HomeMy WebLinkAboutAdmin 72-84CORPORATION OF THE TOWN OF NEWCASTLE
40 TEMPERANCE STREET
BOWMANVILLE, ONTARIO
L7 C 3A6 TELEPHONE 623-3379
REPORT TO THE HYDRO LIAISON COMMITTEE MEETING
HELD THURSDAY, SEPTEMBER 20 1984
ADMIN. 72 - 84
SUBJECT: FEASIBILITY STUDY ON THE BOWMANVILLE ARENA
RECOMMENDATIONS:
It is respectfully recommended that the Hydro Liaison Committee recommend
to Council the following:
1. That Administrator's report ADMIN. 72 - 84 be received; and
2. That Ontario Hydro and the Town of Newcastle enter into a
Supplementary Agreement to conduct a Feasibility Study on the
Bowmanville Arena in accordance with the attached terms of
reference.; and
3. That the necessary by-law authorizing the entering into the
agreement be presented to Council for adoption; and
4. That Council authorize the expenditure of up to $12,000 from the
Parkland Reserve Fund to cover anticipated consulting fees; and
5. That once the agreement has been duly signed, that staff be
authorized to solicit proposals on the Feasibility Study from
consultants through the Purchasing Office.
BACKGROUND AND COMMENT:
As part of the ongoing discussions with Ontario Hydro, staff have been
discussing the need of conducting a Feasibility Study on the existing
Bowmanville Arena. The need to study the future of the arena is
evident in the annual structural reports that we have received from
our engineering consultants. A copy of the most recent inspection
report is attached for Committee's information.
While recognizing the need to study the arena, Hydro officials have
indicated that the impact by Hydro on the use of the arena is perceived
ADMIN. 72 - 84
as minimal. They are, however, prepared to assist the Town in
the Feasibility Study and establishing the extent of impact. At the
same time, Hydro is in no way committing themselves to any funding of the
upgrading or replacement of the facility. The suggested agreement
contemplates that the Feasibility Study, including staff time,
may cost as much as $25,000. Ontario Hydro officials suggested that they
would be willing to cost -share the study based upon Hydro contributing
approximately one third of the total cost. It is anticipated that the
consultant's cost would be in the $15,000 - $20,000 range, with
staff involvement adding as much as $5,000.
When the budget was approved in 1984, it was anticipated that funding
for the complete study would come from Ontario.Hydro. In order to make
up the shortfall in funding, it is recommended that Council authorize
the expenditure of a maximum of $12,000 from the Parkland Reserve Fund
to cover the shortfall in anticipated consulting fees.
Respectfully submitted,
DSJ:nof David Johnston, M.C.I.P.,
Chief Administrative Officer
L,AU L.. h7�pR U G. L. TOTTEN B sc.. P.Eng.
NEON R. L. SIMS B A Sc.. BEng
J. M. HUBICKI B A.Sc., P Eng.
RC. EBERLE ER A.Sc., . Eng.
P. C.fBERLEE B.A.Sc., P Eng.
CONSULTANTS ----------------------
TOTTEN SIMS HUBICKI ASSOCIATES (1981) LIMITED
1600 HOPKINS STREET; WHITBY, ONTARIO
totten sims hubicki associates L1N2C3 14161668-9363
July 3Cth, 1984
Corporacion of the Town of Newcastle
40 Temperance Street
Bowmanville, Ontario
LIC 3A6
Attention: Mr. T.A. Fanning, R.D.M.R.
Director of Community Services
RP: Bowmanville .Arena,
Town of Newcastle
Reference is made to our visual inspection of the Bowmanville Arena on
July 37th, 1984.
The .fclow.ing is a. summary. of our observations -.ahich,are of structural.
significance:
1. Several active cracks were noted in the perimeter non -load bearing
cnnerete block walls which enclose the main arena, particularly along the
south wall.
6. Several concrete Diocks'are badly deteriorated, ' and the mortar. joints.
between the concrete blocks are deteriorating and are badly cracked or,
missing in; several locations.
3. Damp parches werenoted on the interior and exterior faces of the
perimeter concrete block walls where more excessive deterioration o` the
concrete Flocks and mortar ioints was evident.
