HomeMy WebLinkAboutCOD-043-06
, .
.. CJ1J!.-4Jglon
REPORT 113
REPORT
CORPORATE SERVICES DEPARTMENT
Meeting:
COUNCIL
Date:
June 26, 2006
~P6+ '3'1,"J ~o~
Report #:
COD-043-06
File#_
By-law #
Subject:
CL2006-8, Bowmanville Waterfront Trail and Pedestrian Bridge
Recommendations:
It is respectfully recommended to Council the following:
1. THAT Report COD-043-06 be received;
2. THAT Rutherford Contracting Limited, Gormley, Ontario with a total revised bid in the amount of
$222,602.42 (Plus G.S.T.), being the lowest responsible bidder meeting all terms, conditions, and
specifications of Tender CL2006-8, be awarded the contract for the Bowmanville Waterfront Trail
and Pedestrian Bridge as required by the Engineering Department;
3. THAT funds required in the amount of $357,000.00 ($222,602.42 revised tender, plus design,
administration, contingencies, benches and garbage receptacles) be drawn from Engineering
2005 Capital Account #110-32-325-83280-7401 (Including $107,000.00 from Canada / Ontario
Infrastructure Program; and
4. THAT the attached By-law marked Schedule "A" authorizing the Mayor and the Clerk to execute
the necessary agreement be approved.
Submitted by:
ReViewedbyd ~~
Franklin Wu,
Chief Administrative Officer
. . Ca nella, C.E.T.
Director of Engineering Services
MM/NT/ASC/LB/km
REPORT NO.: COD-043-06
PAGE 2
BACKGROUND AND COMMENT
Tender specifications were provided by Totten Sims Hubicki Associates for the Bowmanville
Waterfront Trail and Pedestrian Bridge, as required by the Engineering Department and as
shown on the map below:
If
~~~
$
BOWMANVILLE
Tenders were advertised in local papers, as well as electronically. Subsequently, tenders were
received and tabulated as per Schedule "B" attached.
As the low bid exceeded the budget allocation of $357,000.00, one of the two pedestrian
bridges and 150 m of trail have been deleted from the project. The tender specifications
provided for deletions as required to meet the available budget.
The total project cost, including Project Administration, and costing allocation is $357,000.00
and will be provided from the 2005 Capital Budget Account # 110-32-325-83280-7401, and
includes $107,000.00 from Canada / Ontario Infrastructure Program.
The low bidder has previously performed satisfactory work for the Municipality of Clarington.
REPORT NO.: COD-043-06
PAGE 3
The Director of Finance has reviewed the funding requirements and concurs with the
recommendation. Queries with respect to department needs, specifications, etc., should be
referred to the Director of Engineering.
After further review and analysis of the bids by the Engineering Department, Totten Sims
Hubicki Associates and Purchasing, it was mutually agreed that the low bidder, Rutherford
Contracting Limited, Gormley, Ontario, be recommended for the contract for the Bowmanville
Waterfront Trail and Pedestrian Bridge.
Attachments:
Attachment 1 - Schedule "A" By-law
Attachment 2 - Schedule "B" Recommendation Memo & Letter
Schedule "A"
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
BY-lAW 2006-
Being a By-law to authorize a contract between the
Corporation of the Municipality of Clarington and Rutherford
Contracting Limited, Gormley, Ontario, to enter into agreement
for the Bowmanville Waterfront Trail and Pedestrian Bridge.
THE CORPORATION OF THE MUNICIPALITY OF ClARINGTON HEREBY ENACTS AS
FOllOWS:
1 . THAT the Mayor and Clerk are hereby authorized to execute, on behalf of the
Corporation of the Municipality of Clarington and seal with the Corporation Seal, a
contract between, Rutherford Contracting Limited, Gormley, Ontario, and said
Corporation; and
2. THAT the contract attached hereto as Schedule "A" form part of this By-law.
By-law read a first and second time this day of
,2006.
By-law read a third time and finally passed this day of
,2006.
John Mutton, Mayor
Patti l. Barrie, Municipal Clerk
SCHEDULE "B"
MEMO
TO:
Louann Birkett, Purchasing Manager
FROM:
Peter Windolf, O.A.L.A., Manager of Park Development
DATE:
June 16, 2006
SUBJECT: Bowmanville Waterfront Trail and Pedestrian Bridge
Contract CL2006-8
The Engineering Services Department has reviewed the recommendation
provided by TSH and offers the following comments.
We concur with the recommendation to award the contract to Rutherford
Contracting Limited in the amount of $222,602.42 exclusive of G.S.T. for the
waterfront trail and pedestrian bridge works.
In order to bring the project within budget one of the two proposed pedestrian
bridges and 150m of trail have been deleted from the project.
A contingency amount of approximately 10.0% is carried forward for the project
due to the poor soil conditions at the bridge location and at sections of the
proposed trail and an additional amount of $16,000 has be allocated for the
supply and installation of park benches and trash receptacles along the trail.
