>-0:::
Ol-ei
(I)~:I
a 0 a
Z...J(I)
O.....Z
0::0::-
o - I.&.J (I)
C21->~
i5 (I) 0
5 ~ I.&.J:I
0::(.)
<(I-
::><(
0(.)
(I)
C>
Z
~
Cl
Cl
e:::
C3
z
i5
Vl
-'
<(
U
Z
e;
e:::
c..
D:l
I
D:l
o
-z
"'0
i=
(.)
WJ
~
"'
.t
-
a::
..J
:;(
I-
WJ
o
l-
S
~
'"
~
I
I z -<
"'" I :s '" '" I
"'XQ. ... " -<
0 ",gJ~ ;1- ~ '" '" a:I
0 -!J --- cot"'}......... .,,, Z I
'" LaJ~~~~ "'" a:I
.,'" 0
::2:" .. ....
E: ' i -< '" i= z
a::: u 0
L&.. LrJ i=
Ji~ If) u
'" I '" .....
., ... If)
'" a::
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
L-
"
>
o
o
...J
l~~
r Q
",Cl
gZ :>::1
..J...J
....0
~
IbI IbI
1bI$1bI1b11b1
IbI 1bI~1bI1b11b11b1
1biIllj!IbIlblLiJlbllbllblIbI
1bI1bI1bl1bI1bIC)1bI1bI1bI1bI1bI
IbiI I!;jJ 1H;J--~--D---D
1biIlblIblIIbIPlbllbilllj!IbIIbI
IbiIlbIlftlbl<C1bI1bI1bI1bI
Q(; \S 1bI. IbI IbI C IbI IbIJD IbI
.E 1: '" . IbI IbI lI::plil IbI 111\I
EE "'",:V:/" "I"
E E <'"c""", IbI IbI
EE
00 Q.
~~~
<(
ll::
m~
o
.....u
~Z
>-UJ
I-ll.
o
ll::
UJ
-<~
U
.....
~O
>-UJ
I-~
-I
U
,
"
'"
o
It) I
o
l~ z
T~ Q
I-
U
LrJ
If)
9 1-1
OL
g: ~g1
t
T
lJ
t"'-r-;
'\..,1-
~ r
'"
..
"
'"
u
It) I
U
l~ z
T~ Q
I-
U
.....
If)
9
"U
'"
;;::
.0
'"
a.
.,
.,
"
OJ
c:
~
o
.c:
Q)
'"
Q)
.i
'-
'"
.c:
~
o
Q)
.,
.!!! '"
c: 0
::J 0
'"
.,
CI)....; CD
a.. 0 10.. >
~ r:: q) 0
.2 E Z
'- ..... "-
o g.=
<c",E
lD 6 .E
a.
,:::-.,,,,
>,'-
" "
.83:.,
>'c:
=~o
" .-
.r:."'O~
., c: '"
III " E
.. '- a_
(f) '" ., "0
1.LJ>e>
~8.3<c
o
Z<COJu
I
I
I
I
I
I
I
I
I
I
I
o
(/)
a..
o
Cl
Z
S:
~
Cl
Cl
a::
~
z
~
(f)
:cCt::
I-LaJ
->
3:8(1)
LaJ LaJ
~z-I
<(LaJO
Ct::a.::C
I.l..OLaJ
LLlCt::U
Ct::OZ
<( <(
:::lOZ
OLaJLaJ
(1)(1)1-
o!;
--1<(
zu~
o
Ct::Ct::Ct::
;=:Se
(I):::l
<(u
of!:
U
...J
:$
u
z
:>
o
a::
CL
o
~
~
z
o
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
..
Cl " 1XI
Z c,-a; I
;:)-.1 c:'"
0'" ;2~1 1XI
0::_ -..
~ EE Z
Cll&J E.E 1 ..... 0
"'''' -1
B:o '" ..: TI-9L-l j::
I- xO (.)
-< .::::
CO l&J
0:: -c U)
Cl "c
'Of; -~
(',1....- ----in
Ii ~ --T
~ rll=...'erJ
~$
E'"
Ego.
:;~~
f+.
~
I
"'-
l:l'<:l
<
'~/
:;<
-
..
......
0>0
.6 E
:t:.c
'6
-
8-
..ll
,,0
tIIZ
..
'"
c:
:E
....
o
o
T
~
o
tII
z
Q~
!::l&J
en-
0>
D..l&J
ZO
1&.1-
D..U)
o
Cl
Cl
Cl
Cl
Cl
Cl
Cl
Cl
Cl
L\ L\ L\ llll L\ II L\ L\,
-
c
",0
C:6;
,,-
~
..
..-
c:E
0",
....
'",.",
c:E
2'"
" ..
..>
~OQ.
i!O.g~
'.."
z<(
1&.1'
11..<(
o
"Z
zO
~i=
<(.) .,
a:: l&J en
"1Il UJ
b
Z
'" llJ 1.0 to to
co ro (C l.O
f-
a::
o
ll..
ll..
::l
en
Z
o
I
!:i
o
al
cZ
zj
<c..
"
Z
j::
<
a::
"
'b N '" 0 0
"' ~ '" '"
I') I') I')
~ "' ~ '" (5
N ~ 0
N I') I') ...
" 0 '" I') ...
"' ..... 0> N
'" 0 N .....
~
0 '" I') ...
'<:l "' ..... '" N
'" 0 N .....
- ~
l:l 0 '" ... ...
0 N ... .....
0> - I') .....
-
0)
Ql
....
~
"
N N I"') ..,.
.....
0
0
z
...
Ql
....
'"
E 0 0 0 0
0 0 0 0 ~
15 N "' '"
~ N
:r
:::;:
Cl
Z
~
Cl
Cl
a::
~
z
~
en
-.I
<
(.)
Z
>
o
a::
a...
~O
lOa::
oj ~~
"6Q} C1) ~~:z
1ii~.o 'o.gO
rn .s.;c _0 -g. ?" 6
..... o Q)J... V""c c...... "'C
IV CD I- o.,e: a.I C I.". ;t;::
"Uo,O""'E .- E'- .~,
o c g ... G> 0) E &.0:5 :l <
< ....CUO=:.CD ~lo_"""CI1
..0 0.21O"'O..-CcnU
-.I 011:: ~ 0) > E
- cO c: 0 ~ E'- c~ m -.9. (I)
:5:;::;~:;::;..cEo - "':':CD-IO E
r- c-oQ.::l ~o~5c 0If-1 r-:....
UJ ::l::lcO)E"O ,.. "'-'- c 10 Ql
Q 0 UJ1: 0._ c: "i)"t'J4) Q.,B.-..-...... ,=E_
Eoo......5:o .oCD.oCDO)~IOVl
....ooEO) ..cg_.o~ 8~- E
"0_ ...."" - - ~ 0 ~ - ,.:
c;:.!loo.s: "0..0....00 J.......
o .... c: 0 0 Q) CL..... t') 0 CI) 0 c 3:
:1 .... I" '_ .,.. CD Cl .c "C ._ 0
ctJo;::....D" ........o"OrnmG> c: J::
.............. 1:'-"'0 CD ......c - 0 Q) en
G,) c 0_0'>< Q) ~ (1)_...... c..... l-
.:::t. c.c c ...... 00-000 _.J: (J) C QJ
U - E 0 -0- "- 0 CD U)
015 J::c.,jo.r:..&;,O"i-.r::. <tn.-
l... o..c'(.) Q) _ co V)c3=
.0-00.........:- G.>-C Q) .. e: E U 0''-
G> .ic">,u...oE CD 0I::l ._CD
CI)"C E 'a~:E 61:7)50 .c:c.~ 0 ~:5
g'cuE"'Cc..og'c: ...c:tri.!=O E...... mO
:E::t:.-2~.....o~E.$- CD"i)::I s:: Ern
Ec:oclo...coc J:3="'6O'l:Sfll
Gl:>'-o'-o- ..-~ .- G>
l.. 0 o~oooc OJ
<( c<( Q..<:> Q..... ::; ~::; 0 < 0<( :;( ~ < 5
~ 0<( [II UCLUlJ..."
_ lJ...
] 0
o
E .....
~ ~
g' 1&.1
'" C
c:
60.
::;;~
1XI
-.I
~
UJ
o
CD
.c
C'l
o
o
C'l
>
o
z
I
,
I
I
,
I
I
I
I
I
,
I
J
I
,
'0
I(/)
'e..
:0
LU
-oJ
::EO
o::::I:
OLU
l=u
jZ
a..~
LU
>-1--
I--Z
LU -
LL.<(
<(::E
CI')
ct::
::E:5
~~
-u
::Ect::
~-
-oJU
<(ct::
o
I.L..
1
o
CO
"
1J
..
~
~f
u "
c-'"
0",
" 0
",'"
"'",
.. c
"'0
...-
0"
"'c
'"
c
-- "
:0 1,..-1)
iiJ r121 j~ 1
~"'.., i1"'- oC
:Ec6~ ~
~g~ t
!!!L.J l:l
o
..-
o
.
LO
,0
,"l:t
,
I
I
I
I
I
I
I
1-
..J
~
~
I-
III
III
III
~
..J
Z
~
III
a::
:s
~
(!)
z
~
U
~
a::
I
I
I
I
I
I
,
1
I
,I
I
I
-C-
"
..
0'"
'SE
EE
E~Q..
ex~
1ifi
".-
..'"
OlE
OlE
..!!O
.5,....
ox",/
Ui~~.c
I ,.
.... ".
(,,;:",
/' . '.' ,
,.. ':. :., E
,- . 'I-E.~
I... ..' J ~ E
I '-' '\
h' /.\
r .
\.:.
\ , .
\ .
o
CO
......
0-
'"
'"
-c
.."
1J~
Ol",
" "
..-
"E
~o
.- 't
.s"
"'c-
,
-i~t-
I')
o
o
N
>
o
Z
c
V)
C-
O
'"
C1
I
l~
o >
- ...
... z
:r
.
-.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
'" .
'" .
.
'"
... '"
...
>-
'"
~~
x:>
::>
...
I
(!)
Z
~
~
o
o
a:
C3
z
~
en
...J
:s;
U
Z
~
a:
Cl.
o
1:2
~
z
o
z
::5
..
V)
C-
LaJ
t-
V)
LaJ
...J
o
::J:~
9
LaJ...J
U~
Z
<
Z
LaJ
t-
Z
-
<
~
I
I
'"
'"
-
-
I
E
E
'"
"'''
_0
",,-'"
0.!1
I-'C
~m
"'0
...1."-
~ ~\=-1
<eEl'"
Eo ..J..
~ LO ~
"""'",
'" a:i
'"
:1:1-
I-Z
-~
~~
::elll
~<
III ZU
1 _Z
III ::E ~
~ ~~
;::: ..J Z
~ <~
'" a::...J
ji
~I-
U~
a::~
-0
Ua..
"
c
"
1-
'0
..,
o
0.
I
r 9ot1J
I
~
'"
:>
'"
c
in
110M }O aOO.:l T
---- ---...........
E
ES
~E
z
::5
..
I
I
pO&-J+ paqq!C1
~5!~ WW l
I
I
J: ::Ii
o . I
':;:::;-0)
o .'"
0"'" 3': CD
't:"I:t" en
..03::< .!:!
.E<~ 5
Ul
-g (.J oS II
:Eo .l::;
I) - 0\ II
~ 0l.E E
Dl c: "E ==
.E ~ 8 -E
... 0 U
{:go.E
,,0 "
"c ..Q E
5] = o. r::
-;" 1l:I:t
~:e"i5~
&.Btn"iiCtl
.E .43.5 i -:1
o.c:E e--
w U II _:t
I-lDc!t:'Ci;
O .J::.J::- ..r::.
1-11')<<0
Z_
oC
1
oC
Z
cO
"';::: -
c c.> "'"'
::>'" ~
e:'" Z
x"'
"'::5 :::IE
::>~
li!..J
<:;<
a::
:s
~
u
D::
U
E
E
'"
"'''
~]
-
PI)
... ...
L-"
~
o
'"
.~ Oil
'" C >
:; tJ ~
,,-
'" c"
Q ..!! 01
en E.E
41'0
~:;
0"
0..5
I
110M }O aOO.:l T
----
--
I E
E .~
~ E
I
L_
I
>-
"'
oC;s:
~'"
>c>
::>
...
I
""
I
I
I
I
I
....
C
I "5
....
....
.,0)
..,~
....
I u.,
c'"
O-u
u.,
I .,
....
0
z
I .;-u
.... C
I) 0
i; 0)
0.....
I Co.
., - >.
.... 0 l-
I)"'"
....
u
C
I 0
U
N
I .,
....
0
z
.:
.>t: .,
1- ....
"5 -
"
ll: '"
.,
-u -u
~ C
I 0
"E
0
>
.,
I :;
0
m
I
I
I
I
,
0::
...... ~"'"..
!""".: ~ .." '.p. ".
-u
c-u
0"
EOlO;::
E ",'0
ecl>
1":g g.
10.,0)
N.oO
.,
0) .,_
OO)~
.0 0 .,
..o~
'-..0.-
O"U
3rn8..
c 01
O-u
....cO)
Cloo
.,
-u
~
'"
.0
"
VI
N
.,
....
0
Z ~
c
"0 ::>
.... ()
-u :r:
.0
" ~
"" VI
,!,,'.
"
a::
~
::::l
()
:r:
~
I
z
o
z
0
~
0
.
~
I CO
> I LO
., I I
a:: ,
,
10 , I
~ I
Ol I I 0
e , I (/)
co I a..
Ol 12
Ol ,g 0
~
en
a:::
~
C) >
Z ~
~ a.. ~
en
0 ~ ~
0 ~ to
~ ~
a::: a:::
z (J
~ Z :)
..J 0 ::l
$ (J Z
()
., Z C) ~
01 ~
e 'i Z a:::
e .... Co:)
N ., a:: -
.t::. n.. ~
Cl -
0
VI 0 (J
a.. 0) Z
0 0) it: 0
., 0
.t::. "'E ~ ...J
.... "
Oi z a:::
0) 0
c c ~ ~
.- 0 - ~
E.. .,
u E Z
" c
05: E " .... -
E E'~
o 5 0
Eco u 0)
.,
E I c ....
-
o - .,
IXlU-u E
.. 0;:: 0
~1'04Doi=
., ...... '" E
u.... c
~.- t).-
..... L. ..0;:: c:
0-'" c .-
0- 0 0
.t::. ....:;: 0 L. ~
+,.,aJo+,""O
L. L..:i: II) OJ 0
1>..2.,.- ., 01
> ::J > "C C
o U I "'., 0
a..1: c: .f: (I) '0;
., I> 0 ll: c
..... > c: cO .,
., "'0 E .
ffi '-'-...."'Ow
uoo 0_ C
s::1lf-..... CI)"D -ull:
o "- 0
6 UIIF5 =.t::.
<(01
Z ~ N <(
~Dro ppe d curb at. entrances
Note 2~ ~ 250
.. .. \ k150 r- 150 R=5mm
1.\. J" ...<....::--..:..,:,.
o \''''(>;......
R ;.... ;i}f;';;Y:;' ;i~
~ . i~5~;~:,;ii?:;1
I . /i,. .'., ,." . '-.'i' J
LLI..:.......:......",.:.,..:..:J
/5-11-\ . -1501-
For flexible .. L-l-[275 ----!
povement
For rigid pavement 25x75mm
keyway centred in concrete base
Nate 1 and 3
I
~.
I
I
I
I
I
I
I
---
I-
I
I
I
I
I
I
~.
I
I
I
Thickness of
adjacent sidewalk
1
10
N
,.,
o
10
N
NOTES:
1 . When curb and gutter is adjacent to concrete pavement
or base, this drawing is to be used in conjunction with
OPSD-552.010 and 552.020.
2 Flexible and composite pavement shall be placed 5mm
above the adjacent e~ge of g~tter.
3 For slipforming procedure, a 5:1: batter is acceptable.
A Treatment at entrances shall conform with OPSD-351.010.
8 Outlet treatment shall conform with OPSD-610 Series.
C The length of transition from one curb type to another
shall be 3.0m. except in conjunction with guide rail,
it shall conform to OPSD-900 Series.
D All dimensions are in millimetrs unless otherwise shown.
ONTARIO PROVINCIAL STANDARD DRAWING
CONCRETE BARRIER CURB
WITH NARROW GUTTER
April 1999
OPSD - 600.080
I
I
j
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
'..,
Tapered top
See alternative C
.
1
"
~1200
Riser sections
as required
.
...
,.'
Monolithic base' with inlet
end outlet openings to suit
See alternatives A C1nd B J
mox ".
..,
Bench or sump
os specified
300mm,
Granular bedding
. '.~..~ : . ,~;"~,'
.. ~. +. ~......, ,
,.....,.'::.. ..... "';'" .
Typ --I. . _ '-:'.. ."'~. .II. _~ ~": _
F"-= ".:._ ~:' .'-:-~''''.:. "_:....:~..~
c.::-" . -==-"-:-:&'40.- -'!:' ~
NOTES:
1 The sump is measured fram the lowest invert.
A Granular backfill sholl be placed to a minimum
thickness of 300mm all around the
maintenance hole.
S Precast concrete components according
to OPSD-701.030, 701.031, or 701.032.
C Structure exceeding 5.0m in depth to include
safety platform according to OPSD-404.020.
o Pipe support according to OPSD-708.020.
E For benching and pipe opening details,
see OPSD-701.021.
F For adjustment unit and frame installation
see OPSD-704.010.
G All dimensions ore nominal.
H All dimensions are in millimetres
unless otherwise shown.
ONTARIO PROVINCIAL STANDARD DRAWING
PRECAST CONCRETE
MAINTENANCE HOLE
1200mm DIAMETER
--------
..,
:
.'
...
300mm
Note 1
+
.
..
"!
". ....~ <t ~.. ,.',. ", :.r
P':' ,.-.' "~ ..,' ~ . ..,. . ..':"'f
"'51-"-' _. .... - .......~.
~.::- . ';""';"-~~~-;,:~-..::t..::....:.d
Granular
bedding
SUMP DETAIL
ALTERNATIVES
Bottom riser section with
inlet and outlet openings to
.1
Bench or
sump os
specified
.
~1200
~. ,. #.
.' . .I + I. '" .
. ,4.:'" ...'; ...;00..,': t:'.,
r .4"' ,~'~~,'od. :.,t. :..:' "
L-7~'-----4&...J
Granular
bedding
A PRECAST SLAB BASE
Riser
section
~
Bench or
sump as
specified
275
.:,. 1& ,..'.t4. 300
." - --,.... "-"'".', ."., - ':II
Ste~~ :~f~~;':::"""~~~nulor
os specified bedding
B CAST -IN-PLACE BASE
flat cop
Riser
section
~
.
C PRECAST FLAT CAP
Nov 2004
OPSD
701.010
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
7. Wye connection
8. 45~ bend
MAXIMUM SIZE HOLE IN THE WALL IN
6. Dead end
~ i:: .~: ;'.~.:.
o max
0/2 min
Section
50mm
min
Maintenance No. 1-4 No.5 & 6
Hole Diameter
1200 700 860
1500 860 1220
1800 1220 1485
2400 1485 2020
3000 1930 2450
3600 2195 3085
PRECAST RISER SECTIONS
No.7
Inlet Hole Outlet Hole
700 860
860 1170
1220 1485
1485 2020
1930 2450
2195 3085
No.8
780
960
1220
1760
2300
2730
NOTES:
A Concrete for benching to be 30MPa.
B Benching to be given wood float finish. channel to be given steel trowel finish.
C Benching slope and height to be as specified.
D All dimensions are nominal.
E All dimensions are in milimetres unless otherwise shown.
ONTARIO PROVINCIAL STANDARD DRAWING
MAINTENANCE HOLE BENCHING
AND PIPE OPENING DETAILS
Nov 2004
OPSD - 701.021
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Opening Dimensions
Grote
o
Type Slope
2H:1V
3H:1V
A 4H:1V
6H:1V
8H:1V
10H:1V
HOR
u
[
~
I
L ,.... ~. r f "'"
I Note 1 I 185mm2/m
1 [ eoch~
L 600 -! 150
~ L . ----__J r~~O:d';S _ .
. Typ . ... ,'. ".
,:....: ::.,. ~:.~ r..:.:........:.l
1..-.:...--__;....__.:...__....:._-' _______ Granular ---t::::.""-.:...--..:....:...__.:....._;..._.:l
~ bedding
A
FRONT VIEW
A
~
774
sf
Co
~
Ii
o
"C
~
>
o
E
E
o
'"
150
NOTES:
1 Outlet hole size 525mm moximum diameter,
location as .required.
A Where inlet is placed across ditch end
is accessible to vehicular traffic, grating
slope is to be 6H:1V or flotter.
S Center reinforcing in wall and slob :!:25mm.
C Granular backfill ta be placed to 0 minimum
thickness of 300mm 011 around the ditch iniet.
o Grating accarding to OPSO-403.010.
E Pipe support according to OPSD-708.020.
F All dimensions are nominal.
G All dimensions are in millimetres unless
otherwise shown.
670
632
618
608
605
603
600
52
71
78
83
85
86
87
ONTARIO PROVINCIAL STANDARD DRAWING
PRECAST
CONCRETE DITCH
600 X 600mm
INLET
b
600
x
o
E
E
o
.,:
-.
E Co
E E
o ~
o m
'"
o
on
SECTION A-A
150mm
overlap, Typ
",d <tI
.
WWF
185mm2/m
each way
.
.
'.
