HomeMy WebLinkAbout2007-088
THE CORPORATION OF THE MUNICIPALITY OF ClARINGTON
BY-lAW NO. 2007-088
being a By-law to authorize the execution of a
Subdivision/Consent Agreement as contemplated by the
Principles of Understanding between the Municipality of Clarington
and Halloway Holdings Limited dated March 1, 2006
WHEREAS the Regional Municipality of Durham's Land Division Committee under its file
LD016/2006 gave its provisional consent under section 53 of the Planning Act, R.S.O. 1990,
c.P.13, as amended, to the transfer by Halloway Holdings Limited of part of its lands located
between Highway No.2, Clarington Boulevard, the unopened Concession 3 road allowance and
Green Road subject, among other things, to the making of an agreement with the Municipality of
Cia ring ton;
AND WHEREAS at its Special Meeting on April 23, 2007 Council of the Municipality of
Clarington approved Report #PSD-48-07 and the recommendations contained therein including
the recommendation that the Subdivision/Consent Agreement contained in Report be executed
on behalf of the Municipality which will satisfy the aforesaid condition of the provisional consent
to the transfer,
NOW THEREFORE the Council of The Corporation of the Municipality of Clarington hereby
enacts as follows:
1. THAT the Mayor and the Municipal Clerk on behalf of the Municipality of Clarington be
authorized to execute the Subdivision/Consent Agreement attached to this By.-Iaw.
By-Law read a first time this 23" day of April 2007.
By-Law read a second time this 23" day of April 2007.
By-Law read a third time and finally passed this 23,d day of April 2007.
. Bar~-Municrpalp@rk
SUBDIVISION/CONSENT AGREEMENT
THIS SUBDIVISION/CONSENT AGREEMENT made as of the 23rd day of April,
2007.
BETWEEN:
.
HALLOWAY HOLDINGS LIMITED
(hereinafter called "Halloway")
OF THE FIRST PART
- and -
THE CORPORATION OF THE
MUNICIPALITY OF CLARINGTON
(hereinafter called the "Municipality")
OF THE SECOND PART
WHEREAS:
A. Halloway and the Municipality entered into Principles of Understanding ("Halloway
Principles") dated March 1, 2006. The Halloway Principles are registered as Instrument No.
DR5l3890 in the Land Registry Office for the Land Titles Division of Durham (No. 40) ("Land
Registry Office").
B. The lands to which this Subdivision/Consent Agreement applies are more particularly
described in Schedule "A" hereto ("Halloway Lands").
C. Halloway represents and warrants that it is the registered owner in fee simple of the
Halloway Lands and that they are not encumbered by a mortgage or charge.
D. On January 15, 2007, the Regional Municipality of Durham's Land Division Committee
under its file LD016/2006 gave its provisional consent ("Provisional Consent") under section 53
of the Planning Act, R.S.O. 1990, c.P.B, as amended, to the transfer by Halloway of the part of
the Halloway Lands referred to herein a the "Severed Lands". The Severed Lands are more
particularly described in Schedule "B" hereto. The Provisional Consent is subject to certain
conditions including the making of this Subdivision/Consent Agreement. A copy of the
Provisional Consent is contained in Schedule "c" hereto.
- 2 -
E. Following satisfaction of the conditions to the Provisional Consent and the issuance of a
certificate that the consent has been given pursuant to subsection 53(42) of the Planning Act,
Halloway intends to transfer the Severed Lands to Home Depot Holdings Inc. ("Home Depot")
for development thereon of a home improvement store ("Home Depot Store") in accordance with
the Municipality's Official Plan Amendment No. 44 and Zoning By-law Amendment 2006-047.
F. A copy of the concept plan for development of the Halloway Lands is contained in
Schedule "c" of the Halloway Principles. It is referred to hereinafter in this Subdivision/Consent
Agreement as the "Concept Plan for Development". The Concept Plan for Development was
endorsed in principle by the Municipality's Council's Resolution #C-114-06 passed at its special
meeting on March 1,2006. A copy of Resolution #C-114-06 is contained in Schedule "D" of the
Halloway Principles.
G. The Stevens Road Extension Agreement dated March 1, 2006 has been executed by the
Municipality, Halloway, Players Business Park Ltd. and West Diamond Properties Inc. A copy
of it is contained in Schedule "E" of the Halloway Principles.
H. Halloway has agreed to transfer Part I on Reference Plan 40R-24802 to the
Municipality for the purpose of widening Green Road as provided below in this
Subdivision/Consent Agreement.
I. This Subdivision/Consent Agreement is made pursuant to subsection 53(12) of the
Planning Act, R.S.O. 1990, c.P.13, as amended.
J. The execution of this Subdivision/Consent Agreement by the Mayor and the Municipal
Clerk on behalf of the Municipality of Clarington is authorized by By-law 2007-088 passed by
the Municipality's Council at its meeting on April 23, 2007.
NOW THEREFORE in consideration of the premises herein contained and the sum of
TWO DOLLARS ($2.00) and other good and valuable consideration (the receipt whereof by
each of the Parties is hereby acknowledged) each of the Parties covenants and agrees with the
other Parties as follows:
RECITALS AND SCHEDULES
1.
(a)
Each of Recitals C to H and Schedules "A" to "J" are hereby incorporated into the
operative part of this Subdivision/Consent Agreement and each shall be construed
as covenants contained in this Subdivision/Consent Agreement.
- 3 -
(b) In this Subdivision/Consent Agreement, unless otherwise provided the term
"Director" means the Municipality's Director of Engineering Services.
LANDS TO BE TRANSFERRED TO MUNICIPALITY
2. On or prior to the execution of this Subdivision/Consent Agreement by the Municipality,
Halloway shall transfer to the Municipality for a nominal consideration in fee simple, free
and clear of encumbrances and restrictions Part 1 on Reference Plan 40R-24802. The
transfer shall be in a form satisfactory to the Municipality's Solicitor and shall be
registered on title at the cost of Halloway including the payment of any Land Transfer
Tax and the payment to the Municipality of its reasonable legal costs.
DRAINAGE. EROSION CONTROL. GRADING. LANDSCAPING AND
SERVICING OF HALLOWAY LANDS
3. Halloway at its cost shall undertake, complete and maintain the grading, construction and
installation of the services, works and landscaping required to be implemented in
accordance with the following plans and drawings as finally approved by and on file with
the Director and the Director of Planning Services:
Drawing Title Drawing Dated Last Revision Prepared By
No. Date
Site Services Plan S-2 May 2005 March 28, 2007 D.G. Biddle & Associates
Limited
Site Grading Plan S-3 May 2005 March 28, 2007 D.G. Biddle & Associates
Limited
Erosion and Sedimentation S-4 May 2005 March 28, 2007 D.G. Biddle & Associates
Control Plan Limited
Storm Drainage Scheme S-5 May 2005 March 28, 2007 D.G. Biddle & Associates
Limited
Landscape Concept D 1 of 8 February April 18, 2007 Henry Kortekaas &
2007 Associates Inc.
CLARINGTON BOULEVARD WORKS AND STEVENS ROAD DRIVEWAY
EXTENSION WORKS
4.
(a)
Schedules "D" to "I" inclusive apply in respect of the Boulevard and Driveway
Works, the Boulevard and Driveway Works Performance Guarantee and the
Security for the Maintenance Guarantee for the Boulevard and Driveway Works.
The Clarington Boulevard Works comprise the Clarington Boulevard-Traffic
Island Restoration Works, the Clarington Boulevard-Parking Bump Out
Construction Works, and the Clarington Boulevard-Boulevard Works. The
Clarington Boulevard Works and the Stevens Road Driveway Entrance Works are
more particularly described in Schedule "D".
(b) Halloway shall undertake, complete and maintain the Clarington Boulevard
Works and the Stevens Road -Driveway Entrance Works (collectively the
"Boulevard and Driveway Works") at its cost in accordance with Schedule "E"
- 4-
hereto. On or before the execution of this Subdivision/Consent Agreement by the
Municipality, Halloway shall deposit cash or an irrevocable unconditional letter
of credit with the Municipality in the amount shown in the "Boulevard and
Driveway Works Cost Estimate" contained in Schedule "I" hereto as the
performance guarantee ("Boulevard and Driveway Works Performance
Guarantee") required by Schedule "F" hereto.
HIGHWAY No.2 LANDSCAPING AND STREETSCAPING WORKS
5. Forthwith after the execution of this Subdivision/Consent Agreement by the
Municipality, Halloway shall pay to the Municipality the sum of $63,540.00 for use by
the Municipality in constructing and installing, at the Municipality's risk, streetscaping
on Highway No.2.
STEVENS ROAD EXTENSION
6.
