Loading...
HomeMy WebLinkAboutPSD-047-17Planning Services Public Meeting Report If this information is required in an alternate accessible format, please contact the Accessibility Coordinator at 905-623-3379 ext. 2131 Report To: Planning and Development Committee Date of Meeting: June 26, 2017 Report Number: PSD-047-17 File Number: ZBA 2017-0016 Resolution Number: PD-136-17, C-214-17 By-law Number: Report Subject: An Application by SmartREIT to rezone the subject lands to accommodate a 25,360 square metre retail outlet centre, Baseline Road, Bowmanville Recommendations: 1.That Report PSD-047-17 be received; 2.That staff consider the public comments received in the further processing of the application for rezoning (ZBA 2017-0016) including the preparation of a subsequent report; and 3.That all interested parties listed in Report PSD-047-17 and any delegations be advised of Council’s decision. Municipality of Clarington Report PSD-047-17 Page 2 Report Overview The Municipality is seeking public input on a proposal for a 25,360 square metre (273,000 square feet) retail outlet centre. SmartREIT is proposing to build a retail outlet centre across three properties located near the southeast corner of Waverley Road and Baseline Road West. The project will involve demolishing the vacant RONA building and using a cut and fill plan to replace the flood storage capacity required in the floodplain of the Bowmanville Creek. The Applicant has submitted several technical studies to support their proposal and demonstrate their conformity with the land use planning requirements of the Province, the Region of Durham and Clarington. 1. Application Details 1.1. Owner: Bowmanville Creek Developments Inc. 4246551 Canada Inc. & 220 Real Estate Limited Partnership Municipality of Clarington 1.2. Applicant: SmartREIT 1.3. Agent: MHBC Planning Limited 1.4. Proposal: To rezone the subject lands to accommodate a 25,360 square metre (273,000 square feet) retail outlet centre. 1.5. Area: 33.3 ac. 1.6. Location: 205 Baseline Road West, Bowmanville (site of the vacant RONA building and the surrounding lands). 1.7. Roll Number: 020-120-20705, 020-120-20650, 020-120-20750, 020-120-20600 1.8. Within Built Boundary: Yes Municipality of Clarington Report PSD-047-17 Page 3 2. Background 2.1. The land at the southeast corner of Waverley Road and Baseline Road West have been planned for commercial development for over 30 years. The site is comprised of three properties (see Figure 1). 4246551 Canada Inc. owns the 3.75 ha property in the middle of the site that is occupied by the vacant RONA building. The second property wraps around the RONA property on three sides (west, south and east) and is owned by Bowmanville Creek Developments Inc. (BCD Inc.). It was intended that a RONA home improvement store would be the large retailer that would anchor the smaller retail and restaurant development on the rest of the site. The third property, along the east side of the site, is currently owned by the Municipality. In conjunction with this development proposal, the Applicant has requested that the Municipality consider deeming this land surplus and make it available for purchase. Figure 1 – The three properties within the proposed development site Municipality of Clarington Report PSD-047-17 Page 4 RONA Property 2.2 In the fall of 2006, Site Plan approval was given for a 7,511 square metre (80,850 square foot) home improvement store. The current RONA building was constructed in 2008 but the building was never occupied. The Bowmanville store opening (along with three other RONA stores) was initially delayed due to the 2008 recession. 2.3 In July 2009, RONA made the decision to list the property and building for sale or lease. Over the past eight years municipal and Clarington Board of Trade staff have received numerous inquiries from prospective tenants and purchasers. However, the zoning regulations limited the types of businesses that could occupy the existing building. A Minor Variance application was submitted in September of 2016 to expand the list of businesses that could operate from the RONA property and building. The approved Minor Variance expanded the permitted uses from building supply and large product retailers to include other forms of retail sales. Bowmanville Creek Development Inc. Property 2.4 Development applications were also received to develop the lands surrounding the RONA store that are owned by Bowmanville Creek Developments Inc. (BCD Inc.). Final Site Plan Approval was granted by the Ontario Municipal Board in August of 2006. This approval was for 11,678 square metres (125,700 square feet) of commercial floor area. However, without an anchor tenant occupying the RONA building, no development has taken place on the BCD Inc. property. Municipality of Clarington Property 2.5 The lands to the east of the RONA and BCD Inc. properties is located within the floodplain of the Bowmanville Creek. In its current state, this land is environmentally protected. Through detailed consultations with the Municipality and Central Lake Ontario Conservation Authority the Applicant has put forward a cut and fill plan to reallocate a portion of the flood storage capacity to an approved