Based on our visual inspection and a review of previous. inspection reports an:d.
existing: drawings of the Bor,..rjanville Arena, it, is concluded that:
I. The cencreta blocks and mortar jointsofthe perimeter concrete biock
walls are in fair to poor condition-ar_d are deteriorating. The
deterloracion ':being accelerated by water from the main arena roof.
r nnSug down and being blown onto the block walls. The water is absorbed
into the coocrets blocks and mortar joints, and freeze -thaw action
promotes the deterioration of the wails.
2. The cracking of the concrete block wails -is -elated to settlement aud!or
movement of the wall foundations. Because the block wa_is are nor -loading
bearing, they are considered co be structurally adequate at the present
tine.
3.-nmed4ate repairs to the cracked and deteriorated concrete blocks and
,rortar joints sbould be carried out ..efore progressive :?eterioration
results in a failure of the concrete block walls.
2
4. The timber 'Bowstring' trusses are in generally fair to good condition
with no evidence of recent distress noted.
5. The structural steel columns supporting the timber 'Bowstring' trusses and
the structural steel open web steel joists under the end bay roof joists
are in good condition.
Based on our visual inspection, it recommended that the following work be
implemented to retard the rate of deterioration of the perimeter concrete
block walls:
1. Replace and/or repair the deteriorated concrete blocks.
2. Remove the badly deteriorated mortar between the concrete blocks, grout
the cracks in the walls, and repoint the joints between the blocks.
3. Install eavestrough along the north and south sides of the main arena with
suitable downspouts.
It is noted that a, short length of eavestrough already exists along the north
wall of the main arena and the deterioration of the concrete block wall in the
area where the eavestrough exists, is minimal.
Please contact the undersigned if additional information is required, or if we
could be of further assistance in the above regards.
Yours very truly,
G.L. Aleong, P. Eng.
Designated Structural Specialist
GLA/ek
om
mG
o�
aP
totten sims hubicki associates
Attachment "A"
History of 5ownanville Memorial Arena
1946 - 1984
The Bowmanville Memorial Arena is situated on Oueen Street, just
below the end of Temperance Street, overlooking the Bowmanville Creek Valley.
The arena property involves 4.47 acres and has a frontage of 280.5' on an
irregular shaped lot, limited parking to about 12 cars in the front of the
arena. The parking lot on the south side of arena can accommodate about
20 to 25 cars.
The present seating capacity of the arena is (640) with (330)
standing room for a total of (970) people. These figures were determined by
the Newcastle Fire Department.
The overall outside dimensions of the main arena building are
196' x 106' and the ice surface approximates 175' x 75'. An 80' x 24' two
storey front building section is located on the north side of the arena and
27' x 66' extension on the west end of the arena houses the ice plant and
the surfacing machine.
The arena was constructed in 1948, at which time the bowstring
trusses were supported by concrete block loads bearing walls and pilasterns.
In 1959, structural steel columns supported on piles were introduced to
relieve the severely cracked perimeter walls of the truss loads.
Men the arena opened its doors for business in 1949, it relied
on natural ice. The Kinsman Club of Boitnanville assumed the financial
responsibility for having artificial ice installed in the Boeananville !Memorial
Arena in 1952.
In 1960, the refrigeration plant and ice surface equipment building,
west of the main arena area was built after the existing boiler room collapsed.
In 1971, the existing bowstring trusses were repaired.
A new plastic brine "U" pipe system was installed in 1976. However,
the arena floor is sand and as such isnot usable in the spring or summer.
../2
History of Bowmanville Memorial Arena Continued... Page 2.
A visual and dimensional inspection of the Bowmanville Memorial
Arena was carried out in August 1976, at which time the timber trusses,
roof purlines and miscellaneous framing members of the arena structure were
examined.
In 1976, Totten Sims Hubicki & Associates carried out an inspection
and recommended further wort: to the roof structures at a cost of $45,000.00.
This work was completed in February of 1977. Fe were informed that we would
have another inspection in 1982.
In 1982 the inspection was carried out by Totten Sims Hubicki &
Associates and minor repairs were made to the roof structures. In Play of 1983
several more cracks in the roof trusses were discovered.