(a)
Halloway agrees with the Municipality that the Developer-Funded section of the
Stevens Road Extension as defined and provided for in the Stevens Road
Extension Agreement is a local service within the meaning of section 59 of the
Development Charges Act, 1997, S.O. 1997, c.27, as amended; and
(b) Halloway acknowledges that the "Urban Profile Works" on the "Developer-
Funded Section" of the Stevens Road Extension as both terms are described and
defined in the Stevens Road Extension Agreement will be designed and
constructed on the aforesaid Developer-Funded Section. Halloway shall deposit
with the Municipality the "Performance Guarantee" to secure its obligation to pay
for fifty (50%) per cent of the cost of the aforesaid Urban Profile Works as is
required by and in accordance with the Stevens Road Extension Agreement. The
terms "Urban Profile Works," "Developer-Funded Section," and "Performance
Guarantee" have the same meaning in this Subdivision/Consent Agreement as
they have in the Stevens Road Extension Agreement.
PRIV ATE ROAD C
7.
(a)
The "Private Road C Improvements" (as hereafter defined) are shown on the
Concept Plan for Development. The lands which comprise Private Road Care
more particularly described as Parts 16, 17,21 and 22 on Plan 40R-24257.
(b) Halloway shall construct at its cost the Private Road C Improvements shown on
the Concept Plan for Development in accordance with the construction
drawings, specifications, cross-sections and streetscaping improvements
including lighting contained in Schedule "F" of the Halloway Principles and
- 5 -
landscaping shown on the Landscape Concept Plan referred to in paragraph 3 of
this Subdivision/Consent Agreement ("Private Road C Improvements"), to the
satisfaction of the Director. The parties agree that any of the foregoing drawings,
cross-sections and specifications may be revised in an agreement between
Halloway and the Municipality made pursuant to section 41 of the Planning Act
without amendment being made to this Subdivision/Consent Agreement.
(c) Halloway agrees that at its cost it will keep the Private Road C Improvements
after they have been constructed in a proper state of repair and maintain it in a
reasonable and proper manner, provided that Halloway's duty to do so shall
terminate on the day on which the Municipality exercises its option to purchase
Private Road C in accordance with paragraph 7(b) of the Halloway Principles, and
provided further that Halloway shall remain responsible for the cost of the
rectification of all deficiencies that have been identified prior to the day on which
the aforesaid option to purchase is exercised in a written notice given by the
Director to Halloway, pursuant to paragraph 7(e) of this Subdivision/Consent
Agreement. Paragraph 7(e) shall apply with all necessary changes to it being
assumed to have been made to give effect to this paragraph 7(c).
(d) Halloway hereby permits the Municipality, its employees, contractors and agents
to enter on and to inspect the state of repair and the maintenance of the Private
Road C Improvements from time to time.
(e) If any deficiency in the repair or maintenance of the Private Road C
Improvements is identified by the Director, he shall forthwith give written notice
of the same to Halloway requiring the rectification of such deficiency by a date
specified in the written notice. If Halloway fails to rectify the deficiency on or
before the date specified in the written notice, the Municipality, its employees,
contractors and agents may enter on Private Road C, as the case may be, and
cause the deficiency identified in the aforesaid written notice to be rectified at the
expense of Halloway. Forthwith after rectifying the deficiency, the Director shall
give written notice to Halloway of the cost of rectifying it shall include an
allowance of thirty (30%) per cent to be paid to the Municipality for its overhead
expenses. Forthwith after being given written notice of the cost of rectifying the
deficiency as aforesaid, Halloway shall pay the amount in question as a debt owed
by Halloway to the Municipality.
(f) Notwithstanding paragraph 7(b), Halloway may defer the construction and
installation of portions of the landscaping and sidewalk on the westerly side of
Private Road C which are part of the Private Road C Improvements referred to in
paragraph 7(b) until Halloway completes the construction of a building or
buildings which is on a site on the Halloway Lands which abuts the corresponding
portion of the westerly side of Private Road C, provided that the construction and
installation of such landscaping and sidewalk shall be commenced and completed
- 6 -
in accordance with conditions imposed on site plan approval under section 41 of
the Planning Act for such building or buildings, and provided further that
paragraph 7( c) shall apply with all necessary changes thereto being assumed to
have made to give effect to the intent ofthis paragraph (t).
INCORPORATION OF HALLOWAY PRINCIPLES AND STEVENS ROAD EXTENSION AGREEMENT
8. The Halloway Principles and the Stevens Road Extension Agreement are incorporated by
reference in their entirety in the operative part of this Subdivision/Consent Agreement.
Each of the Municipality and Halloway covenants to observe and perform their respective
obligations under the Halloway Principles and the Stevens Road Extension Agreement, as
each may be amended, restated, modified, supplemented by them and/or assigned and
assumed from time to time. Notwithstanding the foregoing, the Halloway Principles, and
the Stevens Road Extension Agreement continue in force and effect and time continues to
be of their essence.
NOTICE
9. If any notice or other document is required to be or may be given by the Municipality or
by any official of the Municipality to Halloway by this Subdivision/Consent Agreement,
such notice shall be transmitted by telefax, mailed by first class prepaid post or delivered
to:
Halloway:
177 Nonquon Road.
20th Floor
Ohsawa, ON ldG 3S2
q {IS 5} 9 - t'l 72
OR,
Municipality:
The Municipality of Clarington
40 Temperance Street
Bowmanville, ON LIC 3A6
Attention: Director of Planning Services
Fax: 905-623-0830
or such other telefax number or address of which any party has notified the other parties
in writing. Any such notice telefaxed or mailed or delivered shall be deemed good and
sufficient notice under the terms of this Agreement and if telefaxed or delivered prior to
4:30 p.m. on any business day (excluding Saturdays, Sundays and statutory holidays)
shall be deemed to have been received at the time of delivery or transmission and if
mailed by pre-paid registered mail, it shall be deemed to have been received on the third
business day (excluding Saturdays, Sundays and statutory holidays) following the
mailing thereof. Notwithstanding the foregoing, in the event that it may be reasonably
anticipated that due to Force Majeure any notice will not be received within the time limit
set out above, then such notice shall be sent by an alternate means of transportation which
- 7 -
may reasonably be anticipated will cause the notice to be received reasonably
expeditiously by the addressee.
FORCE MAJEURE
10. In this Subdivision/Consent Agreement, the term "Force Majeure" means any delay for
the duration of the delay which is imposed by reason of strikes, lockouts, riots, wars or
acts of military authority, acts of public enemies, sabotage, epidemics, washouts, nuclear
and radiation activity or fallouts, rebellion or civil commotion, fire or explosion; flood,
wind, water, earthquake or other casualty, or an Act of God and any act, omission or
event whether of the kind herein enumerated or otherwise not within the control of
Halloway, none of which has been caused by the deliberate default or act or omission by
such party and none of which has been avoidable by the exercise of reasonable effort or
foresight by such party. Halloway or the Municipality, as the case may be, shall notify the
other parties to this Subdivision/Consent Agreement of the commencement, duration and
consequence (so far as the same is within the knowledge of Halloway or the
Municipality, as the case may be) of any Force Majeure affecting the performance of any
of its obligations hereunder within thirty (30) days of gaining such knowledge.
ACTING REASONABLY
11. All discretionary decisions by officials of the Municipality referred to in this
Subdivision/Consent Agreement shall be deemed to be qualified by the words "acting
reasonably" .
CHANGES IN NUMBER OR GENDER
12. This Subdivision/Consent Agreement shall be read with all changes of gender or number
required by the context in which the words or figures in question appear.
ENUREMENT
13. This Subdivision/Consent Agreement shall enure to the benefit of and be binding on the
parties hereto, and their respective successors and assigns.
STATUS STATEMENT
14. Within ten (10) days of receiving a written request from Halloway, the Municipality shall
provide a written statement either confirming that Halloway is in good standing and not
in default of any provisions of this Subdivision/Consent Agreement, or setting out the
- 8 -
manner and extent to which Halloway is in default. Should the Municipality not respond
to said written request from Halloway, Halloway is entitled to rely on such non-response
as indicating that Halloway is in good standing and not in default of this
Subdivision/Consent Agreement.
AUTHORITY OF MUNICIPALITY
15. Halloway acknowledges and agrees that the Municipality has authority to enter into this
Subdivision/Consent Agreement, that every provision hereof is authorized by the law and
fully enforceable by the parties, and that this Subdivision/Consent Agreement is executed
by the Municipality in reliance on the acknowledgement and agreement of Halloway as
aforesaid.
REGISTRATION OF AGREEMENT ON TITLE TO HALLOWAY LANDS
16. Halloway hereby consents to the registration of a Notice of this Subdivision/Consent
Agreement on the title to the Halloway Lands.
TIME OF THE ESSENCE
17. Time is of the essence of this Subdivision/Consent Agreement.
IN WITNESS WHEREOF the parties hereto have hereunto set their hands and seals the
day and year first above written and the parties hereto have hereunto affixed their corporate seals
by the hands of their proper officers duly authorized in that behalf.
SIGNED, SEALED AND
DELIVERED
In the presence of:
- 9 -
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
THE CORPORATION OF THE
MUNI Y OF CLARINGTON
/
".
\
w
atti unicipal Clerk
We have authority to bind the Corporation.
WAY HOLDINGS LIMITED.
