Loading...
HomeMy WebLinkAboutEGD-013-18Clarftwn Engineering Services Report If this information is required in an alternate accessible format, please contact the Accessibility Coordinator at 905-623-3379 ext. 2131. Report To: Council Date of Meeting: July 3, 2018 Report Number: EGD -013-18 File Number: Resolution: GG -248-18 By-law Number: Report Subject: Tooley Road Sidewalk, West Side from Nash Road to 275 meters North Recommendations: 1. That Report EGD -013-18 be received; 2. That the location of the proposed sidewalk on the west side of Tooley Road from Nash Road to 275 meters north remain unchanged from the approved subdivision drawings; and 3. That all interested parties listed in Report EGD -013-18 and any delegations be advised of Council's decision. Municipality of Clarington Page 2 Report EGD -013-18 Report Overview This report provides background information and rationale for the placement of the sidewalk on the west side of Tooley Road from Nash Road to 275 meters north. 1. Background 1.1 Tooley Road is classified as a Collector Road from Nash Road to Pebblestone Road in the Official Plan. As per section 19.6 of the Official Plan, the design principles specify that Collector Roads have sidewalks on both sides of the road in order to facilitate the safe movement of pedestrians in a higher traffic area. In this case, it is unlikely a sidewalk will be incorporated on the east side of Tooley as there is limited development potential. It is therefore important that a sidewalk exist on the west side to provide a safe, convenient pedestrian route that conforms to the Official Plan's objective of a balanced transportation system that accommodates cycling and walking as an important form of active transportation in addition to meeting our design standards wherever possible. 1.2 One of the key elements of an effective active transportation network are the `connecting links' between the various components of the network. The Clarington Transportation Master Plan looks at where these connecting links can be constructed. Connecting links allow users to safely move from one area to another, including crossings of busy streets, without long detours that discourage active transportation. 1.3 Through subdivision and site plan development, developers are required to construct roads, sewers, sidewalks, street trees, street lighting, and other features that service the new homes, as well as others in the community. The services that are required are determined through the subdivision application process, and in accordance with the Municipality's design standards. 2. Analysis 2.1 The proposed sidewalk is on the west side of Tooley Road from Nash Road to 275 meters north. With the exception of 111.5 meters north of Nash Road, the standard offset of 0.75 m from the public road allowance has been used for the location of this sidewalk. 2.2 The location of the sidewalk at the southern portion of Tooley Road is at the back of curb, which is usually done only as a last resort. This location is due to significant design challenges, utility conflicts and as a result of no opportunity for property acquisitions (via road widening), to accommodate the sidewalk in the standard location. As the sidewalk reaches the new development, it is shown in the standard location as per the approved subdivision and lot siting drawings. 