REPORT
CORPORATE SERVICES DEPARTMENT
Report #:
GENERAL PURPOSE AND ADMINISTRATION COMMITTEE . ~r1A )1.57-07
June 18, 2007 ~SoJu b>>/l.
COD-039-07 File #_ By-law ./)007--/113
Meeting:
Date:
Subject:
CL2007-21, Elgin Street Reconstruction
Recommendations:
It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
1. THAT Report COD-039-07 be received;
2. THAT Hard-Co Construction Ltd, Whitby, Ontario with a total bid in the amount of
$1,616,400.00 (Plus GST), being the lowest responsible bidder meeting all terms,
conditions and specifications of Tender CL2007-21 be awarded the contract for the Elgin
Street Reconstruction as required by the Engineering Department;
3. THAT funds required in the amount of $762,000.00 (which includes $1,616,400.00
tendering, consulting and contingencies and less the Region of Durham portion) be
drawn from Engineering 2007 Capital Accounts # 110-32-330-83291-7401 ;
4. THAT the tender award be subject to the approval of the Regional Municipality of
Durham for their portion of the work; and
5. THAT the attached By-law marked Schedule "A" authorizing the Mayor and the Clerk to
execute the necessary agreement be approved.
Submitted by:
~..s: eJk
Franklin Wu,
Chief Administrative Officer
.S. Cannella, C.ET
Director of Engineering Services
MM\LAB\km
CORPORATION OF THE MUNICIPALITY OF ClARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T(905)623-3379 F (905)623-4169
REPORT NO.: COD-039-07
PAGE 2
BACKGROUND AND COMMENT
Tender specifications were provided by Totten Sims Hubicki Associates for the Elgin Street
Reconstruction, as required by the Engineering Department.
Tenders were advertised in local papers, as well as electronically. Subsequently, tenders were
received and tabulated as per the letter from Totten Sims Hubicki Associates Schedule "B" attached.
Subject to the Council Approval of Report EGD-045-07 authorizing the transfer of surplus funds from
the Concession Road 3 Bridge Rehabiltation of $102,000.00 and $25,000 from the West Townline
Sidewalk, the total project cost, including project administration, costing allocation is $762,000.00
and is within the revised 2007 Engineering Capital Budget allocation of $762,000.00 as outlined in
the memo from Engineering Services and the letter from Totten Sims Hubicki Associates marked
Schedule "B" and will be drawn from Accounts # 110-32-330-83291-7401.
A portion of the work included in this tender is for the works for the Region of Durham for which they
will be invoiced accordingly. It is therefore recommended that the contract award be subject to the
approval of the Region of Durham.
The low bidder has previously performed satisfactory work for the Municipality of Clarington.
The Director of Finance has reviewed the funding requirements and concurs with the
recommendation. Queries with respect to department needs, specifications, etc., should be
referred to the Director of Engineering.
After further review and analysis of the bids by the Engineering Department, Totten Sims Hubicki
Associates and Purchasing, it was mutually agreed that the low bidder, Hard-Co Construction Ltd.,
Whitby, Ontario, be recommended for the contract for the Elgin Street Reconstruction.
Attachments:
Attachment 1 - Schedule "A", By-law
Attachment 1 - Schedule "B"
Memo from Engineering Services & Letter from Totten Sims Hubicki
Schedule "A"
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
BY-LAW 2007-
Being a By-law to authorize a contract between the
Corporation of the Municipality of Clarington and Hard-Co
Construction Ltd, Whitby, Ontario for the Elgin Street
Reconstruction.
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY ENACTS AS
FOllOWS:
1. THAT the Mayor and Clerk are hereby authorized to execute, on behalf of the
Corporation of the Municipality of Clarington and seal with the Corporation Seal, a
contract between, Hard-Co Construction Ltd, Whitby, Ontario, and said
Corporation; and
2. THAT the contract attached hereto as Schedule "A" form part of this By-law.
By-law read a first and second time this day of
,2007.
