Loading...
HomeMy WebLinkAboutPSD-012-18Clarftwn Planning Services Public Meeting Report If this information is required in an alternate accessible format, please contact the Accessibility Coordinator at 905-623-3379 ext. 2131. Report To: Planning and Development Committee Date of Meeting: January 29, 2018 Report Number: PSD -012-18 Resolution: #PD -020-18 File Number: COPA2017-0013 and ZBA2017-0038 By-law Number: Report Subject: Applications by Alpa Pre -Engineered Panel Systems Inc. to allow the expansion of the existing industrial business at 2021 Baseline to 2033 Baseline Road Recommendations: 1. That Report PSD -012-18 be received; 2. That the Official Plan Amendment and Zoning By-law Amendment applications submitted by Alpa Pre -Engineered Panel Systems Inc. continue to be processed and that a subsequent report be prepared; and 3. That all interested parties listed in Report PSD -012-18 and any delegations be advised of Council's decision. Municipality of Clarington PSD -012-18 Report Overview Page 2 The Municipality is seeking the public's input on applications to amend the Clarington Official Plan and Zoning By-law 84-63, submitted by Alpa Pre -Engineered Panel Systems Inc. The applications would permit the expansion of the existing industrial business at 2021 Baseline Road to 2033 Baseline Road. The expansion will include a 1980 square metre addition to the existing building, outdoor storage area, additional parking and loading spaces and stormwater management facilities. 1. Application Details 1.1 Owner/Applicant: Alpa Pre -Engineered Panel Systems Inc. 1.2 Agent: Adrian Litayski, Johnston Litayski Ltd. 1.3 Proposal: General To allow the expansion of an existing business at 2021 Baseline Road to incorporate lands at 2033 Baseline Road including: x A 1,980 square metre addition to an existing building of the same size x Outdoor storage area of approximately 2.5 ha x Parking and loading spaces x Stormwater management facilities Official Plan Amendment To change the designation of the lands at 2021 and 2033 Baseline Road from Light Industrial to General Industrial with appropriate policies to allow greater outdoor storage. Rezoning To rezone the lands at 2033 Baseline Road from the "Agricultural (A) Zone" to an appropriate zone that would permit the industrial development. 1.4 Area: 4.82 hectares (11.9 acres) 1.5 Location: South-west corner of Baseline Road and Rundle Road 1.6 Roll Numbers: 181701002015910 181701002015605 1.7 Within Built Boundary: No Municipality of Clarington PSD -012-18 2. Background Paae 3 2.1 Amendment 107, a comprehensive update to the Official Plan, was approved by the Region of Durham on June 19, 2017. In order to submit the Clarington Official Plan Amendment application Alpa Pre -Engineered Panel Systems Inc. required Council's permission to accept the application within two years of the comprehensive update. Council approved the applicant's request on September 18, 2017. 2.2 The applicants have owned and operated their pre-engineered panel manufacturing business from 17 Cigas Road in Courtice since February 2011, expanding to this location in 2015. Prior to the applicants owning the property it was occupied by a truss manufacturing company. The applicants submitted a site plan application for 2021 Baseline Road in March of 2017 for the existing stormwater management infrastructure on the site. A stormwater pond was constructed without approval and impacted the Canadian Pacific Railway. There remain a number of stormwater management issues and the site plan has not been finalized at the time of writing this report. 2.3 The applicants are looking to expand the existing business onto the abutting property to the east, 2033 Baseline Road. Official Plan and Zoning By-law amendment applications were received on November 20, 2017. Figure 1: Proposed expansion of the existing business at 2021 Baseline Road. Municipality of Clarington PSD -012-18 Paae 4 2.4 The applicant has submitted the following studies in support of the applications: X Planning Justification Report; X Stormwater Management Design Brief; X Phase I Environmental Site Analysis; x Phase I & II Archaeological Assessment; and x Traffic Impact Study. 2.5 The studies are being reviewed by staff and agencies and will be summarized in a future report. 3. Land Characteristics and Surrounding Land Uses 3.1 The subject lands consist of two parcels, 2021 and 2033 Baseline Road. 2021 Baseline Road has an existing industrial use with an 1,981 square metre panel manufacturing and assembly building, outdoor storage in the side and rear yards, an accessory building and water retention pond in the rear yard, parking and loading spaces in the front and side yards. 