Loading...
HomeMy WebLinkAboutCOD-009-18Clarftwn Corporate Services Report If this information is required in an alternate accessible format, please contact the Accessibility Coordinator at 905-623-3379 ext. 2131. Report To: General Government Committee Date of Meeting: March 26, 2018 Report Number: COD -009-18 Resolution: GG -183-18 File Number: CL2018-3 By-law Number: Report Subject: Farewell Creek Trail — Phase I and Erosion Protection Works Recommendations: That Report COD -009-18 be received; 2. That ORIN Contractors Corp. with a total bid amount of $478,037.74 (net HST Rebate) being the lowest compliant bidder meeting all terms, conditions and specifications of Tender CL2018-3 be awarded the contract for the completion of the Farewell Creek Trail Phase I project as per terms, conditions and specifications of tender documents. 3. That the total funds required for this project in the amount of $611,320.33 (net of HST) which includes construction cost of $478,037.74 and other related costs such as consulting, material testing and contingency of $133,282.59 is in the budget allocation as provided and will be from the following accounts: Farewell Creek Trail — Phase 1 (2017) Various Erosion Protection Works (2018) 110-32-325-83288-7401 $500,000.00 110-32-340-83437-7401 $111,320.33 4. That all interested parties listed in Report COD -009-18 and any delegations be advised of Council's decision regarding the award by the Corporate Services Department. Municipality of Clarington Report COD -009-18 Report Overview To request authorization from Council to award CL2018-3 for the Farewell Creek Trail - Phase I 1. Background Page 2 1.1 Tender specifications were prepared by the Engineering Department Farewell Creek Trail - Phase I. The result of the tender will be a 580 m trail from the existing Tooley's Mill southward alongside the existing creek. The trail will terminate just south of the proposed pedestrian bridge crossing. The scope of work includes a pedestrian trail, pedestrian bridge construction and the erosion control work associated with the long term bridge structure stability. 1.2 Tender CL2018-3 was issued by the Purchasing Services Division and advertised electronically on the Municipality's website. Notification of the availability of the document was also posted on the Ontario Public Buyer's Association website. Twenty- seven (27) companies downloaded the document. 1.3 The tender closed on February 23, 2018. 2. Proposal 2.1 Five (5) bids were received in response to the tender call. Bids were reviewed and tabulated by the Purchasing Services Division (see Attachment 1). 2.2 The results were provided to the Engineering Services Department for their review and consideration. 2.3 After a further review and analysis of the submissions by the Municipality's Engineering Services Department and the Purchasing Services Division, it was mutually agreed that the low bidder, ORIN Contractors Corp, be recommended for the award of contract CL2018-3 for the Farewell Creek Trail - Phase I. 2.4 Reference checks for ORIN Contractors Corp. were completed and were satisfactory. 3. Financial 3.1 This project involves two projects tendered together as a joint contract since the works are related. The total funds required for this project in the amount of $611,320.33 (net of HST) which includes construction cost of $478,037.74 and other related costs such as consulting, material testing and contingency of $133,282.59 is in the budget allocation as provided and will be from the following accounts: Farewell Creek Trail — Phase 1 (2017) 110-32-325-83288-7401 $500,000.00 Various Erosion Protection Works (2018) 110-32-340-83437-7401$111,320.33 Municipality of Clarington Report COD -009-18 Page 3 3.2 Queries with respect to Department needs should be referred to the Director of Engineering. 4. Concurrence 4.1 This report has been reviewed by the Director of Engineering Services who concurs with the recommendation. 5. Conclusion 5.1 It is respectfully recommended that ORIN Contractors Corp. being the lowest compliant bidder be awarded a contract in the amount of $478,037.74 (net HST rebate) tender CL2018-3 for the Farewell Creek Trail - Phase I project to be completed as per the terms, conditions, specifications and drawings contained within the tender document. 6. Strategic Plan Application The recommendations contained in this report conform to the Strategic Plan. Submitted b Marie Marano, H.B. Sc., Reviewed by: C.M.O. Andrew C. Allison, B. Comm, LL.B. Director of Corporate Services CAO Nancy Ta or, A, CPA, CA. Director of Finance/Treasurer Staff Contact: David Ferguson, Purchasing Manager, 905-623-3379 x2209 or dferguson@clarington.net Attachments: Attachment 1 — Summary of Bid Results for Tender CL2018-3 List of interested parties to be notified of Council's decision is on file in the Corporate Services Department. Municipality of Clarington Resort COD -009-18 Municipality of Clarington Summary of Bid Results Tender CL2018-3 Farewell Creek Trail - Phase I Paae 4 Pricing shown in the table below is estimated annual spend for the Municipality of Clarington. Company Total Cost (Including HST) Total Cost (net HST Rebate) ORIN Contractors Corp. $530,839.86 $478,037.74 Dynex Construction Inc. $590,156.04 $531,453.79 M&S Architectural Concrete Ltd $654,057.27 $588,998.83 C.W. Services $659,464.16 $593,867.60 All Services $896,924.28 $807,708.09