location in the Bowmanville Creek watershed. By placing fill on the Municipal land the Applicant is proposing to bring this land out of the floodplain and make it suitable for development. Current Proposal 2.6 A Pre-consultation Meeting was held with the Applicant and their consultants on May 11, 2017. Following that meeting, SmartREIT submitted an application to rezone the subject lands to accommodate a 25,360 square metre (273,000 square feet) retail outlet centre on May 26, 2017. A conceptual site plan is shown in Figure 2. Municipality of Clarington Report PSD-047-17 Page 5 2.7 Outlet centres are generally characterized by the following key attributes: • They contain retail tenants that sell their brand‐name goods at discounted prices; • They typically have much larger trade areas than traditional retail centres, extending as far as 50‐60km or more in many cases; • They often do not have traditional anchor tenants, rather a collection of several major retailers that function as large ‘draws’ or attractions; • They are generally located along major well‐travelled highways, and in close proximity to significant tourist destinations, and/or with access to major consumer markets; and • They generally range in size from 4,600-37,000 square metres (50,000‐400,000 square feet) in gross leasable area. (source: urbanMetrics) 2.8 The application was deemed complete on June 9, 2017. Figure 2 – Conceptual Site Plan (Source: SmartREIT) Municipality of Clarington Report PSD-047-17 Page 6 2.9 Should this rezoning application be successful, the tentative timeline for this project is as follows: • Development approvals – Fall of 2017 • Earth works to implement the cut and fill plan – 2018 • Building Construction – 2019 • Opening Day – Summer of 2020 3 Land Characteristics and Surrounding Uses 3.1 The subject site is located in the south end of Bowmanville, near the southeast intersection of Waverley Road and Baseline Road West. The site is comprised of vacant land and an unoccupied home improvements store. Figure 3 – Development site and surrounding lands Municipality of Clarington Report PSD-047-17 Page 7 3.2 The surrounding uses include: North - Low density, residential neighbourhood (see Figure 4) South - Highway 401 East - Bowmanville Creek and TSC store West - Shell fuel bar, Waverley Road interchange Figure 4 – Homes on Lockhart Gate 4. Provincial Policy A few of the objectives of the Provincial Policy Statement and the Growth Plan for the Greater Golden Horseshoe is to ensure that new development occurs within existing settlement areas and takes advantage of existing municipal infrastructure. The subject site is located within the “Built Boundary” of the Bowmanville Urban Area. A significant portion of new growth must occur inside of the built boundary (existing neighbourhoods). In addition, development should not prevent the future expansion of the community. Development should be coordinated to ensure a balance between promoting economic prosperity and efficiently managing the natural environment. Maintaining the vitality and viability of downtowns and main streets is also a key objective of Provincial policy. Development shall generally be directed outside of hazard areas (such as floodplains) or areas of environmental sensitivity. However, Provincial policy also sets the broad conditions that must be satisfied before development can proceed in these areas. The detailed application of the Provincial policies is reflected in the policies of the Durham Regional Official Plan and the Clarington Official Plan. Municipality of Clarington Report PSD-047-17 Page 8 5. Official Plans 5.1 Durham Regional Official Plan The Durham Region Official Plan designates the subject site as “Living Areas” to the west and “Major Open Space Areas” to the east. “Living Areas” are intended to be used for housing purposes as well as limited office and retail in appropriate locations provided that the functions and characteristics of other commercial areas such as Town Centres (now known as Urban Centres in Clarington OPA 107) are not adversely affected. In addition, local centres and corridors, major retail uses and certain Employment Area uses may be permitted, provided appropriate designations and policies are included in the municipal official plan. The “Major Open Space Areas” matches the area of the site that is currently within the floodplain of the Bowmanville Creek. A “Key Natural Heritage and Hydrologic Feature” is also identified as crossing the eastern part of the development site. Development and site alteration is not permitted within areas subject to flooding hazards. However, development may be considered in these areas identified, in accordance with relevant Provincial policies and regulations. Baseline Road West and Waverly Road are identified as Type “A” Arterial Roads. On May 3, 2017, Durham Regional Council received a report on the transportation improvements required to the Highway 401 interchange at Waverley Road. The report provided the following evaluation of the proposed outlet centre. “The development of the SmartREIT site supports employment growth in the Region and conforms to the Living Area designation in the Regional Official Plan. The proposed development represents a significant new private investment and would create new local jobs, attract visitors and could be a catalyst for other new development. In particular, the Regional Official Plan recognizes that the Region will have an interest in commercial planning if a commercial proposal is 56,000 square metres (602,800 square feet) or larger in size, or if the proposal would have the potential to negatively impact the planned functions of a Regional Centre. The SmartREIT proposal, at 25,362 square metres (273,000 square feet), does not exceed / compromise either of these tests (Report #2017-COW -100).” 