2.3 Sidewalk at the non-standard location is not desirable for a number of reasons, including, but not limited to: Municipality of Clarington Page 3 Report EGD -013-18 • Inconsistent slope where driveway meets sidewalk. This also can impact our ability to comply with AQDA standards for accessibility; • Utility cabinets located behind sidewalk and closer to house fronts; • Inconsistent location for underground services and utilities; If a utility company or municipal works were to require exposing a service in the driveway, it would impact the entire driveway; • Less separation between vulnerable pedestrians and the vehicles using the road; • Trees could not be planted between the sidewalk and the road. These trees aid in traffic calming, create a nicer experience for pedestrians and aid in reducing heat traps caused by a lack of a tree canopy; • The sidewalk width would have to be increased to 1.8 meters. This increases the cost of the sidewalk by 20% or more and also increases the Municipality's long term maintenance costs; No boulevard snow storage area for snow that is ploughed off the road resulting in the residents potentially having to clear their entire property frontage of snow rather than just their driveway width; Should the road need to be widened in the future, the sidewalk would have to be replaced, resulting in higher costs. 2.4 A copy of our design standard for a 26.0 m Collector Road, C-206, is provided as Attachment 1 for your reference. The standard highlights the location of all utilities required within the public road allowance. 2.5 Demonstration plans as well as engineering design drawings for the subdivision were available for potential purchasers to view prior to purchase. These drawings clearly show the sidewalk at the standard location. Attachment 2 shows the proposed sidewalk as provided in the approved subdivision plans. Attachment 3 shows a sample house siting plan for one of the homes within the approved subdivision which also shows the sidewalk location_ 3. Concurrence Not Applicable Municipality of Clarington Page 4 Report EGD -013-18 4. Conclusion 4.1 The location of all services on which the public depend are provided through our public road allowance. The Official Plan defines the location of residential, commercial and industrial development so they may be serviced via our public road allowances. Our design standards are developed in consultation with utility stakeholders and define a specific location for each service both vertically and horizontally within the public road allowance. This methodology permits us to locate services to meet long term needs and expectations and also prevents confusion and conflict between stakeholders of the services, the Region of Durham, utility companies and the Municipality. Significant effort and coordination is undertaken to develop location standards and staff advise we adhere to these standards. 4.2 It is respectfully recommended that the proposed sidewalk within the plan of subdivision be located using the standard offset of 0.75 m from the public road allowance as was approved. 