HomeMy WebLinkAboutCOD-054-06
.. ... ..
~!!I!.pn
REPORT
CORPORATE SERVICES DEPARTMENT
Meeting:
GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
Date:
September 18, 2006
Report #:
COD-054-06
File#_
By-law # ~01J0 - I ?, 7
GPA- 33- Db
Subject:
CL2006-52, Access Construction - Strathaven Lifecare and 280 King Street East
Driveway Improvements, Bowmanville
Recommendations:
It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
1. THAT Report COD-054-06 be received;
2. THAT Ron Robinson Limited, Bowmanville, Ontario with a total bid in the amount of
$71,825.25 (Plus G.S.T.), being the lowest responsible bidder meeting all terms,
conditions, and specifications of Tender CL2006-52, be awarded the contract for the
Access Construction, Strathaven Lifecare and 280 King Street East Driveway
Improvements, Bowmanville, Ontario as required by the Engineering Department;
3. THAT the funds required in the amount of $267,000.00 ($71,825.25 tender, plus traffic
signals above and below ground infrastructures, driveway closure and administration) be
drawn from the Engineering 2006 Capital Account # 110-32-330-83277-7401;
4. THAT additional funds required in the amount of $1 ,530.00 be provided from the Road
Contribution Reserve Fund and $15,470.00 from the Development Charges Road and
Related; and
5. THAT the attached By-law marked Schedule "An authorizing the Mayor and the Clerk to
execute the ne ssary agreement be approved.
A.S. Cannella, C.E.T.
Director of Engineering Services
MM\NT\ASC\LAB\km
Reviewed by: ~:...:. ~ 0 c:.-~ ~
Franklin Wu,
Chief Administrative Officer
Submitted by:
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T(905)623-3379 F (905)623-4169
REPORT NO.: COD-054-06 PAGE 2
________________________________________________________________________________
BACKGROUND AND COMMENT
Tender specifications were provided by Totten Sims Hubicki Associates for the Access
Construction, Strathaven Lifecare and 280 King Street East Driveway Improvements,
Bowmanville, Ontario within the Municipality of Clarington, as required by the Engineering
Department.
Tenders were advertised in local papers, as well electronically. Subsequently, tenders were
received and tabulated as per Schedule “B” attached.
The total project cost as outlined in the memo from Engineering Services, marked Schedule “B”,
including Project Administration, and costing allocation is $267,000.00 ($71,825.25 tender, plus
traffic signals above and below ground infrastructure, driveway closure and administration and
will be provided as follows:
2006 Budget Account # 110-32-330-83288-7401 $250,000.00
Road Contribution Reserve Fund $ 1,530.00
Development Charges Road and Related $ 15,470.00
$267,000.00
The low bidder has previously performed satisfactory work for the Municipality of Clarington.
The Director of Finance has reviewed the funding requirements and concurs with the
recommendation. Queries with respect to department needs, specifications, etc., should be
referred to the Director of Engineering.
After further review and analysis of the bids by the Engineering Department, Totten Sims
Hubicki Associates and Purchasing, it was mutually agreed that the low bidder, Ron Robinson
Limited, Bowmanville, Ontario, be recommended for the contract for the Access Construction,
Strathaven Lifecare and 280 King Street East Driveway Improvements, Bowmanville, Ontario.
______________________________________________________________________
Attachments:
Attachment 1 – Schedule “A”, By-law
Attachment 2 – Schedule “B”, Memo from Engineering Department and Letter from TSH
Schedule “A”
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
BY-LAW 2006-
Being a By-law to authorize a contract between the
Corporation of the Municipality of Clarington and Ron
Robinson Limited, Bowmanville, Ontario, to enter into
agreement for the Access Construction, Strathaven Lifecare
and 280 King Street East Driveway Improvements,
Bowmanville, Ontario.
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY ENACTS AS
FOLLOWS:
1. THAT the Mayor and Clerk are hereby authorized to execute, on behalf of the
Corporation of the Municipality of Clarington and seal with the Corporation Seal, a
contract between, Ron Robinson Limited, of Bowmanville, Ontario, and said
Corporation; and
2. THAT the contract attached hereto as Schedule "A" form part of this By-law.
By-law read a first and second time this day of , 2006.
By-law read a third time and finally passed this day of , 2006.
___________________________
John Mutton, Mayor
__________________________
Patti L. Barrie, Municipal Clerk
ClfJlmgton
SCHEDULE "S"
MEMO
TO: Louann Birkett, Purchasing Manager
FROM: Bruno Bianco, P. Eng., Design Engineer
DATE: September 12, 2006
SUBJECT: ACCESS CONSTRUCTION-STRATHAVEN L1FECARE AND 280 KING
STREET EAST DRIVEWAY IMPROVEMENTS, BOWMANVILLE
CONTRACT CL2006-52
MUNICIPALITY OF CLARINGTON
FILE NO.: G.20.24
The Engineering Services Department has reviewed the recommendation provided by
TSH and offers the following comments.