;:; ~ 6S
Title:
Name: Title:
J/We have authority to bind the Corporation
SCHEDULE "A"
THIS SCHEDULE IS SCHEDULE "A" to the Subdivision/Consent Agreement which
has been authorized and approved by By-law No. 2007-088 of The Corporation of the
Municipality of Clarington enacted and passed the 23'd day of April, 2007.
Description of the Hallowav Lands
Firstly: Part of Lot 16 Concession 1 in the Municipality of Clarington, in the Regional
Municipality of Durham (formerly Geographic Township of Darlington), designated as
Parts 2, 3, 4, 5 and 6 on Plan 40R-24257, being the whole ofPIN 26613-0103 (LT).
Secondly: Part of Lot 16 Concession I in the Municipality of Clarington, in the Regional
Municipality of Durham (formerly Geographic Township of Darlington), designated as
Part 1 on Plan 40R-24257, being the whole of PIN 26613-0106 (LT).
Thirdly: Part of Lot 16 Concession 1 in the Municipality of Clarington, in the Regional
Municipality of Durham (formerly Geographic Township of Darlington), designated as
Parts 7,8,9, 10 and lion Plan 40R-24257, being the whole ofPIN 26613-0107 (LT).
Fourthly: Part of Lot 16 Concession I in the Municipality of Clarington, in the Regional
Municipality of Durham (formerly Geographic Township of Darlington), designated as
Parts 12 and 13 on Plan 40R-24257, being the whole of PIN 26613-0035 (LT).
Fifthly: Part of Lot 16 Concession I in the Municipality of Clarington, in the Regional
Municipality of Durham (formerly Geographic Township of Darlington), designated as
Parts 14, 15, 16, 17 and 18 on Plan 40R-24257, being the whole of PIN 26613-0034
(LT).
Sixthly: Part of Lot 16 Concession 1 in the Municipality of Clarington, in the Regional
Municipality of Durham (formerly Geographic Township of Darlington), designated as
Parts 19, 20, 21, 22 and 23 on Plan 40R-24257, being the whole of PIN 26613-0033
(LT).
Seventhly: Part of Lot 16, Concession 1, in the Municipality of Clarington, in the
Regional Municipality of Durham (formerly in the Township of Darlington), designated
as Parts 13 and 15 on Plan 40R-16730, being Part of PIN 26613-0044 (LT)
SCHEDULE "B"
THIS SCHEDULE IS SCHEDULE "B" to the Subdivision/Consent Agreement which
has been authorized and approved by By-law No. 2007-088 of The Corporation of the
Municipality of Clarington, enacted and passed the 23rd day of April, 2007.
Description of Severed Lands
Firstly: Part of Lot 16 Concession 1 in the Regional Municipality of Durham (formerly
Geographic Township of Clarington), designated as Part 1 on Plan 40R-24257, being the whole
of PIN 26613-0106
Secondly: Part of Lot 16 Concession 1 in the Regional Municipality of Durham (formerly
Geographic Township of Clarington), designated as Parts 2, 3 and 4 on Plan 40R-24257, being
Part of PIN 26613-0103
Thirdly: Part of Lot 16 Concession 1 in the Regional Municipality of Durham (formerly
Geographic Township of Clarington), designated as Parts 10 and 11 on Plan 40R-24257, being
Part of PIN 26613-0107
Fourthly: Part of Lot 16 Concession 1 in the Regional Municipality of Durham (formerly
Geographic Township of Clarington), designated as Part 12 on Plan 40R-24257, being Part of
PIN 26613-0035
Fifthly: Part of Lot 16 Concession 1 in the Regional 'Municipality of Durham (formerly
Geographic Township of Clarington), designated as Parts 15 and 16 on Plan 40R-24257, being
Part of PIN 26613-0034
Sixthly: Part of Lot 16 Concession 1 in the Regional Municipality of Durham (formerly
Geographic Township of Clarington), designated as Parts 19, 20 and 21 on Plan 40R-24257,
being Part of PIN 26613-0033
Schedule "C "
Page 1
SCHEDULE"C"
THIS SCHEDULE IS SCHEDULE "C" to the Subdivision/Consent Agreement
which has been authorized and approved by By-law No. 2007-088 of The Corporation of
the Municipality of Clarington, enacted and passed the 23rd day of April, 2007.
Provisional Consent of the
Re2:ion of Durham Land Division Committee
MINUTES AND DECISIONS
DURHAM LAND DIVISION COMMITTEE
As per: The Planning Act,
the Durham Act
and in accordance with the Provincial Rules of Procedure
CONSENT APPLICATION heard on: Monday, Jan 152007
LD 016/2006 Submission B 003/2007
Owner
Location
Municipality
Halloway Holdings Limited
Part lot 16, Conc. 1
Municipality of Clarington
(Newcastle)
Consent to sever a vacant 3.22ha commercial parcel
of land, retaining a 3.7ha commercial lot with a
building.
This application was tabled 16 January 2006 at the request of the Regional Municipality
of Durham Planning Department.
Mr. Bryce Jordan of Sernas Associates was authorized by the agent on behalf of
Halloway Holdings Limited to represent the owner at this public hearing.
Mr. Jordan advised the Committee that the application was tabled 16 January 2006
because Official Plan and Zoning By-law Amendments were not in place. Mr. Jordan
stated that required planning instruments are now in place to permit the proposal to
proceed.
A letter was received 15 January 2007 from Steven A. Zakem of the law firm Aird &
Berlis acting on behalf of Loblaw Properties Limited. The letter said Loblaws owns and
operates a supermarket "immediately across lands owned by Halloway that are subject
of this application". The concern was raised that a proposed access to Highway 2 to be
shared by the subject and retained land does not align with the access to his client's
property (and to Clarington Centre as a whole). The Committee noted the Municipality
had received a site plan application (SPA2005-022) to ensure that development on the
proposed lands can be accommodated within the larger development framework. The
Municipality commented that servicing and access easements under the Planning Act
will also be necessary once the site plan application is finalized.
The Committee noted that the Municipality of Clarington comment referenced retail
commercial policies of the Clarington Official Plan (OPA #43) and Bowmanville West
Town Centre (OPA # 44) as well as enabling zoning by-laws for affected properties had
been approved by Municipal Council. The comment noted that only two appeals remain
to be adjudicated and that they do not interfere with approval of this application.
The Committee had information reports received from: the Regional Municipality of
Durham Planning and Works Departments, the Municipality of Clarington, and Central
Lake Ontario Conservation. Agency comments were handed to Mr. W. Hugo/Mr. B.
Jordan of Sernas Associates.
Schedule "e "
Page 2
DECISION OF THE COMMITTEE
APPLICANT/OWNERS ARE RESPONSIBLE FOR FULFILLING ALL CONDITIONS.
MOVED: J.-M. Komarnicki
SECONDED: J. Hurst
That application LD 016/2006 be approved as applied for, subject to:
1/ That the applicant satisfy the requirements of the Regional Municipality of
Durham Works Department concerning the provision of Regional services,
financial and otherwise.
2/ That the applicant satisfy the requirement of the Municipality of Clarington,
financial and otherwise.
3/ That the applicant satisfy item #1 of the comment received from Regional
Municipality of Durham Planning Department dated 12 January 2007.
4/ That the applicant submit two copies of a registered reference plan on the
subject parcel.
5/ That the consent be subject to the following time periods:
Last Date for fulfilling Conditions is Friday, Jan 25 2008.
Expiry Date of Application LD 016/2006 is Monday, Feb 25 2008.
CLEARING AGENCIES
6/ That prior to the signing of the certificate by the SecretaryfTreasurer that the
consent has been given, the SecretaryfTreasurer is to be advised in writing
by the Regional Works Department that condition #1 has been carried out
to its satisfaction.
7/ That prior to the signing of the certificate by the SecretaryfTreasurer that the
consent has been given, the SecretaryfTreasurer is to be advised in writing
by the Municipality of Clarington that condition #2 has been adhered to.
8/ That prior to the signing of the certificate by the SecretaryfTreasurer that the
consent has been given, the SecretaryfTreasurer is to be advised in writing
by the Regional Municipality of Durham Planning Department that condition
#3 has been adhered to.
9/ That prior to the signing of the certificate by the SecretaryfTreasurer that the
consent has been given, the SecretaryfTreasurer has to be satisfied that the
time periods outlined in condition #5 have been adhered to.
CARRIED UNANIMOUSLY
Signed by all members present and concurring that
this is the Committee Decision of LD 016/2006 on
Monday, Jan 15 2007.
(CHAIR)
(VICE CHAIR)
ABSENT
D. Sullivan
H. Graham
J. Collins
L. Evans
M.V. Hedge
J. Hurst
J. M. Komarnicki
R. E. Sutton
ABSENT
Assistant SecretaryfTreasurer
Last Date of Appeal of this Decision or any of the conditions therein is Tuesday, Feb 13 2007.
