Report To: Planning and Development Committee
Date of Meeting: September 10, 2018
Report Number: PSD-074-18 Resolution:
File Number: COPA2018-0002 & ZBA2018-0011 By-law Number:
Report Subject: Applications by 2556079 Ontario Inc. (CCT AutoTrans) to recognize
the existing industrial business at 1960 Baseline Road West and to
allow an expansion of the business onto a portion of 1972 Baseline
Road West
Recommendations:
1. That Report PSD-074-18 be received;
2. That Amendment No. 115 to the Clarington Official Plan as contained in Attachment 1 of
Report PSD-074-18 be adopted;
3. That the application to amend the Zoning By-law by 2556079 Ontario Inc. be approved
and that the By-law attached to Report PSD-074-18 be passed;
4. That once all requirements of site plan approval are satisfied, the By-law authorizing the
Removal of the (H) Holding Symbol be approved;
5. That the Durham Regional Planning Department and Municipal Property Assessment
Corporation be forwarded a copy of report PSD-074-18 and Council's decision; and
6. That all interested parties listed in Report PSD-074-18 and any delegations be advised
of Council's decision.
Municipality of Clarington Page 2
Report PSD-074-18
1. Application Details
1.1 Owner/Applicant: 2556079 Ontario Inc. (CCT AutoTrans)
1.2 Agent: Miller Planning Services
1.3 Proposal: General
To recognize the existing auto transport business at 1960 Baseline
Road and to allow an expansion of the business onto a portion of
1972 Baseline Road. The expansion will provide additional parking
area for commercial transport vehicles and stormwater
management.
Official Plan Amendment
To permit an exception in the Light Industrial designation for 1960
Baseline Road and a portion of the lands at 1972 Baseline Road to
permit an auto transport operation in the Light Industrial Area and
fronting on an Arterial Road, Baseline Road.
Rezoning
To rezone a portion of the lands at 1972 Baseline Road from
“Agricultural (A) Zone” to an appropriate zone that would permit the
freight transport operation.
1.4 Area: 1960 Baseline Road – 1.7 hectares (4.14 acres)
1972 Baseline Road - 26.5 hectares (65.6 acres)
1.5 Location: The north side of Baseline Road, just east of Solina Road
1.6 Roll Numbers: 181701002021000
1.7 Within Built Boundary: No
Report Overview
This report recommends the approval of Clarington Official Plan and Zoning By-law
Amendment applications submitted by 2556079 Ontario Inc. (CCT AutoTrans). The
applications would permit the continued use of an auto transportation business at 1960
Baseline Road and permit the expansion of the business onto a portion of 1972 Baseline
Road. The expansion of the existing auto transport business onto the south-west portion of
1972 Baseline Road would be for parking of commercial transport vehicles and stormwater
management.
Municipality of Clarington Page 3
Report PSD-074-18
2. Background
Municipality of Clarington Page 4
Report PSD-074-18
Municipality of Clarington Page 5
Report PSD-074-18
3. Land Characteristics and Surrounding Land Uses
Municipality of Clarington Page 6
Report PSD-074-18
3.3 The lands are currently the highest at the south-western portion of the property and the
grade drops significantly to the north-east, draining towards Darlington Creek.
3.4 The surrounding uses are as follows:
North - Single detached dwellings and agricultural lands.
South – A light and heavy industrial equipment rental business, a panel
manufacturing and assembly industrial business, CP Rail line, Owasco
Auto Mall under construction and future Metrolinx Go Rail Layover Facility.
East – Agricultural lands and single detached dwellings.
West – Light Industrial designated lands with single detached dwellings and future
Highway 418.
4. Provincial Policy
Provincial Policy Statement
Growth Plan
5. Official Plans
Durham Region Official Plan
Clarington Official Plan
Municipality of Clarington Page 7
Report PSD-074-18
6. Zoning By-law
6.1 1960 Baseline Road is currently zone General Industrial (M2) and1972 Baseline Road is
zoned Agricultural (A). A Zoning By-law Amendment is required to permit the proposed
industrial use expansion on 1972 Baseline Road. The amendment would rezone the
portion of the property identified in Figure 1 from “Agricultural (A) Zone” to “Holding -
Light Industrial Exception (M1-4) Zone”. The M1-4 zone permits all uses within the
Light Industrial (M1) Zone and also permits an auto cartage or transportation depot and
yard, which is a freight transport use under the Official Plan. A by-law will be forwarded
to Council to remove the holding provision once the conditions of site plan approval
have been met.
