HomeMy WebLinkAboutCOD-040-06
Cl!Jl-!lJgron
REPORT
CORPORATE SERVICES DEPARTMENT
Meeting:
GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
Date:
June 19,2006
Report #:
COD-040-06
File#_
By-law # CAo 0 ~ -/ ~J3
(~f'A. ~'Cf- C') ~
Subject:
CL2006-26, Farewell Creek Erosion Protection, Courtice
Recommendations:
It is respectfully recommended that the General Purpose and Administration Committee recommend to
Council the following:
1. THAT Report COD-040-06 be received;
2. THAT Dynex Construction Ltd., Concord, Ontario with a total bid in the amount of $176,618.55
(Plus G.S.T.), being the lowest responsible bidder meeting all terms, conditions, and
specifications of Tender CL2006-26, be awarded the contract for the Farewell Creek Erosion
Protection, Courtice, Ontario as required by the Engineering Department;
3. THAT funds required in the amount of $125,000.00 be drawn from Engineering 2006 Capital
Account #110-32-330-83288-7401;
4. THAT additional funds required in the amount of $25,000.00 be provided from the Road
Contribution Reserve Fund and $66,240.00 from the Development Charges Road and Related;
5. THAT the Region of Durham be invoiced for the additional funds required in the amount of
$8,760.00; and
6. THAT the attached By-law marked Schedule "An authorizing the Mayor and the Clerk to execute
the necessary agreement be approved.
Submitted by:
Reviewed bY.~~
ranklin Wu,
-# Chief Administrative Officer
A.S. Cannella, C.E.T.
Director of Engineering Services
MM/NT/ASC/LB/km
REPORT NO.: COD-040-06
PAGE 2
BACKGROUND AND COMMENT
Tender specifications were provided by Totten Sims Hubicki Associates for the Farewell Creek
Erosion Protection, Courtice, Ontario, as required by the Engineering Department and as shown
on the map below:
/Iv
w~e
s
Farewell Creek Works (2006)
Tenders were advertised in local papers, as well as electronically. Subsequently, tenders were
received and tabulated as per Schedule "B" attached.
The total project cost, including Project Administration, and costing allocation is $225,000.00
and will be provided as follows:
2006 Budget Account # 110-32-330-83288-7401
Road Contribution Reserve Fund
Development Charges Road and Related
Region of Durham
$125,000.00
$ 25,000.00
$ 66,240.00
$ 8.760.00
$225,000.00
REPORT NO.: COD-040-06
PAGE 3
The Region of Durham has provided written agreement to pay for one third of the total cost of
the project up to a maximum of $50,000.00. Included in the 2006 Budget Allocation of
$125,000.00 was $41,240.00 to be recovered from the Region. As the total tender exceeded
the budget allocation and as the Region has agreed to up to a maximum of $50,000.00, an
additional $8,760.00 will be provided from them and which they will be invoiced for accordingly.
The low bidder has not previously performed work for the Municipality of Clarington, however
have provided satisfactory service for the City of Vaughan and the City of Toronto.
The Director of Finance has reviewed the funding requirements and concurs with the
recommendation. Queries with respect to department needs, specifications, etc., should be
referred to the Director of Engineering.
After further review and analysis of the bids by the Engineering Department, Totten Sims
Hubicki Associates and Purchasing, it was mutually agreed that the low bidder, Dynex
Construction Ltd., Concord, Ontario, be recommended for the contract for the Farewell Creek
Erosion Protection, Courtice, Ontario.
Schedule "A" By-law
Schedule "B" Memo
CORPORATION OF THE MUNICIPALITY OF ClARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T(905)623-3379 F (905)623-4169
Schedule "A"
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
BY-lAW 2006-
Being a By-law to authorize a contract between the
Corporation of the Municipality of Clarington and Dynex
Construction Ltd., Concord, Ontario, to enter into agreement
for the Farewell Creek Erosion Protection, Courtice, Ontario.
THE CORPORATION OF THE MUNICIPALITY OF ClARINGTON HEREBY ENACTS AS
FOllOWS:
1. THAT the Mayor and Clerk are hereby authorized to execute, on behalf of the
Corporation of the Municipality of Clarington and seal with the Corporation Seal, a
contract between, Dynex Construction Ltd., Concord, Ontario, and said
Corporation; and
2. THAT the contract attached hereto as Schedule "A" form part of this By-law.
By-law read a first and second time this day of
,2006.
By-law read a third time and finally passed this day of
,2006.