5.2 Clarington Official Plan The Clarington Official Plan (Official Plan) currently designates the subject site as “Highway Commercial” to the west and “Environmental Protection Area” to the east. Businesses within the “Highway Commercial” designation are intended to serve the specialized needs of residents on an occasional basis. They generally require large parcels of land to accommodate large format stores and benefit from exposure to highway traffic. Retail and service commercial uses are permitted within this designation. Municipality of Clarington Report PSD-047-17 Page 9 The east side of the development site is located within the floodplain of the Bowmanville Creek. As a result, these lands are designated “Environmental Protection Area”. The boundaries of the Environmental Protection Area are based on the limits of the floodplain. No new buildings or structures are permitted on lands identified as natural hazards such as floodplains. The Official Plan permits minor deviations to these designation boundaries, without amendment, provided such deviations do not alter the intent of this Plan. The Applicant is proposing to compensate for the floodplain storage capacity within the development site on other lands. This will be done by placing fill in the area of the site that is within the floodplain. An Environmental Impact Study and a Cut and Fill Plan have been submitted by the Applicant to determine the amount of fill that must be brought on site and where the new floodplain boundary should be located. This matter will be reviewed carefully. 5.3 Clarington Official Plan as amended by Amendment 107 (OPA 107) The subject site is designated “Gateway Commercial” to the west and “Environmental Protection Area” to the east under OPA 107. The “Gateway Commercial” designation is intended to serve the specialized needs of residents and attract tourists and visitors to the Municipality. They generally require large parcels of land to accommodate large format stores and benefit from exposure to highway traffic. Retail and service commercial uses are permitted within this designation. In addition to the floodplain of the Bowmanville Creek, the policies of OPA 107 also identify parts of the development area as being part of a Natural Heritage System. The “Environmental Protection Area” policies in OPA 107 are the same as those contained in the current Official Plan as outlined in Section 5.2 of this report. 6. Existing Zoning Rights and Changes Requested 6.1 The western part of the development site is zoned “Special Purpose Commercial (C5)” (the RONA property) and “Special Purpose Commercial Exception (C5-14)” (the majority of the BCD Inc. property). Both zones permit a variety of commercial uses including retail commercial uses. The combined floor area that has already been approved on the development site is 19,189 square metres (206,500 square feet). There is no limit on the maximum floor area in either zone. However, the “C5-14” zone does include limits on individual unit sizes. 6.2 The eastern part of the site is zoned “Environmental Protection” (the Municipal property) and “Environmental Protection Exception (EP-16)” (the balance of the BCD Inc. property). This part of the site is located within the flood plain of the Bowmanville Creek. 6.3 The Applicant has requested that a number of changes be made to the existing zoning requirements to accommodate a 25,360 square metre retail outlet centre. An outline of the requested changes is included in Table 1 below. Municipality of Clarington Report PSD-047-17 Page 10 Table 1 – Requested Zoning Changes Zoning Requirement Existing Zoning By-law Proposed Zoning Amendment Retail Outlet Centre Not defined Proposed definition – Retail Outlet Centre: shall mean an open-air and/or enclosed centre that comprise retail commercial establishments typically selling brand- name goods at a discount. In addition uses such as eating establishments, personal service shops, places of entertainment, fitness centres and other uses are incorporated to compliment the retail commercial establishments. Personal Service Shop Not permitted Permit Personal Service Shop Fitness Centre Not permitted Permit Fitness Centre Limits on total floor area None None Limits on individual unit sizes Only a limited on the number of individual units under 465 square metres (5,000 square feet) are permitted Delete all individual unit size limits Maximum Height for Non- Hotel Buildings 10 metres 20 metres Front Yard Setback 15 metres 6 metres Exterior Side Yard Setback 10 metres 6 metres Minimum parking requirements No parking ratio for