5. Strategic Plan Application The recommendations contained in this report conform to Priority 4 of the 2015 - 2018 Strategic Plan initiatives to "Enable safe, efficient traffic flow and active transportation". Submitted by: Anthony Cannella, Director of Engineering Services Reviewed by: Andrew C. Allison, B. Comm, LL.B CAO Staff Contact: Ron Albright, Assistant Director, 905-623-3379 ext. 2305 or RAIbright@clarington.net Attachments: Attachment 1 - 26.0 m Collector Road Design Standard Attachment 2 - Approved Subdivision Plan Attachment 3 - Sample House Siting Plan The following is a list of the interested parties to be notified of Council's decision: Margaret Sessa STREET NE z E O~za O O~ MW§~ n YL 2 O N U •� 4 L FF O U) N p L O 0 3 O � L 0] 0 Z > r U •L y� U SC O w + L ao 4- N O z O �o m z !Z N 0-0 ++ p L O 7 a O E / L M I «« J O C N = (} W } U 0 Ld Q N :'' y c .. C7 _ In O N +U N N Ld 0 ' M U N L o(n�' 0 z ¢ m OTO O z m S' LO ui J L �L<Q + Z-- --- 4 C a � U).*E E N o Lq p 00 U) E ZEE o� O N �-tm n Ex M L I �_U I1 L V N p ED cn U 7 U L N L >r U N #?- Id Z — LU oit 3 o 4-- cn Jo O 01 J � C LUM Q U) N O O U Uj wA DO O a L �Ld g � M W � O �I WOI O In 0 4-1 VI J N 3 Q N V L (nN Ca X iF LiJ STREET LINE All dimensions are in metres unless otherwise noted. Muq&ipality of Clarington Engineering Services Department CHECKED REVISION N0. APS 26m ROAD ALLOWANCE -URBAN REVISION DATE APPROVED DATE 14.5m PAVEMENT C-206 APRIL 2004 44�O N � @tyg,r4t+ PROP 25.35m OF -G - CURB & GUTTERS AS PER STD C-302. BEI'Lry ST'p LEGEND-----, " I EX HSE /3017 ORIGINAL SURVEY ELEVATION ORIGINAL ELEVATION TO REMAIN PROPOSED ELEVATIONS PROPOSED SWALE DIRECTION OF DRAINAGE SUMP PUMP PHASING LINE SAN m 19• �r (O EX CURe� �R0 O NEO c � QPOQ�tOQER T� / •(O EXISTING NpNSE 6+ N M 'x, �,;pEWALK 703.75 101.35 103.15 D PHASE 1 SCALE= 1:300 1 13ELLI" CE? CURB ANO CENTERFIELD DRI VE i F_X 2 Oram VC S�EXTEND EXIST CONC SIDEWALK \U` Ful CURB TO PROP CURB RB EXvvvt� �� rnr, SVG WM f � > MATCH TO EX CURB eb LL's_ -€tf Cr 136.53 TIC 136.68 EX XJJ6.29 o 1?/M o TO AIN D / N \71 s \ mac' c \� \ P E WORK A VE � ,�" ;� m \\� R OVA ONLK F RE DRIVE M a ' Al LET BE INCLU D WITH P E /CONDO IUM V EV LO z N k TE \� TOOVI CRTCV GRAD BOARD FENCE Y r r T 11 x --- — --13 36.67 136.65 1 X 6.68 o k \ \ EXISTING RESIDANCE RL u c", 135 RIM 13 0 M a o I co � - - LIMIT OF GRADING PHASE 2 2o W- CL I EXISTING GROUND 134 , EXISTING EXISTING GROUND RESIDANCE ._ EDGE OF EX ASPHALT 133 134-- m - A 135 -------- X EXISTING GROUND DRIVEWAY 13 5 AI O J_ M M LOT 9 W 0 0 _ a 1 3 6 PROPOSED GRADE 3:1 SLOPE MAX EXISTING GROUNC 135--- 134 35- -134 .W Iz 1.50m CL 0 It --- — --13 6 j z o EDGE OF EX ASPHALT EX ASPHALT EXISTING RESIDANCE 1 DRIVEWAY 135 PROPOSED SIDE YARD of SWALE AT 2.10% GR - - 1z 34 F --f- - -- I SECTION N SCALE: HORZ. 1:150 VERT. 1:75 132 I� Zp o LOT 9I ao Of EXISTING RESIDANCE J IF 7 0 EXISTING = of 136 - - 1z CURB DEPRESSION FOR DRIVEWAY ACCESS TO BLOCK 10 TO BE 20.00m WIDE. RESIDANCE z0 W- CL I EXISTING GROUND 134 - EXISTING EXISTING GROUND RESIDANCE 0 d EDGE OF EX ASPHALT 133 134-- 135 134 EXISTING GROUND DRIVEWAY 13 5 PROPOSED GRADE PROPOSED YARD SWALE---13 13 4 1 3 3PROPOSED -j -SIDE GRADE (3:1 SLOPE) 4 SECTION 0 SCALE: HORZ. 1:150 132, iI VERT. 1:75 SECTION P Z 1:150 VERT. BLOCK 11 Z LOT 4/5 srl 3.D0m I 11.00mt LOT 1 a� ROAD WIDENING 0.75m &I 134 EXISTING GROUND 133— EXISTING GROUND PROPOSED GRADE (3:1 SLOPE) 134 PROPOSED SWALE 132-- - -BOE -YARD 132 SECTION Q 133 SCALE: HORZ. 2.00%i - VERT. I I PROPOSED GRADE PROPOSED CONC.SIDEWALK 132 U W.0 ZI Zp o EXISTING CURB do GUTTER FROM SOUTH P/L OF LOT 1 TO W J J CLARINGTON STD C-302, 7 0 EXISTING = of m 8 .60m LOT 1 CURB DEPRESSION FOR DRIVEWAY ACCESS TO BLOCK 10 TO BE 20.00m WIDE. RESIDANCE z0 W- CL