SECTION 8-8
Nav 2004
--------....-
- - --
OPSD
705.030
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
CONTRACT NO: CL2007-27
GREEN ROAD RECONSTRUCTION
STEVENS ROAD CONSTRUCTION
G. GENERAL CONDITIONS
OPSS General Conditions of Contract (September 1999) although not attached are
considered part of this Tender.
I I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
CONTRACT NO: CL2007-27
GREEN ROAD RECONSTRUCTION
STEVENS ROAD CONSTRUCTION
H. REGION OF DURHAM DESIGN SPECIFICATIONS AND
STANDARD DRAWINGS FOR REGIONAL SERVICES
It shall be the Contractor's responsibility to obtain those editions current at the time of
tendering.
30
I
~
~
I
I
I
BEDDING MATERIAl. f>S
PER S-401
STANDARD 'y' FITTING
fIDlERSED
SEE NOTE 8
STANDARD '8' ELBOW
20 MPa CONC. (150 mm)
TO UNDISTURBED selL
I
TYPE A
I
BEDDING MATERIAl AS
PER 5-401
STANDARD 'Y' FITTING
REVERSED
STANDARD '5" ELBOW
SEE NOTE 5
STANDARD 90" ELBOW
CONe. FlLLET
20 MPa CONC. ('SO mm)
TO UNDISTURBED SOIL
TYPE B
NO TEES SHALl BE USED (TYP.)
~
I
I
I G MATERIAL f>S
PER S-401
SEE NOTE 5
20 IdPa CONe. (150 mm)
TO UNDISTURBED SOIL
I
SECTION A-A
A
DROP STRUCTURE
TYPE A OR B
I
2 MAINTENANCE HOLE STEPS REQUIRED
WHERE'D' EXCEEDS 1800 mm
I
I
I
I
A
..E.I.8t1
I
TABLE OF MINIMUM DIMENSIONS " MAXIMUM VELocmES
OROP. PIPE TYPE 'A' TYPE'S' MAX. VElOCITY GRADES NOT
OIAUETER '0' 'L' '0' 'L' Ml5 TO EXCEED
200 600 7SO 1200 '050 1 '2 I.BO%
280 636 801 1275 1050 1 55 1.60%
300 6~9 900 '425 1125 1 70 1.50"
375 900 1125 1675 1200 1 92 1.'2%
.450 975 1200 2025 1275 2-16 1..42"
GRADES BASED ON MANNING FORMULA AT 82% FlOW.
I
I
DROP
MAINTENANCE
STRUCTURES FOR
HOLES
ALL DIMENSIONS IN UIWMEiRES EXCEPT WHERE NOTED.
OWG. DATE: 1978 0.3
RE1IlSlON NO.: 9
REV. DATE: 2002 10
~ N.T.S.
I
I
BfDOING MATERIAL f>S
PER S-401
SEE NOTE 5
20 MPa CONe. (,:so mm)
TO UNDISTURBED SOIL
SECTION B-B
NOTES:
1. FOR SEWER SIZES UP TO 450 mm OIA. THE
DROP PIPE SHALL BE THE SANE SI2E f>S THE
INlET PIPE. FOR SEWER SIZES GREATER THAN
450 mm THE DROP PIPE StWJ. BE ONE SIZE
SMAULER THAN INlET PIPE.
2. OBVERT OF 0Il0P PIPE SHALL BE LEVEL WITH 08VERT
OF OUTLET PIPE AND BENCNED TO THE OBVERT
OF THE OUTLET PIPE.
3. OROP STRUCTURE SHALL BE ENCI>SED IN A MINIt.fUM
OF 150 mm Of 20 ..Po CONCRETE. MAINTENANCE HOLE
STEPS SHALL BE PROVIDED ON OUTSIDE FACE OF
MH. DROP STRUCTURE SHALL BE STRAPPED TO
STEPS WITH STAINLESS STEEL BANOS.
.. MAXIMUM \/El.OCmES SHOWN IN TABLE INDICATED
THE MAX. FLOW \IEL.OCITY IN INCOUING PIPE
WITHOUT O\IERSlHOOTlNG.
5. AOJUSTUENT IN '0' AND 'L' SHALL BE MADE
THROUGH THI5 SECTION OF PIPE.
6. AI.l CONCRETE IN DROP STRUCTURE SHALL BE
20 UPa AT 28 DAYS.
7. IdtNIUUN DIMENSIONS 8f>SED ON USE OF
STANDARD CONCRETE FITTINGS.
8-107
I
I
I
I
I
~O.D. + 600-j
I <MIN. 900) I
PlAIN OR REINFORCED
CONCRETE MIN. 15 MPc
CONCRETE ARCH
DRY TRFNCH
19 mm CRUSHER RUN
UMESTONE COMPACTED
TO 98 " PROCTOR
D[NSITY
WIT TR(.:'N~H
HLB BLEND OF
CRUSHED CLEAR
STONE
CONCRETE ENCASEMENT
OT DETAIL
1. PVC WATERMAlN MAY NOT BE CONCRETE ENCASED.
2. CONCRETE ENCASE"'ENT OF GRAIIITY SANITARY
SEWERS MUST EXfEND FRO", PIPE JOINT TO
PIPE JOINT.
3. THIS OETAlL APPUES TO PROPOSED PIPING ONLY.
r-O.O. + 6QO~ r--O.D. + 6QO~
I (MIN. 900) I I (MIN. 900) I
1 ~:~?f@~~;~:~i~;;;~i:l~::~ ~~6~~~~P=TY :,:t~1f~s~J:J;~~:j;:J.itf;!;H:; I
t ...,............. .,..."......,...,.. 19..." CRUSHER RUN . .,............,..., -. ........"... t
UMESTONE COMPACTED
TO 96 " PROCTOR
DENSITY
I
I
I
I
I
I
I
I
I
CLASS A
REINFORCED A, m 1.0" Lf m 4.6
REINFORCED A, m 0.4" Lf _ 3.4
PlAlN 4- 2.6
SAND COVER COMPACTED
TO 9"" PROCTOR DENSITY
r--O.D. + 600~
I ("'IN. 900) I
~1~I:~{~~~1.::;it{0ifj~~~! 1
~'. ,. .
. ':'.:'~~:'
::.:;~;
w.#....;,
..,.......,
.::~.~H.k::..
.:r -";>.~.~::"':'..
. :'"~:.~.: \.~::.:.::.: :;:.:...:.::':~.; ~\" ~ ...'-' ~~
SAND BEDDING AND CO'VER
COMPACTED IN 150 mm LAYERS
TO 9"" PROCTOR D[NSITY
DRY TRFNCH
19 mm CRUSHER RUN
U"'ESTONE COMPACTED
TO 96 " PROCTOR
DENSITY
WET TR~NCl-l
HLB BLEND OF
CRUSHED CLEAR
STONE
100
!
CLASS B
CONCRETE AND CPP PIPE
CLASS D
DUCTILE IRON AND COPPER PIPE
Lf .. 1.9
LEGEND
O.D. - OUTSIDE DIAMETER OF PIPE
Lf - LOAD FACTOR
As .. AREA OF STEEL
NOTES
WET TRENCH
HLB BLEND OF
CRUSHED CLEAR
STONE
,. BEDDING MATERIALS SHALL BE FULLY EXfENDED
AND COMPACTED AGAINST TRENCH WALLS.
BE:DDlNG MATERIALS SHALL BE: PlACED AND
COMPACTED IN 1 SO mm LAYERS.
2. NO NECHANlCAI.. COWPACTION EQUIPMENT SHALl..
BE USED ON TOP OF PIPE PRIOR TO PlACING
A UINlUUM OF 300 mm COVER.
3. PIPE SHALL BE BEDDED TO PROPOSED UNE
AND GRADE WITH UNIF'ORU AND CONTINUOUS
SUPPORT FROM BEDDING. BLOCKING WITH N/y
HARD OBJECT SHALL NOT BE: USED TO BRING
THE PIPE TO GRADE.
4. 19 mm OIA. CRUSHER RUN UUESTONE TO
OPSS 1010 - GRANULAR A SPEC. - TABLE 2
(WHEN SPECIFIED).
5. HL B BLEND CRUSHER CLEAR STONt TO
OPSS 1033 - TABLE 2 (WHEN SPECIFIED).
6. CONCRETE TO OPSS 1350 (WHEN SPECIFIED).
AU. DIMENSIONS IN U1WWETRES EXCEPT MiERE NOTED.
DWG, DATE: 1978 03
RE'.1SlON NO., 7
REV. DAlE: 2005 05
SCAl,E, N. T.S.
I
I
I
I
I
WORKS DEP A1RTMENT
DRY TRENCH
PVC
CLASS P
PE AND VC PIPE
SANITARY,
(MAIN AND
AND CONCRETE
STORM AND WATER
SERVICE) TRENCH BEDDING
ENCASEMENT DETAILS
8-401
I
1-
\0 mm WAlER SER"'CE
- ~
\ COllPORAl1ON
MAIN STOP
&: APPROVED
SADDLE
I
WATERMAlN ~
1
I
RESTRAINED
PLUG
SER"'CE BOX
8
l!!
z
:;
50 mm DRAINING QJRB STOP
50 mm COPPER SERVICE PIPE
~-Q\~~
MAIN STOP
" APPROVED
SADDLE
I
I
1
I
50 mm
- WATERMAIN
1
ANCHOR lEE &: VALVE OR
TEE &: RESTRAINED VALVE
I
100 mm TO 300 mm
WATER SERVICE
"7
I
I
~
19 mm CLEAR CRUSHED STONE
50 mm x 150 mm X 300 mm
CEDAR BLOCK
BLOWOFF
SER"'CE BOX
8
l!!
;;;
:>
100 mm TO 300 mm
WA lER SERVICE
50 mm DRAINING CURB STOP
50 mm COPPER7
RESllRAlNED CAP 1///
I
I
I
WA lERMAlN
50 mm CORPORA nON
UAINSTOP
GAlE VALVE &: BOX
AS PER S-4OB
I
50
mm
BLOWOFF FOR 100 mm
I
50 mm
I
19 mm CLEAR CRUSHED STONE
50 mm x 150 mm X 300 mm
CEDAR BLOCK
TO 300 mm WATER SERVICE STUBS
ALL DIMENSIONS IN UILUMEllRES EXCEPT IltiERE NOTED.
OWG, DATE: 1993 11
REVISION NO.: 3
REV. DATE, 2005 05
SGALE: N. T.S.
BLOWOFF
"TOP SECl10N
VALVE BOX
(1:35 mm SLIDE TYPE)
SO mm COPPER
BLUE PAINTED
LOCAl1ON STAKE
T
CRIMP
o
'"
x
<
:>
_ TOP SECl10N
VALVE BOX
50 mm COPPER
NOTE:
CATHODIC PROTECllON.
BONDING GABLE AND
llRACER WIRE SHALL BE
AS PER S-4:35. S-4:39.
8-406
I
I-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
FINISHED
GRADE
13 mm ROUND
HOLE \\lTH
GROMMET
1.35 mm SUDt TYPE-
VAlVE BOX .& COVER
TRACER \\lRE
Eon
"!i'!
NO
.z
X",
<",
..U>
EXTENSION (AS REQUIRED)
50 mm OPERATING NUT
OPEN TO LEFT
GUIDE PLATE
NON-RISING STEI\I
TRACER WIRE CONNECTED
TOGETHER USING A SPUT
BOLT , 10 CONNECTOR.
SPUT 'IKlLT SHALL BE
WRAPPED IN ELECTRICAL.
PUTTY.
I
/
...
WA TERUAlN
L300-l
SLIDE TYPE
FINISHED
GRADE
E'"
0'"
.....
NO
,z
~l::I
..u>
TRACER WIRE
EXTENSION STEM SHALL BE
FASTENED TO OPERA liNG
NUT \\lTH 2 SET SCREWS
I
I
I
I
j.
I
I
I
I
I
\
\
\
\
\
1
I
'~:;:.~ .~'~.t
. ~r. ;":.::
(...). '\.~:
5.4 kg ZINC ANOOE
SCUD CONCRETE BLOCK
150 mm x 150 mm x 300 mm
L,so-l
NOTES
" VAL\<E BOX SHALL BE ADEQUATELY BRACED \'MILE BACKFILLING
AND MUST REMAIN PLUMB.
2. VAL\<E BOX EXTENSION SHALL BE USED ONLY IF REQUIRED,
3. REFER TO "STANDARD SPEClFlCA1l0NS FOR lHE CONSTRUCTION
OF" WA TERUAlNS" FOR PLAcaAENT OF MARKER STAKES.
4. VI>J.\<E SHALL BE COMPLETELY BACKFILLED \\lTH 19 mm
CRUSHER RUN UIIIESTONE.
5. \\HEN THE DEPTH Of THE OPERATING NUT IS GREATER
THAN 2.0 m BELOW FINISHED GRADE AN EXTENSION
STEI\I SHALL BE USED.
6. ALL INUNE VI>J.VES INSTALLED ON PVC WATERIIIAIN SHALL BE
RESTRAINED AS PER 5-433, UNLESS OTHER\\lSE NOTED.
7. IF VAL\<E BOX IS LOCATED IN A GRA\<EL AREA. A
1,0 m )( 1.0 m x 50 mm ASPHALT Ca.LAR SHALL BE INSTALLED.
100 mm TO
VALVE BOX
ARRANGEMENT FOR
400 mm GATE VALVE,
AND TRACER WIRE
PVC OR CPP WATERMAIN
ALL OIUENSlONS IN IllILUIIIETRES EXCEPT WHERE NOTED.
owe. DATE: 1991 11
REVISION NO.' 14
REV. DATE, 2004 07
SCALE: N. T.S.
8. TRACER ...,RE COATED, 7 STRAND,
12 GUAGE TW75, Th\J75 OR
RW90XLPE \\lRE RATED AT IIIINUS 40' C.
9. TRACER \\lRE SHALL BE INSTALLED
OUTSIDE VAL\<E BOX AND BROUGHT
INTO UPPER SEGlION THROUGH 13 mm
ROUND HOLE AND LOOPED AT TOP.
LOOP SHALL BE MINIMUM 450 mm IN LENGTH.
10. TRACER "'RE SHALL BE INSTALLED IN ALL
P.V.C. AND C.P.P. IIIAIN UNE VAL\<E BOXES.
11. CATHODIC PROTECTION. BONDING CABLE AND TRACER WIRE
SHALL BE AS PER S-435, S-439.
8-408
~JOINTS SHALL BE UECHANICAlLY
RESTRAINED /OS PER S-433
CONCRETE BLOCK
~IN. 1000 150 x 150 x 300
,
I
,
I
,
I
NOTES
1. JOINTS SHALL BE UECHANICAULY RESTRAINED.
2. BEDDING /OS PER S-4D1.
3. HYDRANT EXTENSIONS SHALL BE INSTAUID AT BOTTOU OF BARREL
4. ANCHOR TEE, VALVE & HYDRANT SH.\l.L BE COUPLETELY BACKALLEO
wITH 19 mm CRUSHER RUN UUESTONE.
5. IF" HYDRANT REQUIRES ACCESS ACROSS DITCH, INSTAUAll0N SHALL
BE /OS PER S-428.
8. TRACER WIRE COATED. 7 STRAND. 12 GAUGE TW75. TWU75 OR
RW 9D XLPE WIRE RATED AT UINUS 4O"C.
7. TRACER WIRE SHALL BE INSTAI..LID AT ALL HYORANT LOCATIONS.
8. CATHODIC PROTECl1ON. BONDING CABLE AND TRACER WIRE SHALL BE /OS PER S-435. S-439.
I
'1. HYDRANT
I-
I
IT
ill g
iL
.
I
,
I
I
I
I
WRAP TRACER WIRE
ONCE AROUND
HYDRANT BARREL
I
TRACER WIRE COATED
7 STRAND 12 GAUGE
TW7S. TWU7S OR
RW 90 XlPE WIRE
RATED AT UINUS 4O"C
I
I
19 mm CRUSHER RUN
U.ESTONE COUPACTED
TO 9'"' PROCTOR
DENSITY
I
I
I
I
CONCRETE BLOCK
200 x 200 x 300
I
I
I
I
HYDRANT ASSEMBLY WITH
MECHANICALLY RESTRAINED JOINTS
ALL OIUENSlONS IN UILUUETRES EXCEPT WHERE NOTED.
Dwe. DATE, 1978 03
RE\1saON NO.: 11
REV. DATE, 2002 10
SCALE: N. T.S.
I
I
ATTACH TRACE WIRE
UP THROUGH sPur
RING AND FI>STEN
.,0
....~
~i
t
ANISHED GRADE
l:iw
o
o~
~<>
;;;0
"'w
!;iill
oZ
Ii:
w
IIlW
0<0
""
ADJUSTABLE VAlVE BOX SHALL BE
SET FlUSH WITH ANISHED GRADE
TRACER WIRES CONNECTED TOGETHER
USING A SPUT BOLT # 10 CONNECTOR
sPur BOLT SHALL BE WRAPPED IN
ELECTRiCAl PUTTY
150 mm
p.tC PIPE
MIN. 1 SOO
19 mm CRUSHER RUN
UUESTONE COUPACTED
TO 98X PROCTOR
DENSITY
8-409
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
COPPER SERVICE PI/
TYPE 'K'
BRASS SERVICE GROUND CLAlAP C/W
TRACER WIRE CONNECTOR
SEE NOTE 4
TRACER WIRE COATED 7 STRANO,
12 GAUGE lW75, lWU75 OR RW 90 XLPE
WIRE RATED AT MINUS 40"C.
CORPORAT10N MAIN STOP
(WITH />PPRCNED SAODLE)
\FlNISHED ROAD GRADE
"
0,"
"'0
-z
'"
'"
Ul
TRACER WIRES CONNECTED
rOOmiER USING A SPUT
BOLT * 10 CONNECTOR,
~~
"'-
ZINC ANOOE
FINISHED GRADE
CURB STOP lOCATIONS
AS PER S-445
ROO
SERVICE BOX ~
CURB STOP ---, '"
8
...
Z
:i
RlMP END
OF PIPE
MAX.
150
1-,50-1
50 mm l( 150 mm )( 300 mm
CEDAR BLOCK PlACED
ON UND~RBEO GROUND
COPPER SERVICE PtPE
TYPE 'K'
CORPORATION UAlN STOP
(WITH APPROVED SAODLE)
FERROUS WM
INSULATION AS PER S-307
EXISTING
WATERUAlN
LOWERING WATER SERVICES
19
mm
AND
WATER
1.1
I WORKS DEPARTMENT
NOTES
" THE WATER CONNECTION SHAlL BE LAID FROM THE UAlN TO
150 mm BEYOND THE PROPERTY UNE, IN NEW SUBOMSlONS ONLY.
2, HORIZONTAl GOOSE NECK SHAll BE USEO WHEN COVER lESS
THAN 1700 mm.
3, WATERMAlN SHAll BE T/>PPED UNDER PRESSURE.
+. SER\IICE GROUND ClAMPS AND sPur BOLT SHAll BE
WRAPPED WITH ELECTRICAl PunY,
15. ANOOE SHALL BE PLACED AT LEAST 1.0 m AWAY FROM THE SERVICE
AND AS DEEP AS THE BOTTOu OF THE SERVICE,
6, ANODE SHAll BE lOCATED BElWEEN THE UAJN STOP
AND CURB STOP.
7. PWUBING CONTRACTOR TO REMOVE TAll PIECE AND
HOOK UP TO CURB STOP,
a. CATHODIC PROTECTION, BONDlNG CABLE AND TRACER WIRE
SHAlL BE AS PER 5-+35. S-+39.
9. MIHlI.AU~ SEPARATION DISTANCE BETWEEN TAPPED COUPUNGS
SI-Wl.. BE 1.0 m.
10. COUPUNGS SHAll NOT BE PERUfTTED aETWEEN THE
MAlN STOP AND THE CURB STOP WITHOUT PERlUISSION
OF THE REGION OF DURIWl,
All OIMENSlONS IN UIWUETRES EXCEPT \'MERE NOTED.
DWG. DA~ 1981 0+
REVISION NO.: 17
REV. OAl[: 2005 05
SCALE: N. T.S.
25 mm COPPER
SERVICE
8-410
I
1-
<
1
I
1
SAOOLE
I
I
I
I
I
1
1
1
I
I
I
1
1
1
PROPOSED WATERMAlN
MIN. 600
19 mm CORPORATION
SERVICE TEE
..
FLOW
NOTES
VALVE SHALl BE
OPERATED BY REGIONAL
PERSONNEL ONLY
WIN. 600
EX:ISTlNG WATERMAlN
OLE
PROPOSED ANO EXIS11NG WATERMAlN SHALl
BE TAPPED USING SERVICE SADOLE
19 mm MAIN STOP StWl. BE
REMOVEO ANO REPlACED
WITH A 19 mm BRASS PLUG
AFTER TES11NG HAS BEEN
COUPLETEO
OOPPER COUPRESSION
JOINT TO UALE I.P .T.
COUPUNG
~
~t
19 mm TYPE -K-
COPPER
19 mm BACKFLOW PREVENTER
19 mm CURB STOP MAY BE
OPERATED BY THE CONTRACTOR
1. TRENCH SHALl BE lEFT OPEN AND FENCED IN
ACOORDANCE WITH SAFETY REGULATlONS.
2. INSULATION OF WATERMAlN BY-PASS REQUIRED
DURING FREEZING CONDITIONS.
ALl DIUENSlONS IN UIWUETRES EXCEPT WHERE NOTED.