retail outlet centres Retail Outlet Centre = 1:20 square metres Municipality of Clarington Report PSD-047-17 Page 11 7. Background Studies Submitted by the Applicant 7.1 Planning Justification Report The Planning Justification Report provides a list of all items requested by this rezoning application. It describes a retail outlet centre as high-end and brand name retailers selling merchandise at discounted prices. These will typically be apparel retailers rather than household goods, grocery or home improvement retailers. According to the Planning Justification Report, the requested rezoning and the proposed outlet centre development are consistent with: • The Provincial Policy Statement; • The Growth Plan for the Greater Golden Horseshoe; • The Durham Regional Official Plan; • The Clarington Official Plan; and • The Clarington Official Plan as amended by OPA 107. In addressing the restrictions on individual unit sizes, the Planning Justification Report states: “Over the years, the Municipality has instituted individual unit size restrictions on various retail commercial developments outside of the Downtown, including on the subject site. The intent and purpose of unit size restrictions was to avoid unacceptable market impacts to merchants in Downtown Bowmanville. As Downtown Bowmanville has continued to prosper and maintain viability, the need for restrictions on unit sizes has lessened considerably (as previously identified through the urbanMetrics Report completed for the Municipality). As a result, Municipal staff have supported the removal and / or lessening of unit size restrictions on commercial developments in other areas of Bowmanville (Planning Report, page 7).” Building on the comments made in the urbanMetrics Report commissioned by the Municipality, the Planning Justification Report states that the proposed development “will act as a major regional draw, bringing visitors from outside of the Bowmanville and beyond Durham Region. Given this, the proposed retail outlet centre is not anticipated to have undue retail market impacts on established retailers in Downtown Bowmanville.” The Planning Report goes on to point out that the proposed development will create a viable use for the vacant lands and will provide a number of short-term and long-term employment opportunities for the Municipality thereby enhancing its economic base. Municipality of Clarington Report PSD-047-17 Page 12 It is the conclusion of the Planning Justification Report that the proposed development will permit a development which is compatible with adjacent land uses. The proposed development will support the environmental policies of the Clarington and Durham Regional Official Plans by restoring and enhancing the Bowmanville Creek floodplain and associated wetlands through a comprehensive cut and fill plan and restoration plan which will result in restored and enhanced areas to the south of Highway 401. 7.2 Traffic Impact Study The Traffic Impact Study (TIS) provides a preliminary review of the key transportation impacts of the proposed outlet centre. The transportation analysis provided includes a forecast of traffic volume in 2020, when the outlet centre opens, and traffic volume in 2030, ten years after the outlet centre has been open. Improvements will be required to Baseline Road, the intersection of Waverley and Baseline Road and to the Highway 401 interchange. A more detailed TIS will be prepared based on the comments received as part of this initial review process. 7.3 Functional Servicing Report The purpose of the Functional Servicing Report (FSR) is to show that the development can be graded and serviced in a way that meets the design standards of Clarington, Durham Region and CLOCA. While detailed design work will be completed as part of the Site Plan review process, the FSR confirms that existing and proposed infrastructure (water, sanitary sewer and stormwater sewers) will be sufficient to accommodate the proposed outlet centre development. 7.4 Floodplain Cut and Fill Plan The purpose of the Cut and Fill Plan is to determine how much fill must be moved onto the east side of the subject site in order to raise that part of the land out of the Regional floodplain. The Cut and Fill Plan goes on to demonstrate that all of this fill can be acquired from the Municipal property located on the south side of Highway 401 between Waverley Road and Liberty Street (see Figure 5). The existing storage capacity of the floodplain will be maintained. Municipality of Clarington Report PSD-047-17 Page 13 Figure 5 – Lands to be cut and lands to be filled 7.5 Environmental Impact Study (EIS) The EIS provides an outline of the proposed development plan, identifies potential effects to the existing natural features, and recommends appropriate mitigation measures. Existing wetlands and natural vegetation that will be removed as a result of the proposed development, will have to be recreated after the completion of the cut and fill plan. CLOCA will assist in reviewing and approving this compensation work prior to the beginning of construction. Municipality of Clarington Report PSD-047-17 Page 14 8. Preliminary Market and Impact Assessment (urbanMetrics Report) In advance of