SCHEDULE"D"
THIS SCHEDULE IS SCHEDULE "D" to the Subdivision/Consent Agreement which
has been authorized and approved by By-law No. 2007-088 of The Corporation of the
Municipality of Clarington, enacted and passed the 23rd day of April, 2007.
Description of
Boulevard and Drivewav Works
The Boulevard and Driveway Works are shown on the Site SerVices Plan Drawing No. S-
2 which is referred to in paragraph 3 of the Subdivision/Consent Agreement.
Schedule "E"
Page 1
SCHEDULE "E"
THIS SCHEDULE IS SCHEDULE "E" to the Subdivision/Consent Agreement
which has been authorized and approved by By-law No. 2007-088 of The Corporation of
the Municipality of Clarington, enacted and passed the 23rd day of April, 2007.
BOULEVARD AND DRIVEWAY WORKS
1. Works ReQuired
Halloway at its expense shall construct and install the Boulevard and Driveway
Works. From the date of issuance of an "Authorization to Commence Works" (as
hereafter defined) until the date of issuance of a "Certificate of Acceptance" (also as
hereafter defined) of them Halloway shall be fully responsible for the construction and
maintenance of the Boulevard and Driveway Works including the cost thereof in
accordance with the provisions of this Subdivision/Consent Agreement. After the
issuance of a Certificate of Acceptance, the Works referred to in such Certificate shall be
the responsibility of the Municipality. Halloway shall apply for an Authorization to
Commence Works no later than the day on which the home improvement store is opened
for retail sales to members of the public.
2. Hallowav's En2ineer
At all times until this Subdivision/Consent Agreement is released, Halloway shall
retain Halloway's Engineer who shall perform the duties set out in Schedule "H" to this
Subdivision/Consent Agreement. On the execution of this Subdivision/Consent
Agreement and on each occasion on which a new Halloway's Engineer is retained,
forthwith after retaining Halloway's Engineer, Halloway shall give the Director written
notice of the name, address and telefax number of Halloway's Engineer. No partnership,
association of persons or corporation shall be retained as Halloway's Engineer without
the prior written approval of the Director. All notices to be given to Halloway's Engineer
are properly given if given by personal service, by telephonic facsimile communication,
or first class prepaid post addressed to Halloway's Engineer at the address or telefax
number provided to the Director pursuant to this paragraph. Forthwith after the Director
gives Halloway written notice requiring it to do so, Halloway shall give the Director
written notice advising him whether or not the approved Vendor's Engineer continues to
be retained by Halloway.
3. Desi2n of Boulevard and Drivewav Works
(1) Halloway covenants and agrees that the design of the Boulevard and Driveway
Works shall conform with all applicable legislation and the Municipality's Design
Criteria and Standard Detail Drawings. In the event of any dispute as to such
Schedule "E"
Page 2
requirements or their interpretation, the dispute shall be resolved by the Director
whose decision shall be final.
(2) Halloway shall provide and submit to the Director all necessary Engineering
Drawings for the Boulevard and Driveway Works. Halloway shall obtain all
approvals for the construction and installation of the Boulevard and Driveway
Works as required by this Subdivision/Consent Agreement.
4. Enl!ineerinl! Drawinl!s
(1) Prior to the issuance of any Authorization to Commence Works, Halloway shall
obtain the written approval of the Director of the original copy of all drawings of
the Boulevard and Driveway Works (the "Engineering Drawings"). If
construction and installation of the Boulevard and Driveway Works has not
commenced within two (2) years from the date of approval of the Engineering
Drawings, the Engineering Drawings shall be resubmitted to the Director for his
reconsideration and approval after any revisions required by the Director have
been made to them (the "Reapproved Engineering Drawings"). From and after the
approval by the Director of the Reapproved Engineering Drawings, they shall be
deemed to be the Engineering Drawings for the purpose of this
Subdivision/Consent Agreement, and thereafter all Boulevard and Driveway
Works shall be constructed and installed in accordance with them. Halloway
hereby irrevocably assigns to the Municipality without cost to the Municipality
the right to use and to reproduce the Engineering Drawings and all reports that
relate in whole or in part to the Boulevard and Driveway Works which have been
prepared by or for Halloway in connection with the performance of Halloway's
obligations under this Subdivision/Consent Agreement. Halloway acknowledges
that approval of the Engineering Drawings or reports by the Director shall not
relieve Halloway from its obligation to satisfy all requirements of or made
pursuant to this Subdivision/Consent Agreement.
(2) Prior to the issuance of any Authorization to Commence Works, Halloway shall
provide the Director without cost to the Municipality Halloway's Engineer's (1)
written acknowledgement that the Engineering Drawings may be used and/or
reproduced by the Municipality without cost or prior approval or permission, (2)
written permission for the Municipality's officers, employees, agents, contractors
and supplier to use the specifications, data, drawings, records and reports whether
completed or in progress of completion in satisfaction of Halloway's obligations
under the provisions of this Subdivision/Consent Agreement without cost or prior
approval or permission, and (3) written undertaking to deliver to the Director the
original copy of the Engineering Drawings forthwith after being given written
notice by the Director requiring Halloway's Engineer to do so, whether or not
Schedule "E"
Page 3
Halloway's Engineer's fees and disbursements in respect of any of them have
been paid. Prior to each occasion on which a new Halloway's Engineer is retained
by Halloway and approval of the Director is sought, Halloway shall provide the
Director with a similar written acknowledgement and written permission of the
new Halloway's Engineer, provided that if the new Halloway's Engineer is to be
retained by the Director on behalf of Halloway, the Director shall obtain from the
prospective Vendor's Engineer the aforesaid written acknowledgement and
permission. Forthwith after the Director gives Halloway's Engineer written notice
requiring them or it to do so, copies of the Engineering Drawings, computer disks,
specifications, data, drawings, records and reports referred to in this paragraph
shall be provided to the Director without cost to the Municipality.
5. Staeine of Construction of Works
Not used.
6. Approval of Schedule of Works
Prior to the issuance of any Authorization to Commence Works respecting any of
the Boulevard and Driveway Works, Halloway shall obtain the written approval of the
Director of a draft schedule (the "Schedule of Works") which sets out the time at which,
and the sequence in which, Halloway proposes to construct and install each of the
Boulevard and Driveway Works.
7. Approval of Boulevard and Drivewav Works Cost Estimates
The Municipality acknowledges that the Director has approved the "Boulevard
and Driveway Works Cost Estimates" contained in Schedule "I".
8. Requirements for Authorization to Commence Works
Halloway shall not commence the construction or installation of any of the
Boulevard and Driveway Works without the written permission of the Municipality (the
"Authorization to Commence Works"). Halloway shall only commence the construction
and installation of those Boulevard and Driveway Works permitted by the Authorization
to Commence Works.
9. Inspection and Stop Work
Halloway shall ensure that every contract that may be made by Halloway with
any contractor to construct or install any of the Boulevard and Driveway Works shall
provide that employees or representatives of the Municipality may, at any time, inspect
the Boulevard and Driveway Works undertaken by such contractor and shall require the
Schedule "E"
Page 4
contractor to comply with stop work orders given by the Director pursuant to this
paragraph 9. The Director may give Halloway a written order to stop the construction or
installation of any of the Boulevard and Driveway' Works that is being undertaken by
giving written notice either to Halloway or to Halloway's Engineer to that effect if in the
Director's opinion either (1) the Boulevard and Driveway Works are not being
undertaking such that a completed construction and installation of all the Boulevard and
Driveway Works satisfactory to the Municipality in accordance with this
Subdivision/Consent Agreement will result, or (2) the Performance Guarantee and the
Security for the Maintenance Guarantee required to be provided pursuant to this
Subdivision/Consent Agreement in respect of the Boulevard and Driveway Works has
not been deposited or is not maintained in good standing. Halloway shall comply with the
stop work order forthwith after it is given by the Director in accordance with this
paragraph 9 by requiring Halloway's contractor and sub-contractors who are constructing
and installing the Boulevard and Driveway Works or components thereof in question and
are referenced in the order to comply with it forthwith. A stop work order may be given
to Halloway by giving to Halloway's Engineer by personal service on Halloway's
Engineer or any representative of Halloway's Engineer, by prepaid first class post
addressed to Halloway's Engineer, or by telefax to Halloway's Engineer at the address
and telefax number referred to in paragraph 2 of this Schedule.
10. Construction in Accordance with Em!ineerinl! Drawinl!s
The Boulevard and Driveway Works shall be constructed and installed in
accordance with the Engineering Drawings as approved by the Director. No deviation
from the Engineering Drawings is permitted unless such deviation is authorized in
writing by the Director before it is undertaken. All construction and installation of the
Boulevard and Driveway Works shall be undertaken and carried out by Halloway or by
Halloway's contractor, as the case may be, in accordance with the regulations for
construction set out in Schedule "H" to this Subdivision/Consent Agreement.
11. Sequence of Construction of Works
Following the issuance of an Authorization to Commence Works, Halloway shall
proceed in good faith to construct and install all of the Boulevard and Driveway Works
referred to in the Authorization to Commence Works continuously and in accordance
with the timing and sequence therefore set out in the Schedule of Works.
