HomeMy WebLinkAbout2007-148THE CORPORATION OF THE MUNICIPALITY OF
CLARINGTON
BY-LAW 2007 - 148
Being a By-law to authorize a contract between the Corporation of the Municipality of
Clarington and AMEC E & C Services Ltd., Don Mills, Ontario, to enter into an
agreement for Consulting Services, Municipal Peer Review of the Durham/York
Energy From Waste Environmental Assessment Study.
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY
ENACTS AS FOLLOWS:
THAT the Mayor and Clerk are hereby authorized to execute, on behalf of the
Corporation of the Municipality of Clarington with the Corporation Seal, a
contract between AMEC E & C Services Ltd., Don Mills, Ontario and said
Corporation; and
2. THAT the contract attached hereto as Schedule "A" forms part of this By-law.
By-law read a first and second time this 25th day of June, 2007.
By-law read a third time and finally passed this 25th day of June, 2007.
nethy', ayor
v
~~
at~~ ~ arrie unicipal Clerk
~-°~~ --
•-
j ~ ~ ~ i _~ ~ ,., ~-~ ~_ - ~~
~--~- - ~~., r ~ ~ ~ ~ I- ,..,`~ ~.~ _ ~ _ ~-_
Leading the Way ~---~`~
Municipality of Clarington
40 Temperance Street
Bowmanville, Ontario L1 C 3A6
(905) 623-3379
Purchase Order
Purchase Order No. 03482
Date 7/26/2007
Revision Number 2
Page 1
~.__.~ y ~
°~= ~ ~I, 4
Vendor: Ship To:
AME00002 Municipality of Clarington
AMEC E & C SERVICES LTD. 40 Temperance Street
2020 WINSTON PARK DRIVE Bowmanville Ontario L1C 3A6
SUITE 700
OAKVILLE ON L6H 6X7
^ Changed Since the Previous Revision
Shi in Method Pa went Terms Confirm With
r1FFAl II T NFT sn r)AYR
L/N Item Number Description Req'd Date U/M Ordered Unit Price Ext. Price
r Reference Number FOB
1 CONSULTING Air Quality Peer Review EFW 7/5/2007 Lot 1.000 $ZU,000AUU
CONSULTING None
To cover professional services required for an air
quality peer review of the proposed energy from
waste -York Durham Residual Waste project as per
your proposal dated May 14/07.
2 BREAKDOWN TASK 1 7!26/2007 0.000 $0.000
BREAKDOWN Destination
Review of Site Selection process and air quality
aspects @ $4,500.00
_
...
_
3 _ Task 2 7/26/2007 Lot 0.000 $0.000
- Destination
Review of Final Site Selection and air quality
aspects @ $3,000.00
.
-
,,
4 Task 3 7/26/2007
. Lot _ 0.000 $0.000
- Destination
REview Environmental Assessment -Air Quality @
$12,500.00
5 References: 7/26/2007 Each 0.000 $0.000
REFRENCES: Destination
Above in accordance with your proposal dated May
14!07.
6 P.O. REVISIONS 7/26/2007 Each 0.000 $0.000
P.O. REVISIONS Destination
Revisions to PO reflect address changes only.
EEREQ #1983
NOTES:
1) THE VENDOR WILL SUPPLY AND DELIVER GOODS AND/OR SERVICES TO THE CORPORATION
OF THE MUNICIPALITY OF CLARINGTON IN ACCORDANCE WITH TERMS AND CONDITIONS ON
BOTH SIDES HEREOF.
2) NO CHARGES WILL BE ACCEPTED FOR PACKING, CRATING OR CARTAGE UNLESS OTHERWISE
SPECIFIED.
''Subtotal
Trade Discount
Freight
'Miscellaneous
'HST
PST'
rr'GST
°Order Total
$'LU,000.UU
$0.00
$0.00
$0.00
$0.00
$0.00
$20,000
$0
$0
$0
$0
$0
$1,200
PURCHASING MANAGER
amen:
May 14, 2007
Faye Langmaid,
Manager of Special Projects
Municipality of Clarington
Dear Faye
Re: Air Quality Peer Review of Proposed Energy From Waste-York-Durham Residual
Waste
We are pleased to provide a scope and cost estimate for undertaking the peer review of the air
emissions and impacts related to the proposed energy from residual waste environmental
assessment in York-Durham.