DWG. DAJE, 1982 03
REIIISIDN NO.: 5
REV. DATE: 2005 05
19 mm TEST POINT BY-PASS SCALE: N.T.S.
8-429
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
GRANUlAR 1liRUST BLOCK
19 mm CRUSHER RUN
UMESTONE COMPACTED TO
98 ~ PROCTOR DENSITY.
5
lE
g
i:
75
r
"L.
MECHANiCAl JOINT C.\P
300
0.0.
"
300
UNDSTURBED GROUND
ELEVATION
DEAD ENDS
"L.
GRANUlAR 1liRUST BLOCK
19 mm CRUSHER RUN
UMESTONE COMPACTED TO
96 1I PROCTOR DENSITY.
300
0.0
ELEVATION
RESTRAINED TEE
TRENCH W1DT1i
WHERE PIPE IS 1WO SIZES LARGER OR
MORE TO REDUCED PIPE.
I.e. 300 . TO 150 .
200 . TO 100 .
RESTRAINED REDUCER
PLAN
.L.
GIWlULAR 1liRUST BLOCK
1 9 rnm CRUStiER RUN
UMESTQNE COMPACTED TO
96 ~ PROCTOR DENSITY.
;
300
.0.
300
UNDISIURBED GROUND
ELEVATION
PLUGGED CROSS
NOTES
1. AU. JOINTS ENCOUNTERED WITHIN 1liE SPECIAED
RESTRAINING LENG1li "L. SHALl. BE RESTRAINED FROM
1liE ARST JOINT ON FmlNG.
2. GRANUl.AR THRUST BLOCKS SHALl. BE FULLY OOENDED
AND COMPACTED AGAINST TRENCH WAU.S. IF TRENCH
WAU. ARE SATUAAlED OR DISTURBED. SPECIAl. DESIGN
DETAILS OF 1liRUST RESTRAINT SHALl. BE PROIIIDED BY
1liE ENGINEER FOR RE\IIEW BY THE REGION.
3. GRANUlAR 1liRUST BLOCKS SHALl. BE ENCLOSED WI1li
ALlER FABRIC IF GROUND W~TER TABLE IS ABOVE 1liE
TRENCH BED OR IF GROUND WATER IS SEEP1NG
THROU H TRENCH W
4. WHEN F11T1NGS ARE PAR11AU.Y OR FULLY EXPOSED
UNDER PRESSURE. AU. JOINTS MUST BE RESTRAINED.
5. M Fjllt\~'Illllw. SHALl. BE RESTRAINED IN EARTH
6. CA1liODlC PROTECIlON. BONDING CABLE AND ~ER
WIRE SHALl BE ~ PER 5-435, 5-439.
7. AU. SIDES SHALl. BE RESTRAINED FOR IN UNE TEES.
6. JOINT RESTRAINTS ARE NOT REQUIRED FOR STRAIGHT
RUNS IN ENGINEERED ALL APPUCATIONS.
PIPE
OIA.
'00&1150
200
300
400
.l. MIN. RESTRAINING
LENG1li (m)
lS.2
19.6
27.7
36.3
~LL DIMENSIONS IN MI
ES EXCEPT WHERE NOTED.
DV/G. DATE: 1991 11
RE\lSlON NO.: 6
REV. D~TE: 2006 04
SeAJL, N. T.S.
THRUST BLOCK FOR PVC WATERMAINS
FOR HYDRANT RUNOUTS. TEES
AND DEAD ENDS
8-433
I
1,-
I
I
1
I
I
I
1
I
I
1
I
1
1
1
1
1
I
f1.V
p~ p1Y
~~
rN' II~
pflD~.
~
~
< '2,
~ftIOlI"
J'l!'plfi
f'IlEpO: rN'
f~ ~.f-
.oIfifPc;.rf
~",,,, pfl'!~~
rN'1II-
~~
f/~
~~"~
~rJIl
t';;
< ,q,
'#loD
t1~C
< ~2c
'~rJIll1"
~~,
. ,g
f<'
tIt!~
.,< ,q liP tl~
< ,g,
.~
< ,q ;~,
~
p05~
prf.\fIJ- '"
~ c;. 00"''''
~.,,~ljoO~'
.~rJf '"~'
NOTES ~~fJd. III-
1, ANODE SHALL BE PLACED AT LEAST f ,0 m AWAY FRON
THE WATER SYSTEI; APPURTENANCES ANO AS DEEP AS
THE BOTTOIA OF THE APPURTENANCES, NININUN DISTANCE
BETWEEN ANOOES SHALL BE La m,
2, ALL BONOING AND ANODE CABLE CONNECTIONS SHALL BE
THERNrrE WElDEO, ALL THERNrrE WELD CONNECTIONS SHALL
BE COATED WITH AN APPROVEO COATING NATERI~
3, BONDING CABLE SHALL BE NO, S. SEVEN STRAND
COATED COPPER WIRE. CADWElDED TO FTTTINGS.
4. 5.4 kg ZINC ANODE SHALL BE SUPPUED AND INSTALLED IN
A MANNER APPROVED BY THE REGION FOR EVERY
, 000 m OF TRACER WIRE INSTALLED.
5. UAGNESIUM ANODE CABlES SHALL BE SLUE AND
ZINC ANODE CABlES SHALL BE WHrrE.
S. ONE 5.4I<g ZINC ANODE SHALL BE INSTALLED
ON EACH RESTRAINER.
ALL DIMENSIONS IN NILLiMETRES EXCEPT WHERE NOTED.
DWG, DATE: 1981 04
REIIISION NO.: S
REV. DATE: 2005 05
SCALE: N. T.S.
~?
'/IA
rN' t1~C
,q
5~ffi
CATHODIC PROTECTION / BONDING
CABLE / TRACER WIRE
FOR PVC AND CPP WATERMAIN SYSTEMS
8-435
I
1,-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
,
I
I
i1
WORKS DEPARTIIENT
I
~ LOT
E I
EE
E8 E
c- E
~l ~
,tj I
~~ ~
f';>- 15
Ill", '"
::E~ 0:::
~~ ~
"'''' ~
,.5mB- i-
O.6m- J
Ifs '" I
1.5m : ....1
I 1. O,15m
: I T I
i~
w
z
:J
~
9
w
Z
::J
b
~
!Ii!
:J
b
~
P/L
,
,
,
,
,
,
,
,
, ,
~I i . MH"\
,--m-i-~_~~d+-""':=-=mm-6--m--
1 WA lERU,6,IN
---~=T--l---------
~ LOT
I
P/L
NOTES
1, WATER SER'VICES TO EXTEND 0.15 m INSIDE
PROPERTY UN"-
SANITARY AND STDRW SER\1CES TO EXTEND
1.5 m INSIDE PROPERTY UNE.
2. BEDDING DETAIL AS PER S-.w1
3. CURB STOP SHOULD NOT BE LOCATED
IN DRIVEWAY MiERE POSSlBlL
+. CURB STOP SHAll BE LOCATED
AT PROPERTY UNE.
SERVICE CONNECTION LOCATION
SINGLE FAMILY RESIDENTIAL LOTS
(NEW CONNECTIONS)
AU. OIUENSlONS IN UIUUMETRES EXCEPT WHERE NOTED.
DWG. DATE: 1991 11
RE\'lSION NO.: 6
REV. DATE: 2002 10
SCAlE: N.T.S.
8-445
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
EXIS11NG
ROAD
LONGITIJDINAL LAP JOINT TREATMENT
FOR PROPOSED WlE WlDENINGS
NOTES
--------------------
VERTICAL FACE AND BOT1OW
OF KEY SHALL BE SWEPT ClEAN
ANO PAINTED WIIH BlTUWINOUS
EMULSION.
1-
C.d SURFACE COURSE
;."I:: T BINDER ASPHALT
END TREATMENTS
RNAL UFT OF ASPHALT SHALL BE PLACED IN FOLLOWING YEAR
'::~,,-;c...;f---~,,-;c...~
I
ALL VERTICAL FACES OF END
JOINTS SHAll. BE SWEFT CLEAN AND
PAINTED WIIH BrruWINOUS EWUlSION
PRIOR TO PAlliNG.
APPROXIIotATE 20 DEGREE SKEW (l'I'PICAL)
3.0 m CUT 3.0 m CUT
4() mm OEPTH I 3.0 m WIDE CUT 1 r- SURFACE OVERLAY OF ASPHALT
(WIN) 1-/= _ ____.l.._____
---------
EXIS11NG ROAD T
EXISTING
ROAD
3.0 m CUT
EXISTING
ROAD
40 mm DEPTH
(MIN)
EXIS11NG
ROAD
EXISTING
ROAD
NOTES
ALL \IER11CAL FACES OF JOINTS
SHALL BE SWEPT CLEAN AND PAINTED
WIIH BrruWINOUS EWUl.SION PRIOR
TO PAlliNG.
2.5 m fW,.fp
PROP. BINDER _T
0.5 m
LAP JOINTS
TYPICAL END TREATWENT - FINAl. OVERLAY
f- NO~
------~- ~~~m:~ fiJ~#lNTED
WIIH ElIT\JIoIINOUS EWULSlON PRIOR
TO PA\IlNC.
I I I 1-- APPROXJIotATE 20 DEGREE SKEW (TYPICAL)
3.0 m CUT
0.5 m CUT
2.S m RAMP REMOVED
L RNAL UFT OF ASPIW.T
EXISTING BINDER
ASPHALT (2 UFTS)
0.5 m
NOTES
D1WENSlONS IN ILUWETRES EXCEPT \\tiERE NOTED.
Owe. DATE: 1986 04
RE\IlSION NO.: 5
REV. DATE: 2006 04
PAVEMENT JOINT TREATMENT SCALE: N.T.S.
8-501
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
CONTRACT NO: CL2007.27
GREEN ROAD RECONSTRUCTION
STEVENS ROAD CONSTRUCTION
I. GEOTECHNICAL INVESTIGATION
II
Ii
Ii
I
I:
I
I'
Ii
II
II
It
I
I
I
I
I
I
I
I
~
Soil Engineers Ltd
CONSULTING SOIL, FOUNDATION & ENVIRONMENTAL ENGINEERS
100 NUGGET AVENUE, TORONTO, ONTARIO M15 3A7. TEL (416) 754-8515. FAX, (416) 754-8516
BARRIE
TEL, ~OS) 721-7863
fAX,~OS)7l1.7864
MISSISSAUGA
7EL, (905) 542-7605
fAX: (905) 542-2769
BOWMANVILLE
TEL: (90S) 62l-8333
fAX, (90S) 623-4630
NEWMARKET
?EL: (905) 853.0647
fAX, (905) 853.5484
GRAVENHURST
?EL, ~OS)684-4242
fAX, (705) 684.8522
prnR80ROUCiH
TEL, ~05) 748.0576
FAX,(905j623-4630
HAMILTON
7EL: (905)662.1428
fAX, (90~ 662-3809
A REPORT TO
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
A SOn, INVESTIGATION FOR PROPOSED
ROAD RECONSTRUCTION
GREEN ROAD
MUNlCIPALTY OF CLARINGTON (BOWMANVILLE)
Reference No. 0703-S049
MAY 2007
DISTRIBUTION
3 Copies - D.G. Biddle & Associates Limited
1 Copy - Soil Engineers Ltd. (BowmanviIle)
1 Copy - Soil Engineers Ltd. (Toronto)
II
Ii
Ii
II
Ii
II
Ii
II
II
II
Ii
Ii
II
t
,
I:
I
I
II
I
~
Reference No. 0703-S049
ii
TABLE OF CONTENTS
1.0 INTRODUCTION 1
............................................................................................
2.0 SITE AND PROJECT DESCRIPTION 2
......................................................
3.0 FIELD WORK ....................,........................................................................3
4.0 SUBSURFACE CONDITIONS '. 4
..................................................................
4.1 Pavement SlIUcture. . 4
.................................................................................
4.2 Topsoil .............................................................................................. 5
4.3 Sand Fill 6
.............................................................................................
4.4 Silty Clay Till.................................................................................... 7
4.5 Silty Clay................................................................................;.......... 8
4.6 Silty Sand Till ................................................................................. 10
4.7 Gravelly Sand............................................................~..................... 11
4.8 Compaction Characteristics of the Revealed Soils ........................ 13
5.0 GROUNDWATER CONDITIONS .......................................................... 16
6.0 DISCUSSION AND RECOMMENDATIONS ........................................ 18
6.1 .Sewer Bedding................................................................................ 20
6.2 Sewer ConslIUction......................................................................... 21
6.3 Pavement Design ............................................................................ 25
6.4 Roadside Ditches ............................................................................ 26
6.5 Soil Parameters ............................................................................... 27
6.6 Excavation....................................................................................... 28
7.0 LIMITATIONS OF REPORT ................................................................... 31
Ii
I
I
I
I
I
I
I
I
I
I
I
,
I
I
I
I
I
I
Ii
Q
Reference No. 0703-S049
III
TABLES
Table I - Estimated Water Content for Compaction..................................... 13
Table 2 - Groundwater Levels....................................................................... 16
Table 3 _ Pavement Design .....................~..................................................... 25
Table 4 - Protection Against Flow Erosion................................................... 27
Table 5 - Soil Parameters .............................................................................. 27
Table 6 - Classification of Soils for Excavation ....,...................................... 29
DIAGRAMS
Diagram 1 - Lateral Earth Pressure (Sound Tills) ............................................ 21
. ENCLOSURES
Borehole Logs............................................................... . . Figures 1 to 4
Grain Size Distribution Graphs..................................... Figures 5 to 9
Borehole Location Plan and Subsurface ProfIle ........... Drawing No.1
I
I
I
I
I
I
I
I
I
I
I
a
I
I
I
I
I
I
I
~
Reference No. 0703-S049
1
1.0 INTRODUCTION
In accordance with a letter of authorization dated March 12,2007, from
Mr. W.G. Creamer, Project Manager, ofD.G. Biddle & Associates Limited, on
behalf ofThe corporation of the Municipality of Clarington, a soil investigation was
carried out on Green Road, between King Street West and Stevens Road,
Municipality of Clarington (Bowrnanville), for a proposed Road Reconstruction.
Tb.e purpose of the investigation was to reveal the subsurface conditions and to
determine the engineering properties of the d,isclosed soils for the design and
reconstruction of the existing road.
The findings and resulting geotechnical recommendations are presented in this
Report.
Reference No. 0703-S049
2
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
2.0 SITE AND PROJECT DESCRIPTION
The Municipality ofClarington (Bowmanville) is situated on Iroquois Lake plain
where drift has been partly eroded by the water action of the glacial lake and, in
places, filled with lacustrine clay, silt and sand.
The investigated section is Green Road, between King Street West to the south and
Stevens Road to the north. The existing road consists of surface-treated granular
material and the section of road near the intersections of King Street West and
Green Road are paved with asphaltic concrete. The road is lined with a gravel
shoulder and ditch on both sides.
It is understood that the proposed project will consist of the reconstruction of Green
Road between King Street West and Stevens Road and the installation of sanitary
sewers.
I
,
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Ii
~
Reference No. 0703-S049
3
3.0 FIELD WORK
The field work, consisting of 4 boreholes to depths of 6.1 In, 6.3 m and 6.4 m, was
performed on April 17 , 2007, at the locations shown on the Borehole Location Plan
and Subsurface Profile, Drawing No.1.
The holes were advanced at intervals to the sampling depths by a track-mounted,
continuous-flight power-auger machine equipped for soil sampling. Standard
Penetration tests, using the procedures described on the enclosed "List of
Abbreviations and Terms", were performed at the sampling depths. The test results
are recorded as the Standard Penetration Resistance (or 'N' values) of the subsoil.
The relative density of the granular strata and the consistency of the cohesive strata
are inferred from the 'N' values. Split-spoon samples were recovered for soil
classification and laboratory testing.
The field work was supervised and the findings recorded by a Senior Geotechnical.
Engineer.
The elevation at each of the borehole locations was interpolated from the Site Plan
provided by D.G. Biddle & Associates Limited.
Reference No. 0703-S049
4
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
4.0 SUBSURFACE CONDITIONS
Detailed descriptions of the encountered subsurface conditions are presented on the
Borehole Logs, comprising Figures 1 to 4, inclusive. The revealed stratigraphy is
plotted on the subsurface profile on Drawing No.1, and the engineering properties
of the disclosed soils are discussed herein.
Beneath a pavement structure, a layer of sand fill and/or a layer of topsoil, the site is
underlain by strata of silty clay till, silty clay, silty sand till and layers of gravelly
sand at various depths and locations.
4.1 Pavement Structure (All Boreholes)
The pavement structure near the intersection of King Street West and Green Road
consists of asphaltic concrete, approximately 100 mm in thickness, and a granular
base, 1100 mm in thickness. The pavement structure in the other sections of
Green Road consists of surface-treated granular material and granular fill, 800 mm
and 1200 mm in thickness.
The granular fill consists of crushed stone, well-graded sand and a variable amount
of silt.
The natural water content values of the granular fill range from 2% to 9%, with a
median of 3%, showing that the fill is generally in a dry to moist, generally damp
condition.
I
,
,
I
--!
,
[
~
I
-
I
I
I
I
I
I
I
I
I
I
I
I
I
I:
I
Ii
I
~
Reference No. 0703-S049
5
Grain size analyses were performed on 2 representative samples of the granular fill
and the results are plotted on Figure 5. The results indicate that the silt content
(Sieve No. 200) is 9% and 11 %, indicating that a portion of the granular fill meets
the OPS Gradation Specification Requirements for Granular 'B'. The granular fill,
if carefully salvaged, is suitable for use as road base, road subgrade stabilization
and structural backfill material. However, periodic testing should be done if the
material is to be used for new granular sub-base construction. In cuts, the granular
fill will slough to its angle of repose, which is generally about 350:t from the
horizontal and flatter if the fill is in a wet condition.
4.2 Topsoil (Boreholes 1,3 and 4)
The revealed topsoil beneath the granular fill on the road is 30 cm and 80 cm in
thickness. It is dark brown in colour, indicating that it contains appreciable
amounts of roots and humus. These materials are unstable and compressible under
loads; therefore, the topsoil is considered to be void of engineering value. Due to
its humus content, it may produce volatile gases and may generate an offensive
odour under anaerobic conditions.
The topsoil encountered beneath the pavement surface must be stripped prior to the
road reconstruction.
The topsoil is sandy in texture, and depending on its thickness and water content
(factors indicating its consolidated state), it had been left in place during the road
construction in the past. This condition may occur in other places.
~
~
Reference No. 0703-S049
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
6
4.3 Sand Fill (Boreholes 2 and 3)
The sand fill extends to depths of2.6 m and 1.5 m in Boreholes 2 and 3,
respectively. Sample examinations show that the sand fill consists of fme to
medium sand, some silt and traces of gravel.
The obtained 'N' values of the sand fill are 24, 34 and 38 blows per 30 cm of
penetration, indicating that the fill was placed with compaction, and has been
consolidated by traffic loading.
The natural water content values of the sand fill range from 9% to 21 %, with a
median of 15%, indicating that the fill is in a moist to wet, generally wet condition.
The original topsoil was encountered in Borehole 3 beneath the pavement structure
and sand fill, and in Boreholes I and 4 beneath the pavement structure, indicating
that the topsoil was not completely stripped during previous pavement construction.
A grain size analysis was performed on I representative sample; the result is plotted
on Figure 6.
Due to the generally compacted state of the fill, it is suitable for medium traffic
loads. However, in using the fill for structural fill or pavement construction, it
should be assessed by test pits, subexcavated, sorted free of any deleterious
materials, if any, and properly recompacted.
One must be aware that the samples retrieved from boreholes 10 cm in diameter
mav not be trulv representative of the geotechnical and environmental quality of the
fill. and do not indicate whether the tousoil beneath the earth fill was completelv
striuued. This should be further assessed bv laboratory testing and/or test pits.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
Reference No. 0703-8049
7
4.4 Silty Clay Till (All Boreholes)
The silty clay till consists of a random mixture of soils and particle sizes ranging
from clay to gravel, with the clay fraction exerting the dominant influence on the
soil properties. Occasional wet sand and silt seams and layers were detected in the
clay till mantle.
The obtained 'N' values range from 23 to 100+, with a median of 100+, from which
the consistency of the till is inferred to be very stiff to hard, being generally hard.
The Atterberg Limits of2 representative samples and the natural water content
values of all the samples were determined; the results are plotted on the Borehole
Logs and summarized below:
Liquid Limit
Plastic Limit
Natural Water Content
21% and 24%
14% and 15%
6% to 15% (median 8%)
The results show that the till is a cohesive material with low plasticity. The natural
water content generally lies below its plastic limit, confinning the generally hard
consistency as disclosed by the 'N' values.
Grain size analyses were performed on 2 representative samples; the results are
plotted on Figure 7.
Reference No. 0703-S049
8
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
According to the above fmdings, the following engineering properties are deduced:
. Moderate frost susceptibility and water erodibility.
. Low permeability, with an estimated coefficient of permeability of
10-7 em/see, and runoff coefficients of:
Slope
0% - 2% 0.15
2% - 6% 0.20
6% + 0.28
. A cohesive soil, its shear strength is primarily derived from consistency
which is inversely related to its moisture content. It contains sand; therefore,
its shear strength is augmented by internal friction.
. It is generally stable in a relatively steep cut; however, prolonged exposure
will allow infiltrating precipitation to saturate the soil fissures, and this may
lead to localized sloughing.