12. Completion Time for Construction of Works
Within twelve (12) months of the date of the issuance of an Authorization to
Commence Works, Halloway shall complete the construction and installation of the
Boulevard and Driveway Works authorized in such Authorization to Commence Works.
Schedule "E"
Page 5
13. Additional Work
Until the conclusion of the Maintenance Guarantee Period referable thereto if in
,
the opinion of the Director, any incidental work is required to provide for the adequate
operation, functioning and maintenance of any of the Boulevard and Driveway Works,
Halloway, at its cost, shall construct and install such additional facilities and perform
such additional work as the Director may request from time to time by written notice
given to Halloway.
14. Incomplete or Faultv Works and Liens
(1) Without derogating from the other provisions of this Subdivision/Consent
Agreement, if, in the opinion of the Director, (1) Halloway is not constructing and
installing or causing to be constructed or installed any of the Boulevard and
Driveway Works required by this Subdivision/Consent Agreement so that it or
they will be completed within the time specified for such completion in the
Schedule of Works, or (2) the Boulevard and Driveway Works or any
component(s) thereof are being improperly constructed or installed, or (3)
Halloway neglects or abandons the said Boulevard and Driveway Works or any
part of them before completion, or (4) unreasonable delay occurs in the
construction or installation of the Boulevard and Driveway Works, or (5) for any
other reason the Boulevard and Driveway Works are not being constructed or
installed properly and promptly and in full compliance with the provisions of this
Subdivision/Consent Agreement, or (6) Halloway neglects or refuses to
reconstruct or reinstall any of the Boulevard and Driveway Works or
component(s) thereof which may be rejected by the Director as being defective,
deficient or unsuitable, or (7) Halloway otherwise defaults in performance of this
Subdivision/Consent Agreement, the Director may give Halloway notice in
writing of his opinion respecting any such matter. Following the later to occur of
the expiry of ten (10) business days, excluding Saturdays and Sundays and
statutory holidays following the giving of such notice plus the expiry of any
additional period as may be specified in the notice given to Halloway by the
Director, the Municipality, at the cost and expense of Halloway, may engage a
contractor, supplier of services or materials and such workmen, and purchase such
services, supplies and/or services as in the opinion of the Director are required for
the completion of the construction and installation of the Boulevard and Driveway
Works and all components thereof and the performance of all covenants of
Halloway relating to the Boulevard and Driveway Works as provided by this
Subdivision/Consent Agreement. In cases of emergency or urgency, or in order to
preserve the integrity of the Boulevard and Driveway Works or any component
thereof as determined by the Director in his absolute discretion, any deficiency(s)
or defect(s) in the Boulevard and Driveway Works, and any failure to complete
Schedule "E"
Page 6
the Boulevard and Driveway W arks and all components thereof in accordance
with this Subdivision/Consent Agreement may be corrected, remedied or
completed by the Municipality, its contractors, suppliers and employees at the
cost of Halloway without prior notice to Halloway, provided that forthwith after
the Municipality so acts, the Director shall give written notice to Halloway of his
determination as aforesaid, describing the action taken by the Director, and the
cost of correcting or remedying the deficiency or default in question or the cost of
completing the Boulevard and Driveway Works and the components thereof, as
the case may be. For the purposes of this paragraph 14(1) the cost of any work
which the Municipality undertakes under this paragraph 14(1) shall be determined
by the Director in his absolute discretion. It is understood and agreed by the
Parties that the costs for which Halloway is responsible under this paragraph
14(1) shall include a management fee payable to the Municipality either of thirty
(30%) percent of the contractor's charges to the Municipality (including any
charges for overhead and profit) or, if such work is undertaken by the
Municipality, thirty (30%) percent of all costs incurred by the Municipality to
correct or remedy the deficiencies or defect or to complete the Boulevard and
Driveway Works and all components thereof as the case may be. Halloway shall
pay the Municipality an amount equal to the cost of all Boulevard and Driveway
Works and components thereof, and the cost of correcting or remedying all
deficiencies and defects referred to in this paragraph 14(1) which have been
incurred by the Municipality or are estimated in the Director's absolute discretion
to be likely to be incurred by the Municipality forthwith after the Director gives
Halloway written demand for payment of such cost. If the amount paid is based
on the Director's estimate as aforesaid, forthwith after actual costs are known the
Director shall give Halloway written notice thereof. If the actual costs are more
than the estimated costs, Halloway shall forthwith pay the Municipality an
amount equal to the difference between them. If the actual costs are less than the
estimated costs, the Municipality shall forthwith refund the difference between
them to Halloway.
(2) In the event (1) a claim for a lien in respect of the Boulevard and Driveway
Works or any component thereof is registered against the title to any land vested
in or which should have been vested in the Municipality or is filed with the
Municipality, or (2) the Municipality receives written notice of a claim of an
alleged beneficiary of a statutory trust under the Construction Lien Act, such
registration, filing or notice shall constitute a default in performance by Halloway
of this Subdivision/Consent Agreement. In any such case, the Director may notify
Halloway in writing of such default. If Halloway fails to discharge the lien or the
claim as the case may be within ten (10) business days, excluding Saturdays,
Sundays and statutory holidays, after the giving of such notice plus any further
Schedule "E"
Page 7
period of time as may be specified in the notice, then the Municipality in its
absolute discretion may (1) pay the full amount of the claim and security for costs
into a court of competent jurisdiction in order to obtain an order vacating such
claim for lien, (2) discharge the claim in full by paying the amount claimed or in
part by paying a portion thereof, or (3) draw the full amount of the claim in cash
from a letter of credit deposited with the Municipality as the security for the
Boulevard and Driveway Performance Guarantee and hold the cash in a deposit
account of the Municipality as the security for the Boulevard and Driveway
Performance Guarantee in respect of the claim in question. The Municipality may
draw on and appropriate the whole or any portiones) of the Performance
Guarantee and the Security for the Maintenance Guarantee for the purpose of
making payment under this paragraph 14(2). Halloway shall indemnify the
Municipality against the costs and expense incurred by the Municipality in
making a payment pursuant to this paragraph 14(2) forthwith after the Director
gives Halloway written notice requiring him to do so. In the event that the
Municipality draws on and appropriate any portion of the Boulevard and
Driveway Performance Guarantee or the Security for the Maintenance Guarantee
for any of the aforesaid purposes, forthwith after the Director gives written notice
to Halloway requiring it to do so, Halloway shall reinstate the Boulevard and
Driveway Performance Guarantee and/or the Security for the Maintenance
Guarantee, as the case may be, to the full amount(s) required under the provisions
of this Subdivision/Consent Agreement.
15. Acknowledeement Respectine Emereencv. etc. Repairs
Halloway acknowledges that if in cases of emergency or urgency or in order to
protect the integrity of the Boulevard and Driveway Works or any component thereof, the
Director acts to correct, remedy or repair any deficiency(s) or defect(s) in the Boulevard
and Driveway Works, neither on entry on the Boulevard and Driveway Works or any
portion of them nor any such action by the Director or any person authorized to undertake
the same by the Director shall be deemed to be an acceptance of any of the Boulevard
and Driveway Works by the Municipality, nor an assumption by the Municipality of any
responsibility or liability in connection therewith, or a release by the Municipality of
Halloway from any of its obligations under this Subdivision/Consent Agreement.
16. Damaee to Existine Services
Forthwith after written demand therefore is given by the Director to Halloway,
Halloway shall pay to or to the direction of the Municipality, the cost of repairing any
damage to any property or services of the Municipality, the Region, Hydro One or any
utility authority or company or (the "Damaged Services") including without limiting the
generality of the foregoing, any road(s), water, electrical, gas, telephone, cable television
Schedule "E"
Page 8
and sewer systems, and the cost of relocating any Damaged Services, caused by or
resulting from the construction or installation of any of the Boulevard and Driveway
Works, provided that all such repairs and or relocation(s) are completed to the
satisfaction of the Director, the Region and Hydro One or the relevant utility authority or
company which owns or is responsible for the Boulevard and Driveway Works, property
or services in question.
17. Use of Boulevard and Driveway Works by Municipality
Halloway acknowledges and agrees that any of the Boulevard and Driveway
Works may be used by The Municipality and such other person( s) who is (are) authorized
by the Municipality for any of the purposes for which the Boulevard and Driveway
Works are designed, without interference by Halloway, and without the payment of any
fee or compensation to Halloway, and for such purposes the Municipality and other
person(s) authorized by the Municipality may enter upon the portion of Halloway Lands
on which any of the Boulevard and Driveway Works are located.
18. Requirements for Certificate of Completion
Halloway acknowledges and agrees that the construction and installation of any of
the Boulevard and Driveway Works authorized in an Authorization to Commence Works
shall not be deemed to be completed for the purposes of this Subdivision/Consent
Agreement until the Director has provided Halloway with written certificate that such is
the case (the "Certificate of Completion"). In addition to satisfying the other
requirements of this Subdivision/Consent Agreement respecting its issuance, a Certificate
of Completion shall not be issued until such of the Boulevard and Driveway Works
authorized by the Authorization to Commence Works for which a Certificate of
Completion is required, have been inspected by the Director, and he is satisfied such
Boulevard and Driveway Works have been constructed and installed in accordance with
the Engineering Drawings and has received all certificates and confirmations from
Halloway's Engineer as provided for in this Subdivision/Consent Agreement.