The review of the materials will consider:
• Appropriate consideration of air emissions in the site selection and review process. This
would iriclude a review of how existing air quality is considered in the selection process; as
well as reviewing how the human exposure impacts are addressed (e.g. maximums, exposed
populations, sensitive receptors).
• Review of proposed technology and the appropriateness of the air emission characterization
for those technologies.
• Are the emissions from the proposed facility appropriately characterized? Are all possible
emissions considered? I n the review we would ask: Are they appropriate for the site and the
proposed operations? Are all sources considered? Were they estimated using the most
current data and methods/equations? Was consideration given to worst-case, average-case
emissions and upset conditions?
• Are the control measures appropriate for the technology? Are they adequate? Are the
control measures proposed consistent with current best practices?
• Air quality modeling. It is essential that the appropriate air q uality model be used for the
assessment. This model should be capable of handling multiple sources, varying
meteorological conditions and multiple receptors. The review will consider: Was the
appropriate model used? Was it used in the correct mode? Are the results interpreted
correctly? Were all sources considered? Were the appropriate meteorological data used?
Was deposition considered? This will entail a review of the input parameters to the model.
• liiipact levels. Have the appropriate locations been considered in the impact assessment?
Was special attention given to sensitive receptors (schools, ecologically sensitive areas,
nearby residents)? MOE has standards for many of the emitted compounds. Have these
AMEC E&C Services Ltd.
885 Don Mills Road
Don Mills, ON, M3C 1V9
Tel 416-445-9959
Fax 416-445-9307 www.amec.com scope of work Clarington Rev1.doc
Page 2
been appropriately chosen and used? How has the assessment addressed multi-media
impacts (e.g. deposition)? How are compounds that do not h ave MOE standards addressed?
Were nuisance impacts considered? Were potential future standards considered? What
response plans have been developed to deal w ith complaints and impacts?
We would be able to start work immediately and based on our discussions, we will be able to
meet the projected schedule for the various review tasks.
At present there are no specific tasks. We would propose that as specific tasks are developed
(i.e. review of specific documents and phases of the project) that a budget would be developed
for each review. We would base this budget on my current rate of $150 per hour. This does not
include GST or expenses.
For budgeting purposes we would propose the following task budgets:
Task 1: Review of Site Selection process and air quality aspects: $4500
Task 2: Review of Finat Site Selection and air quality aspects: $3000
Task 3: Review of Environmental Assessment -Air Quality $12500
This would include an ai r quality review of relevant reports on the site selection process, the air
quality aspects of the final site selection and the detailed review of the air quality impact
assessment for the Environmental Assessment. Tasks 1 and 2 include one meeting with the
Municipality and project team, Task 3 includes two meetings with the Municipality and Project
Team.
These separate budgets would be a "not to exceed" effort. Should other tasks or activities (e.g.
extra meetings, hearing attendance) be required, they would not be undertaken until further
authorization was provided.
It is assumed.that Dr. Tony van der Vooren will be the only person working on this project. His
ciriculum vitae is attached. Dr. van der Vooren's responsibilities within AMEC, include the
management of and technical input into the following types of studies: air emission inventories
(including environmental audits and assessments); regulatory approvals; air pollution control
studies, air quality and impact evaluation and modeling; stack sampling and monitoring; and,
risk assessment. He has extensive experience (about 25 years) in the performance of such
studies for a wide variety of clients across all industrial sectors. Recently he has been involved
in peer reviews for the City of Ajax for the Duffin Creek expansion, the Towns of Warwick and
Napanee for the expansion of major landfills in their areas.
If other AMEC staff are required, this would not be done with prior authorization by Clarington.
If you have any questions or would like further clarification, please give me a call. In order for
rre to star t the review, please sign the attached letter tc i..dicate y our acceptance.
Looking forward working on this project!
M:\aaproposals\Clarington MSWlscope of work Clarington Rev1.doc
Page 3
Yours truly,
AMEC Americas Limited
Toriy van der Vooren Ph.D., P.Eng., QEP
Manager; Air Quality
Environmental Department
tony.vatidervooren@am ec.cotn
M:\aaproposals\Clarington MS1Mscope of work Clarington Rev1.doc