The low bid for the above final phase of the referenced project is $71,825.25 exclusive of
G.S.T. The design, consulting, and contract administration fees have already been
taken into account through previous phases and are ongoing. The total project cost
outlined by TSH is $267,000.00 which results in an estimated over expenditure of
$17,000.00 with respect to the entire project.
As indicated by TSH, the increased costs are due to the inflated pricing seen throughout
2006 in comparison to the 2005- construction year. Therefore, the engineering
department advises the following Municipal breakdown for the above referenced
project;
Estimated Costs & Funding
Reserve Funds-Road Contributions
Available Project Funds $22,500.00
DC-Roads & Related
Account 11032330823777401 -. $227,500.00
Total $250,000.00
Total Project Cost $267,000.00
Budaet Deficit $17,000.00
Reserve Funds-Road Contributions
Additional Proposed Funds $1,530.00
DC-Roads & Related
$15,470.00
, Total $17,000.00
"All values exclusive of GST
,.
SCHEDULE "B"
We concur with the recommendation to award the contract to Ron Robison
Limited in the amount of $71,825.25 exclusive of G.S.T. for the access
construction of Strathaven Lifecare and 280 King Street East.
We recommend the report to Council move forward based on the above
apportionments. Attached for your files is the recommendation provided by TSH.
Should you have any further question, please feel free to contact the
undersigned.
Regards,
Bruno M. Bianco, P. Eng.
Design Engineer
BB/dv
Cc: William McCrae, P. Eng., Totten Sims Hubicki'
Nancy Taylor, Director of Finance
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T(905)623-3379
..
II
TIll
SCHEDULE "S"
Totten Sims Hubicki Associates
513 Division Street,
Cobourg, Ontario. Canada K9A 5G6
(905) 372-2121 Fax: (905) 372-3621
E-mail: cobourg@tsh.ca www.tsh.ca
engineers
architects
.planners
September II, 2006
Mr. A. S. Cannella, C.E.T.
Director of Engineering Services
Corporation of the Municipality of CIa ring ton
40 Temperance Street
BOWMANVILLE, Ontario. LlC 3A6
Dear Mr. Cannella:
Re: Access Construction - Strathaven Life Care
and 280 King Street East Driveway Improvements, Bowmanville
Contract CL2006-52, Municipality of Clarington
Tenders for the above project were opened at the Municipal Offices on Thursday, August 24, 2006 at
2:15 p.m. A list of the bids received is provided in the table below. All numbers are exclusive of GST.
BIDDER TOTAL BID AMOUNT
Ron Robinson Limited $71,825.25
Bowmanville, ON
Lafarge Paving & Construction Limited $74,568.00
Oshawa, ON
TSH has reviewed all bids accepted by the Clarington Purchasing Department and have confirmed the bid
values noted above. As requested by the Purchasing Department references have been checked for the
low bidder Ron Robinson Limited. Staff from the Region of Durham and the D.G. Biddle & Associates
were contacted and have confirmed the contractor's performance on projects of similar scope to be
satisfactory. Ron Robinson Limited has also completed several projects for the Municipality of
Clarington over the past several years including the reconstruction of Hunt Street and Scugog Street in
Bowmanville. Their performance on these projects was also satisfactory.
The driveway relocation for the Strathaven Life Care Centre and 280 King Street East is the final phase of
a multi phased project to install signals and to relocate the main access to the Bowmanville Mall. An
estimate of overall project cost excluding G.S.T. is summarized as follows:
Mr. A.S. Cannella, C.E.T.
September 11,2006
2
SCHEDULE "B"
Description Estimated Cost Comment
Installation of underground infrastructure $72,610.44 Developer to be reimbursed
for traffic signals (front ended by developer
to coordinate with on site works and control
oroiect schedule)
Installation of above ground signal $85,000.00 Clarington PO I
infrastructure and line painting by Region
of Durham
Driveway Closure $2,313.86 Completed under Clarington
Contract CL2005-3
Driveway Relocation $71,825.25 Completed under Contract
CL2006-52
Detailed Design, Project Coordination & $35,250.45 TSH Project Number 12-29246
Construction Administration from May 15, 2005
Total Project Costs $267,000.00
Contingency allowances have been included in the estimate for each project component. The project is
now estimated to be $17,000 over the $250,000 budget amount. This is primarily a result of the
unforeseen significant increase in fuel prices, resulting in a dramatic increase in the cost of asphalt cement
used in the production of hot mix pavement, and the unforeseen volume of work available for contractors
to bid on in 2006.
Based on the above, it is recommended that the tender in the amount of$71,825.25 (exclusive ofG.S.T.)
be awarded to Ron Robinson Limited, of Bowmanville, Ontario.
Deposit cheques or bid bonds should be retained for the low and second low bids until the Contract has
been executed.
Should you require any further information, please contact the undersigned.
Yours truly,
WM/cg
P/12.29246JCorrcspl2I8S I.doc
Enc!.
pc: Mr. Bruno Bianco, P.Eng., Design Engineer, Municipality of Cia ring ton
VII