19. Requirements for Certificate of Acceptance
Halloway acknowledges and agrees that the none of the Boulevard and Driveway
Works covered by a Certificate of Completion shall be accepted, nor deemed to be
accepted for the purpose of this Subdivision/Consent Agreement until the Director has
provided Halloway with written certificate that the Boulevard and Driveway Works in
question have been accepted (the "Certificate of Acceptance"). If the Director is of the
opinion that the Boulevard and Driveway Works in question have been properly
maintained and all deficiencies and defects in such Boulevard and Driveway Works have
been remedied and corrected by Halloway on behalf of the Municipality, the Director
Schedule "E"
Page 9
shall provide Halloway with a Certificate of Acceptance of the relevant Boulevard and
Driveway Works.
20. Ownership of Boulevard and Driveway Works by Municipality
For greater certainty, Halloway acknowledges and agrees that the Municipality is
the owner of all of the Boulevard and Driveway Works covered by a Certificate of
Acceptance. Halloway shall have no right or claim thereto, other than as specifically
agreed to between Halloway and the Municipality in writing.
21. Road Damaee Guarantee
Prior to the issuance of an Authorization to Commence Works by the Director for
the construction and installation of the Boulevard and Driveway Works, Halloway shall
deposit Five Thousand ($5,000.00) Dollars with the Municipality which may be drawn
upon by the Municipality to indemnify itself against any cost that the Municipality incurs
in repairing damage caused by Halloway to Clarington Boulevard and/or Stevens Road
Extension in constructing and installing any of the Boulevard and Driveway Works. The
deposit or so much of it as is not drawn upon for the aforesaid purpose shall be repaid by
the Municipality to Halloway without interest when the Security for the Maintenance
Guarantee of the Boulevard and Driveway Works is repaid by the Municipality to
Halloway.
Schedule "F "
Page 1
SCHEDULE "F"
THIS SCHEDULE IS SCHEDULE "F" to the Subdivision/Consent Agreement
which has been authorized and approved by By-law No. 2007-088 of The Corporation of
the Municipality ofClarington, enacted and passed the 23rd day of April, 2007.
BOULEVARD AND DRIVEWAY WORKS
PERFORMANCE AND MAINTENANCE GUARANTEE
1. Boulevard and Drivewav Works Performance Guarantee ReQuired
(a) Prior to the date of issuance of any Authorization to Commence Work,
Halloway shall deposit with the Municipality, cash or an irrevocable and
unconditional letter of credit issued by a bank listed in Schedule "I" of the
Bank Act, acceptable to the Municipality's Director of Finance/Treasurer,
and containing terms satisfactory to the Municipality's Director of
Finance/Treasurer ("Boulevard and Driveway Works Performance
Guarantee"). The Boulevard and Driveway Works Performance Guarantee
shall be in the amount determined by the Director to be the amount
required to secure to the Municipality the performance by Halloway of its
covenants contained in this Subdivision/Consent Agreement to construct
and install the Boulevard and Driveway Works.
(b) Without limiting the generality of the foregoing, III making his
determination, the Director shall have regard for the "Boulevard and
Driveway Works Cost Estimate" or the "Revised Boulevard and Driveway
Works Cost Estimate" (both terms as hereafter defined) whichever is
applicable, for the construction and installation of the Boulevard and
Driveway Works which either application has been made by Halloway to
the Director for the issuance of an Authorization to Commence Works or
an Authorization to Commence Works has been issued by the Director.
(c) If from time to time following the issuance of any Authorization to
Commence Works the Director is of the opinion that the amount of the
Boulevard and Driveway Works Performance Guarantee should be
increased in order to protect the Municipality's interests under this
Subdivision/Consent Agreement, the Director shall consider and, acting
reasonably, approve a Boulevard and Driveway Revised Works Cost
Estimate which on his approval shall be deemed to be the Boulevard and
Driveway Works Cost Estimate for the purposes of this
Subdivision/Consent Agreement. Forthwith after the Director approves a
Boulevard and Driveway Revised Works Cost Estimate, he shall give to
Halloway written notice of his decision and a copy of the Boulevard and
Schedule "F "
Page 2
Driveway Revised Works Cost Estimate. Halloway shall deposit with the
Municipality cash or an unconditional and irrevocable letter of credit in
such amount issued by a bank listed in Schedule "I" of the Bank Act that
is acceptable to the Municipality's Director of Finance/Treasurer and
which contains terms satisfactory to the Municipality's Director of
Finance/Treasurer.
(d) In the event that Halloway does not increase the amount of the Boulevard
and Driveway Works Performance Guarantee for a period of thirty (30)
days following the giving of written notice by the Director to Halloway
requiring an increase in the amount of the Boulevard and Driveway Works
Performance Guarantee, any Authorization to Commence Work that has
been issued shall terminate.
(e) The Director shall give Halloway written notice that the Boulevard and
Driveway Works have been completed. No later than the expiry of the ten
(10) day period following the date on which this written notice is given to
Halloway of the as-constructed costs of the Boulevard and Driveway
Works. If the as-constructed costs of these Boulevard and Driveway
Works as determined by the Director ("As-Constructed Costs") exceeds
the then current Boulevard and Driveway Work Cost Estimate, forthwith
after written demand is given to it by the Director, Halloway shall pay to
the Municipality any amount by which such As-Constructed Costs
exceeds the then current Boulevard and Driveway Works Cost Estimate of
the As-Constructed Costs of the Boulevard and Driveway Works.
2. Use of Boulevard and Drivewav Works Performance Guarantee
(a) From time to time the Municipality may appropriate the whole or anyone
or more portions of the Boulevard and Driveway Works Performance
Guarantee up to an amount(s) determined by the Director, which in
aggregate shall not exceed the amount(s) which in the opinion of the
Director is required to remedy Halloway's breach(es) or defau1t(s) of or
under the provisions of the Subdivision/Consent Agreement. Forthwith
after making each such appropriation, the Director shall give Halloway
written notice thereof and Halloway shall forthwith reinstate the
Boulevard and Driveway Works Performance Guarantee to the full
amount required by this Subdivision/Consent Agreement.
(b) If the whole or any portion of the Boulevard and Driveway Works
Performance Guarantee is appropriated by the Municipality as aforesaid
and is not fully expended by the Municipality, Halloway agrees with the
Schedule "F "
Page 3
Municipality that Halloway will not require the Municipality to pay
interest on any portion of it for the period in which it is held by the
Municipality and deposited by the Municipality in an interest bearing
account in the name of the Municipality, in the event that an amount equal
to the appropriate or any part of it is paid by the Municipality either to
Halloway, to the bank which issued the letter of credit for deposit as the
Boulevard and Driveway Works Performance Guarantee, as directed by
Halloway or the bank, as the case may be.
3. Indemnification of Municipalitv
Halloway shall defend, indemnify and save the Municipality harmless from and
against all actions, claims, liabilities, losses, damages and expenses including reasonable
legal fees which arise by reason of or are caused in whole or in part by the making and/or
the implementation of this Subdivision/Consent Agreement, or the design, construction
and installation, supervision of construction and installation, inspection, and/or
maintenance of the Boulevard and Driveway Works by Halloway, its employees,
contractors, suppliers of services or materials, Halloway's Engineer, Halloway's
Engineer's employees, and Halloway's licensees.
4. Insurance
Halloway shall obtain and maintain and deposit the proof thereof as required by
and in accordance with Schedule "J" of this Subdivision/Consent Agreement.
5. Maintenance Guarantee Required
(1) From the date of issuance of an Authorization to Commence Boulevard and
Driveway Works until the date of issuance of a Certificate of Acceptance of the
Boulevard and Driveway Works or particular component(s) of the Boulevard and
Driveway Works, Halloway agrees with the Municipality to promptly correct,
remedy, repair or replace any portion or component of the Boulevard and
Driveway Works in question that the Director determines to be defective or
deficient having regard to the provisions of this Subdivision/Consent Agreement
at Halloway's cost (the "Maintenance Guarantee"). The amount of the required
Maintenance Guarantee shall be determined in accordance with paragraph 5(1) of
this Schedule. Halloway shall be given written notice of any such deficiency or
defect by the Director forthwith after he identifies the same. Halloway shall
deposit or leave on deposit with the Municipality, cash or an irrevocable and
unconditional letter of credit by a bank listed in Schedule "I" of the Bank Act
acceptable to the Municipality's Director of Finance/Treasurer and containing
terms satisfactory to the Municipality's Director of Finance/Treasurer, as security
for the Maintenance Guarantee (the "Security for the Maintenance Guarantee").