. A poor pavement"supportive material, with an estimated California Bearing
Ratio (CBR) value of3% or less.
. Moderately corrosive to buried metal, with an estimated electrical resistivity
of 4000 ohm/em.
4.5 Silty Clay (Borehole 1)
The layer of clay was encountered beneath the pavement structure and topsoil in
Borehole 1. It is laminated with silt and occasional sand layers.
The obtained 'N' value is 15, showing that the consistency of the clay is stiff.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I:
II
Ii
_J
I
~
Reference No. 0703-S049
9
The natural water content values of the samples were found to be 20% and 22%,
indicating that the clay is very moist to wet.
According to the above findings, the following engineering properties are deduced:
.
Highly frost susceptible and high in soil-adfreezing potential.
The laminated silt layers are highly water erodible.
Low permeability, with an estimated coefficient ofpemieability of 10,7 cmIsec,
and runoff coefficients of:
.
.
.
Slope
0% - 2% 0.15
2% - 6% 0.20
6% + 0.28
A cohesive- frictional soil, its shear strength is derived from consistency and
augmented by the internal friction of the silt. Its shear strength is moisture
dependent and, due to the dilatancy of the silt, the overall shear strength of the
silty clay is susceptible to impact disturbance, i.e. the disturbance will induce a
build-up of pore pressure within the soil mantle, resulting in soil dilation and a
reduction of shear strength.
In steep cuts, the wet clay will slough readily and a cut face in the sound clay
may collapse as the wet silt slowly sloughs.
A poor supportive-pavement material, with an estimated CBR value of 3%.
Moderately high corrosivity to buried metal, with an estimated electrical
resistivity of3000 ohm/em.
.
.
.
Reference No. 0703-8049
10
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
4.6 Silty Sand Till (Boreholes 2, 3 and 4)
The silty sand till consists of well-mixed soil particle sizes ranging from clay to
gravel, with the sand being the predominant fraction. Occasional sand and silt
seams and layers were found in the till mantle.
Sample examinations show that the till displayed slight to some cementation.
Occasional hard resistance to augering was encountered, indicating that cobbles and
boulders are present in the till.
The natural water content values of all the till samples were determined and the
results are plotted on the Borehole Logs. The natural water content values of the
silty sand till range from 5% to 10%, with a median of 8%, indicating that it is in a
damp to moist, generally moist condition.
The obtained 'N' values of the silty sand till are 100+, indicating that the relative
density is generally very dense.
A grain size analysis was performed on 1 representative sample of the silty sand till;
the gradation is plotted on Figure 8.
According to the above findings, the deduced soil engineering properties pertaining
to the project are the following:
. High frost susceptibility and moderate water erodibility.
,
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
Reference No. 0703-S049
11
. Moderate permeability, with an estimated coefficient of permeability of
10-5 em/see, and runoff coefficients of:
Slope
0% - 2% 0.11
2% - 6% 0.16
6% + 0.23
. A frictional-cohesive soil, its shear strength is density dependent, and the
strength of the till is also augmented by cementation.
. It will be stable in steep cuts; however, under prolonged exposure, localized
sheet collapse will likely occur.
. A fair material to support flexible pavement, with an estimated CBR value of
8% to 10%.
. Moderately low corrosivity to buried metal, with an estimated electrical
resistivity of 5500 ohm/em.
4.7 Gravellv Sand (Borehole 1)
The gravelly sand contains some silt and was encountered beneath the deposit of
silty clay in Borehole 1, overlying the stratum of silty clay till. Sample
examinations show the particle sizes of the sand fraction are well graded, and the
gravel and sand particles are subangular to rounded in shape. The presence of
cobbles and boulders in the deposit is inferred from the resistance to augering.
The obtained 'N' value is 100+, indicating the relative density of the deposit is very
dense.
~
i
I
._J
Reference No. 0703-S049
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
12
The natural water content value of the sample was found to be 6%. The low value
shows that, due to the perviousness of the material, the water drained from the
sample as it was taken.
A grain size analysis was performed on 1 representative sample and the result is
plotted on Figure 9.
According to the above fmdings, the following engineering properties are deduced:
.
Non-frost-susceptible and moderately water erodible.
Pervious, with an estimated coefficient of permeability of 10.3 em/see, and
runoff coefficients of:
Slope
0% - 2%
2% - 6%
6%+
.
0.04
0.09
0.13
. A frictional soil, its shear strength is derived from internal friction and is soil
density dependent.
. In steep cuts, the dry and wet gravel will slough to its angle of repose, run with
water seepage and boil with a piezometric head of about 0.4 m.
. A good pavement supportive material, with an estimated CBR value of 21 %.
. Low corrosivity to buried metal, with an estimated electrical resistivity of
7000 ohm/em.
I
I
I:
I
I
I'
I
I'
Ii
I:
I
I
I
I
I
I
I
I
I
~
Reference No. 0703-S049
13
4.8 Compaction Characteristics of the Revealed Soils
The obtainable degree of compaction is primarily dependent on the soil moisture
and, to a lesser extent, on the type of compactor used and the effort applied.
As a general guide, the typical water content values of the revealed soils for
Standard Proctor compaction are presented in Table 1.
T hi 1 E .
dW C
fi C
a e - stImate ater ontent or ompactJ.on
Water Content ('Yo) for
Standard Proctor Compaction
Determined Natural
<,
Soil Type Water Content ('Yo) 100% (optimum) Range for 95% or +
Granular Fill 2 to 9 9 4 to 14
(median 3)
Sand Fill 9 to 21 10 6 to 15
. (median 15)
Silty Clay Till 6 to 15 15 and 16 11 to21
(median 8)
Silty Clay 20 and 22 16 12 to 21
Silty Sand Till 5 to 10 10 6 to 15
(median 8)
Gravelly Sand 6 9 4 to 14
According to the above fmdings, the majority of the in situ soils are either on the
dry side of the optimum or too dry for a 95% or + Standard Proctor compaction;
they will require the addition of water or mixing with wetter soils prior to structural
compaction, particularly in the dry, warm weather and in areas where compaction is
~
I
-!
Reference No. 0703-S049
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
14
best performed on the wet side of the optimum. The silty clay and the inorganic
sand fill are too wet and will require aeration or mixing with drier soils prior to
structural compaction. Aeration of the wet soils can be effectively carried out by
spreading them thinly on the ground in dry, warm weather. The fills must be sorted
free of topsoil inclusions and deleterious materials, if encountered, prior to their use
as structural backfilL
The tills and silty clay should lie compacted using a heavy-weight, kneading-type
roller. The inorganic sand fill and sand can be compacted by a smooth ~oller with
or without vibration, depending on the water content of the soils being compacted.
The lifts for compaction should be limited to 20 cm, or to a suitable thickness as
assessed by test strips performed by the equipment which will be used at the time of
construction.
. When compacting the very stiff to hard and dense to very dense tills on the dry side
of the optimum, the compactive energy will frequently bridge over the chunks in the
soil and be transmitted laterally into the soil mantle. Therefore, the lifts of these
soils must be limited to 20 cm or less (before compaction). It is difficult to monitor
the lifts of backfill placed in deep trenches; therefore, it is preferable that the
compaction of backfill at depths over 1.0 m below the road subgrade be carried out
on the wet side of the optimum. This would allow a wider latitude oflift thickness.
Wetting of the sound tills will be required for this requirement.
If the compaction of the soils is carried out with the water content within the range
for 95% Standard Proctor dry density but on the wet side of the optimum, the
surface of the compacted soil mantle will roll under the dynamic compactive load.
.'
I
I
I
I
I
I
I
I
I
I
I
I
I
I
II
I
I
I
~
Reference No. 0703-S049
15
This is unsuitable for road construction since each component of the pavement
structure is to be placed under dynamic conditions which will induce the rolling
action of the subgrade surface and cause structural failure of the new pavement.
The bedding of the underground services, on the other hand, will be placed on a
subgrade which will not be subjected to impact loads. Therefore, the structurally
compacted soil mantle with the water content on the wet side or dry side of the
optimum will provide an adequate subgrade for the construction.
The presence of boulders will prevent transmission of the compactive energy into
the underlying material to be compacted. If an appreciable amount of boulders over
15 cm in size is mixed with the material, it must either be sorted or must not be used
for structural backfill.
~
Reference No. 0703-S049
16
5.0 GROUNDWATER CONDITIONS
Groundwater seepage encountered during augering was recorded on the field logs.
The boreholes were checked for the presence of groundwater and the occurrence of
cave-in upon their completion and the levels are plotted on the Borehole Logs. The
data are listed in Table 2.
Table 2 - Groundwater Levels
Soil Colour Measured
Changes Seepage Groundwater!
Brown to Encountered Cave-in* Level
Borehole Grey During Augering On Completion
BHNo. Depth (m) Depth (m) Depth (m) Amount Depth (m) EL (m)
I 6.4 4.0 2.4 Slight 1.8* 121.3*
2 6.3 4.0 1.2 Appreciable 1.2* 121.5*
3 6.1 4.0 2.4 Slight 3.7 118.8
4 6.3 4.0 5.8 Some 5.8 116.9
'Cave-in level (In wet sand and silt, the level generally represents the groundwater regime at the borehole
location.)
Groundwater was detected in 2 boreholes towards the southern part of Green Road
towards King Street West at depths of3.7:t m and 5.8:t m, or at E1.118.8 m and E1.
116.9 m, respectivdy. Cave-in was detected in 2 boreholes at the north end of the
investigation, at depths of 1.2:t m and 1.8:t m from the prevailing ground surface, or
at E1. 121.3:t m and EL 121.5:t m, which indicates the groundwater level at the time
of the investigation. The groundwater level in the upper soil stratigraphy is derived
from infiltrated precipitation becoming trapped in the voids of the sand fill, and in
the sand and silt seams and layers.
,
..J
~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
11
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
Reference No. 0703-5049
17
The colour of the soil changes from brown to grey at a depth of 4.0t m below the
prevailing ground surface. This indicates that the brown soils have oxidized and the
permanent groundwater occurs in the grey soils. The groundwater at the site will
generally be subject to seasonal fluctuation.
In the wet seasons, infiltrated precipitation will perch in the voids of the sand fill, in
the soil fissures and in the sand and silt seams and layers in the tills, rendering the
occurrence of a shallower perched groundwater. The yield of groundwater from the
silty clay till and silty clay is expected to be small; from the silty sand till, it will be
moderate. However, the yield from the sand will likely be appreciable and
persistent, depending on its extent.
Reference No. 0703-S049
18
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
6.0 DISCUSSION AND RECOMMENDATIONS
The investigation has disclosed that beneath a pavement structure, a layer of sand
fill and/or a layer of topsoil, the site is underlain by strata ofvery stiffto hard,
genefally hard silty clay till, stiff silty clay; very dense silty sand till, and very dense
gravelly sand.
The groundwater encountered at the time of the investigation ranges from 1.2:1: to
.5.8:!: m below the prevailing pavement surface, or at El. 121.5:!: to El. 116.9:t m,
depending on the location. The shallow groundwater is derived from infiltrating
precipitation perched in the voids of the sand fill, in the soil fissures and in the sand
and silt seams and layers in the tills. If groundwater or seepage is encountered, the
yield will generally be small in the silty clay till, moderate in the silty sand till, and
will likely be appreciable in the sand, depending on its extent.
The geotechnical findings which warrant .special consideration are presented below:
1. A portion of the existing granular fill beneath the asphaltic concrete used for
grain size analysis meets the Gradation Requirements of the OPS
Specifications for Granular' B' material; therefore, if properly salvaged, the
granular fill is suitable as a granular sub-base or as structural backfill and
road sub grade stabilization material. However, periodic testing is required to
confirm the suitability of the granular fill for the proposed road
reconstruction.
-"
.i
.'
I
.
I
I
I
I
I
I
I
.
I
I
I
I
I
I
I
~
Reference No. 0703-S049
19
2. The existing sand fill extends to a depth of2.6::!: ID. Sample examinations
and obtained 'N' values indicate the fill was placed with compaction. In
open steep cuts, the sides are prone to sudden collapse, particularly if the fill
is in a wet condition.
3. It is understood that the proposed sanitary sewer replacement will be
constructed at depths of 2.6::!: to 4.1:t m beneath the existing pavement. The
subsoil in this zone consists of very stiff to hard silty clay till, very dense
silty sand till and well-consolidated earth fill. Open cut in the sand fill and
gravelly sand will require dewatering by very vigorous pumping or well-
point dewatering to stabilize the ground for construction. Where the cut
infringes on old trench backfill, the sides must be flattened to 1 vertical:
2 + horizontal, or shielded by a trench box.
4. The backfill over the sewer must be properly compacted to provide adequate
lateral support for road construction.
5. If the proposed sewers are to be constructed beneath the existing services,
the existing services must be properly secured,
6. In water-bearing silty sand till, the joints of pipes must be leak-proof. The
bedding must consist of Crusher-Run Limestone.
7. Due to the occurrence of sand fill, topsoil, and shallow groundwater level,
the subgrade of the road reconstruction should be inspected and assessed by
a geotechnical engineer.
8. The existing topsoil encountered within a depth of 1.5 m from the
rehabilitated road sub grade surface may be left in place.
9. Excavation into the hard and very dense tills containing boulders may require
extra effort and the use of a heavy-duty backhoe. Boulders larger than 15 cm
in size are not suitable for structural backfill.
~
,
_.J
Reference No. 0703-S049
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
20
The recommendations appropriate for the project described in Section 2.0 are
presented herein. One must be aware that the subsurface conditions may vary
between boreholes. Should this become apparent during construction, a
geotechnical engineer must be consulted to determine whether the following
recommendations require revision.
6.1 Sewer Bedding
The sub grade for the sewer should consist of sound natural soils, or compacted
inorganic fill or granular material. Any topsoil, loose earth fill and weathered soil,
if encountered, must be subexcavated and replaced with properly compacted
granular material.
A Class 'B' bedding for open cut is recommended for construction of the
underground services. The bedding material should consist of compacted
20-mm Crusher-Run Limestone, or equivalent.
Joints of sewer to be built in water-bearing silty sand till or sand must consist of
leak-proof pipes or the joints must be wrapped with a waterproof membrane. This
is to prevent sewer failure resulting from infiltration of fines.
In order to prevent pipe floatation when the pipe trench is deluged with water, a soil
cover with a thickness equal to the diameter of the pipe should be in place at all
times after completion of the pipe installation.
I
I
I,
I
I
I
I
I
I
I
I
I
1
I
I:
I:
Ij
II
IJ
~
Reference No. 0703-S049
21
Openings to subdrains and catch basins should be shielded with a fabric filter to
prevent silting.
6.2 Sewer Construction
Open-Cut Method
Where the sewers will be constructed using the open-cut method, it must be carried
out in accordance with Ontario Regulation 213/91. Where earth fill is encountered,
the sides should be flattened to 1 vertical: 1 or + horizontal, or should be stabilized
by shoring.
In the areas where a vertical cut is necessary, the use of a trench box is considered
to be appropriate.
In the design of the trench box andlor shoring structure, the recommended lateral
earth pressure distribution for the revealed soils is given in Diagram 1.
Dia am 1 - Lateral Earth Pressure (Sound Tills)
O.25H
H - Height of Excavation in metres
O.50H
y - Bulk Unit Weight
22.0 kN/m3
O.25H
0.4 y H
Reference No. 0703-S049
22
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
The soils above the trench box must be cut at I vertical: 1 or + horizontal.
In the areas where the new trench infiinges upon or is close to the old trench
backfill for the existing underground sei-vices, the side slopes of the new trench
must be shored, or stabilized by a trench box. Where existing underground services
are to remain, they must be properly supported prior to the new trench excavation.
The new water main should be protected against soil corrosion. In determining the
mode of protection, the electrical resistivity of 3000 ohm/cm given for the silty clay
should be used. This, p'owever, must be confmned by testing the soil along the
water main alignment at the time of sewer construction.
Oven-Cut Trench Backfilline:
The on-site inorganic soils are suitable for trench backfill. In the zone within 1.0 m
below the road subgrade, the backfill should be compacted to at least 98% of its
maximum Standard Proctor dry density, with the moisture content 2% to 3% drier
than the optimum. In the lower zone, a 95% or + Standard Proctor compaction is
considered to be adequate; however, the material must be compacted on the wet
side of the optimum. The occurring soils will require aeration in dry, warm weather
conditions for proper compaction.
In normal underground services construction practice, the problem areas of road
settlement largely occur adjacent to manholes, catch basins and services crossings.
The silty soils are generally difficult to compact in these close quarters, and it is
recommended that a sand backfill should be used. The narrow trenches for services
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
Reference No. 0703-S049
23
crossings should be cut at 1 vertical:2 horizontal so that the backfIll in the trenches
can be effectively compacted. Otherwise, soil arching in the trenches will prevent
achievement of the proper compaction. In this case, imported sand fill, which can
be appropriately compacted by using a smaller vibratory compactor, must be used.
The areas at the interface of the native soil and the sand backfill should preferably
be flooded for at least 1 day.
The lifts of each backfill layer should be limited to 20 cm thick, unless test strips
can verify otherwise.
One must be aware of the possible consequences during trench backfilling and
exercise caution as described below:
. When construction is carried out in freezing winter weather, allowance
should be made for these following conditions. Despite stringent backfill
monitoring, frozen soil layers may inadvertently be mixed with the structural
trench backfill. Should the in situ soil have a water content on the dry side
of the optimum, it would be impossible to wet the soil due to the freezing
condition, rendering difficulties in obtaining uniform and proper compaction.
Furthermore, the freezing condition will prevent flooding of the backfill
when it is required, such as when the trench box is removed. The above will
invariably cause backfill settlement that may become evident within 1 to
several years, depending on the depth of the trench which has been
backfIlled.
Reference No. 0703-S049
24
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
. In areas where the underground services construction is carried out during
winter months, prolonged exposure of the trench walls will result in frost
heave within the soil mantle of the walls. This may result in some settlement
as the frost recedes, and repair costs will be incurred prior to final surfacing
of the new pavement.
. To backfill a trench, one must be aware that future settlement is to be
expected, unless the side of the cut is flattened to at least I vertical:
1.5 + horizontal, and the lifts of the fill and its moisture content are
stringently controlled; i.e., lifts should be no more than 20 cm (or less if the
backfilling conditions dictate) and uniformly compacted to achieve at least
95% of the maximum Standard Proctor dry density, with the moisture
content on the wet side of the optimum.
. It is often difficult to achieve uniform compaction of the backfill in the lower
vertical section of a trench which is an open cut or is stabilized by a trench
box, particularly in the sector close to the trench walls or the sides of the
box. These sectors must be backfilled with sand. In a trench stabilized by a
trench box, the void left after the removal of the box will be filled by the
backfill. It is necessary to backfill this sector with sand, and the compacted
backfill must be flooded for I day, prior to the placement of the backfill
above this sector, i.e., in the upper sloped trench section. This measure is
necessary in order to prevent consolidation of inadvertent voids and loose
backfill which will compromise the compaction of the backfill in the upper
section. In areas where groundwater movement is expected in the sand
mantle, seepage collars should be provided.
I
,
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
Reference No. 0703-S049
25
6.3 Pavement Desil!:n
According to the borehole findings, the recommended pavement structures for
Green Road are presented in Table 3.
T bl 3 P t D .
a e - avemen eSlgn
Course Thickness (mm) OPS Specifications
Asphalt Surface 40 HL-3 .
Asphalt Binder HL-8
Local 60
Collector 80
Granular Base 150 Granular' A'
Granular Sub-base Granular 'B'
Local 300
Collector 400
As noted, a portion of the existing granular fill in-Green Road contains a high silt
content and is considered unsuitable for use as road base material. For the
reconstruction of Green Road, the existing granular fill, within the depth of the
recommended pavement structure, and the underlying topsoil, within a depth of
1.5:t m from the proposed subgrade, must be subexcavated and replaced with
properly compacted inorganic material. The subexcavated existing granular fill can
be used to stabilize the sub grade and to raise the grade below the pavement
structure.
Prior to placement of the granular bases, the subgrade surface should be proof-
rolled and any soft material should be subexcavated and replaced with properly
compacted organic-free earth fill or granular material. All the granular bases should
(I)
j
,
i
i
d
Reference No. 0703-S049
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
26
be compacted to their maximum Standard Proctor dry density. The earth backfill
within the zone 1.0 m below the pavement must be compacted to 98% or + of its
maximum Standard Proctor dry density, with the moisture content 2% to 3% drier
than the optimum.
The silty subgrade will suffer a strength regression if water is allowed to saturate
the mantle. The following measures should, therefore, be incorporated in the
construction procedures and road design:
. . If the road construction does not immediately follow the trench backfilling,
the subgrade should be properly crowned and smooth-rolled to allow interim
precipitation to be properly drained.
. Prior to the placement of the granular bases, the subgrade should be proof-
rolled, and any soft spots should be rectified.
. If the roads are to be constructed during the wet seasons and the subgrade is
softened, the granular sub-base should be thickened. In extreme cases, the
top 0.8 m of the subgrade should be replaced by compacted granular
material.
6.4 Roadside Ditches
The invert of the ditches should be at least 1.2 m below the crown of the finished
pavement, and the sides should be graded to 1 vertical:at least 3 or + horizontal for
stability. In order to prevent rainwash erosion, the sides must be sodded. The wet
perimeter of the open ditches should be protected against flow erosion by using the
measures given in Table 4.