It appears each year, more and more repairs are needed to keep
the facility operational. At the same time, more inspections are required
to ensure the safety of the various user groups. Given these circumstances
it is appropriate that the Corporation of the Town of Newcastle examine.
the future of the Bowmanville Arena by way of a feasibility study.
August 1984
Terms of Reference
for a
Feasibility Study
on
Bowmanville Arena
1. Responsibilities of the Consultant
Background/Rationale for Study
The feasibility is intended to help the Newcastle Community Services
Planning Board and Council decide upon the best course of action
with respect to the Bowmanville Arena. If the arena is to be replaced
where should it be located, what features should be incorporated, and
at what cost both capital and operating.
(a) Mandate
The Consultant will identify where Town Council has seen fit to
proceed with a feasibility study for a new arena including where
the Master Plan has made reference through its recommendations.
The Consultant should note where the Community Services Department
has included an allowance for a new arena in its 5 Year Capital
Forecast.
In light of the Master Plan and its recommendation to form a Planning
Board, the Consultant will, through the study team, contact this Board
and identify their concerns or related issues.
(b) Master Plan
The Town of Newcastle has recently completed its Master Plan for
Culture and Recreation. The Consultant should cross reference this
document relative to the Bowmanville Arena.
(c) Ministry of Labour
Over the past number of years the Ministry of Labour has conducted
numerous status reports on the structure of the Bowmanville Arena.
The Consultant's role will be to examine information contained in
these reports as it applies to the present facility and whether
replacement is necessary.
(d) Population
It will be the responsibility of the Consultant to identify the
past and future population trends for the service area by utilizing
information provided through the Region of Durham.
.../2
Terms of Reference for a Feasibility Study
on Bowmanville Arena Continued...
(e) Demand Patterns
Page 2
The Consultant is to identify the unique geographic distribution
of the population of the Municipality. The Consultant should also
make reference to the user patterns and needs relative to the age
and functional nature of the building and the three other arenas
in the municipality.
(f) Users Input
It will be the responsibility of the Consultant to identify the
users of the facility. Information obtained is to contain the
actual use of the facility, user feedback, making special note of
their concerns and issues raised. Such input may be obtained
through public meetings and/or user questionnaires.
2. Purpose/Objectives of the Study
(a) Overall Purpose and Objectives
The general purpose of the study is to examine the alternatives of
an arena and define or recommend how community needs for this
facility can best be met in a financially feasible way.
(b) Knowing the Purpose/Objectives have been met
It is required that the consultant identify all required data in the
decision making process.
3. Scope or Constraints of the Study
(a) Geographic Boundaries
Except as specifically noted in 1 (e) of the terms of reference the
geographic boundaries of the study will be within a three (3)
mile radius of the urban area of Bowmanville.
(b) The Consultant should note that the facility will primarily serve the
needs of Bowmanville.and area residents.
The study is to have regard to the following official documents and
Municipal Departments:
-Master Plan for Culture and Recreation
-Town of Newcastle Official Plan
-Regional Population Projections
-Service Plans (hard services)
-Traffic Counts
-Usage Patterns of Existing Arena
-Community Services Department
-Treasury Department
-Public Works Department
-Fire Department
.../3
Terms of Reference for a Feasibility Study
on Bowmanville Arena Continued... Page 3.
4. Information Requirements
(a) Consulting process shall include reviewing of alternatives which
could include the following features:
- International Ice Surface
- Twin Pad (immediate or future)
- Banquet Facilities
- Fitness Area
- Seating Capacity (1,500?)
Energy Efficiency
- Year Round Ice Making Capabilities
- Access for Handicapped
- Squash Courts
- Senior Citizens Centre
- Number of Dressing Rooms
(b) Impact
The consultant is required to relate the various design features
that might be incorporated into the facility to the direct and indirect
economic impact that might result in the community. For example, would
an international ice surface attract greater purchase dollars to the
arena as opposed to a regular size surface. In considering the
economic impact demographic trends must be identified, both the
needs and potential markets prospective. Any specific trends related
to senior citizens must also be identified as part of the feasibility study.
(c) Operating and Capitial Projections
A complete review of alternative facility types relating to capital
and operating costs must be provided outlining the impact of those
costs in considering the alternatives, but primarily in the
recommended approach. Particular reference is requested to those
costs related to the Community Services Department and its ability
to meet present and future needs.
