Loading...
HomeMy WebLinkAboutEGD-22-06 CWJlJgton REPORT ENGINEERING SERVICES DEPARTMENT Meeting: Date: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE Monda~April 10,2006 Report #: EGD-22-06 By-law # hP('} - \ 1 Ul.,1o BALDWIN STREET RECONSTRUCTION - NEWCASTLE File #_ Subject: Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report EGD-22-06 be received; 2. THAT Council consider the urbanization of Church Street from Edward Street south to the dead end in conjunction with the Regional project to decommission the North Street Sanitary Sewage Pumping Station and the Baldwin Street reconstruction project. 3. THAT the additional costs of $250,000.00 associated with the urbanization of Church Street be added to the 2006 Capital Budget and financed through the Move Ontario infrastructure funding program; and 4. THAT all those who attended the Public Information Centre and who have contacted the Municipality be informed of this report. A(fJ Reviewedby(J~~ A.S. Cannella, C.E.T., Franklin Wu, Director of Engineering Services Chief Administrative Officer Submitted by: ASC*bb*jb CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T(905)623-3379 F (905)623-4169 Report #EGD.22..Q6 Baldwin Street Reconstruction. Newcastle Page 2 1..0 BACKGROUND 1. 1 Baldwin Street is classified as a semi-urban local residential street on the latest Road Needs Study and is included in the road reconstruction budget for 2006 pending Council approval. The proposed reconstruction will provide for full urbanization of Baldwin Street from Highway 2 south to Edward Street including storm sewer installations. The Region of Durham has completed the Class Environmental Assessment process for the North Street Sanitary Sewage Pumping Station. Based on the results of the evaluation, the preferred alternative as indicated on the Regional notice is to 'eliminate the pumping station with a new gravity sanitary sewer'. The preferred alignment for the new gravity sewer will be 'along existing Church Street, Edward Street, and Baldwin Street' (see attachment #1). The Region's initial plan was phased construction. Phase 1 included the sanitary sewer installation on Church Street from Edward Street south to the dead end. Future phases would include the remaining sewer installation on Edward Street and Baldwin Street and ultimately decommissioning the pumping station on North Street. The reconstruction of Baldwin Street became a Municipal priority. In doing so, it has accelerated the Regional forecast to decommission the pumping station and install the sanitary sewer in one phase along Church Street, Edward Street, and Baldwin Street. 2.0 APPROACH 2.1 To assess suitable reconstruction measures for both Municipal and Regional projects and to obtain local resident input to the design process, a Public Information Centre was held. The public was notified of the meeting by newspaper advertisement and through the circulation of notices. Report #EGD.22..Q6 Baldwin Street Reconstruction . Newcastle Page 3 3.0 INFORMATION CENTRES 3.1 Information Centre, March 7, 2006 At the meeting the following documentation and plans were presented for discussion: · Existing Road Condition Base Plans, showing proposed road works with aerial photography as a background for both Clarington and the Regional works; · A typical road sections for urban designs with on-street and off-street parking for Baldwin Street; · A Tree Assessment Report and a Soils Report was available for reading. In all, approximately eight people attended the meeting and the attendance register and comment sheets are on file within the Engineering Services Department and available for review. The design proposals for the work presented were well received with concerns expressed about curb depression locations, catch basin location, sidewalk location, on-street parking and the full urbanization of Church Street. Others were merely in attendance as interested observers or coordination concerns with the Santa Clause parade. The majority of concerns with respect to curb depressions, sidewalk locations, and parking are being resolved through the design process. However the concern with respect to the full urbanization of Church Street is outstanding. 4.0 CHURCH STREET URBANIZATION 4.1 As two separate projects by the Municipality and Region are progressing simultaneously, it is evident that they are and will be viewed as one due to circumstance. The Engineering Department is protecting for the future Report #EGD-22-06 Page 4 urbanization of Church Street through the Regional road restoration plans being prepared for the proposed sanitary sewer. The full urbanization of Church Street is not currently included in the five-year reconstruction forecast. Several residents expressed concerns with the plan to restore Church Street to its original road cross section. Preliminary discussions with the Region have outlined the reconstruction responsibility should the Municipality decide to consider the urbanization of Church Street over and above the restoration works proposed by the Region through their contract. The estimated costs for this work is approximately $250,000.00. 5.0 DISCUSSION 5.1 As a result of the Information Centre, detailed design will proceed based on the comments received for the work that is being proposed by the Municipality and the Region. It is recommended that the opportunity to fully urbanize Church Street from Edward Street southerly to the dead end, be incorporated into this project and the financing of this project be drawn from the recently announced Move Ontario infrastructure funding program. This report has been reviewed by the Finance Department and they concur with the recommendations contained herein. Attachments: Attachment 1 - Site Plan D'D D~'~' .EMILYSTW ~D DEMILYSTE ~ . I ffi . '-' > .!5 ~ . G ro ~"''''D D' _~w DiD JAMES ST Wf- ! JAMES ST E nDD* '""""n '"'''''' i N W~E S KING AVENUE WEST LILLIAN CRESCENT f- (fJ Z s: o --' <t: CO FOSTER CREEK CT EDWARD STREET W w z :s a: w f- If! W I U HART COURT SUNSET BOULEVARD 1/ NEWCASTLE f- W W a: f- If! I f- a: o z i . . . . . . . . ;::'" fiijlf;~; GEORGE ST W f- w w a: f- If! a: w :;c w ro GEORGE ST E WILMOT STREET KING AVENUE E HARMER DRIVE f- W W a: f- If! Z o W f- ~ ~ o a: w ~ LAKING DRIVE <{ I EDWARD STREET EAST D SHI RLEY AVENUE ~D 8 BRIDGES DRIVE If! If! <{ <3 CLa.r..pn Legend - 2006 Municipal Capital Projects .. 2006 Regional Capital Projects ,<<><:j'? ' DRAWN BY: E.L. DATE: April 3, 2006 KEY MAP REPORT EGD-22-06 r ATTACHMENT NO.1