John Mutton, Mayor
Patti l. Barrie, Municipal Clerk
SCHEDULE "8"
Cl!Jl-!lJgron
MEMO
TO: Louann Birkett, Purchasing Manager
FROM: Bruno Bianco, P. Eng., Design Engineer
DATE: June 12, 2006
SUBJECT: FAREWELL CREEK EROSION PROTECTION
COURTICE, CON 2 PT LOT 33
CL2006-26
RC 50.04
The Engineering Services Department has reviewed the recommendation
provided by TSH and offers the following comments.
As indicated in the approved 2006 Budget, this project is to be funded in part by
the Development Charges Roads and Related monies at 2/3 the amount of the
contract value. The total approved estimated budget value is $125 000.00. The
final closing tender value for the low bidder is $176 618.55 exclusive of G.S.T.,
design, consulting, and contract administration fees as well as contingency fees.
Therefore, including these additional fees, the total estimated project value
required will be $225 000.00.
As discussed by TSH, the limited amount of preliminary design information
available for the project resulted in the estimated budget value being
substantially low. Due to the current magnitude of onsite erosion, preventative
measures are required in order to reduce future costs. The engineering
department therefore recommends moving forward with the project based on the
cost apportionments listed below;
r'~C\NCdSUe
~
I
SCHEDULE "8"
Proposed Budget Breakdown
Development Regional Recovery Road Total
Charges Roads & Contribution
Related Reserve Fund
Current $83 760.00 $41 240.00 $0.00 $125000.00
Project [2/3 estimated [1/3 estimated budget
Funding budget value] value to a max. of
$50 000.001
Proposed $150 000.00 $50 000.00 $25000.00 $225 000.00
Budget [2/3 of the Closing [Approved by the
FundinQ Project Valuel ReQion-see attachedl
We concur with the recommendation to award the contract to Dynex Construction
Ltd. in the amount of $176 618.00 exclusive of G.S.T. for the Farewell Creek
Erosion Protection budget project. We suggest the funds be added to the current
account number 110 32 330 83288 7401 and the purchase order of $50000 .00
be requested of the Region in order to proceed.
We recommend the report to Council move forward based on the above
apportionments. Attached for your files is the recommendation provided by TSH.
Should you have any further question, please feel free to contact the
undersigned.
Regards,
-~~~) ~
Bruno M. Bianco, P. Eng.
Design Engineer
BBlsc
Attachment
cc William McCrae, P. Eng., Totten Sims Hubicki
Nancy Taylor, Director of Finance
CORPORATION OF THE MUNICIPALITY OF cLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T(905)623-3379
II
TIll
SCHEDULE "8"
Tonen Sims Hubicki Associates
513 Division Street,
Cobourg, Ontario, Canada K9A 5G6
(905) 372.2121 Fax: (905) 372-3621
E-mail: cobourg@tsh.ca www.tsh.ca
engineers
architects
planners
June 9,2006
Mr. A. S. Cannella, C.E.T.
Director of Engineering Services
Corporation of the Municipality of Clarington
40 Temperance Street
BOWMANVILLE. Ontario. L I C 3A6
Dear Mr. Cannella:
Re: FarweU Creek Erosion Protection, Courtice
Contract CL2006-26
Municipality of Clarington
Tenders for the above project were opened at the Municipal Offices on Wednesday, May 31, 2006 at
2: 15 p.m. A list of the bids received is provided in the table below. All numbers are exclusive of GST.
BIDDER TOTAL BID AMOUNT
Dynex Construction Ltd. $176,618.55 *
Concord, ON
560789 Ontario Limited, oIa R & M $221,538.00
Construction
Acton, ON
Bry Ron Contracting Limited $233,525.50
Ajax, ON
407043 Ontario Limited $243,450.00
oIa Hollandia Land & Environmental Solutions
Chelmsford, ON
Rutherford Contracting Ltd. $332,699.46
Gonnlev, ON
· Extension Error
The low bidder's tender has been reviewed and is in order. Dynex Construction Ltd. completed the
Bowmanville Crib Wall project, Contract CL2004-27, for the Municipality ofClarington last year. Their
perfonnance on the contract was satisfactory. Dynex has also completed similar work for the City of
Vaughan and the City of Toronto and those contacted con finned the contractor's performance on other
projects to be satisfactory.
Mr. A.S. Cannella. C.E.T.