I ~
I
Reference No. 0703-S049 27
I Table 4 - Protection Against Flow Erosion
I Drainage Flow (mlsec) Protective Measures Against Flow Erosion
0.60rless Not Required
I 0.6 to 1.5 Sodded Gutter
I 1.5 to 2.1 Cobbled Gutter
2.1 to 4.5 30 cm Paving Stone
I 4.5 + Gabiori Mat on Geotextile Backing
I 6.5 Soil Parameters
I The reco11l1Ilended soil parameters for the project design are given in Table 5.
I Table 5 - Soil Parameters
I Unit Weie:ht and Bulk Factor
Unit Weipt Estimated
(kN Iin. ) Bulk Factor
I Bulk Submerged Loose Compacted
Sound Tills 22.0 12.5 1.35 1.03
I Sand 21.0 10.8 1.25 1.02
I Silty Clay 20.5 11.5 1.30 1.00
Sand Fill 20.5 10.5 1.25 1.00
I
I
I
I
I
Reference No. 0703-S049 28
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
Table 5 - Soil Parameters (Cont'd)
Lateral Earth Pressure Coefficients
Active At Rest Passive
K. K.. Kp
Existing Fill OA5 0.55 2.22
Silty Clay Till OAO 0.50 2.50
Silty Clay 0.35 OA5 2.86
Sand and Silty Sand Till 0.30 OAO 3.33
Runoff Coefficients
Gravelly Silty Sand Silty Clay and
Slope Sand Till Silty Clay Till
0% - 2% 0.04 0.11 0.15
2% - 6% 0.09 016 0.20
6%+ 0.13 0.23 0.28
Coefficients of Permeability (em/see)
Gravelly Sand 10,3 .
Silty Sand Till 10,5
Silty Clay and Silty Clay Till 10,7
Maximum Allowable Soil Pressure
For Thrust Block Desil!l1
Sound Natural Soils 100 kPa
6.6 Excavation
Excavation should be carried out in accordance with Ontario Regulation 213/91.
Excavations should be sloped at 1 vertical: I horizontal for stability.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
Reference No. 0703-S049
29
For excavation pUIpOses, the types of soils are classified in Table 6.
Table 6 - Classification of Soils for Excavation
Material Type
Sound Tills 2
Weathered Soil, Earth Fill, Sand above groundwater 3
Sand below groundwater 4
At depths below the groundwater level, seepage in the clay till during excavation is
expected to be slow and controllable by normal pumping from closely spaced
sumps.
Excavation into the very stiff and very dense tills containing boulders will require
extra effort and the use of a heavy, properly equipped backhoe.
Where excavations are carried out in water-bearing sand and sand till, the
possibility of flowing sides and bottom boiling dictates that the ground be
predrained, either by pumping from closely spaced sump-wells (excavations
shallower than 0.5 m below the groundwater) or, if necessary, by the use of a well-
point dewatering system (excavations deeper than 0.5 m into the groundwater
table). In order to provide a stable sub grade for the services or foundation
construction, the groundwater should be depressed to at least 0.5 m below the .
subgrade. However, this should be confirmed by test pumping prior to and/or
during project tendering and/or construction.
~
Reference No. 0703-8049
30
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Prospective contractors must be asked to assess the in situ subsurface conditions for
soil cuts by digging test pits to at least 0.5 m below the intended bottom of
excavation. These test pits should be allowed to remain open for a period of at least
4 hours to assess the trenching conditions.
I
I
I
I'
I
I
I
I
I
I
I
I
I
I
I
I
IJ
I:
I
~
Reference No. 0703-S049
31
7.0 LIMITATIONS OF REPORT
It should be noted that no tests have been carried out to determine whether
environmental contaminants are present in the soils. Therefore, this report deals
only with a study of the geotechnical aspects of the proposed project.
This report was prepared by Soil Engineers Ltd. for the account of The Corporation of
the MUnicipality of Clarington, and for review by its designated consultants and
government agencies. The material in it reflects the judgement of Kelvin Hung, B.A.Sc.,
and-Daniel Man, P.Eng., in light of the information available to it at the time of
preparation. Any use which a Third Party makes of this report, or any reliance on
decisions to be made based on it, are the responsibility of such Third Parties.
Soil Engineers Ltd. accepts no responsibility for damages, if any, suffered by any Third
Party as a result of decisions made or actions based on this report.
SOIL ENGINEERS LTD.
~-b, \\MO
Kelvin Hung, BASc.
Pu/J;JJ---
Daniel Man, P .Eng.
KH/DM:rs
I
Ii
Ii
I
I
I'
II
II
I
II
Ii
I'
Ii
,
Ii
II
Ii
Ii
I]
I
I
LIST OF ABBREVIATIONS AND DESCRIPTION OF TERMS
The abbreviations and terms commonly employed on the borehole logs and figures, and in the text
of the report are as follows:
1. SAMPLE TYPES 3. SOIL DESCRIPTION
AS Auger sample a) Cohesionless Soils:
CS Chunk sample
DO Drive open 'N' (Blows/ft) Relative Density
DS Denison type sample
FS Foil sample 0 to 4 very loose
RC Rock core with size and 4 to 10 loose
percentage of recovery 10 to 30 compact
ST Slottoo tube 30 to 50 dense
TO Thin-walled, open over 50 very dense
TP Thin-walled, piston
WS Wash Sample b) Cohesive Soils:
2. PENETRATION RESISTANCE/'N' Undrained Shear
Strength (ksf) 'N' (Blows/ft) Consistencv
Dynamic Cone Penetration Resistance:
A continuous profile showing the
number of blows for each foot of
penetration of a 2-inch diameter 90. point
cone driven by a 140-pound hammer
falling 30 inches.
Plotted as
Less than 0.25 0 to 2 very soft
0.25 to 0.50 2 to 4 soft
0.50 to 1.0 4 to 8 firm
1.0 to 2.0 8 to 16 stiff
2.0 to 4.0 16 to 32 very stiff
over 4.0 over 32 hard
Standard Penetration Resistance or 'N' value: c)
Method of Determination of Undrained
Shear Strength of Cohesive Soils:
The number of blows of a 140-pound
hammer falling 30 inches required to
advance a 2-inch a.D. drive open
sampler one foot into undisturbed soil.
Plotted as '0'
x 0.0 - Field vane test in borehole
The number denotes the
sensitivity to remoulding.
.6. - Laboratory vane test
D - Compression test in laboratory
WH Sampler advanced by static weight
PH Sampler advanced by hydraulic pressure
PM Sampler advanced by manual pressure
NP No penetration
For a saturated cohesive soil, the
undrained shear strength is taken
as one half of the undrained
compressive strength.
METRIC CONVERSION FACTORS
I ft. = 0.3048 metres 1 inch = 25.4 mm
lIb. = 0.453 kg 1 ksf = 47.88 kN/m2
.~
Soil-Errgineers1rtt
CONSULTING SOIl, FOUNOATION 8< ENVIRONMENTAl ENGINEERS
100 NUC;GET AVENUE, TORONTO, ONTARIO M15 3A7 . TEl, (416) 754-8515. FAX, (416) 754-8516
I
01
I v
0
<Zl
,
'"
0
t'-
I 0
0 :-
Z :l
u
"
I ~
~
"
~ ~
I ~
d
~
I d
~
I z
0 ~
I ....
~ "
p
~ ~
I ; ~.
~ ~
00
I .... I
~
~.
N c
w ~
I .... :a w
00 8 "
z I
- ~ ~
w
I g
I ~ ~ ~
i w
Ii ~ g
a ~ ~
e;
.~ w
Ii ~ ~ g
8 ~ w
~ ~ ~ g
w <.>
c
::= c il
Ii ~. ~
~ is ~
,,; ~
, ,CJ-~
Ii
,., I
I
<; Figure: 5
"
ci
- N ~
'" ::0
C:! ~
'" ic
" " " " "
~ ~ ~ ~ g s
e ~ c >? II
~ ~ e...
S!2 ~ ~ ~ ~ 1 ~
:Ii 's 's '0 ]
<Q ::; :.J .s 0
0
'0 " C U
'3 'Q ...
'" ~ :g l]
<; ::; 0: li ~ "
ci 0: ,- 8
o 'Q
::E .n
-
ec- ~
.,- '"
~- :5
::i- =>
,,;: z
~ ~
Cl Cl
. I
.
.
. I
. :
. :
.
. ,- "
'" .
",' I ;1
'" .
~' /' :1
'" . .
./ V .,
. '" : :
/ / . I
.
. : ,
H
7 . I
.
.
.~ I
. I
, ' . :
.
T .
. I
/. . I
.
II
. . .
. . .
.
I
I . . . .
. . . /
. .' .
. . .'
.
. '":
. . (I)
. .
, ~
"' .
/
.
"
~
~
~
~
.
.
.
.
.
.
2
!
s
~
~
s
"
e
"
'"
"
~
"
'"
'"
'"
~ ::: 0
iia!ned lUOOJ'ld
"
~
~
'"
"
ci
'0
~
'"
w
~
B
C/O
'0
a
0 ~
0
'is
e B ~
~ (I)
0 .. 0
J II 0 0
'" :;2 ~
aI I 0
~ ]
's u
~ ...
,S ~ 0
,~ ~ c
~
'" ] ~ c.
0 'u
'~ 0 ~
c. '8
<.:l 8 "
... ::E
co
2
il 8
'Q
'e- II
... j
N _
'0
1-
(I)
on is"
~ fi ~
:i.
~
Nd~"t
C/O
...
o
~ 0
"'" .s ,g
E 5 ~
- .- t;::l
-5 '" ,-
&~j
o l<l U
<:;
z <:;
~ Z
'0 ~
1 1
<Q (I)
-
ti: "Cii
~
~ g
ii
o "
0\
'l"
0
OJ
,
'"
0
t"-
O
0 >
Z :l
v
"
0
@
<..!l
" >
~ il
~
b
~
::J
~
z
0 ~
.....
~ "
;:J
~
; ~ ~
~ ~
rJ:i. ~
..... ~
~ ~
~ '" ~
..... ~
en v I
Z
..... ~
~
C '"
~
~
.....
~ ~ ~
\'.l
;.;; ~ 0 ~
~ ~
~ ~ U
.l:: ~
SiJ
~ ~ 5
~ '"
'" ~ ~
~
0 8
:""'" ~
... '"
~ Q
Q ~
'"
.,;
:i
(6
-"
/
I
I
I
I
)
/
/
I
II
1/
/
1/
/
/
~ /
s
~
c
~
"
"
^
"
a
~
~
.
~
.
.
.
.
.
.
.
:5
o
'"
o
~
o
r-
o
'"
<>
'"
o
..
<>
'"
~ ;; 0
BlI!'S"dl=d
I
:5 Figure: 6 I
.,; - ,.
- <>
II t; II II ~ I
~ ~ ~ ~ ~ '
c c c e :.= 2
- ~ & i ~
li 's "tl ~ E
;:; ;:; .s c I
0
"tl 0 0 u
"g. '.0 ""
gj 'u ~ ~
;:; ;;: '~
;;: '0 ,~ I
::E '"
;; '"
.,;
I
I
.,; I
I
I
I
"tl I
...
0
<>:
'"
Ii u;
> Q
8 I
'" ~
"tl
Iii '"
is ~
'g I
~ ~ !
2: '" """
on ~ '0
~ c !
c :2 I
.
'IS "tl I c
~ 'ra '"
~ 0 g
's ~ ....
,5 .0 0
~ 0 -go ,€ ~ I
<;; 'll ~ ;;; ~
. ... ..., t
~ 'u
~ 0 Ii C!
e- ';; "" '" ;::;
e "
0 ::;: '"
"" .... I
.;:' 0
0 (; .
~ z (; .. E ,5
~ u Z E s ;;
'0 0
1l u ~ '~ '"
] 1 "a,ofl ';; I
'S' ~ il'_ gj
"" ~ '" 0 l>l- 0
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
0\
"""
0
u:l
,
'"
0
t-
O
i:i ,.
:;
z "
8
5
~
~ ~
~
~
~
~
~
z
0 ~
i-I
Eo-< ,;
~
=:I
S ~
Eo-< ~
rJ'1 ~
i-I i
~
~
N w ~
i-I ~ ~
rJ'1
Z
~ ~
~
w
!
:s I>i ~
....;j ~
r: 15 w
3 !
~ Ii: ~
!); U
r::: ~
:i
'r u
~ ~
<5 ~ w
~ d ~
~ ~
0 ~
.... " <5 "
.... ~ ~
~ " ~
w Ii:
'" ~
:;
(j
/I
'1
7
/
I
/ 1//
/
I J
I I
I
7; -0
/ II ~
~
1// O:l
I
fT '"
I.
-c-
.
,
"
"
~
;;
!
~ ~
.
.
.
.
~ .
~ .
.
~
s
i
c
s
s
o
;:
o
...
000
N
8u!Ssed lu;QJ;ld
o
M
o
'"
o 0
"" r-
o 0
-0 '"
;:; Figure: 7
0
.:;
l!;> ~ ~ '" -0 ~
~ :::: ;: ~
N r- ~
" " " " "
~ ~ ~ ~ ~ g
:!? '#. '#. :!? ii
'" "- ~ ~ "-
-, ~ I i ~
:t: 's 's ~
l'l ;:l ;:l .s: E
'" u p U
;:; .S ,"= ...
.:; '" ~ 'u ~ 1l
;:l E: '"
~ 1;;
~ e
E: 'S
::; ~
.:;
~
'" l=
"
0 >"
<=<
~ <(
i ....
u
5
'" i
'" -
Iii '" .,
c ~
0
'tl
0 E !
~
j '" ~
.. c '0
c ~ .c
E ~ c ~
II il j '5 '"
. c2 "-
u '" 0
'5 ~ ... ... '" "! .:; a
,. 0 N
. -g p ~
N 'ii
Vi '" 0 .
~ <=< "-
c 'u '" I
~ ~ N '"
"- '2 -0 ,.;
e 0 - '"
0.. 0 ::; ...
0
<; "'" c
0 2 0
0 z o .. '-' ~
~ . Z E a
... 0 '0 ~ ~'~ '"
g '., ] '6.-5 '~
'~ B ~ &-
e 0 0 U
0.. .... l'l '" 0 <>l
0\
'<l"
0
<Zl
,
""'
0
r--
0
~ >
d
"
<.l
I:l
~
" >
~ d
~
~
~
~
~
I
I
I
/
1/
I
/
1/
/
V
1/
)
/
I
/
1/
/
I
"
~
~
!
!
'.
.
.
.
.
.
.
~
~
~
.
s
"
o
;;
8
~
o
00
o
....
o
'"
o
on
o
"
o
'"
000
....
liuJsoed l""'d
<5
o
o
Figure: 8
'"
.,
o
n It
~ ~
~C
-
~ ~
"t:I .9
'g. ;
~ c:
l.l..r;.~
'#. '#. ._ d
- '-':;: ~
i:3 .... .0 ~
"tl 5 ~ ~
.E ~ 5 E
.r;. u 0-
:!i ~ 'll
] .~ ~
ea.. 0 ''::::
;::;: ~
'"
<5
o
o
al
o
a::
.I
....
o
== u
~- g
z ..
..: ~-
tI) ~
5 ~
- 0
tI) ~
o
~
5
il
tI)
"tl
a
c il
,.8 ~
i ~
~ tI)
o .. c
J! :2 ~
al ~ '!ij
.i! ~ (3
g .8 ~
o -g- ~
'll .i! li-
i j j .... ~ ~ :6
i
~
's
,5
u
,~
'"
,5
.5
,.:..;.
<5
..0
~
tI)
I
@..
u
Q.
~
tI)
....
-= ~
E .g
g ~
'., '"
~ 'I
illS
8
<:;
Z 0 ..:.:..
~ Z 5
'0 Q.l -
.c Q. -5
eo ~ ~
lXl Jl g
c
~ 'j
I .3
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Q,
-.r
I 0
cr.J
,
M
0
t-
O
I 0 ~
Z
"
u
I ij
as
""
"
~ ,.
:i
u
I ..
k
..,
~
I tl
~
I z
0 ~
I ~
Eo-; :>
Q
~ ~
I ;: ~
Eo-; ~
"-1 ~
.~ ~
I ~
~ ~
c
w ~
~ ~ ~
I "-1 8 ~
~ ~
I ~
w
I ~
u
I ~
,....
~ ~ ~
~ So.
- ~ ~ ~
~ ~ ~
.== IE
~
.1 5iJ ~ ~ c
~ ~ ~ w
I'; ~ ~
:--- " ~ u
I ... ~ w
~ " ~
'"
.,; ~
u ='
I "~"
I
" -,
"
j
/
1/
I
/
",
17 I
I
/
r/
;I
.
~
;!
~
.
.
.
.
.
.
"
~
.
~
c
~
~
e
'"
'"
0, 0 0 0
.... M _
BU!S"d I~
'"
'"
'"
~
'"
...
~
'"
"
<; Figure: 9
'"
.,;
'" b
-
" " " " "
~ ~ ~ ~ g ~
~ :1f. ;,'I. ~ d
~ ~ :0 ~
- - ~ ~ ~
's 's ~ 5 S
"'"
;:l ;:l .s " Ii ~
"'" u ~ 8
'5 i 0..
". :!l ~ 1l
;:l 0: il .a 11
w
0: '13 ,~
<; ::; w
.,; ~
.,;
0
z
-g ...(
CIl
,,2 ~
w
Ii ~ -
~ ~
"
cij g
"'" (;)
a w
c ~
c
'u
:: E !
w
is CIl ,.c;
~ !!' c "0
~ J:>
j i2 ~
] j "
'~ CIl
U c-
'5 ~ ... ~
,5 0
~ ..g- ,€, ~
0; 1l ,,2 ;;
.S- ~
= ~ '" 0.
'!! ~ u ..., 0
c- '5 ..., N ~
" .l: :2 '"
(;) CIl
...
0
<; "']' "
'" 0
:: z <; '~
~ u Z 5 is
~ "0 ~ ~ 'il ...
] "Ii 0. '~
.8'- o "~ il' ~.
0.. <'l CIl o lil 0
I
,
J
JOB NO.: 0703-5049 LOG OF BOREHOLE NO.: 1 FIGURE NO.: 1 I
JOB DESCRIPTION: Proposed Green Road Reconstruction
JOB LOCATION: Green Road, between King Street West and Stevens Road
Municipality of Clarington METHOD OF BORING: Flight-Auger
DATE: April 17, 2007
SAMPLES Shear Strength Atterberg Limits
...< I
8' X (kN/m2) X Wp WL ~
Elev. SOIL ~ 50 100 150 200 I I ~
" . , . ;
DESCRIPTION 01 ...<
Depth " " Penetration Resistance Water Content [il I
.... r:/J
" ::I
(m) -S " 01 ,;3 0 (blows/0.3m) 0 . (%) . ~
::I ~ ::::- fr 10 30 50 70 gO 5 15 25 35 45
Z E-< Z 0 ' , , , , , , ,
123.1 Pavement Surface 0 I
U.u 1 AS - -
GRANULAR, Fill 2 DO 35 0 . I
7
122.1 3A DO - I-
1 2
1.U 30cm TOPSOIL 38 DO 16 " I
-. -
Brown, stiff . 20
SILTY CLAY 4A DO - ,,,
sandy 48 DO 15 0 u_
121.1 occ. sand and silt 2 . -
L.U \seams and layers /
Brown, very dense 6
5 DO 100+
GRAVELLY SAND
120.2 PROPOSED
SANrrARY
L.!l Hard 3 INVERT
6 DO 100+ <:
.9
;;
C.
E
0
brown "
---- 4 <:
0
SILTY CLAY, Till grey E
M
a ....:
'"
7 DO 100+ . . ~.
ill
5 @)
sandy, a trace of gravel .!:.
ace. sand and sltt seams and d>.
layers, cobbles and boulders >
III
0
6 g I
116.7 B DO 100+
6.4 END OF BOREHOLE
7 I
I
B
: j
J
~ Soil Enginee~s Ltd. .
I:
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
_J
I
_J
:1
JOB NO.: 0703-5049 LOG OF BOREHOLE NO.: 2 FIGURE NO.: 2
JOB DESCRIPTION: Proposed Green Road Reconstruction
JOB LOCATION: Green Road, between King Street West and Stevens Road
Municipality of Clarington METHOD OF BORING: Flight-Auger
- DATE: April 17, 2007
SAMPLES Shear Strength Atterberg Limits
....l
~ X (kNlm2) X Wp WL ~
Elev. 50 100 150 200 I I ;>
SOIL " ~
- ....l
DESCRIPTION .,
Depth " " Penetration Resistance Water Content ~
... OIl
-" ~ ~
(m) ~ " .,9 0 (blowslO.3m) 0 . (%) .
~ ~ fr 1.0 . 30 50 , 7,0 90 ~ 15 . 25 35 45
Z Z 0
122.7 Pavement Surface 0 I~I
-(),Q 1 AS -
~
GRANULAR, Fill 2 DO 42 h
121.9
OF Brown ,11
3 DO 38 1
SAND, Fill -
I^ 1
4 DO 24
oce. topsoil inclusions 2
21 - PROPOSED c
SANITARY .2
SA DO - INVERT 1ii
120.1 58 DO ' 23 15 is.
2:0- Very stiff to hard P E
0
1~ 0
3 c
6 DO 100+ III 0
E
"l
SILTY CLAY, Till boulder ~
'"
---- ~
brown W
- 4 @)
sandy, a trace of gravel grey c
,
occ. sand and sill seams and 6 "
>
layers, cobbles and boulders 7 DO 100+ '"
I" u
boulder 5
117.5
5.2 Brown, very dense ----
boulder
SILTY SAND, Till ---- . I
a trace of gravel .
ace. sand and sill seams and 8A AS 6'
layers, cobbles and boulders -
116.4 9 DO 100+ .