I a 134 - EXISTING EXISTING GROUND RESIDANCE 0 d 133 134-- 134 EXISTING GROUND 1 3 3PROPOSED GRADE (3:1 SLOPE) 133 PROPOSED SIDE YARD SWALE AT 2.00% GR 132, iI 132 SECTION P SCALE: HORZ. 1:150 VERT. 1:75 Z EXISTING) &, RESIDANCE0. LOT 1 134 — — i 134 EXISTING GROUND 133— 133 PROPOSED GRADE (3:1 SLOPE) PROPOSED SWALE 132-- - -BOE -YARD 132 SECTION Q SCALE: HORZ. 1:150 VERT. 1:75 U NOTE: o EXISTING CURB do GUTTER FROM SOUTH P/L OF LOT 1 TO NORTH P/L OF LOT 9 TO BE REMOVED AND RESTORED TO CLARINGTON STD C-302, ALL CURB DEPRESSIONS TO BE 6.00m WIDE FOR RESIDENTIAL DRIVEWAYS. CURB DEPRESSION FOR DRIVEWAY ACCESS TO BLOCK 10 TO BE 20.00m WIDE. 134 - EXISTING EXISTING GROUND RESIDANCE 133 TOOLEY ROAD EXISTING CURB & GUTTER 4 -7r-� SECTION R SCALE: HORZ. 1:150 VERT. 1:75 1 J L Attachment 2 to Report EGD -013-18 i —r T3Y - � m �Lt- — — I I I G ADING N TES 1) THIS LOCATION AND ELEVATION OFLL EXISTING UTILITIES AND SERVICES TO BE VERIFIED BY THE CONTRACTOR PRIOR TO COMMENCING CONSTRUCTION. CONCERNED UTILITIES TO BE GIVEN ADVANCED NOTICE FOR STAKE OUT. THE CONSULTANT ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF THE UTILITIES SHOWN ON THE DRAWINGS. 2) QUANTITIES, DIMENSIONS AND ELEVATIONS TO BE VERIFIED BY THE CONTRACTOR PRIOR TO ORDERING MATERIALS OR COMMENCING CONSTRUCTION. 3) ALL SLOPES TO BE 3:1 (MAXIMUM) UNLESS OTHERWISE NOTED ON THE DRAWINGS. 4) ALL SWALES SHALL BE CONSTRUCTED WITH 2% MINIMUM GRADE UNLESS OTHERWISE NOTED ON THE DRAWINGS. 5) ALL SLOPES AND SWALES SHALL BE SODDED ON A MINIMUM OF 150mm OF TOPSOIL. 6) ALL DISTURBED AREAS WITHIN THE TOOLEY ROAD, CENTERFIELD DRIVE AND NASH ROAD BOULEVARDS TO BE RESTORED WITH SOD ON A MINIMUM OF 150mm OF TOPSOIL. 7) PROPOSED SIDEWALKS TO BE SAWCUT. DO NOT TROWEL EXPANSION JOINTS. 8) ALL SWALES SHALL BE CONSTRUCTED AT 0.15m MINIMUM DEPTH UNLESS OTHERWISE NOTED ON THE DRAWINGS. 9) PROPOSED DRIVEWAY ACCESS TO BLOCK 10 DEVELOPMENT OFF CENTERFIELD DRIVE AND TOOLEY ROAD SHALL CONSIST OF THE FOLLOWING UNLESS OTHERWISE APPROVED BY THE ENGINEER: 300mm GRANULAR 'B' 150mm GRANULAR 'A' - 50mm HLB ASPHALT 40mm HL3 ASPHALT 10) SUFFICIENT EXISTING PAVEMENT, CURB AND BOULEVARD WORKS TO BE REMOVED AND RESTORED TO PROVIDE A SMOOTH NO. DATE TRANSITION TO EXISTING. EXTENT OF REvlslo REMOVAL AND RESTORATION TO BE DETERMINED BY MUNICIPAL FIELD STAFF. APPROVED 11) BLOCK 10 LAND BETWEEN LOT 6 AND LOT 7 TO BE RESTORED WITH 150mm TOPSOIL AND SOD AND BE DIRECTOR,ENGINEERING SERVICES MAINTAINED BE THE DEVELOPER MUNICIPALITY OF CLARINGTON APPROVED AS TO FORM IN RELIANCE UPON THE UNTIL DEVELOPMENT OF BLOCK 10 PROFESSIONAL SKILL AND ABILITY OF D.G.BIDDLE AND ASSOCIATES AS TO DESIGN AND SPECIFICATION 12) RESPECTING ALL WORK IN THE MUNICIPAL RIGHT OF WAY, THE DATE I CONTRACTOR IS TO PROVIDE AT LEAST 48 CORPORATION OF THE MUN HOURS PRIOR NOTICE TO OUR ENGINEERING SERVIC TRANSPORTATION N AND DESIGN STAFF AT 905-623-3379. T00 LEY MILLS SUB. , 13) A ROAD OCCUPANCY PERMIT WILL BE COU RTI C E, REQUIRED FOR ANY WORK DONE IN THE MUNICIPAL ROAD ALLOWANCE. 14) ALL RESTORATION OR WORK DONE IN PHASE THE ROAD ALLOWANCE MUST BE COMPLETED AS PER MUNICIPAL FIELD LOT GRAD STAFF DIRECTION. 15) THE PERFORMANCE GUARANTEE WILL NOT BE REFUNDED BY THE MUNICIPALITY OF CLARINGTON UNLESS THE WORKS HAVE BEEN INSPECTED BY MUNICIPAL FORCES AND DEEMED TO BE COMPLETE AND (4 D. G. Biddle S� A SATISFACTORY. , consulting engine 16) EXISTING CURB & GUTTER FROM SOUTH ss KING STREET EAST P/L OF LOT 1 TO NORTH P/L OF LOT 9 PHONE (905)576-850( TO BE REMOVED AND RESTORED TO info®c^Jgbidc CLARINGTON STD C-302. 