By-law read a third time and finally passed this day of
,2007.
Jim Abernethy, Mayor
Patti L. Barrie, Municipal Clerk
C[{1[ington
SCHEDULE "B"
MEMO
TO: Louann Birkett, Purchasing Manager
FROM: Bruno Bianco, Design Engineer
DATE: June 12, 2007
SUBJECT: Elgin Street Reconstruction
Tender Award Recommendation
Contract CL2007 -21
CRC.ElginSt.1
The Engineering Services Department has reviewed the recommendation
provided by TSH and offers the following comments.
Engineering Services has submitted report EGD-045-07 for Council's
consideration. The report reallocates funding to this project in order to complete
the project within the 2007 capital budget year.
As such, we concur with the recommendation to award the contract to Hard-Co
Construction Ltd. in the amount of $1,616,400.00 exclusive of G.S.T. for the 2007
Elgin Street reconstruction project from Odell St to Fourth St in order to take
advantage of proposed Regional works.
As recommended, we have carried a contingency amount of approximately 5.5%
to address the issues that may arise from the existing neighbourhood. Therefore,
including design and tender fees as well as contract administration fees and
utility relocations, the engineering department advises the following breakdown
subject to Council's resolution of report EGD-045-07 for the above referenced
project;
SCHEDULE "B"
Elgin St. Reconstruction
Account 1103233083291 7401
Total Project $762,000.00
Amount
Budget Amount $635,000.00
Estimated $127,000.00
Budget Deficit
Estimated $127,000.00
Transfer of Funds
(EGD-045-07)
Revised Budget $0.00
DeficiUSurplus
In light of the circumstances discussed by TSH in the attached recommendation,
we recommend the report to Council be moved forward based on the above.
Attached for your files is the draft Report EGD-045-07. Should you have any
further question, please feel free to contact the undersigned.
Regards,
~~~0-
Bruno M. Bianco, P. Eng.
Design Engineer
BMB/dv
cc William McCrae, P. Eng., Totten Sims Hubicki
Nancy Taylor, Director of Finance
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T(905)623-3379
II
TIH
SCHEDULE "B"
Totten Sims Hubickj Associates
513 Division Strect,
Cobourg, Ontario, Canada K9A 5G6
(905) 3722121 Fax: (905) 3723621
Emai!;cobourg@tsh.ca www.lsh.ca
engineers
architects
planners
June 11,2007
Mr. A. S. Cannella, C.E.T.
Director of Engineering Services
Corporation ofthe Municipality ofClarington
40 Temperance Street
BOWMANVILLE, Ontario L I C 3A6
Dear Mr. Cannella:
Re: Elgin Street Reconstruction, Bowmanville
Contract No. CL2007-21, Municipality of Cia ring ton
Tenders for the above project were opened at the Municipal Offices on Tuesday, June 5, 2007 at
2: 15 p.m. A list of the bids received is provided in the table below. All numbers are exclusive of GST.
I BIDDER
Hard-Co Construction Ltd.
Whitby, ON
Ron Robinson Limited
Bowmanville, ON
TOTAL BID
(Excluding CST)
I
$ 1,6 16,400.00
'_"m ..........................___................_ __.
$1,824,830.62
TSH has reviewed all bids accepted by the Clarington Purchasing Department and have confirmed the bid
values noted above. Hard-Co Construction has completed several projects for the Municipality of
Clarington in recent years including the reconstruction of Wellington Street in 1999 and Mearns Avenue
in 2000. Currently, Hard-Co is constructing the Municipality of Cia ring ton Contract CL2006-28 Baldwin
and Church Street Reconstruction. All completed work for the Municipality ofC/arington in recent years
has been completed in a satisfactory manner. They have also carried out projects for other municipalities
in the area including the City of Kawartha Lakes and the Regional Municipality of Durham. All
references contacted assessed Hard-Co's perfonnance to be good.