6.3 END OF BOREHOLE .
.
7
8
~ Soil Engineers Ltd. -
I
I
J
JOB NO.: 0703-5049 LOG OF BOREHOLE NO.: 3 FIGURE NO.: 3 I
JOB DESCRIPTION: Proposed Green Road Reconstruction -
JOB LOCATION: Green Road, between King Street West and Stevens Road
Municipality of Clarington METHOD OF BORING: Flight-Auger
DATE: April 17, 2007
SAMPLES Shear Str ength Atterberg Limits
E X (kN/m 2) X Wp WL tiJ
Elev, SOIL ~ 50 100 150 200 I I ii;
"
- .....
DESCRlPTION "
Depth 1:1 " Penetration Resistance Water Content !Xi
t tIl ~
(m) S " <l il 0 (blowslO .3m) 0 . (%) . ~
~ :::- "" 1.0 30 50 70 90 5 15 25 35 45
:I ".
Z !-< Z 0 . . , .
122,5 Pavement Surface 0 I
u.U 1 AS - I.
GRANULAR, Fill 7 I
2. DO 34 () .
t:
0
.,
121.5 1 "
1.0 3 DO 34 C. I
Brown E
SAND, Fill 0
"
121.0 t:
1.b 1 0
4 DO 11 E
.,
TOPSOIL 2 .;
~
120.2 ~
11 [j
2.3 Brown. hard 5 DO 100+ @
-!
SIL TV CLAY, Till 3 ! " ~
6 DO 100+ . PROPOSED
sandy, a trace of gravel ~ITARY
occ. sand and sill seams and INVERT
layers, cobbles and boulders . '!f'
118.5 4
4.U Grey. very dence
7
SIL TV SAND, TIll 7 DO 100+
5
a trace of gravel
OCC. sand and sill seams and
layers, cobbles and boulders
116.4 8 DO 100+ 6
6.1 END OF BOREHOLE
7
8
~ Soil Engineers Lid.
I
I
I
I
I
I
I
I
I
r:
: 1
I
Ii
Ii
II
Ii
I
I:
Ii
Ii
Ii
I:
I
Ii
Ii
Ii
Ii
Ii
I
:1
JOB NO.: 0703-5049 LOG OF BOR~HOLE NO.: 4 FIGURE NO.: 4
JOB DESCRIPTION: Proposed Green Road Reconstruction
JOB LOCATION: Green Road, between King Street West and Stevens Road
Municipality of Glarington METHOD OF BORING: Flight-Auger
DArn: April 17, 2007
SAMPLES Shear Strength Atterberg Limits
...l
8' X (kNlm2) X Wp WL ~
Elev. SOIL '-' 50 100 150 200 I I &i
"
- ...l
DESCRIPTION '"
Depth " " Penetration Resistance Water Content ~
II ~ '"
(m) 'S " -S 0 (blows/0.3m) 0 . ('!o) .
::l ~ if 10 30 50 70 90 7 . 1.5 . 2,5 35 45
:z :z 0 , ,
122.7 . Pavement Surface 0
0.0 r- 100mm ASPHALTIC CONCRETE 3
1 AS . !"::
2 DO 100+
2A AS . .
GRANULAR, Fill 5 ,- ~, ,,-
3A DO .
.1 I"'l .
121.5 38 DO 46 . 17
1.2 30cm TOPSOIL 4 AS - .
- 1
Brown, hard 5 DO 34 ,...
2
7 "
0
SILTY CLAY, Till 6 DO 100+ '"
"
i5.
E
0
sandy, a trace of gravel "
3 7 "
oce. sand and silt seams and 7 DO 100+ . 0
layers, cobbles and boulders E
'"
to
PROPOSED ~
I ~
SANITARY
118.7 INVERT W
4.0 4 @l
Grey, very dense . ---
.J
5 s:
8 DO 100+
SILTY SAND, Till
5
a trace of gravel ~
occ. sand and silt seams and
layers, cobbles and boulders 6 1
116.4 9 DO 100+
6.~ END OF BOREHOLE.
7
8
.
~SoilEnimeers Ltd.
I
I
I
I
I
I
I'
Ii
Ii
I
Ii
I:
I,
I
Ii
I
Ii
Ii
II
I
~
Soil Engineers Ud
GEOTECHNICAL. ENVIRONMENTAL. BUILDING SCIENCE
100 NUGGET AVENUE, TORONTO, ONTARIO M15 3A7 . TEL, (416) 754-8515. FAX, (416) 754-8516
MISSISSAUGA
ru, (905) 542.7605
fAX: (90ij 542-2769
BARRIE
TE~ (7Oij 721-7863
fAX: (7Oij 7l~7864
BOWMANVIUE
TE~ (905) 6lJ.8333
fAX: (905) 6lJ.4630
NEWMARKET
ru, (905) 853-0647
fAX: (9Oij 853-5484
CiRAVENHURST
TE~ (705) 684-4242
FAX, (7Oij 684-8522
PETERSOROUGH
TE~ (705)748-0576
fAX, (905)623-4630
A REPORT TO
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
A SOn., INVESTIGATION FOR PROPOSED
ROAD CONSTRUCTION
STEVENS ROAD lJETWEEN GREEN ROAD AND
CL~GTONBOULEVARD
MUNICIPALITY OF C~GTON (BOWMANVlLLE)
Reference No. 0703-S051
MAY 2007
DISTRIBUTION
3 Copies - D,G, Biddle & Associates Limited
I Copy - Soil Engineers Ltd. (Bowmanvi1le)
I Copy - Soil Engineers Ltd. (Toronto)
HAMIlTON
ru, (905) 662.1428
fAX, (905) 662.3809
II
I
I
I
.
I
.'
Ii
.
.
1
I
I
1
1
I.
1
I:
IJ
~
Reference No. 0703-S051
11
TABLE OF CONTENTS
1.0 INTRODUCTION . I
.......................................................................................
2.0 SITE AND PROJECT DESCRIPTION 2
......................................................
3.0 FIELD WORK 3
.............................................................................................
4.0 SUBSURFACE CONDITIONS .................................................................. 4
4.1 Topsoil..............................................................................................4
4.2 Silty Clay Till.................................................................................... 5
4.3 Sandy Silt Till and Silty Sand Till.................................................... 7
4.4 Sandy Silt and Silty Fine Sand ......................................................... 8
4.5 Silty Clay ......................................................................................... 10
4.6 Compaction Characteristics of the Revealed Soils ........................ 12
5.0 GROUNDWATER CONDITIONS ................~......................................... IS
6.0 DISCUSSION AND RECOMMENDATIONS........................................ 17
6.1 Underground Services .................................................................... 18
6.2 Trench Backfilling .......................................................................... 19
6.3 Pavement Design ............................................................................ 21
6.4 Soil Parameters ................................................................................ 22
6.5 Excavation.......................................................................................23
7.0 Lllv1ITATIONS OF REPORT ................................................................... 25
I
I
I'
I
I
I
I
I
1
I
I
I
I
I
I'
I;
I:
I,
I,
(t)
Reference No. 0703-S051
iii
TABLES
Table 1 - Estimated Water Content for Compaction..................................... 12
Table 2 - Groundwater Levels........................................................................ 15
Table 3 - Pavement Design ...........................................................................21
Table 4 - Soil Parameters .............................................................................. 23
Table 5 - Classification of Soils for Excavation ........................................... 24
ENCLOSURES
Borehole Logs .. ........... ............ .................. ................. ...
Grain Size Distribution Graphs.....................................
Borehole Location Plan and Subsurface Profile ...........
Figures 1 to 4
Figures 5 to 8
Drawing No. I
I
I
I
'1
'1,
.,,..
I . . II.
, --------------------.
.. .
J ".
fl
fl
fl
i
{ ,.......
'.
". . F
".; ..
~: . ~:
...._"'" ..~
I ..... . / :.\ .
'.' .' ~ I . ,
: __--'1_-......... .., ,
, . . - -..:.:.. .
. ----
,FlIT. IrAtERI,WII (BY cm$s)
M'._(BYlI1llj!ils)..............
....:.
~
[I
~
r
II
,
..
I:.
I...... .'
'. ."c',.; ,
;,1: .
.~
[.J' '.11';:'
I' ,I
l'
__ II
I .Il' ..
.', '....,.. ~LELOCA;..~NPLAN
. I AND SUBSURFACE PROFILE
, .,
-_ Ref. No.: 0703-8049
125
II
/
.... _ ~'.':'': _ '.f. '. _ .' ,_ .., "',.
~
~
. ".
jl'
. ~i
'~.~..'"
124
l::C
... ...........;. 'D~ ~"
.1",
.
"", ...- .
122
'.,j
-- -.- - .-.
,
r
'1Il:....
I _. _L.'
,l,;,s 'r-
- ...
Date:
May 2007
,
~"t
ill
"'.' f.....' ..... .. ..,-.".....,. . '/1' ~
".. "'. "",:' -.... "; --"':"---r'-'--"-r ....--! I
.~L~.--~J .I!' L i
I' ~~~
~
~ Drawing No.: 1
-t Scale: Vert: 1: 100 Hofiz: I: 1000
. ,~n". R7Vr.:TMJrl'lIl.<;! '1m
I'
I
I'
I
I
I
I
I
I
I,
I
Ii
It
I
I
Ii
Ii
I
I
~
Reference No. 0703-S051
I
1.0 INTRODUCTION
In accordance with a letter of authorization dated March 12, 2007, from
Mr. W.G. Creamer, Project Manager, ofD.G. Biddle & Associates Limited, on
behalf of The Corporation of the Municipality of Clarington, a soil investigation
was carried out on the section of Stevens Road between Green Road and Clarington
Boulevard, Municipality of Clarington, for a proposed Road Construction.
The purpose of the investigation was to reveal the subsurface conditions and to
determine the engineering properties of the disclosed soils for the design and
construction of the proposed project.
The fIndings and resulting geotechnical recommendations are presented in this
Report.
Reference No. 0703-S051
2
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~.
2.0 SITE AND PROJECT DESCRIPTION
Bowmanville is situated on Iroquois Lake plain where drift has been partly eroded
by the water action of the glacial lake and, in places, filled with lacustrine clay, silt,
sand, and reworked till.
The investigated section of the proposed Stevens Road is located between Green
Road and Clarington Boulevard, south of King Street West. The area consists ofan
existing open field with scattered trees. The ground surface is generally undulated
with the highest elevation in the west end and descending towards the east. An
existing school is located on the north side of the investigated area near the east
end.
It is understood that the proposed project will consist of the construction of Stevens
Road and the installation ofundeiground services.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-
I
-
~
Reference No. 0703-S05l
3
3.0 FIELD WORK
The field work, consisting of 4 boreholes to depths of 7.6 m and 8.1 m, was
performed on April 17, 2007, at the locations shown on the Borehole Location Plan
and Subsurface Prome, Drawing No.1.
The holes were advanced at intervals to the sampling depths by a track-mounted,
continuous-flight power-auger machine equipped for soil sampling.. Standard
Penetratiol1 tests, using the procedures described on the enclosed "List of
Abbreviations and Terms", were performed at the sampling depths. The test results
are recorded as the Standard Penetration Resistance (or 'N' values) of the subsoil.
The relative density of the granular strata and the consistency of the cohesive strata
are inferred from the 'N' values. Split-spoon samples were recovered for soil
classification and laboratory testing.
The field work was supervised and the findings recorded by a Senior Geotechnical
. .
Technician.
The elevation at each of the borehole locations was interpolated from the Site Plan
provided by D.G. Biddle & Associates Limited.
Reference No. 0703-S051
4
I
I
I ,
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
4.0 SUBSURFACE CONDITIONS
Detailed descriptions of the encountered subsurface conditions are presented on the
Borehole Logs, comprising Figures 1 to 4 , inclusive. The revealed stratigraphy is
plotted on the subsurface profile on Drawing No.1, and the engineering properties
of the disclosed soils are discussed herein.
Beneath a veneer of topsoil, the site is underlain by various strata of sandy silt, silty
. fine sand, silty clay, silty clay till, silty sand till and sandy silt till at various depths
and locations.
4.1 Topsoil (AIl Boreholes)
The revealed topsoil is 15 to 36 cm in thickness. It is dark brown in colour,
indicating that it contains appreciable amounts of roots and humus. These materials
are unstable and compressible under loads; therefore, the topsoil is considered to be
void of engineering value and must be stripped prior to the road construction. Due
to its humus content, it may produce volatile gases and may generate an offensive
odour under anaerobic conditions.
Since the topsoil is considered void of engineering value it can only be used for
general landscaping and landscape contouring purposes. A fertility analysis can
determine the suitability of the topsoil as planting material.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
{t)
Reference No. 0703-8051
4.2 Silty Clay Till (All Boreholes)
The silty clay till is sandy and consists of a random mixture of soils and particle
sizes ranging from clay to gravel, with the clay fraction exerting the dominant
influence on the soil properties. Occasional wet sand and silt seams and layers were
detected in the clay till mantle. The structure of the till is heterogeneous, indicating
that it is a glacial deposit.
The obtained 'N' values range from 6 to 100+, with a median of 18 blows per
30 cm of penetration. This indicates that the consistency of the till is firm to hard.;
being generally very stiff. The firm clay till occurs beneath the sandy silt layer
within a depth of 0.81: m below the prevailing ground surface, where the soil has
been weakened by the weathering process.
The Atterberg Limits of 1 representative sample and the natural water content
values of all the samples were determined; the results are plotted on the Borehole
Logs and summarized below:
Liquid Limit
Plastic Limit
Natural Water Content
25%
16%
6% to 16% (median II %)
The results show that the till is a cohesive material with low plasticity. The natural
water content generally lies below its plastic limit, confirming the generally very
stiff consistency as disclosed by the 'N' values.
5
Reference No. 0703-S051
6
I
.
I
I
I
I
I
I
I
I
I
I
I
-.
I
I
I
I
I
~
A grain size analysis was performed on I representative sample; the result is plotted
on Figure 5.
According to the above findings, the following engineering properties are deduced:
. Moderate frost susceptibility and water erodibility.
. Low permeability, with an estimated coefficient of permeability of
10.7 em/see, and runoff coefficients of:
Slope
0% - 2% 0.15
2% - 6% 0.20
6%+ 0.28
. A cohesive soil, its shear strength is primarily derived from consistency
which is inversely related to its moisture content. It contains sand; therefore,
its shear strength is augmented by internal friction.
. It is generally stable in a relatively steep cut; however, prolonged exposure
will allow infiltrating precipitation to saturate the soil fissures, and this may
lead to localized sloughing.
. .A poor pavement-supportive material, with an estimated California Bearing
Ratio (CBR) value of3% or less.
. Moderately corrosive to buried metal, with an estimated electrical resistivity .
of 4000 ohm/em.
.'
I
I
.
.
I,
.'
.'
I
I
I
.'
,
I,
.
.'
I:
,
.,
I
Ii
, j
I
~
Reference No. 0703-S051
7
4.3 Sandy Silt Till (Boreholes 1 and 3) and Silty Sand Till (Boreholes 1,2 and 3)
The sandy silt and silty sand tills consist of well-mixed soil particle sizes ranging
from clay to gravel, with silt or sand being the predornimmt fraction. Occasional
sand and silt seams and layers were fomid in the till mantles. The materials are
heterogeneous in structure, indicating that they are glacial tills.
Sample examinations show that the tills display slight to some cementation.
Occasional hard resistance to augering was encountered, indicating that cobbles and
boulders are present in the tills.
The natural water content values of all the till samples were determined and the
results are plotted on the Borehole Logs. The natural water content values of the
sandy silt till range from 6% to 16%, with a median of 8%, indicating that the sandy
silt till is in a moist to very moist, generally moist condition. The natural water
content values of the silty sand till range from 6% to 14%, with a median of 8%,
indicating that the silty sand till is in a moist to very moist, generally moist
condition.
The samples slaked and collapsed readily when placed in water, and the wet
samples became dilatant when shaken by hand.
The obtained 'N' values of the sandy silt till are 50 and 100+, indicating that the
relative density is dense to very dense. The obtained 'N' values of the silty sand till
are 100+, indicating that the sand till is very dense.
A grain size analysis was performed on 1 representative sample each of the sandy
silt till and silty sand till; the gradations are plotted on Figures 6 and 7, respectively.
Reference No. 0703-S05l
8
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
According to the above fmdings, the deduced soil engineering properties pertaining
to the project are the following:
. High frost susceptibility and moderately high water erodibility.
. Moderately high to moderately low permeability, depending on the clay
content, with an estimated coefficient of permeability of 10.3 to 10-6 em/see,
and runoff coefficients of:
Slope
0% - 2% 0.04 to 0.15
2% - 6% 0.09 to 0.20
6% + 0.13 to 0.28
Frictional-cohesive soils, their shear strength is density dependent, and the
strength of the tills is also augmented by cementation.
. They will be stable in steep cuts; however, under prolonged exposure,
localized sheet collapse will likely occur.
. Fair materials to support flexible pavement, with an estimated CBR value of .
8% to 10%.
. Moderately low corrosivity to buried metal, with an estimated electrical
resistivity of 5000 to 5500 ohm/em.
4.4 Sandy Silt (Boreholes 1,2 and 3) and Silty Fine Sand (Borehole 4)
The sandy silt and silty fme sand were encountered beneath the topsoil and occurred
within a depth of 1.2:t m from the prevailing ground surface. Sample examinations
show that the sand and silt are non-cohesive. They are generally in a very moist to
wet condition. The wet samples became highly dilatant when shaken by hand.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
J
,
_J
I
~
Reference No. 0703-8051
9
The obtained 'N' values of the sandy silt and silty fine sand range from 2 to 12,
with a median of 3, indicating that they are very loose to compact, being generally
very loose. The sandy silt and silty fine sand are generally weathered where they
have been weakened by the infiltration precipitation.
The natural water content values of the sandy silt and silty fme sand range from
16% to 24%, with a median of 18%. The values indicate that the sandy silt and silty
fille sand are in a very moist to saturated, generally wet condition.
According to the above fmdings, the engineering properties relating to the project
are given below:
. High frost susceptibility, with high soil-adfreezing potential.
. High water erodibility; susceptible to migration through small openings
under seepage pressure.
. Pervious to relatively pervious; the sandy silt has an estimated coefficient of
permeability of 10-4 em/see and the silty fine sand has an estimated
coefficient of permeability of 10-3 em/sec. The runoff coefficients of the
silty fine sand and sandy silt are given below:
Slope Sandy Silt Silty Fine Sand
~-~ Qm QM
2% - 6%0.12 0.09
6% + 0.18 0.13
Frictional soils, their shear strength is density dependent. Due to their
dilatancy, the strength of the wet sand and silt is susceptible to impact
disturbance, i.e. the disturbance will induce a build-up of pore pressure
~
Reference No. 0703-S051
within the soil mantles, resulting in soil dilation and a reduction of shear
strength.
. In excavation, the moist sand and silt will be stable in relatively steep cuts,
while the wet sand and silt will slough and run slowly with seepage bleeding
from the cut face. They will boil with a piezometric head of 0.4 m.
. Fair pavement-supportive materials, with an estimated CBR value of 8%.
. Moderately low corrosivity to buried metal, with an estimated electrical
resistivity of 5000 to 5500 ohm/em.
4.5 Silty Clav (Borehole 4)
The silty clay deposit was encountered beneath the silty fme sand. It is laminated
with wet fine sand seams, indicating that it is a lacustrine deposit.
Sample examinations show that the consistency of the silty clay is very stiff. The
obtained 'N' values of the clay are 19 and 29, which confirm the very stiff
consistency of the clay.
The Atterberg Limits of 1 representative sample and the natural water content of all
the samples were determined. The results are plotted on the Borehole Log and
. summarized below.
Liquid Limit.
Plastic Limit
Natural Water Content
28%
16%
16% and 23%
I
,.1
10
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I'
I
.
I
I
I
I'
I:
.,
I
I,
Ii
I
I
I
I
I:
I.
I
~
Reference No. 0703-8051
II
The results indicate that the clay is a material of low plasticity. The natural water
content generally lies between its liquid and plastic limits, confirming the
consistency of the clay determined by the 'N' values.
A grain size analysis was performed on I representative sample of the silty clay and
the result is plotted on Figure 8.
According to the above findings, the following engineering properties are deduced:
. Highly frost susceptible and, due to the high silt content and high moisture
content, it has a high soil-adfreezing potential.
. Low to moderate water erodibility.
. The clay is virtually impervious. However, due to the silt layers, the lateral
permeability is higher than the vertical permeability. The estimated
coefficient of permeability is 10.7 em/see, with runoff coefficients of:
Slope
0% - 2% 0.15
2% - 6% 0.20
6%+ 0.28
. A cohesive soil, its shear strength is primarily derived from consistency
which is inversely dependent on soil moisture.
. Firm clay will consolidate under surcharge loads.
. Firm clay will be stable in a cut at 1 vertical:2 horizontal.
. A poor pavement-supportive material, with an estimated CBR value of 3 % or
less.
. Moderately high corrosivity to buried metal, with an estimated electrical
resistivity of3500 ohm/em.
{l)
Reference No. 0703-S051
12
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
4.6 Compaction Characteristics of the Revealed Soils
The obtainable degree of compaction is primarily dependent on the soil moisture
and, to a lesser extent, on the type of compactor used and the effort applied.