2033 Baseline Road currently has a single detached dwelling which would be demolished. 3.2 The surrounding uses are as follows: 3.2.1 North — Single detached dwellings, a transport depot (CCT Auto Trans) and agricultural lands. 2011 Baseline Road has a single detached dwelling and a number of vehicles on the site. It is currently surrounded by the existing industrial use on the east, west and south. 3.2.2 South — CP Rail line, single detached dwellings, Owasco Auto Mall under construction and future Metrolinx Go Rail Layover Facility. 3.2.3 East — Agricultural lands and single detached dwellings. 3.2.4 West — Agricultural lands, a light and heavy equipment rental business and a transportation depot. Municipality of Clarington PSD -012-18 Paae 5 Environmental f. Protection Area Possible CCT Auto Trans Expansion Courtice Area as per Council permission Urban Boundary to FILE DPA oIL Existing Proposed 1 Storey , ,,., , U �_ 1 Sto ,.. BuildingCC) rey �, ...- _w..* Addition —Baseline -Road CCTAuto Trans Subject Site d,\2� PaC`{5G o ra Proposed Metrolinx Layover Area _ Owasco Auto Mall Y4,Q1 N - ZBA 2017-0035 COPA2017-0013 3' Figure 2: Surrounding Land Use 4. Provincial Policy 4.1 Provincial Policy Statement The Provincial Policy Statement requires municipalities to promote economic development by providing an appropriate mix and range of employment uses and providing opportunities for a diversified economic base. Employment areas shall support a wide range of economic activities and ancillary uses. 4.2 Growth Plan 4.2.1 The Growth Plan 2017 promotes economic development and competitiveness in the Greater Golden Horseshoe. Municipalities are to promote more efficient use of existing employment areas, vacant and underutilized employment lands, and increasing employment densities. Municipality of Clarington PSD -012-18 Paae 6 4.2.2 The Growth Plan requires upper tier municipalities to set a target for employment densities that reflects the current and anticipated type and scale of employment that characterizes the employment areas. Municipalities may identify prime employment areas within their Official Plan which are employment areas for uses that are more land extensive or have low employment densities. 5. Official Plans 5.1 Durham Region Official Plan 5.1.1 The subject sites are designated "Employment Areas" in the Regional Official Plan. Employment Areas are intended to accommodate a full range of employment uses such as, but not limited to: manufacturing, warehousing, offices, and the storage of goods and materials. 5.1.2 The Region of Durham has set a target ratio of jobs to population of 50% or one job for every two persons in employment areas for the Region as a whole. 5.2 Clarington Official Plan 5.2.1 The subject lands are designated Light Industrial in the Clarington Official Plan and are within the Greenfield Area. The Light Industrial designation permits manufacturing, fabricating and assembly uses; however, the policies direct the uses to generally be conducted within a building and restricts outdoor storage. The Light Industrial designation permits a maximum of 25% of the total gross floor area of the building as outdoor storage space. The General Industrial designation permits manufacturing, fabricating and assembly uses as does the Light Industrial designation but allows outdoor storage up to 100% of the total gross floor area. In both cases outdoor storage areas are to be located at the rear of the property and appropriately screened. 5.2.2 In order to expand the business to the adjacent property to the east the applicants are proposing to designate both properties General Industrial with a site specific policy for their outdoor storage requirements. 5.2.3 The Official Plan sets a target of achieving one job for every three residents in Clarington by 2031 and to accommodate 50% of the forecasted employment growth within designated employment areas. The Plan also targets a gross density of 50 jobs per gross developable area in Greenfield Areas. 5.2.4 Baseline Road is designated as a Type C Arterial Road. Municipality of Clarington PSD -012-18 6. Zoning By-law Paae 7 6.1 2021 Baseline Road is currently zoned General Industrial (M2) and 2033 Baseline Road is currently zoned Agricultural (A). The existing industrial use meets the permitted uses of the M2 zone. 6.2 A Zoning By-law Amendment is required to permit the proposed industrial use expansion on 2033 Baseline Road. The amendment would rezone the property from "Agricultural (A) Zone" to an appropriate zone that would permit the industrial development. 