Schedule "F "
Page 4
(2) The Maintenance Guarantee expires on the later to occur of (1) the date of
issuance of the Certificate of Acceptance of the Boulevard and Driveway Works,
and (2) the day which commences on the date of the issuance of the Certificate of
Completion of the Boulevard and Driveway Works and is two (2) years following
the date of its commencement.
6. Use of Maintenance Guarantee
From time to time, the Municipality may appropriate the whole or any part of the
Security for the Maintenance Guarantee if Halloway fails to pay any cost(s) payable by
Halloway to the Municipality under this Subdivision/Consent Agreement. The amount(s)
of such appropriation shall not exceed the amount( s) which in the opinion of the Director
are required to remedy Halloway's breach(es) or defau1t(s) as determined by the Director
of correcting or remedying a deficiency(s) or defect(s) in the Boulevard and Driveway
Works or a portion or component thereof, which is covered by the Maintenance
Guarantee and is in question. Forthwith after the Municipality makes any such
appropriation, the Director shall give Halloway written notice thereof. Forthwith, after
the giving of such notices, Halloway shall restore the Security for the Maintenance
Guarantee to the full amount required by this Subdivision/Consent Agreement.
7. Reduction and Release of Boulevard and Drivewav Works
Performance Guarantee
(a) Prior to the release of the Boulevard and Driveway Works Performance
Guarantee, in the discretion of the Director, the amount of the Boulevard
and Driveway Works Performance Guarantee may be reduced, from time
to time, to reflect the progress of completion of the Boulevard and
Driveway Works and other facilities and improvements which are required
to be constructed and installed by Halloway after taking into account any
outstanding claims the satisfaction of which is provided for in this
Subdivision/Consent Agreement. The maximum reduction that may be
permitted to be made. by the Director is such that will leave on deposit
with the Municipality as the Boulevard and Driveway Works Performance
Guarantee is the amount equal to the sum of (1) the value of the
uncompleted Boulevard and Driveway Works as determined by the
Director having regard for the Boulevard and Driveway Works Cost
Estimate then in force plus any amount determined by the Director but not
to exceed twenty (20%) percent of such value as a completion allowance
payable to the Municipality, and (2) as the Maintenance Guarantee fifteen
(15%) percent of the value of the completed Boulevard and Driveway
Works, also determined by the Director after considering the material, if
any, submitted to the Director by Halloway's Engineer in support of an
Schedule "F "
Page 5
application for reduction of the Boulevard and Driveway Works
Performance Guarantee in respect of the Boulevard and Driveway Works
that have been completed by Halloway as well as the contract documents,
sub-contracts and supply contracts pertaining to the Boulevard and
Driveway Works and the provisions ofthe Construction Lien Act.
(b) Halloway will not require the Municipality to release to Halloway any
unused portion of the Boulevard and Driveway Works Performance
Guarantee until each of the following conditions is satisfied:
(i) A Certificate of Completion has been issued for the Boulevard and
Driveway Works for which the Boulevard and Driveway Works
Performance Guarantee was initially required to be deposited with
the Municipality.
(ii) Halloway has deposited or has left on deposit with the
Municipality the Maintenance Guarantee applying to the
Boulevard and Driveway Works for which the Boulevard and
Driveway Works Performance Guarantee initially was required to
be deposited with the Municipality.
(iii) The Director is satisfied that in respect of the construction and
installation of the Boulevard and Driveway Works for which such
Boulevard and Driveway Works Performance Guarantee was
initially required to be deposited with the Municipality, there are
no outstanding claims relating to such Boulevard and Driveway
Works.
(iv) The Municipality is satisfied that there are no outstanding claims
relating to the Boulevard and Driveway Works which the
Municipality is required or may be permitted to pay either under
the provisions of the Construction Lien Act or otherwise.
(v) The Municipality is satisfied that Halloway is not in breach of any
of its covenants contained in this Subdivision/Consent Agreement.
8. Reduction and Release of Maintenance Guarantee
Halloway will not require the Municipality to release to Halloway the Security for
the Maintenance Guarantee until each of the following conditions is satisfied:
Schedule "F "
Page 6
(a) A Certificate of Acceptance has been issued for the Boulevard and
Driveway Works for which such Maintenance Guarantee is required under
this Subdivision/Consent Agreement.
(b) The Municipality is satisfied that there are not outstanding claims relating
to such Boulevard and Driveway Works which the Municipality is
required or may be permitted to pay either under the provisions of the
Construction Lien Act or otherwise.
(c) The Municipality is satisfied that Halloway is not in breach of any of its
covenants contained in this Subdivision/Consent Agreement.
(d) The Director has received the as-constructed drawings for such Boulevard
and Driveway Works from Halloway as well as the computer disks, if any,
have been prepared by Halloway's Engineer.
9. Unpaid Monies
Except as otherwise provided in this Subdivision/Consent Agreement, the due
date of any money payable under it, unless a different due date is specified in this
Subdivision/Consent Agreement, shall be thirty (30) days after the date of the giving of
the written invoice to Halloway. Interest shall be calculated and be paid by Halloway to
the Municipality on all sums of money of which Halloway is in default at the same rate,
and in the same manner, and at the same time as is the case with Municipality taxes
which are in arrears at the date on which the default in question commences.
Schedule "G"
Page 1
SCHEDULE"G"
THIS SCHEDULE IS SCHEDULE "G" to the Subdivision/Consent Agreement
which has been authorized and approved by By-law No. 2007-088 of The Corporation of
the Municipality ofClarington, enacted and passed the 23rd day of April, 2007.
DUTIES OF HALLOWAY'S ENGINEER
1. RESPONSIBILITY FOR DESIGN ETC.
In addition to the other requirements of this Subdivision/Consent Agreement,
Halloway's Engineer shall prepare all drawings, plans, studies, reports, estimates,
calculations and documentation for the consideration and approval of the
Director. The approval of the Director shall not absolve or release Halloway or
Halloway's Engineer of the responsibility and liability for any errors or omissions
in the above drawings, plans, reports, stages or documentation or from liability for
any damage or loss caused or resulting directly or indirectly by Halloway's
Engineer.
2. REPRESENT HALLOWAY AND OBTAIN MUNICIPALITY
APPROV ALS
Halloway's Engineer is hereby authorized by Halloway to act as Halloway's
representative in all matters pertaining to the design, construction and installation
of the Boulevard and Driveway Works and the overall management of the
development, and shall co-operate with the Municipality and the Director to
protect the interests of the Municipality and the general public in all matters
relating to the design, construction and installation of the Boulevard and
Driveway Works.
3. PROVIDE RESIDENT SUPERVISION
Halloway's Engineer shall provide fully qualified, experienced supervisory layout
and inspection staff, acceptable to the Director, to provide continuous inspection
service during all phases of the construction and installation of the Boulevard and
Driveway Works. Without limiting the generality of the foregoing, Halloway's
Engineer shall be responsible for the following:
(a) To carry out or arrange for the carrying out by qualified personnel of field
layout including the provision of line and grade to the contractors and,
where required, restaking.
Schedule "G"
Page 2
(b) To thoroughly inspect the construction, installation, and supply of
materials to ensure that all work is being performed in accordance with the
Engineering Drawings, the Municipality's Design Criteria and Standard
Drawings, and applicable plans of survey, as the case may be, and all
applicable law. Halloway's Engineer shall have the authority and
responsibility to immediately stop and/or reject any work, procedure, or
material which in his opinion does not comply with the Engineering
Drawings, the Municipality's Design Criteria and Standard Drawings, the
applicable plans of survey and/or the applicable law.
(c) To provide co-ordination and scheduling of the construction and
installation of the Boulevard and Driveway Works in accordance with the
timing provisions contained in this Subdivision/Consent Agreement and
the requirements of the Director.
(d) To investigate and immediately report to the Director any unusual
circumstances, potential problems, conflicts, errors, defective work or
material which may arise during the construction and installation of the
Boulevard and Driveway Works.
(e) To obtain field information during and upon completion of the
construction and installation of the Boulevard and Driveway Works
required to modify the Engineering Drawings to produce the as-
constructed drawings of the Boulevard and Driveway Works.
4. MAINTAIN RECORDS
Halloway's Engineer shall maintain all records, data, reports, approvals and
orders pertaining to the construction and installation including all contract
documents, sub-contracts and supply contracts, payment certificates, payment
records and receipts, certificates of substantial performance, the names and
addresses of all contractors, sub-contractors and suppliers of materials and
services, certificates of completion of sub-contracts and proof of service and
publication thereof in accordance with the provisions of applicable legislation and
make all of the foregoing available for examination by the Director as required by
the Director without cost. If any change is made in the terms of a contract, sub-
contract or supply contract or in the name or address of a contractor, sub-
contractor and supplier from information that may not have been provided to the
Director by Halloway or Halloway's Engineer pursuant to this
Subdivision/Consent Agreement, Halloway's Engineer immediately after
becoming apprised of each change shall give the Director written notice of it.