As a general guide, the typical water content values of the revealed soils for
Standard Proctor compaction are presented in Table 1.
T bilE'
dW C
ti C
a e - stunate ater ontent or omoaction
Water Content (%) for
Standard Proctor Compaction
Determined Natural
Soil Type Water Content (%) 100% (optimum) Range for 95% or +
Silty Clay Till 6 to 16 13 8 to 20
(median 11) .
Sandy Silt Till 6 to 16 11 7 to 16
(median 8)
Silty Sand Till 6 to 14 10 6 to 15
. (median 8)
Sandy Silt and 16 to 24 12 8 to 16
Silty Fine Sand (median 18)
Silty Clay 16 and 23 15 to 19 12 to 24
According to the above findings, the majority of the in situ soils are generally
suitable for a 95% or + Standard Proctor compaction. However, the sandy silt and
silty fIne sand are too wet and will require aeration or mixing with drier soils prior
to structural compaction. Aeration of the wet soils can be effectively carried out by
spreading them thinly on the ground in dry, warm weather. Alternatively, they can
be properly stockpiled to drain of excess water.
j
I
I
)
Ii
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
Reference No. 0703-S051
13
The tills and clay should be compacted using a heavy-weight, kneading-type roller.
The sand and silt can be compacted by a smooth roller with or without vibration,
depending on the water content of the soils being compacted The lifts for
compaction should be limited to 20 cm, or to a suitable thickness as assessed by test
strips performed by the equipment which will be used at the time of construction.
One should be aware that with considerable effort a 90%:t Standard Proctor
compaction of the wet sandy silt aild silty fine sand is achievable. Further
densification is prevented by the pore pressure induced by the compactive effort;
however, large random voids will have been expelled, and with time the pore
pressure will dissipate and the percentage of compaction will increase. There are
. many cases on record where after a few months of rest, the density of the
compacted mantle has increased to over 95% of its maximum Standard Proctor dry
density.
When compacting the hard and dense to very de.nse tills on the dry side of the
optimum, the compactive energy will frequently bridge over the chunks in the soil
and be transmitted laterally into the soil mantle. Therefore, the lifts of these soils
must be limited to 20 cm or less (before compaction). It is difficult to monitor the
lifts of backfill placed in deep trenches; therefore, it is preferable that the
compaction of backfill at depths over 1.0 m below the road Stibgrade be carried out
on the wet side of the optimum. This would allow a wider latitude oflift thickness.
If the compaction of the soils is carried out with the water content within the range
for 95% Standard Proctor dry density but on the wet side of the optimum, the
surface of the compacted soil mantle will roll under the dynamic compactive load.
Reference No. 0703-8051
14
I
I
I
I
I
I'
I
I
I
I
I
I
I
I
I
I
I
I
I
~
This is unsuitable for road construction since each component of the pavement
structure is to be placed under dynamic conditions which will induce the rolling
action of the subgrade surface and cause structural failure of the new pavement.
The bedding of !he underground services and culverts, on the other hand, will be
placed on a subgrade which will not be subjected to impact loads. Therefore, the
structurally compacted soil mantle with the water content on the wet side or dry side
of the optimum will provide an adequate subgrade for the construction.
The presence of boulders will prevent transmission of the compactive energy into
the underlying material to be compacted. If an appreciable amount of boulders over
15 cm in size is mixed with the material, it must either be sorted or must not be used
for structural backfill.
--1
II
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
Reference No. 0703-S051
15
5.0 GROUNDWATER CONDITIONS
Groundwater seepage encountered during augering was recorded on the field logs.
The boreholes were checked for the presence of groundwater and the occurrence of
cave-in upon their completion and the levels are plotted on the Borehole Logs. The
data are listed in Table 2.
Table 2 - Groundwater Levels
Soil Colour Measured
Changes Seepage Groundwater/
Brown to Encountered Cave-in* Level
Borehole Grey During Augering On Completion
BHNo. Depth (m) Depth (m) Depth (m) Amount Depth (m) E1. (m)
I 7.6 4.0 3.0 Appreciable 3.1* 118.8*
2 7.6 4.0 0.0 Appreciable 0.1 122.2
3 7.6 2.3 0.0 Some 3.1 118.4
4 8.1 2.7 0.5 Some 1.2 119.5
'Cave-in level (In wet sand and sil~ the level generally represents the groundwater regune at the borehole
location.)
Groundwater and cave-in were detected in all boreholes at depths ranging from 0.1
to 3.1 m from the prevailing ground surface, or at E1s. 122.2 to 118.4 m, which
represents the groundwater level at the time of the investigation. The groundwater
level in the upper soil stratigraphy is derived from infiltrated precipitation becoming
trapped in the fissures in the weathered soils, and in the sand and silt seams and
layers.
~
Reference No. 0703-S05l
. The colour of the soil changes from brown to grey at depths ranging from
2.3 to 4.0 m below the prevailing ground surface. This indicates that the brown
soils have oxidized and the permanent groundwater occurs in the grey soils. The'
groundwater at the site will generally be subject to seasonal fluctuation.
In the wet seasons, infiltrated precipitation will perch in the soil fissures and in the
sand and silt seams and layers in the tills, rendering the occurrence of a shallower
perched groundwater. The yield of groundwater from the clay and clay till is
expected to be small; from the sandy silt till and silty sand till it will be moderate.
However, the yield from the sand and silt will likely be appreciable and persistent,
depending on the extent of the depths.
16
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
Reference No. 0703-S051
17
6.0 DISCUSSION AND RECOMMENDATIONS
The investigation has disclosed that beneath a veneer of topsoil, the site is underlain
by strata of very loose to compact, generally very loose sandy silt and silty fine
sand, very stiff silty clay; firm to hard, generally very stiff silty clay till; dense to
very dense sandy silt till; and very dense silty sand till at depths and locations. The
very loose and fIrm soils occur in the weathered zone generally extending to a depth
of 1.2 in below the prevailing ground surface.
The groundwater is inferred to lie at depths ranging from 0.1 to 3.1 m from the
prevailing ground surface, ont E1. 122.2 to 118.4 m, depending on the location.
However, the perched groundwater from infIltrating precipitation may occur in
places at a shallower depth in wet seasons. If groundwater or seepage is
encountered, the yield will generally be small from the clay and silty clay till,
moderate from the sandy silt till and silty sand till, and is likely appreciable from the
sand and silt, depending on the extent of the sandy deposits.
The geotechnical findings which warrant special consideration are presented below:
1. The topsoil is highly compressible and must be stripped as it is unsuitable for
engineering applications.
2. A Class 'B' bedding is recommended for the construction of the new culvert.
3. Due to the occurrence of topsoil and weathered soils, the road subgrade must
be inspected by a geotechnical engineer, or a geotechnical technician under
the supervision of a geotechnical engineer.
Reference No. 0703-S051
18
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Q
4. Excavation into the hard and very dense tills containing boulders may require
extra effort and the use of a heavy-duty backhoe. Boulders larger than 15 cm
in size are not suitable for structural backfill.
The recommendations appropriate for the project described in Section 2.0 are
presented herein. One must be aware that the subsurface conditions may vary
between boreholes. Should this become apparent during construction, a
geotechnical engineer must be consulted to determine whether the following
recommendations require revision.
6.1 Underl!:round Services
The subgrade for the underground services should consist of sound natural soils, or
properly compacted inorganic earth fill.
A Class ':B' bedding is recommended for the underground services construction.
The bedding material should consist of compacted 20-mm Crusher-Run Limestone,
or equivalent.
In order to prevent pipe floatation when the underground services trench is deluged
with water, a soil cover with' a thickness equal to the diameter of the pipe should be
in place at all times after completion of the pipe installation.
Openings to subdrains and catch basins should be shielded with a fabric filter to
prevent silting.
I'
I
I
I
I
1
1
I
I
I
I
I,
1
I
I
I,
I
Ii
I;
~
Reference No. 0703-S051
19
6.2 Trench Backfillinl!:
The backfill in the trenches should be compacted to at least 95% of its maximum
Standard Proctor dry density. In the zone within 1.0 m below the road subgrade, the
material should be compacted with the water content 2% to 3% drier than the
optimum, and the compaction should be increased to 98% of the respective
maximum Standard Proctor dry density. This is to provide the required stiffness for
pavement construction.
The in situ inorganic soils are suitable for use as structural fill. As noted, it is
preferable that the compaction of backfill at depths over 1.0 m below the road
subgrade be carried out on the wet side of the optimum.
In normal underground services construction practice, the problem areas of road
settlement largely occur adjacent to manholes, catch basins and culvert crossings.
In areas which are inaccessible to a heavy compactor, sand backfill should be used.
Unless compaction of the backfill is carefully performed, the interface of the native
soils and the sand backfill will have to be flooded for a period of at least 1 day.
The narrow trenches for the culvert crossings should be cut at 1 vertical:
2 or + horizontal so that the back:fi1l can be effectively compacted. Otherwise, soil
arching will prevent the achievement of proper compaction. The lift of each
back:fi1l1ayer should either be limited to a thickness of 20 em, or the thickness
should be determined by test strips.
One must be aware of the possible consequences during trench backfilling and
exercise caution as described below:
~
Reference No. 0703-S051
20
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
. When construction is carried out in freezing winter weather, allowance
should be made for these following conditions. Despite stringent backfill
monitoring, frozen soil layers may inadvertently be mixed with the structural
trench backfill. Should the in situ soil h8.ve a water content on the dry side
of the optimum, it would be impossible to wet the soil due to the freezing
condition, rendering difficulties in obtaining uniform and proper compaction.
Furthermore, the freezing condition will prevent flooding of the backfill
when it is required, such as when the trench box is removed. The above will
invariably cause backfill settlement that may become evident within I to
several years, depending on the depth of the trench which has been
backfilled.
. In areas where the underground services construction is carried out during
the winter months, prolonged exposure of the trench walls will result in frost
heave within the soil mantle of the walls. This may result in some settlement
. as the frost recedes, and repair costs will be incurred prior to the fina1
surfacing of the new pavement and service structures.
. To backfill a deep trench, one must be aware that future settlement is to be
expected, unless the side of the cut is flattened to at least I vertical:
1.5 + horizontal, and the lifts of the fill and its moisture content are
stringently controlled; i.e., lifts should be no more than 20 cm (or less if the
backfilling conditions dictate) and uniformly compacted to achieve at least
95% of the maximum Standard Proctor dry density, with the moisture
content on the wet side of the optimum.
. It is often difficult to achieve uniform compaction of the backfill in the lower
vertical section of a trench which is an open cut or is stabilized by a trench
box, particularly in the sector close to the trench walls or the sides of the
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
Reference No. 0703-S051
21
box. These sectors must be backfilled with sand. In a trench stabilized by a
trench box, the void left after the removal of the box will be filled by the
backfill. It is necessary to backfill this sector with sand, and the compacted
backfill must be flooded for I day, prior to the placement of the backfill
above this sector, i.e., in the upper sloped trench section. This measure is
necessary in order to prevent consolidation of inadvertent voids and loose
backfill which will compromise the compaction of the backfill in the upper
seCtion. In areas where groundwater movement is expected in the sand fill
mantle, seepage collars should be provided.
6.3 Pavement Desim
According to the borehole findings, the recommended pavement structure is
presented in Table 3.
T bl 3 P t D .
a e - avemen eSlgIl
Course Thickness (mm) OPS Specifications
Asphalt Surface 40 HL-3
Asphalt Binder HL-8
Local Road 50
Collector Road 80
Granular Base 150 Granular 'A'
Granular Sub-base Granular 'B', Type II
Local Road 300
Collector Road 375
Reference No. 0703-S051
22
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Q
Prior to placement of the granular bases, the subgrade surface should be proof-
rolled and any soft material should be subexcavated and replaced with properly
compacted organic-free earth fill or granular material. All the granular bases should
be compacted to their maximum Standard Proctor dry density. The earth backfill
within the zone 1.0 m below the pavement must be compacted to 98% or + of its
maximum Standard Proctor dry density, with the moisture content 2% to 3% drier
than the optimum.
The subgrade will suffer a strength regression if water is allowed to saturate the
mantle. The following measures should, therefore, be incorporated in the
construction procedures and road design:
. If the road construction does not immediately follow the trench backfilling,
the subgrade should be properly crowned and smooth-rolled to allow interim
precipitation to be properly drained.
. Prior to the placement of the granular bas,es, the sub grade should be proof-
rolled, and any soft spots should be rectified.
If the roads are to be constructed during the wet seasons and the subgrade is
softened, the granular sub-base should be thickened. In extreme cases, the
top 0.8 m of the subgrade should be replaced by compacted granular
material.
. Fabric filter-encased curb subdrains will be required.
6.4 Soil Parameters
The recommended soil parameters for the project design are given in Table 4.
I
.
I
.'
I
I
I
I
I:
II
I
I
I
I
I
I
I
I
I,
,
~
Reference No. 0703-S051 23
Table 4 - Soil Parameters
Unit Wei2ht and Bulk Factor
UnitWe~ht Estimated
{kN/m3) Bulk Factor
Bulk Loose Compacted
Sound Tills 22.2 1.35 1.03
. Sand and Silt 21.0 1.25 1.02
Silty Clay 20.5 1.30 0.98-
Lateral Earth Pressure Coefficients
Active At Rest Passive
Ka Ko Kp
Weathered Soils 0045 0.55 2.22
Silty Clay and Silty Clay Till 0040 0.50 2.50
Sand and Silt, Silty Sand Till
and Sandy Silt Till 0.30 0.40 3.33
Maximum Allowable Soil Pressure
For Thrust Block Desilm
Sound Natural Soils 100 kPa
6.5 Excavation
Excavation should be carried out in accordance with Ontario Regulation 213/91.
Excavations should be sloped at 1 vertical: 1 horizontal for stability.
For excavation purposes, the types of soils are classified in Table 5.
Reference No. 0703-S051
24
1
1
1
1
I'
I
1
I
1
1
I
1
I
I
1
1
1
1
1
~
Table 5 - Classification of Soils for Excavation
Material . Type
Sound Tills 2
Weathered Soils, Sand and Silt above
groundwater 3
Sand and Silt below groundwater 4
At depths below the groundwater level, seepage in the till mantles during
excavation is expected to be slow and controllable by normal pumping from closely
spaced slJlhps.
Excavation into the hard and very dense tills containing boulders will require extra
effort and the use of a heavy, properly equipped backhoe.
Where excavations are carried out in the wet sand and silt, the possibility of flowing
sides and bottom boiling dictates that the ground be predrained by pumping from
closely spaced sump-wells. However, this should be confirmed by test pits prior to
and/or during project tendering and/or construction.
Prospective contractors must be asked to assess the in situ subsurface conditions for
soil cuts by digging test pits to at least 0.5 m below the intended bottom of
excavation. These test pits should be allowed to remain open for a period of at least
4 hours to assess the trenching conditions.
I
I
I,
I
I
I
I
Ii
Ii
Ii
]
I:
It
I
I
I
I
I
Ii
I
~
Reference No. 0703-S051
25
7.0 LIMITATIONS OF REPORT
It should be noted t'Iat no tests have been carried. out to determine whether
environmental contaminants are present in the soils. Therefore, this report deals
only with a study of the geotechnical aspects of the proposed project.
This report was prepared by Soil Engineers Ltd. for the account of The Corporation
of the Municipality of Clarington, and for review by their designated consultants
and government agencies. The material in it reflects the judgement of Bernard Lee,
. P.Eng., and Daniel Man, P.Eng., in light of the information available to it at the
time of preparation. Any use which a Third Party makes of this report, or any
reliance on decisions to be made based on it, are the responsibility of such Third
Parties. Soil Engineers Ltd. accepts no responsibility for damages, if any, suffered
by any Third Party as a result of decisions made or actions based on this report.
SOIL ENGINEERS LTD.
~
Bernard Lee, P.Eng.
]~ A
lL~p.Eng.
BUDM:rs
I
I
Ii
I
I
Ii
Ii
Ii
II
II
Ii
I:
I
I
I
I
I,
I
I
LIST OF ABBREVIATIONS AND DESCRIPTION OF TERMS
The abbreviations and terms commonly employed on the borehole logs and figures, and in the text
of the report are as follows:
1. SAMPLE TYPES 3. SOIL DESCRIPTION
AS Auger sample a) Cohesionless Soils:
CS Chunk sample
DO Drive open 'N' (Blowslft) Relative Densitv
DS Denison type sample
FS Foil sample 0 to 4 very loose
RC Rock core with size and 4 to 10 loose
percentage of recovery 10 to 30 compact
ST Slotted tube 30 to 50 . dense
TO Thin-walled, open over 50 very dense
TP Thin-walled, piston
WS Wash Sample b) Cohesive Soils:
2. . PENETRATION RESISTANCE/'N' Undrained Shear
Stremrth (kg!) 'N' ffilowslft) Consistencv
Dynamic Cone Penetration Resistance:
A continuous profile showing the
number of blows for each foot of
penetration of a 2-inch diameter 90. point
cone driven by a 140-pound hammer
falling 30 inches.
Plotted as
Less than 0.25 0 to 2 very soft
0.25 to 0.50 2 to 4 soft
0.50 to LO 4 to 8 firm
1.0 to 2.0 8 to 16 stiff
2.0 to 4.0 16 to 32 very stiff
over 4.0 over 32 hard
Standard Penetration Resistance or 'N' value: c)
Method of Determination of Undrained
Shear Strength of Cohesive Soils:
The number of blows ofa 140-pound
hammer falling 30 inches required to
advance a 2-inch O.D. drive open
sampler one foot into undisturbed soil.
Plotted as '0'
x 0.0 - Field vane test in borehole
The number denotes the
sensitivity to remoulding.
~ - Laboratory vane test
o - Compression test in laboratory
WH Sampler advanced by static weight
PH Sampler advanced by hydraulic pressure
PM Sampler advanced by manual pressure
NP No penetration
For a saturated cohesive soil, the .
undrained shear strength is taken
as one half of the undrained
compressive strength.
METRIC CONVERSION FACfORS
I ft. = 0.3048 metres I inch = 25.4 mm
lib. = 0.453 kg I ksf = 47.88 kN/m2
~
Soil Engineers lid.
CONSULTING SOIL, FOUNDATION & ENVIRONMENTAL ENGINEERS
100 NUGGET AVENUE. TORONTO, ONTARIO MIS 3A7 . TEL, (416) 754-8515. FAX, (416) 754-8516
JOB NO.: 0703-S051 LOG OF BOREHOLE NO.: 1 FIGURE NO.: 1
JOB DESCRIPTION: Proposed Stevens Road Construction
JOB LOCATION: Stevens Road, between Green Road and Clarington Boulevard
Municipality of Clarington METHOD OF BORING: Flight-Auger
DATE: April 17, 2007
SAMPLES Shear Strength Atterberg Limits
...l
Elev, ~ X (kNlm2) X Wp WL ~
S
~ 50 100 150 200 I I >
SOIL " , , ; ~
Depth DESCRIPTION '" ...l
" <> Penetration Resistance Water Content I'G
.... en
(m) " ~ ~
"S " '" .,s 0 (blows/0.3m) 0 . (%) . f-
$ > 0. 10 30 50 70 90 5 15 25 35 45 -<
~ , "
Z Z CI , , , , , , , ;::
121,9 Ground Surface 0 23
0.0 I- 30cm TOPSOIL lA 00 - 17 .
121.4 Brown, loose weathered - 1 - 1'5'
l~fl SANDY SILT weathered lC DO 6 Ie:
\
----
u,~ Brown, firm / 2 DO 50 1
1\ SIL TV CLAY, Till
Brown, dense to very dense 16
SANDY SILT, Till 3 DO 100+
some clay, a trace of gnavel 2
Dee, sand and silt seams and
layers, cobbles and boulders 4 00 100+
118,9 3 14
3,0 Very dense 5 DO 100+
.
brown 4
--
grey 14 c:
SA 00 - .12
Q)
SIL TV SAND, Till + c.
E
5 0
<.>
~
0
E
cobbles and co
boulders I" oj
6 ~
+ ~
traces of clay and gnavel w
ace, sand and silt seams and @)
layers, cobbles and boulders c:
7 !
()
114.3 +
7,6 END OF BOREHOLE
8
g
10
I
I
I
I
I
I
I
I
Ii
I:
I,
I:
I
I
I
I
I,
I,
Ii
~ Soil Engineers Ltd.
;
J
JOB NO.: 0703-S051 LOG OF BOREHOLE NO.: 2 FIGURE NO.: 2 1
JOB DESCRIPTION: Proposed Stevens Road Construction I
JOB LOCATION: Stevens Road, between Green Road and Clarington Boulevard
Municipality of Clarington METHOD OF BORING: Flight-Auger
DATE: April 17, 2007 J
SAMPLES Shear Strength Atterberg Limits ~ I
Elev. ~ X (kNJm2) X Wp WL
Ei
SOIL ~ 50 100 150 200 I J "-l
" ,
Depth DESCRIPTION .. ~ I
~ " Pene tration Resistance Water Content
.... rJ')
(m) "
"E .. .c 0 (blowslO .3m) 0 . (%) .
" -
~ > a. 10 30 50 70 90 5 15 25 35 45 -<
= , " ~1
z z Q , , , , , , ,
122.3 Ground Surface 0 A
U.u _. 15cmTOPSOIL 1A DO - I Sf
- 24
Brown, very loose 18 DO 2 I
121.5 SANDY SILT weathered
1
u.o Brown, hard 2 DO 32 1 "., .'