6.2 1960 Baseline Road would continue to be zoned General Industrial (M2) which permits
a cartage or transportation depot and yard.
7. Public Submissions
Municipality of Clarington Page 8
Report PSD-074-18
8. Studies Submitted
Planning Justification Report
Stormwater Management Report
Arborists Report
Archeological Report
Municipality of Clarington Page 9
Report PSD-074-18
9. Agency Comments
Durham Region
Central Lake Ontario Conservation Authority
10. Departmental Comments
Engineering Services Department
Emergency and Fire Services
11. Discussion
Municipality of Clarington Page 10
Report PSD-074-18
Municipality of Clarington Page 11
Report PSD-074-18
12. Concurrence
Not Applicable.
13. Conclusion
In consideration of all agency and staff comments it is respectfully recommended that
the applications for a Clarington Official Plan and Zoning By-law amendments to permit
the existing freight transportation business at 1960 Baseline Road and to allow an
expansion of the business onto a portion of 1972 Baseline Road be approved.
14. Strategic Plan Application
The recommendations contained in this report conform to the Strategic Plan.
Submitted by: Reviewed by:
David Crome, MCIP, RPP, Andrew C. Allison, B. Comm, LL.B
Director of Planning Services CAO
Staff Contact: Brandon Weiler, Planner, (905) 623-3379 ext. 2424 or bweiler@clarington.net
Attachments:
Attachment 1 - Official Plan Amendment
Attachment 2 - Zoning By-law Amendment
List of interested parties to be notified of Council's decision is on file in the Planning Services
Department.
Chad Doiron
Rodger Miller
Attachment 1 to
Municipality of Clarington Report PSD-074-18
SCHEDULE "A"
Purpose and Effect of Official Plan Amendment Number 115 to the
Clarington Official Plan
Purpose: To amend the Clarington Official Plan to permit a freight transport
operation within the Light Industrial Designation and adjacent to an arterial
road.
Basis: The Amendment is based upon applications for an Official Plan
Amendment Number COPA2018-0002 filed by 2556079 Ontario Inc.
Actual
Amendment: The Clarington Official Plan is hereby Amended by adding an exception to
Section 23.19.3 as follows:
1. Section 23.19.3
iii) Notwithstanding Sections 11.6.2 and 11.7.4, a Freight Transport
operation shall also be permitted on the lands known municipally as
1960 Baseline Road (Assessment Roll Number 1817-010-020-
21140) and a 1.6 hectare portion of the property municipally known
as 1972 Baseline Road (Assessment Roll Number 1817-010-020-
21000) and more specifically described in the implementing Zoning
By-law.
Implementation: The provisions set forth in the Municipality of Clarington Official Plan
regarding the implementation of the Plan, shall apply in regard to this
amendment.
Interpretation: The provisions set forth in the Municipality of Clarington Official Plan
regarding the implementation of the Plan, shall apply in regard to this
amendment.
File Number: COPA 2018-0002
Attachment 2 to
Municipality of Clarington Report PSD-074-18
J:\REPORTS TO CLERKS\Electronic Reports\2 - Signed by CAO\PSD-074-18.docx
Corporation of the Municipality of Clarington
By-law Number 2018-______
being a By-law to amend By-law 84-63, the Comprehensive Zoning By-law for
the Corporation of the Municipality of Clarington
Whereas the Council of the Corporation of the Municipality of Clarington deems it
advisable to amend By-law 84-63, as amended, of the Corporation of the Municipality of
Clarington for ZBA2018-0011;
Now Therefore Be It Resolved That, the Council of the Corporation of the Municipality of
Clarington enacts as follows:
1. Schedule ‘4’ to By-law 84-63, as amended, is hereby further amended by changing
the zone designation from "Agricultural (A) Zone" to "Holding - Light Industrial
Exception ((H)M1-4) Zone" as illustrated on the attached Schedule ‘A’ hereto.
2. Schedule ‘A’ attached hereto shall form part of this By-law.
3. This By-law shall come into effect on the date of the passing hereof, subject to the
provisions of Section 34 of the Planning Act.