Therefore, including original Master Plan development, detailed design, tender
fees, and contract administration fees, the engineering department advises the
following Municipal breakdown for the above referenced project;
Bowmanville Waterfront Trail
and Pedestrian Bridoes
Account 110-32-325-83280-7401
Total Project $357,000.00
Amount
Budoet Amount $357,000.00
Estimated $0
Budoet Balance
4':oor
RECEIVED
JUN 1 9 2006
MUNICIPALITY OF CLARINGTON
PURCHASING DEPARTMENT
Bowmanville Waterfront Trail and Pedestrian Bridges
CL2006-8 2
SCHEDULE" B"
June 16, 2006
Originally the Bowmanville Waterfront Recreation Area project was a much more
comprehensive project that was intended to create a waterfront park on the
Bowmanville Creek between Port Darlington Road, West Beach Road,
Soper/Bowmanville Creek and the Port Darlington Marina property. A master
plan was completed and detailed design was started for improvements to the
boat launch, the fish cleaning station, passive recreational areas, parking lots
and a portion of Waterfront Trail through the area. The Municipality received
approval for 29.51 % funding assistance from the Canada/Ontario Infrastructure
Program (formerly SuperBuild).
The original project was scaled back significantly when Council pursued the
acquisition of additional land along the Lake Ontario waterfront for the future Port
Darlington Waterfront Park. A large portion of the consulting costs reflected in
TSH's attached report are related to the original project.
Based on the new scope of work the funding available from the Canada/Ontario
Infrastructure Program for this project is $107,000.00. The remaining
$250,000.00 was provided from Reserves.
We recommend the report to Council move forward based on the above costs
and funding arrangements. Attached for your files is the recommendation
provided by TSH. Should you have any further question, please feel free to
contact the undersigned.
Regards,
k~~
Peter Windolf, O.AL.A
Manager of Park Development
PW/sc
Attachment
cc AS. Cannella, Director of Engineering Services
Ron Albright, P. Eng., Totten Sims Hubicki
Nancy Taylor, Director of Finance
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T(905)623-3379
II
lilt
SCHEDULE "B"
Touen Sims Hublckl Associates
513 Division Street,
Cobollrg, On!:uio, Canada K9A 5G6
(905) 372 2121 Fax: (905) 372-3621
E-/nail: cOhllttlg@tsh.clI www.tsh,Cll
engineers
architects
planners
June 8, 2006
Mr. A. S. Cannella, C.E.T.
Director of Engineering Services
Corporation of the Municipality of Clarington
40 Temperance Street
BOWMANVILLE, Ontario. L I C 3A6
Dear Mr. Cannella:
Re: Contract No. CL2006-8
Bowmanville Waterfront Trail and Pedestrian Bridges
Tender(s) for the above project were opened at the Municipal Offices on Thursday, June 1,2006 at 2:00
p.m. A list of the bids received is provided in the table below. All numbers are exclusive of GST.
BIDDER TOTAL BID
Rutherford Contracting Ltd. $460,623.96
Gormley, ON
Royalcrest Paving & Contracting ltd. $630,598.00
Toronto, ON
Peninsula Construction Inc. $746,638.37
Fonthill, ON
Based on the low bid submitted and other associated costs, the total project costs would be in excess of
the available $357,000 budget from Account #110-32-325-83280-7401. Addendum I states that the tender
quantities could be decreased as required to meet available budget. This quantity reduction results in
total tender amounts as shown below, exclusive of GST.
BIDDER TOTAL BID
Rutherford Contracting Ltd. $222,602.42
Gormlev, ON
Royalcrest Paving & Contracting ltd. $367,497.67
Toronto, ON
Peninsula Construction Inc. $388,992.70
Fonthill, ON
The low bidder's submitted tender has been reviewed and is in order. In addition to the number of
parks Rutherford Contracting Ltd. has completed for the Municipality of Clarington in the last few
years (CL2004-13), Rutherford has also completed a number of projects with similar scope for public
agencies such as the Town of Richmond Hill and the Town of Markham. Those references that were
contacted stated that Rutherford completed the necessary work in a timely manner meeting schedule
requirements. in accordance with project specifications and were professional and knowledgeable of the
required work.
Mr. A. S. Cannella
June 8. 2006
SCHEDULE "B"
2
The following is a summary of the total project costs exclusive ofG.S.T.:
Revised Tender Amount
Master Plan, Detailed Design and Tendering
Contract Administration
Contingencies
Benches and Garbage Receptacles
Total
$222,602.42
$72,943.78
$23,260.24
$22, I 93.56
$16.000.00
$357,000.00
As provided by the Director of Engineering Services funding for this project was considered and
approved as part of the 2005 Budget review process and is to be drawn from Account # 11 0-32-325-83280-
7401.
Based on the total project cost of$357.000.00 and the available budget of $357,000.00 from Account
#110-32-325-83280-7401 the project will faIl within budget.
It is recommended that the revised tender in the amount of $222,602.42 (exclusive ofG.S.T.) be awarded
to Rutherford Contracting Ltd. of Gormley, Ontario based on available budget and their past
performance.
Please proceed with the award of this Contract at your earliest convenience.
Should you have any questions regarding this matter, please contact the undersigned.
Best regards,
/?- JJif
Ron Albright, P.Eng.
Project Engineer
RAfra
"-'"CfIrm.i<ct"42.1I0311.02'<or=pI2I6117doc
pc: Peter Windolf, Manager, Park Development, Municipality of CIa ring ton
TIM