Estimated cost for the project, based on Hard-Co's bid, are summarized on the attached Cost
Apportionment. The Municipality of CIa ring ton's portion of this Contract is projected to be over budget
with an estimated project cost of $762,000.00 and a budgeted amount of $635,000.00 in Account No.
110~32-330-83291-740 I.
The primary reason for the projected budget overrun is an extension of the project north limit, from Third
Street to Fourth Street. By completing the road work in conjunction with replacement of the Region of
Durham's water and sewer infrastructure, approximately $\ 00,000.00 in Clarington costs will be covered
by the Region's sewer and water budgets through restoration of the sewer and watermain trenches.
. ,
Mr. A. S. Cannella, C.E.T.
JUlle 11,2007
SCHEDULE "?"
We recommend that the tender in the amount of$1 ,616,400.00 (exclusive ofG.S.T.) be awarded to Hard-
Co Construction Ltd., Whitby. The award should be conditional on similar approval being received from
the Regional Municipality of Durham as a significant portion ofth1s Contract is for the installation of
regional services.
Should you have any questions regarding this matter, please contact the undersigned.
Yours truly,
J .
A
. 1/
/"
t
,
'/"'7
! 1/
! '
"7" I
,/" !/vI"...
William McCrae, P.Eng.
Senior Project Engineer
WMc/ym
P:\ 12.29600\Corresp\22228.doc
Encl.
pc: Mr. Bruno Bianco, P.Eng, Design Engineer, Municipality of CIa ring ton
TIM
Municipality of Clarington/Region of Durham
Elgin Street Reconstruction, Bowmanville
Low Bid Cost Apportionment
Contract CL2007-21
June 11, 2007
TSH Project if. 12-29600
Clarington Region of Durham Comments
Description Total Elgin & First Watennain & Sanitary Sewer and
Street Appurtenances Appurtenances
Account Number 1103233083291 969306001XX 969306002XX
7401
Construction Costs Contract CL2007-21
Road Works and Storm Sewers $933,680.00 $570,122.60 $36,355.74 $327,201.66 Earth Excavation & Road Restoration on Elgin,
Part A Second, Third and Fourth Street paid by
ReQion
Part B Sanitary Sewer and Appurtenances $287,791.00 $287,791.00
Part C Watermain & Appurtenances $331,429.00 $331,429.00
Part 0 General Items $63,500.00 $23,313.02 $15,039.17 $25,147.81 Prorated
Sub- Total Construction $1,616,400.00 $593,435.62 $382,823.91 $640,140.47
TSH Prolect Number 12-29600 12-29631 12-29632
Design Review, Public Consultation & Tendering
Region Invoiced separately for Sewer and
.. .. .. To May 26,2007 $72,972.87 $41,526.14 $15,246.63 $16,200.10 Watermain. TBE amount invoiced under TSH
project number 12-29600 is shown under other
....m.h.
Construction Administration TSH Project #12-29600 $161,640.00 $59,343.56 $38,282.39 $64,014.05 Estimated
Other Costs
Geotechnical Investigation - Soils Engineers $3,000.00 $1,101.40 $710.51 $1,188.09 Quote - Prorated
Subsurface Investigation - TBE $2,798.75 $2,798.75 Invoice # 91764
Utility Relocation
Veridian $20,000.00 $20,000.00 $0.00 $0.00 Estimated
Enbridge $36,000.00 $0.00 $36,000.00 $0.00 Estimated
Bell $1,800.00 $1,800.00 Estimated
Sub- Total Other Costs $63,598.75 $25,700.15 $36,710.51 $1,188.09
Sub- Total Estimated Project Costs $1,914,611.62 $720,005.47 $473,063.45 $721,542.70
Contingencies $102,388.38 $41,994.53 $23,936.55 $36,457.30 Estimated
Total Estimated Project Costs $2,017,000.00 $762,000.00 $497,000.00 $758,000.00
Budget Amount $1,915,000.00 $635,000.00 $501,000.00 $779,000.00
Over/Under Budget Amount -$102,000.00 -$127,000.00 $4,000.00 $21,000.00
All costs exclude G.S.T.