(d) Site Option and Staffing
A recommended site from alternatives must be identified within the
area defined in 3a an„ assessed using the information available
through the feasibility study.
The study should review requirements of staffing and administering
the new facility and should also contain an implementation strategy
for the study recommendation.
5. Process of Study
(a) Time Schedule
May 1, 1985
April 16, 1985
January - April 1985
January 1985
Prior to First Draft
As Called
Completed Study
Final Draft
Public Input
First Draft
Public Input
Study Team Meetings
(6 to 10 meetings -
minimum 6)
Terms of Reference for a Feasibility Study -
on Bowmanville Arena Continued... Page 4.
5. (b) Possible Staging of Feasibility Study
PRESENTATION TO COUNCIL
FINAL DRAFT
FURTHER DATA COLLECTED & ANALYSIS
FIRST DRAFT
DATA COLLECTION & RESEARCH
CLARIFICATION
START 1ST MTG. 2ND MTG. 3RD MTG. 4TH MTG. 5TH HTG. 6TH MTG.
Oct - D0 V!ITH STUDY WITH STUDY LITH STUDY WITH STUDY HITH STUDY t%!ITH STUDY
1984 TEIC1 TEAM TEA'1 TEAM TEA'.t; TEAR
May. 1/85
The Consultant should note that updated reports are required at each
identified stage of development, at least one week prior to the meeting.
6. Community Participation
Who will be involved and to what extent?
The Consultant must assure that at least two (2) opportunities Tor
input from the population at large (limited) is made available. Present
user groups as well as potential user groups (ie. Senior Citizens)
must ue considered. Demographic shifts must also be considered.
Service Clubs within the Municipality should be invited to offer
input as well as the general public.
The Consultant must assure that each group will have an opportunity to
review the drafts submitted to allow input for data collection and in
some cases gathering of information.
7. Jobs and Responsibilities
Consultant's Responsibilities
It will be the direct responsibility of the Consultant to provide
all reports, to produce the required number of draft copies
of documents and to provide the Municipality with a detailed invoicing
format to be used.
The Consultant will also be responsible to make the necessary
presentation to Staff, Newcastle Community Services Planning Board,
Council, the Community at large and the Study Team.
/5
Terms of Reference for a Feasibility Study
on Bowmanville Arena Continued... Page 5.
7. (a) The Consultant will also establish a format for a reporting relation-
ship (ie staff contacts and correspondence).
The Consultant must enter into a contract to provide the outlined
service to the Town prior to the commencement of the work.
It will be established in the contract that ownership of all materials,
documents, reports and the end product will be that of the Town of
Newcastle.
The Consultant must identify their personnel to work on the project
outlining each individual function, relative man hours and related
experience.
Finally, the Consultant will assume all costs for the required
number of drafts and reports for a specified contract price.
(b) Study Team Responsibilities
Study Teams members will be comprised of the following Municipal Staff:
David S. Johnston, Chief Administrative Officer
Thomas A. Fanning, Director of Community Services
Joseph P. Caruana, Deputy Director of Community Services
H. Fred Payne, Facilities Manager
Terry T. Edwards, Director of Planning
(1) members of the N.C.S.P.B. to be named by the Board.
It will be the responsibility of the Study Team to interpret
the Terms of Reference and to review draft and background
information submitted by the Consultant.
The Study Team will co-ordinated input of Staff to the Consultant and
ensure that Town resources are made available to the Consultant as
required.
Study Team members on the whole will offer guidance as to approach
methods used by the Consultant and will be responsible to involve the
Newcastle Community Services Planning Board (N.C.S.P.B.)
All periodic reports to the Town of Newcastle, General Purpose and
Administration Committee meetings (G.P. & A) and subsequent
recommendations to Council will be the responsibility of the Study Team.
(c) End Use of the Study
It is the intent that the completed study will be the basis for
Council's decision making and authorization to construct the facility
identified to be the best alternative.
(d) Ontario Hydro Impact
Having completed the feasibility study it will be the task of the
consultant to assess any impact that may be attributable to the
Ontario Hydro Generating Station Darlington.