7. Public Notice 7.1 Public notice was mailed to each landowner within 120 metres of the subject lands on December 21, 2017 and Public Meeting signs were installed fronting onto Baseline Road and Rundle Road on December 28, 2017. 7.2 Staff have not received any comments at the time of finalizing this report. 8. Agency Comments 8.1 Durham Region Comments from Durham Region Planning, Works, Health and Transportation have not been received at the time of finalizing this report but will be included in a subsequent report. 8.2 Central Lake Ontario Conservation Authority Comments from the Central Lake Ontario Conservation Authority have not been received at the time of finalizing this report but will be included in a subsequent report. 8.3 Other Agencies Comments from CP Rail and Hydro One have not been received at the time of finalizing this report. Enbridge provided comments that they had no objections to the proposed applications. 9. Departmental Comments 9.1 Engineering Services Department The Engineering Services Department, including the Building Division, has no objections, in principle, to the applications for Official Plan amendment and Zoning By-law amendment. However, a number of comments have been provided that will need to be addressed through site plan approval, should the initial applications be approved. Prior to any development of the subject lands the applicant/owner will be required to address the Municipality of Clarington PSD -012-18 Paae 8 following areas of concern to the satisfaction of the Engineering Services Department through application for site plan approval: x Traffic; x Road Dedication; x Road Improvements; x Grading; x Drainage; x Stormwater Management; x Entrance Construction; and x Noise Attenuation. 9.2 Emergency and Fire Services Department The Emergency and Fire Services Department has no objections to the applications provided the Ontario Building Code requirements are met and the outdoor storage of materials meet the Ontario Fire Code requirements. These issues will be addressed through the Site Plan process. 10. Discussion 10.1 The existing business at 2021 Baseline Road has been operating there since 2015 and prior to that a truss manufacturing company occupied the lands. The applicant's business is the design and manufacturing of pre-engineered floor, wall and truss systems. The manufacturing of the product occurs within the existing building but requires a significant amount of outdoor storage for products until they are shipped offsite, as well as storage of lumber used in the manufacturing. 10.2 The proponent has calculated outdoor storage area of 11,200 m2 based on the storage piles shown on the preliminary site plan. This would be 23 percent of the site. There are two problems with this calculation: x the stacking areas shown do not fully utilize the area set aside for storage; and x outdoor storage should be calculated to include the areas required to maneuver the product (drive aisles) and to comply with the Ontario Fire Code. Staff calculate that the outdoor storage area is approximately 25,000 m2. 10.3 The Clarington Official Plan has the following limits on outdoor storage: xLight Industrial — 25 percent of the total gross building area. xGeneral Industrial — 100 percent of the total gross building area. Municipality of Clarington PSD -012-18 Paae 9 According to staff's calculation, the area for outdoor storage would be the equivalent of 636 percent of the total gross building area or greater than 50 percent of the total site area. 11. Concurrence Not Applicable. 12. Conclusion The purpose of this report is to provide background information on development applications submitted by Alpa Pre -Engineered Panel Systems Inc. for the Public Meeting under the Planning Act. Staff will continue processing the application including the preparation of a subsequent report upon resolution of the identified issues. 13. Strategic Plan Application Not applicable. Submitted by: David Crome, MCIP, RPP Director of Planning Services Reviewed by: Andrew C. Allison, B. Comm, LL.B Chief Administrative Officer Staff Contact: Brandon Weiler, Planner, (905) 623-3379 ex 2424 or bweiler@clarington.net A list of interested parties to be notified of Council's decision is on file in the Planning Services Department. BW/CP/ah/nl I:\^Department\LDO NEW FILING SYSTEMWpplication Files\COPA-Official Plan Amendment\2017\COPA2017-0013 2021-2033 Baseline Road (ZBA2017-0038)\Staff Report\PSD-012- 18.docx