Schedule "G"
Page 3
5. PROVIDE PROGRESS REPORTS
Halloway's Engineer shall provide the Director with reports on the progress of the
construction and installation of the Boulevard and Driveway Works on a monthly
basis, or at such other interval as approved by the Director.
6. PREPARE AS-CONSTRUCTED DRAWINGS
Halloway's Engineer shall prepare and submit the as-constructed drawings of the
Boulevard and Driveway Works together with the computer disks, if any have
been prepared, to the Director provided that the as-constructed drawings shall be
prepared to the satisfaction of the Director.
Schedule "H"
Page 1
SCHEDULE"H"
THIS SCHEDULE IS SCHEDULE "H" to the Subdivision/Consent Agreement
which has been authorized and approved by By-law No. 2007-088 of The Corporation of
the Municipality ofClarington, enacted and passed the 23rd day of April, 2007.
REGULATIONS FOR CONSTRUCTION
1. RESPONSIBILITY FOR DESIGN
All work pursuant to and associated with this Subdivision/Consent Agreement
shall be carried out in strict conformity with all approved Engineering Drawings,
the Municipality's Design Criteria, Standard Drawings and Specifications or any
revisions thereof and all applicable legislation, in addition to any requirements set
out in this Subdivision/Consent Agreement.
2. SAFETY
Halloway shall ensure that all construction pursuant to and associated with this
Subdivision/Consent Agreement is carried out in conformance with the
Occupational Health and Safety Act, and other applicable legislation.
3. PERMITS AND APPROVALS
Halloway shall ensure that any and all permits and approvals required to install or
construct or prepare to install or construct any of the Boulevard and Driveway
Works pursuant to or associated with any part of this Subdivision/Consent
Agreement have in fact obtained and are valid and in good standing.
4. REQUIREMENTS FOR BLASTING
Not Used.
5. REMOVAL OF TOPSOIL
Halloway shall not remove any topsoil from the Halloway Lands except for
construction purpose and such topsoil must remain within the limits of the
Halloway Lands unless otherwise approved by the Director.
Schedule "H"
Page 2
6. DUMPING OF FILL OR DEBRIS
Halloway agrees to neither dump, nor permit to be dumped, any fill or debris, on
nor to remove, or permit to be removed any fill from any part of the Halloway
Lands to be dedicated to the Municipality other than the roads within the limits of
the Halloway Lands, without the written consent of the Director.
7. DISPOSAL OR CONSTRUCTION GARBAGE
Halloway shall remove and dispose of all construction garbage and debris from
the Halloway Lands in an orderly and sanitary fashion in a dump site off the
Halloway Lands and approved by the Director. The Municipality shall not be
responsible for the removal or disposal of garbage and debris. Without derogating
from the foregoing provisions of this paragraph, if Halloway fails to remove
construction garbage or debris from the Property for a period of three (3)
consecutive days following the giving of written notice by the Director to
Halloway requiring it to do so, the Director may cause the construction garbage or
debris to be removed to and disposed of in the aforesaid dumping site at the
expense of Halloway. Forthwith after the Director gives written notice to
Halloway requiring it to pay for the costs incurred in removing and disposing of
the construction garbage or debris, Halloway shall pay the Municipality the
amount of money for it is invoiced.
8. QUALITATIVE AND QUANTITATIVE TESTS
Not used.
9. WEED AND RAT CONTROL
After the commencement of construction Halloway shall institute upon the Halloway
Lands a program of weed and rat control to the satisfaction of the Director,
. .
Schedule "I"
Page 1
SCHEDULE "I"
THIS SCHEDULE IS SCHEDULE "I" to the Subdivision/Consent Agreement
which has been authorized and approved by By-law No. 2007-088 of The Corporation of
the Municipality of Clarington, enacted and passed the 23 rd day of April, 2007.
Boulevard and Drivewav
Works Cost Estimate
Halloway Holdings Ltd.
Bowmanville West Main Central Area
Cost Estimate-Clarington Blvd Works and Restoration and Stevens Rd Entrance
April 3,2007
Item Unit Price Quantity Cost
1.0 Clarington Boulevard - Parking Island Restoration
1.1 Remove ex Mountable Island (incl concrete curb and asphalt surface) M2 $ 30.00 120.0 $ 3,600.00
1.3 Reinstate Concrete Curb and Gutter (incllap joint and asphalt infill) m $ 120.00 45.0 $ 5,400.00
1.4 Install Decorative Light Pole(incl pole base and connect to ex wiring) each $ 6,500.00 1.0 $ 6,500.00
1.5 Brick Boulevard (incl bedding) M2 $ 85.00 120.0 $ 10,200.00
1.6 Street Tree c/w with Ornamental Grate each $ 800.00 1.0 $ 800.00
Sub-Total $ 26,500.00
2.0 Clarington Boulevard - Parking Bump Out Construction
2.1 Remove ex Curb and Gutter and Asphalt M2 $ 30.00 65.0 $ 1,950.00
2.2 Reinstate Concrete Curb and Gutter (incllap joint and asphalt infill) m $ 120.00 25.0 $ 3,000.00
Sub-Total $ 4,950.00
3.0 Clarington Boulevard - Boulevard Works
3.1 1.80m Concrete Sidewalk m $ 70.00 70.0 $ 4,900.00
3.2 Brick Boulevard (incl bedding) M2 $ 85.00 60.0 $5,100.00
3.3 Street Tree clw with Ornamental Grate each $ 800.00 4.0 $ 3,200.00
Sub-Total $ 13,200.00
4.0 Stevens Road - Driveway Entrance
4.1 Granular 'B' (300mm) M3 $ 30.00 30.0 $ 900.00
4.2 Granular 'A' (150mm) M3 $ 45.00 13.0 $ 585.00
4.3 HI8 Asphalt (80mm) $ 65.00 17.0 $ 1,105.00
4.4 HI3 Asphalt (40mm) $ 75.00 8.5 $ 637.50
4.5 Concrete Curb and Gutter m $ 65.00 25.0 $ 1,625.00
4.6 150mm Underdrain m $ 15.00 25.0 $ 375.00
Sub-Total $ 5,227.50
Schedule "I"
Page 2
5.0 Summary - Construction Costs
5.1 Clarington Boulevard - Parking Island Restoration
5.2 Clarington Boulevard - Parking Bump Out Construction
5.3 Clarington Boulevard - Boulevard Works
5.4 Stevens Road - Driveway Entrance
$ 26,500.00
$ 4,950.00
$ 13,200.00
$ 5,227.50
Sub-Total $ 49,877.50
5.5 5% Contingencies
$ 2,493.88
Sub-Total $ 52,371.38
$ 5,237.14
Sub-Total $ 57,608.51
$ 3,456.51
5.6 10% Engineering
5.7 6% GST
5.8 Total Estimated Construction Costs
$ 61,065.02
Schedule "J"
Page 1
SCHEDULE "J"
THIS SCHEDULE IS SCHEDULE "J" to the Subdivision/Consent Agreement
which has been authorized and approved by By-law No. 2007-088 of The Corporation of
the Municipality of Clarington, enacted and passed the 23rd day of March, 2007.
INSURANCE REQUIRED
1. TYPES OF COVERAGE REQUIRED
Halloway shall obtain and maintain insurance of the character commonly referred to as
public liability and property damage with an insurance company approved by the
Municipality's Director of Finance/Treasurer and licensed in Ontario to underwrite such
insurance and containing terms and conditions which are acceptable to the Municipality's
Director of Finance/Treasurer. Such policy or policies of insurance shall indemnity the
Municipality against all damage or claims for damage for:
(a) any loss or damage that shall or may happen to any of the Works or any of the
Utilities or to any part or parts thereof respectively;
(b) any loss or damage that shall or may happen to any of the materials or any of the
equipment or any other things used to construct or install any of the Works or any
part or parts thereof respectively;
(c) any injury to any person or persons including workmen employed on the
Halloway Lands (unless covered by Workers Safety & Insurance Board) and the
public;
(d) any loss or damage that shall or may result from the drainage of surface water on
or from the Halloway Lands;
(e) any loss or damage that shall or may result from the disposal of effluent from any
sewage disposal works; and
(f) any loss or damage that shall or may happen to any public road or to any other
property of the Municipality or to the property of any other person either directly
or indirectly by reason of Halloway undertaking any or all of the Works.
2. AMOUNTS OF COVERAGE REQUIRED
Policy or policies of insurance shall be issued jointly in the names of Halloway and the
Municipality and shall provide the following minimum coverages for five million
($5,000,000.00) dollars for all damage arising out of one (1) accident or occurrence or
series of accidents or occurrences.
Schedule "J"
Page 2
The issuance of such policy or policies of insurance or the acceptance of it or them by the
Municipality shall not be construed to relieve Halloway from responsibility for other or
larger claims for which it may be held responsible.
3. TERM OF INSURANCE
The term of the required insurance shall commence no later than the day on which the
first Authorization to Commence Works is issued and shall terminate no earlier than the
last day on which all Certificates of Acceptance have been issued for each of the Works
for all ofthe Works contemplated by this Subdivision/Consent Agreement.