SILTY CLAY, Till I
sandy, a trace of gravel 13
ace. sand and silt saans and 3 DO 100+ .
120.3 layers, cobbles and boulders
2
2.U Very dense I
+
cobbles and
boulders 3 8
+ . c:
0
~
a.
brown E
4 0
SILTY SAND, Till --- u
grey c:
0
11 E
+ '"
N .
5 '"
~
.
UJ
@ l
cobbles and ...j
boulders 6 7 s:
+
7 ~
10 I
114.7
1.0 END OF BOREHOLE
8
- I
9
. 10
~ Soil Engineers Ltd.
JOB NO.: 0703-5051 LOG OF BOREHOLE NO.: 3 FlGURENO.:3
JOB DESCRIPTION: Proposed Stevens Road Construction
JOB LOCATION: Stevens Road, between Green Road and Clarington Boulevard
Municipality of Clarington METHOD OF BORING: Flight-Auger
DATE: April 17, 2007
SAMPLES Shear Strength Atterberg Limits
....l
Elev. S X (kN/m2) X Wp WL ~
~ 50 100 150 200 I I >
SOIL " , , ~
- ....l
Depth DESCRIPTION "
" <.) P enetration Resistance Water Content c.::
... (Il
(m) " :l ~
S " Oi .;; 0 (blows/0.3m) 0 . (%) . f-
~ > Co 10 30 50 70 90 5 15 2535,45 <I;
:l , " ~
Z Z Q , , , ' , " ,
121.5 Ground Surface 0 7__
u.u 25cm TOPSOIL 1A DO - I
IBrown, very loose 18
120.9 weathered 18 DO 2 I-'
SANDY SILT --
U.o Brown, hard 7
2 DO 42 1 ...
SILTY CLAY, Till
120.0 sandy, a trace of gravel
1.0 ace. sand and silt seams and +
\Iayers, cobbles and boulders /
Brown, very dense 2
119.2 SANDY SILT, Till
~.~ some clay, a trace of gravel +
ace. sand and silt seams and /
! \iayers, cobbles and boulders 3 7
Grey, very dense + . '?
4
cobbles and c:
0
boulders :ai.
+ a.
E
SILTY SAND, Till 5 8
c:
0
E
...
<Xi
traces of clay and gravel 6 ~
~
ace. sand and slit seams and +
layers, cobbles and boulders jjj
@
-i
7 s:
9
113.9 + .
1.0 END OF BOREHOLE
8
9
10
.
I:
I:
.'
I
I
I
I
I
I
I
I
I
.
I
I
I
I
I
I
~ Soil Engineers Ltd.
JOB NO.: 0703-S051 LOG OF BOREHOLE NO.: 4 FIGURE NO.: 4 1
JOB DESCRIPTION: Proposed Stevens Road Construction I
JOB LOCATION: Stevens Road, between Green Road and Clarington Boulevard
Municipality of Clarington METHOD OF BORING: Flight-Auger
DATE: April 17, 2007 J
SAMPLES Shear Strength Atterberg Limits ~ I
Elev. e X (kN/m2) X Wp WL
SOIL ~ 50 100 150 200 I I ~
" , ,
Depth DESCRIPTION ;; ~ I
" 0 Penetration Resistance Water Content
.... <Zl
(m) " :s
"E " ;; .,s 0 (blows/0.3m) 0 . ('!oj .
~ > Co 10 30 50 70 90 5 15 25 35 45 <:
:s , " ~~
Z Z Q , , , , , , ,
120.7 Ground Surface 0 ~9
0.0 36cm TOPSOIL 1A DO - 2
l- I
18 DO 4 IV
Brown, very loose to compact
SILTY FINE SAND 16
119.5 a trace of clay weathered 2 DO 12 1
1.2 -- - ---I
Brown, very stiff -
3
SILTY CLAY 3 DO 19
2 I
a trace of sand 16
118.0 4 DO 29 .
2.7 Grey, stiff to very stiff
3 11
5 DO 11 "
.Q
.,
c.
E
4 8
"
0
SILTY CLAY, Till 10 E
"'
6 DO 10 oi
5 ~
~
sandy, a trace of gravel w
ace. sand and silt seams and @) .
layers, cobbles and boulders "
6 , I
Q)
>
sandy '"
7 DO 14 ()
7 I
sandy 8 DO 21 I
112.6 8
8.1 END OF BOREHOLE I
9
10
~ Soil Engineers Ltd.
Ii
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-
t(")
o
r/)
,
M
o
r--
o
~
OJ
()
<=
~
<l:l
~
z
o
;..;
Eo-<
~
~
;
Eo-<
rJJ
;..;
Q
f;I;:l
N
;..;
rJJ
Z
~
~
~
'1ooOi
~ ~
>
~ z ~ ~
~ ~ ~
~ ~ -
== ~
.~ ~.
~~
~ ~
~
<
w
.
~
.
~
~
:---
...
~
(j
>
<
~
u
~
~
~
Q
Z
<
~
I
I
,
I . .......
-.1 ._f---.
>
j
u
~
~
~
~
....---....-
.._~.
- ...-
~ ,'---
-._--- ..- p-
-.....- bL -
I ;."-1-
i 2-11 .
/
1
w
0;
~
:>
~
i
I
1
....-r
. ,
: r i/.-~~--.
· r I ..1_.....
-.-
H._
~
~
~ ~
~
~
2
Q
w
~
w
~
.
8
Q
Z
<
~
~ .
Q
w
~ .
--
--t-
.0.
w
0;
~
, II.... --f-r- '
~ I. ,...- -1.--
o 1- -+--
-. n l-~+=.::. '-
J
I
-,-_.
.1.....-
L
I
I
I
I
j 0....
i. .--
.. . _ .._.."0
w
~ ~
.
~
~ ~
~ ~
~ -
~
~
~
U
~
a
~
Q
w
"
~
~
~
w ~
~ '
--
"
--
~
o
'"
o
00
o 0
r-- '0
o
~
~
-~t---
/
/
iI--- ----
.----- .._ <5
<;;
.- -- --- f---
. --
o
..,
~ ~ 0
8U!SSBd l~d
8
<;;
Figure: 5
~ \0 C"o "b
II II
- - .-..-.. :>.
~ C ~ ~ ~. H
;0< ... :.c ..!!?
gg -1l ~ g S
..J..J.sS5~
:'5! ~ C U .a..
&0'QU""d
.... .2l .'" a "
- 0.. ~ CIl 1;
0: .0 .~
::; ~
'"
<;;
;;
>
.
_ ii
fo. ...
" 0
;>0 u
j ~
U .
;>0 _"
fo. .;;
..J =
c:tJ ~
~
"E
.
>
U
g
ell
=
~
5j
o
]
.~
~ !
;g =
8 ~ i
! ii .5j
! 0
~ .8 ~
~ "i .€
r.n ~ c;
11 c. U
~i:jv~;:;~l
0.. ~ :e ~
.;:' ~
~i
. u
.9 ~
~ oa
U .
iil 0
.1
1
.$
U
.~
'"
.
'il
o
""
"0
JO
S
,.,
'"
~
o
~
o
~
<;
Z 1:)
u Z S
"0 0 --
'f 0. oS
.g ~ g
0=
t
~ ]
-
'"
0
[/)
,
""
0
t-
O
<:; >
<
z ~
u
..,
<.)
c:
~
~
~ >
<
~
u
~
~
~
~
~
~
z
0 w
;;
..... ~
~ ,;
;;.:J
~
;: w
Z
~
0
~ z
<
rJ:i ~.
..... ~
~ 2
0
~
~ ~
N w
..... ::1
rJ:i <
0
u
Z
..... w
~ ;;
~
Co-'
w
~
8
~
....
~ ~ w
w
t; > ;;
~ ~
z 0 w
~ 9 ::1
~ 3 8 ~
::: 5 z w
i:l 9 >
.... :l ~ ~
~ u ~ 0
~ 5
~
is ~ w
~
~ :l ::1
~
0 u <
~ ~ 0
:::: < is u
w ~
~ ~ 0
~ w
= ~
,,; ~
=>
(j
I /
-- u_ ..,-_._~ -- - - -- ..- --
1- -~---_.- -- .-- l-
I
. - ---- i-
"n --..- - r --.- --- --
-- -.-.. --'-' --- --- -- -
.... . '_~_n -.- ---- 1--. -
- - u_ n_....'_ f--
_n_ -.....-- -- --
.. --- --..- r-- 1--
/
i
I . ... ---- -- 1----_. V ----. .-- 1-----
I i
, - ---- fu-
II / ,
-.~-t - '-'-
. v
.... -
n /
.--.... --1-/ - --
r_. - --- .-- I--
---..
n -- ,- --0.
r / I
I
I J,
- -- ! -
--~ ,
i I
I
I - ---
Ut ---.- -- -- --
-- U___.n -- -- -
n
--.. --
- - --- - --
- -- ----- --- ---1--- -- .----
I
I ---..-.
-J'-
..
r I ----l-
-t. -- I- -
-
---r
I
!
.. - I .-..
_I I.
..---
I -- i --- --"
j _ -..---- - -
...- - ---
I -- -
.... - "- - -
- -
~
~
~ ~
~
.
.
.
o
~ .
~
~
2 .
o
w
~
.
.
~
g
~
c
g
"
"
"
o
o
~
o
00
o
....
~
o
on
~
o
~
o
'"
BU!SS8d l~~d
:=:
o
I
8 Figure: 6 I
.,; ~ ..
:=:
- - - - & I
?! ~ ~ ~ u
e.., e.., u
:~ E " " ~ ~
u u E
-0 u I
...l ;.:; .s " E .;:
-0 ,~ ~ 8 u
'g. 0..
~ :~ ~ -0
;.:; 0:: ~ E ~
~
0:: '0 .~ I
::; ::;: ~
'"
.,;
I
I
.,; I
I
I
-;; I
>
~
,~
"E ..
= 0
~ i= u I
g ~ ~
<Il ~
" Cii ~
0 >-
.. 0 u I
" e
'C z
'" <<:
0 0
'" ~.
-0
" [;
,2 -0 I
~ ~
:=: .i!
0 il
" "0
8 ~ "
~ "' I
~ e
~ -0
~ il '"
'C '"
~ i ~ go
~ 0
] .. e
u "' 0 "
,S > ~ I
.~ s .~ ~
'" 0;
on -0 u
u ~ c:. 0.
" ~ 'y
'e I u '~ - M "'! .,; e
<:> 8 ~ ~
::;: '" I
'" ..
0
g <:; ]' "
z <:; ~ .2
~ u Z .~ 1i
:g u "
U '"
u .i ~ I -5 e ';; I
l " 3- :g
0 0
..... <Il '" 0 iii 0
I
I:
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-
V"\
o
en
,
M
o
C-
O
o
Z
0)
u
c::
~
~
0)
~
z
0 w
~
.... ~
E-- ,;
;:;J
~
~ w
<!
~
Q
E-- %
<
rJJ ~
.... ~
~ 2
Q
w
~ ~
N w
~
.... ~
rJJ 8
Z
.... w
~ ~
~
'-'
"'::i
......
~ ~
w
~ >
~ w
Ii " ~
~ ~
~ <
Ii ~
:: '" Ii w
~ >
.... ~ ~ ~
<
~ ~ 6 "
v
~ ~
~
0
~ ~
~
0 v
~ ~
- < @
.... w
~ ~ "
~ w
tJoJ = ~
.,; 5
"
(J
>
<
~
v
~
~
<5 Figure: 7
0
0 ~
::!: 0
" " II II ~
~ ~ ~ ~ ~ '
~ e ~ e '" ~
'~ - ~ C :E ~
'8 ~ '
'" u E !
;:; ;:; .s c
'" ,~ ~ 8 d::
"g. gj '<:i ~ *
;:; ;;: 'C
~
~ .~ ,~
;;: "
;:;! ~
0 OJ
0
"
%
<
~
! I
u___ .m. -~-- --
--.----- ~..- - -'-- .._~-
I .. .. ---- .---_. I--- -...
. I' ... ------ --".. - .- --- ---- --
-- 0"__- ---- -- ---- --,,- -- --
-- .. -- ----
, .,. --- -------~------ 1--
I ' . -- 1------ rc~~ I--- -
-
I
I 1/
I
,
I .-. -- ~ _.--- If--. -
: "'f--j
I . -. .-- -- --" .-.--
I
,
.....- 1--- ----.
/
....
I '- ---
, --
--[ -. t-----
/
I I /
I
i
, ~~L
j---
.' I -I---
I I ...- --- . ,,--,,-- -_.
I ..---
~rt~ .----
~. -
-
I --J~- -.- ---
r _mo. -- " f-.
I I
/ -- .-
!.BU .'.-.-
- --. -- "
-- .--.
.- .
I
,-- "
I . +---
- --..- -- I---- -- -..
-- -- --- I---
.. .--... -
.-----+.
-.-.. -- --
. ..... --
o
;Q
o
~
~ ~
~
.
.
.
.
.
2 .
Q
W
. .
~
"
'3
0
'"
C
B
co
'5
u
C ]
0 ~
-
U ~
::: B
:!l C
"
0 <5 I
~ u
J ) 5 'C
u ~
t :!l ~. U
~ .D ...
,5 ~ 0
U '" ~ ~
,~ -
'" il [
. ~ :!l '<:i
'f! g. U '~
Cl >
u
~ iii ;:;!
...
.
w
~
v
~ ~
~
s
~
c
~ S
~ --
<
8 ;..
.
8
~
~
o
00
o
...
~
o 0
'" ...
o
M
~ ~ <:I
!U!SSlfd l~d
Co"
ij
~ ".;
l ~
."
.
~.
E= -g
cI ~
z "
<( 'U
'" ...
>- 0
I- ~
...l u
en ~
~
:8
E
~
g.
e
<:)
~
"
... 0..
'" '" 00 E
..; - ~
'"
...
-= 0
;; .~
Z ;; !j
" z E C ;;
I ,sa u
" ~ '"
i .<: ;; 'ijj
! ~ ~
~ lii U
'" '"
<rJ
o
<Zl
,
""
o
t'--
o
o
Z
"
u
0:
1:
<E
"
e<:
>
<
"
u
~
"
~
z
0 "
w
~
.... ~ "
E-i ,
~ -
=
~ w w "
Z Z
~ ~
E-i c
z
<
rJ:J ~ .
.... , .
Q 2
c
w
~ , .
c
N w z .
~ <
.... ~ ~
<
rJ:J 0 ,
u 2 "
Z c
w
,
.... .
~ w
Z
~
I.-' .
w
~
~
Ci
u
~
.....
~ w
Z
~ ~
~
~ ~
~ <
u ~
:::: ~ ~ w
;;; >
.... ~ ~ ~
~ ~ < 0
u u
;j ~
~
i;l ~
~ <
~ ~
0 u
:> ~
::: < i;l
w
~ ~ 0
=> w
= ~
i;"J .; 5
=>
(j
I i I 1/ I
,
-- -.-. , .- .- -7 -.
_ --+-- ..---- 1--
!/
.--- .... - .. ------ --.- f--
I ------.- -- -/ --
. I ... - -/- f-... .-
...---
- 1;?r:- n
- .un_ ...- !----.
/ ,
I i/ --1----.----- - ---1----
I I
V - ----" .. ..-- _._._-~ ---..
~ ....---... -
/ _1-____
L - u__ -- .-1--- -
- 1.- --
.---+--
i
,
I ..-- _u__ -- --
------. -.
i
, -,
I
--...
--- --- --- --
--..._- -- .-.-.- --
-..... ~.~.-
_1 ---- .- ~ .-
u n_
.. - - --
i
, I
I .. --.. .--...- --. .'._.---- -- ~- ~. ~
! J
, -.
,
-- ~-
I .. I ..- ----
..._-t
I - -
t. -
I .-
,
_o...._n .--
I ...-. ++
i ..-
I --.- I
. .-.--...- - I
I ..-. ... -.--
_..
i 0"'.' .- -
.
~
.
~
c
s
"
s
:3
0:>
'"
0:> 0:>
OC r--
15
0:>
on
0:>
..
0:>
..,
~ ;:, 0
!u!SS8d lu;oJ;d
I
;; Figure: 8 I
0:>
0 00 ~ :::! .., ,
N N '=>
OR ~ ~ ~ g --, I
;!? ~ ;!? u
~ ~ ~ ~
- :~ lj " :E ~
's .
~ ~ u s I
;.:; ..J " E .::-
0
:"5i u Z;> U u
.~ "-
= :g e -0
.Sf ..
0:: ~ a u
..J ~ .~
0:: '0 I
::; ~
0:> '"
0
I
I
0 I
I
I
I
"E
~ -0
~ I
u ..
"'3 ~
0 >- u
c:l ..( ~
~ ..J '"
...
0 u 0
.. >- u I
~ f- u
'5 ..J ~
0 <ii ..
-0
~ ~
..
,9 11 I
~ ~ ~
~ 5
~ "0
0 6 ~-
u ~ I
J ! ..
!l c '"
'e 'J)
! .. g.
] 5 u 0 e
.c ...
0 0
.. ~ -0 I
.~ CiS ~ ,~ ~
'" 1l 0:: l ~
c Il 1l u '" t
S "- 11 '~ .. .., "'! 00
- ..
e ~ 'J) I
"- CiS ::; ...
;,; 0
~ ~
0:> ;; E .g
~ ~
8 u z ~ .
1 u 0 0
II .~ '"
- t .c .~ I
.. & ~ ~
"e- u .
0 .. ill U
"- ..J c:l 'J) Cl
I
1--- -
'I
I ~~ c.
- Il/~ M7 <
, 'f ::/ 'T -, ~ .'. l~OO
- ~. . :/,(. ,:0 t ';"', -~_Ll" .' ~_.... .-. . :r:='=;'- I
'-L ' "II' I " ;,'-' ; ''7,'' ~~--~ci ' I
, . --' /''': : '"\... . ;. :_~. . I_~ ~l ,I'I
'~-, p.,~~"", ",,"loa. ,,',",-- ....- .~.....-<;:: ~..
. .. I r-_;._~ ,...~ .....~.. ..... .~4eO~SAN___ . _ i l
~ .' '! "",.-.::..,...-- '. .... '-'-'-'- Hi . -i
..t' :-.... ~ ~/:'! I, It: ~ ~...r-I';~~'; ~;~;:;-;-~~~:,."" .~: '~: ~t-r
- : ,: I 11 ./ -;-1, :. .... ~. - If I 1 '.' I' to'
R. ,,,, 1:" I I . ~.~~ II. I ".'
t 'III r 1 . .. ,1\:./.:,./.;; .
,'. . ! 11' . I;'; .L I'{.. ,,; "iI .>'.' ..:__ ,I '.'. ,_
. :l ,,~ ~ 1 L..:: __,.":'.J " ;:. '"
I8.jj .9.25 -- .... ..". 1.1.00_ 13.00
I
I
I
. . , 1& ~ 1-11 it I I I I AI
". BOREHOLE LOCATION PLAN
. ~. .;., . '. '.' ..: '. AND SUBSURFACE PROFILE
". .. ,~....:.~ ~ .". .
, \':<'.H;;;'" ,~'- ,;:~.. .' '. " '.: Ref. No.: 0703-8051
-0 .~. ~'.,~~ir. .... I.:':~" "
~"f I Dale:
I',' .. ''''-~'.. o'Pvc
Drawiillg i'-ro..~
'-
,
y.: .
'.
~ - ..;;.. - '. .
..~:,:.
,.
:~~
. '.. ~.~
.t&~.:.:::i~;;;<;:.'t~~Wlh.
, ~il?!.~~~t~~~;-.
. !.:! ,:.":.. ,
~'.:: 1
"r;.
~
.. -- r'.
~
,-' 0
.1.
;,";~'-" .
- .-' .j~ ~.
:: .'~:-I'- '~ffl:. ". ~
18:;1
).
,
,
-I
'.+
.,;0
11;'.
:.
r..
I.. 'Mot
.,
Iii,
, ,.
;i' ,
,
;'--
'I'
"
i
i;..
.. ~'.'~'
. ....... '
~. ;.,
I'I:; '. .'
"
,
"l: L .. -
t,
,1..
- -
:-: - >~
b ~', .,
F ......
',';: - '"
..'7.0 $~~ s:.h $:;'
,,' ..u".,....
.le]?!}' ,...: I'
I,',
-,
Scale: Vert: J:100 floriz: 1:1000 .,
'llS'::'.'" .
.. ~";.:t~:,~. '. .
:.- :~..~.~ '''- ,
........
,
.:,
~~f ~ .~.
;~,.
~~~.: ...t~'.~ l:.
.:;- ., ,; ~ :-~';.:~,\f<..
..
-::'>~~:~ ',' .,... 1 .
SOll ENGINEERS LTD. ~
"".~~
.... '.
.
;', ~ :~.,:~.
;:~~.',
-"'~"'~itF;.P;'
:."..:'.
'. ",
;,iF ._.~-,j
.,
,
....,
-
~ I
---:
i
t~
,
c
-Q
<I
"-
Ii
,
~
~
C
0:
,2
'~
--------
...
.>
"
.. sNf
.c,. .~ '..
-;~;
.' ".
-~.:
LEGEND
TOPSOIL
SILTY CLAY
SILTY FINE SAND
SILTY CLA Y TILL
SILTY SANDTlLU
SANDY SILT TILU SANDY SILT
CAVE-IN
%
WATER LEVEL
May 2007