Loading...
HomeMy WebLinkAboutEGD-034-07 Clw:ilJgton REPORT ENGINEERING SERVICES DEPARTMENT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE Date: Tuesday April 10, 2007 iJ,.el::l\ut,on4t: 0ffi - 2q 1/-0t Report #: EGD-034-07 File#: By-law #: Subject: Mill Street Subway Reconstruction, Newcastle - Public Information Centre Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report EGD-034-07 be received; and 2. THAT Council receive the information pertaining to the Public Information Centre of March 20, 2007; 3. THAT staff proceed with the EA process recommending the preferred hybrid alternative as the preferred alternative. Respectfully by, o '--'?~ ~ COL Reviewed by: Franklin Wu Chief Administrative Officer Submitted by: A.S. Cannella Director of Engineering Services ASC/BMB/jo April 2, 2007 CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T 905-623-3379 F 905-623-9282 Report #EGD-034-07 Page 2 1.0 BACKGROUND 1.1 On February 12, 2007, Report EGD-024-07 was received by Council. The resolution passed directed the Engineering Services Department to proceed with the Environmental Study Report and schedule a final Public Information Centre (PIC) to present the hybrid alternative. A PIC was initially scheduled and advertised for March 1, 2007; however, due to weather conditions, the Engineering Services Department rescheduled the meeting in consideration of public safety. The reconstruction of the Mill Street Subway south of Highway 401 in Newcastle was the subject of a well attended PIC at the Newcastle Town Hall on March 20, 2007. 2.0 INFORMATION CENTRE 2.1 Information Centre, March 20, 2007 Staff and representatives from municipal consultants, Totten Sims Hubicki, presented the following information to the members of the public who were in attendance: . Information and meeting notes from Previous PIC's (May 2001 & April 2006) . Graph indicating the Class EA process and various stages highlighting the current stage in the process . Arial photography of the immediate area adjacent to the proposed works . The preferred hybrid alternative with respect to the existing rail line, the surrounding properties, and Toronto St. . Final reports of other Class EA project used as an examples of the ultimate product from the EA process . Various geotechnical studies . Plan and Profile drawings of the reconstructed Mill Street subway and a conceptual rendition of the completed works . Various examples of pedestrian tunnels that currently exist. 2.2 Following the informal presentation of the above material, staff and the municipal consultants held a formal presentation including the history of the project dating Report #EGD-034-07 Page 3 back to 1991 through to the most current alternative being considered today. This formal presentation material is available on file with the Engineering Services Department or on the municipal website at www.clarington.neUhtdocs/department_engineering.html. A post presentation discussion was provided for the general public to help clarify any presentation material and provide verbal comments. 2.3 In all, the meeting was well attended and the register and comment sheets are on file within the Engineering Services Department and available for review. The design proposal presented for the Mill Street subway was generally well received and several members of the public participated in the post presentation discussion. There were comments made with respect to the following aspects of the project: . The historic presence of the existing bridge structure . The southbound entrance sign wording as you approach the structure . The proposed installation of the signals at Toronto St. and Mill St. intersection . The vehicular sightlines along Mill St. . The importance of the proposed pedestrian tunnel . Of the thirty-eight persons who actually registered, two where in favour of the full reconstruction of the historic structure previously presented in 2006 . The remaining comments were extremely positive and observers were satisfied with the works proposed 3.0 DISCUSSION 3.1 As a result of the PIC, finalizing the detailed design will proceed based on the comments received for the work presented by the Municipality with the following issues to be addressed: . The signed entrance will consider the existing Bond Head area and the Port of Newcastle. . The underground infrastructure for the signals will be installed. The intersection will be monitored following the reconstruction and the signals will Report #EGD-034-07 Page 4 be installed when the Engineering Services Department feels they are warranted. . The proposed profile will be reviewed and, if further improvements to the sightlines can be achieved, they will be considered. 4.0 CONCLUSIONS The following schedule is proposed for the completion of the project: Complete construction of Toronto Street improvements September 2007 Tender improvements for Mill Street including sidewalk, pedestrian Icyclist underpass and minor grading September 2007 improvements Complete construction of Mill Street improvements June 2008 Signalization of Mill Street South @ Toronto Future StreetlHiQhwav 401 South Ramp Terminal intersection Attachments: Attachment 1 - Key Map II Qlr. Doncaster-Cr -- ' . . < . \ JOD' <,Jame1orme. 'Ii RobertStW-r-- --RobertStE~ ~5 ~I .., , wa 401 _:(~[- : '. ~1CS!~_{l:t,~::tleights - SunsefBlvct-. >-7 i '-:_Y"- ., DiD! C,alctwell-G.r. \ ) 'TiotO-nfOJSt St. Lawrence & H udson Railway i ./1. / L/-, ) // z.r--..".jC/ r/' __'~-'...//'\.J"-\,;",-..,l:'i,,-- ,/ \ ' OJ " ) (,j' / / ,---./- (/~ ./ / : , /'-.) /' --- ! /._/""j-----' Ci5 ..0 c . 0 -'-~'-o f--.. J\r w~s s /< DRAWN BY: EL DATE: April 2, 2007 REPORT EGD-034-07 ATTACHMENT NO.1 G:\Attachments\MiIIStBridge. mxd