June 9, 2006
SCHEDULE "8"
2
Project costs based on Dynex's bid are summarized as follows:
Description
Construction Costs per Contract CL2006-26
Detailed Design, Tendering & Approvals TSH
Project Number 12-29481 to May 27,2006
Contract Administration (Estimated)
AquaLogic (Geomorphologist)
Sub-Total Project Costs
Contingencies (Estimated)
Total Estimated Project Costs
Less Contribution from Durham Region
Total Estimated Clarington Project Costs
Clarington Budget Amount
Estimated Budget Overrun
Cost
$176,618.55
$17.852.61
$18,000.00
$1,890.00
$214,361.16
$10.638.84
$225,000.00-
$50,000.00
$175,000.00...
$83,760.00-
$91,240.00.....
Clarington's portion of the project costs is estimated to be $91.240 over budget. The budget overrun can
be attributed to not having a preliminary design available at the time the budget estimate was prepared.
Erosion control projects are unique, and the use of benchmark cost data for estimating purposes can be
misleading. In future, erosion control projects should be designed and circulated for approval the year
prior to construction so that a more accurate project cost can be carried in the budget for construction of
the project.
The project is necessary to stop creek erosion, that will in the short term. compromise the abutments to the
Old Kingston Road pedestrian bridge as well as isolate a Region of Durham sanitary sewer siphon chamber
that is located near the creek bank. The Region of Durham committed to pay for 1/3 of the project costs to
a maximum of $50,000 because of the siphon chamber issue. If unchecked the damaged caused to both
Clarington and Region infrastructure by continued erosion will far outweigh the costs estimated to stabilize
the creek through this project.
It is recommended that the tender in the amount of$176,618.55 (exclusive ofG.S.T.) be awarded to
Dynex Construction Ltd. of Concord, Ontario.
Deposit cheques or bid bonds should be retained for the low and second low bids until the Contract has
been executed.
Should you require any further information, please contact the undersigned.
Yours truly,
/t~/l1/~
William McCrae, P.Eng.
Senior Project Engineer
WM/cs
Pl294IllCormp/1eMer 1....4.cIoc
Encl.
pc: Mr. Bruno Bianco, P.Eng., Design Engineer
TIM
The Regional
Municipality
of Durham
.,,,....,..vks Ct:!~k:lf~fn-::','!l
'30~; HOS,SLJ\NO qD, '::
?O, 80X 623
'.....HrmV ON I.' rj i,A,'J
CAN,;.\Q;\
'JJ5",&3B"f': l'
j;V,iV.'. regiun, d ~~ f "~>:irn,~:,: 1':. ~,:-6
C. R. Curtis, P. En,.." MHA
COfl":,("'1-:'~;:o!:,!(,'n0r of \\,'r..: ''''~$
SCHEDULE "8"
February 3,2005
Mr. Anthony Cann$lIa
Director. Engineering Services Department
Corporation of The Municipality Of CJarington
40 Temperance Street
Bowmanville ON L fC 3A6
Dear Mr. Cannella:
RE: Erosion Protection at Old Kingston Road (Hwy. 2) and
Farewell Creek in,the Municipality of Clarington (Courtice)
eIL;:,;'l
This letter is a follow-up to our discussions on January 11.2006
regarding the erosion protection oftheexisting creek bank at Old
Kingston RoadandFart~welt Creek. At that timeT you had inquireq,ifthe
Region wouldcontrfbute to this. erosion protection due to the proximity
and vulnerability of the Regionts e}(lsting and now exposed siphon
cleanout chamber. YOlJ. logethet with your consultant, Mr. Wilt McRae,
advised thattheestlmatedcost of the works presented to the Region
was approximately $12$,000. of which you requested a one third (113)
share directly from the RegIon.
After a site investigation and asse~sment of the work required and a
review of available financing in 2006, the Region is pleased to confirm
that we are Willing to contribute the one third (1/3) share as proposed to
a maximum of $50,000.
It is also understood that the RegIon would be notified prior to tendering
of this contract to reviewthe final design and finalize financing for this
project.
I trust the above is sufficient for you to proceed with this project. If you
have any further questions regarding the above. please contact me
directly at 905-668-7711. Ext.3480.
"
;~y ~~/
(/ , ' -----
\. 1 ~~
'aet\il'iKuSHkIS. P. Eng.
Manager Environmental Services - Design Dfvision
'~
IbklJ
Sorvico eXCQI/(mce
::J~l(..CqmmunitifJs
c:
J. Presta. P.Eng.., Director, Environmental Services
A. Ho, P.Eng., Environmental Services-Design
@
\ 001]/: p.(~~J C~:<:-::;L;r~;~