17) ALL CURB DEPRESSIONS TO BE 6.00m �aFEssro,� WIDE FOR RESIDENTIAL DRIVEWAYS. CURB S SCALE: DEPRESSION FOR DRIVEWAY ACCESS TO BLOCK 10 TO BE 20.00m WIDE. ` m r%DA1AIKI DV. 3 0 U) 0 a 0 r w 0 0 0 i N 0 M c) Z 0 LD z o: W W 2 0 Z w C) Z Q 0 0 0 O O 2 Ir 0 M am0 w Z U) U) w z w 0 0 3 N 0 M O 0 0 Ld Ld 34.00 --J---.F -1700 .40 n N 13: U) a N 1 3 65 N M 3R FIN.FLR. 134.25 h TOP FON 133.97 1.26 ' FIN. ENTRY 133.90 FIN.BSMT SLAB 131.68 U/S FTG 131.45 WEEPERS TO BE PUMPED 3. TO STORM CONNECTION INVERTS NOTED ARE PROPOSED ELEVATIONS. AS—BUILT ELEVATIONS 1 TO BE CONFIRMED ON SITE cc)E 14.48 E UNDERSIDE OF FOOTING MAY BE LOWER THAN ELEVATION NOTED A 1. 6 1,2B CJ c,ia 5502 U) DUE TO EXIST. CONDITIONS. a 133.25 ELEV A EXACT DEPTH OF FOOTING TO o BE DETERMINED ON SITE DURING COVER ON ALL FOOTINGS. ,o EXCAVATION FOR FOOTING. 1R UNDISTURBED NATIVE SOIL. < 00 x S PORCH U) p PORCH HEIGHT 0.55 o M o 133TR�D 1 M n n x N N � CN rj N N STM INV NY M 1}0.95 129.30 [V 17.00 5.84 NOTES: BUILDER TO VERIFY SERVICE _ CONNECTION INVERTS PRIOR - .._..._.... - •--.--.___....----._........_._.......-- X 525mm STM 0.81 TO CONSTRUCTION. BUILDER TO ENSURE 1.2m COVER ON ALL FOOTINGS. FOOTINGS TO BEAR ON TOOLEY ROAD UNDISTURBED NATIVE SOIL. CONSULTANTS DECLARATION: THIS PROPOSAL CONFORMS WITH THE MUNICIPAIJ YS GRADING CRITERIA AND APPROVED SUBDIVISION MASTER LOT GRADING PLAN AND THE PROPOSED HOUSE TYPE IS COMPATIBLE WITH THE GRADING. THE PROPOSED DRIVEWAY LOCATION DUES NOT CONFLICT WITH ADJACENT DRIVEWAYS, WALKWAYS, CATCH IN. HYDRANT, VALVE OR ANY STREET UTILI DATE -J .�, /.1-IREVIEWED BY. ......... ............ ZONING INFORMATION LOT AREA 502.52'2 LOT COVERAGE 223.80'2 44.5% (INCLUDES PORCH) Q?,OFESS101,,4 2 m W R,M�,P, LLAAR�000F 901. ►..,.,..-� ZHIRM Attachment 3 to Report EGD -013-18 REFER TO CONNECTION DETAIL N. EN Rlf ISO.. STORM CONNECTION AT i.Ox y i FIN. QSM FOUNDATION DR/V:i DISCHARGE TD SU PPR �rnm, PoWERED SUTAP PUMP SUMP PR SECTION THROUGH STORM CONNECTION SCALE N.T.S. FOUNDATION DRAIN DISCHARGE DETAIL SCALE: N.T.S. en BEND Ci`N 3Bmm OISCINRGE PIPE RODENT SCREEN - ACfUAL ROUTING LOCATION FIRST FLOOR TO BE DETERMINED BY FlRST FIDOR E 150mm R tFIN=1SHE.DGRADE 0.. R E YliE C/W CAAEOW CAP DATION WYEexwTgN 150x150x30mm O— DRzaC STM SERVICE C 5111 SERVICE ELEVATION SECTION CLARINGTONGRADING8,7_ONINGREVIEW LOT#PLAN#�� B/P#I!Qk_' Building Div io �v By: Dater Engin rvices (Greding) 8Y T Datel - �7 PlannIng DEp tmunt (7orling) ol Nle Oe buWde ph�awmplab naponalpbpX�y b� fuM �ynallwOhte ft..W.tm/GWldelhies N�tl1e eCeCubdPl�Wblone� o�Crea�rrer�iLeThe C�oah�ol ArtStltecl hcllw_mbe lne ybr' (btlbH) plere « Well a«.,.w xiB+reepeclberrymNtptt�«ry oe pB* .w°`ottvH�. a1R«D'�`es°famlh lat Thle Is b ceNlfy that these plerre compry .181 the eppAmbla Alchftsdural Desgn MOW 1".9. by the MunldpeAry 0( CLARINGT LOT N0. 2 PLAN 40M- I LEGEND v! V I Y 1 140,88 PROPOSED GRADE D.�. E3Ildd18 I A198®ClBte0 leilmlted 140.88 EXISTING GRADE consulting engineers and Planners __DIRECTION OF y6 IfING STREET EAST 03HAWA,ON L7H 'IBB DRAINAGE PHONE (905)576-8500 FAX (905)576-9730 $n SUMP PUMP tnfoo*dTTbiddla.com M.E.T. 1 It6M Ulf: Or/71,DRAWING NO. BUILDER -DELTA RAE APRIL 2017 SCALE: 1:250 117408 -SP -2 SUB.NO- 13021Y MILLS JUNE 2017 REVISED PORCH TO COMPLY WITH ZONING MET