receiving this application, the Planning Services Department commissioned a preliminary report by urban Metrics to provide background on the operation of retail outlet centres and the potential impact of an outlet centre on the Bowmanville market. The urbanMetrics report may be updated in the future based on the public comments received and/or analysis of the application. The conclusions of the preliminary report were as follows: Limited Impact on Existing Retail Stores The retail outlet centre proposal will likely be focused on a different range of merchandise then is currently found in the Bowmanville, Clarington and Durham Region market. This will draw customers from a much broader regional area. As such, it is not expected to compete directly for sales with existing Clarington businesses. However, it is possible that some existing apparel stores could experience some impact on their sales performance. Opportunity for Cross-Shopping The proposed retail outlet centre could ultimately provide new opportunities for cross- shopping promotion. The outlet centre is expected to attract customers from other parts of the Region and Province that would not otherwise have visited, stayed and shopped in Clarington. If successful, the outlet centre could raise the profile of Bowmanville as a shopping-tourism destination. The customers it attracts can then be enticed to also shop at existing retail establishments in Bowmanville. Economic Benefits to the Community The proposed retail outlet centre could create approximately 610 jobs on a full-time equivalent basis. The annual property tax revenue from this project is estimated to be $3.6 million. Existing Vacancy Rates are Indicative of a Healthy Downtown The commercial vacancy rate in Clarington is estimated to be 6.7%. This estimate excludes the former Target store (in the process of being occupied with a Lowe’s home improvement store) and the vacant RONA building (to be demolished for the proposed outlet centre). For comparison, normal vacancy rates in a balanced market can be as high as 8.0%. Downtown Bowmanville currently has a vacancy rate of only 4.2%. The authors of the urbanMetrics Report state that 4.2% vacancy rate is indicative of a very healthy downtown for municipalities of comparable size and/or regional commercial function. Municipality of Clarington Report PSD-047-17 Page 15 Positive Impacts Will Exceed Limited Negative Impact on Downtown Bowmanville The conclusion reached by the urbanMetrics Report is that existing retail establishments in Clarington generally serve the local community and therefore will have limited direct competition from the types of retailers that typically locate in outlet centres. In addition, the possibility exists that the non-local customers attracted to the outlet centre may look for additional shopping and dining opportunities in the area around the outlet centre. This spin-off effect created by the outlet centre would likely exceed and/or offset any negative impacts caused by increasing competition. 9. Agency Comments 9.1 Regional Municipality of Durham The proposed outlet centre conforms with the Durham Regional Official Plan. The Applicant will be required to demonstrate that they are placing clean fill on the site. A Traffic Impact Study will be required to assess the impacts to all road users of the adjacent road network. This report should include a strong emphasis on promoting active transportation (walking and cycling) and transit accessibility. 9.2 Central Lake Ontario Conservation (CLOCA) This application must strike the right balance of meeting the development potential of the property with: • Protection of the environmental features on the property; • Ensuring that the development is sufficiently protected from the natural hazards; and • Providing appropriate stormwater management. It appears that this balance can be achieved in principle. However, it is CLOCA opinion that there are a few items that will need to be addressed prior to our support of the proposed rezoning. These items include: 1. Coordinated stormwater servicing; 2. Identify opportunities for low impact development measures; 3. Providing a Compensation Plan for the natural features that will be removed; and 4. Improving the connectivity of the cut area to the Bowmanville Creek floodplain and valley. The property must be filled in order to raise all buildings and parking sufficiently out of the floodplain. A Holding (H) symbol should be placed on the portion of the property currently within the floodplain until it can be demonstrated that this portion has been satisfactorily elevated. Municipality of Clarington Report PSD-047-17 Page 16 The Environmental Impact Study (EIS) will determine the limits of the proposed development. The EIS will identify the boundaries of the natural features and vegetation communities, assess the features and functions, identify areas to be preserved, and recommend buffers to protect the features. Mitigation measures and compensation will be required for any intrusions into wetland and natural heritage features. A permit from CLOCA will be required prior to any works occurring on the site. 9.3 Ministry of Transportation No comments have yet been provided to date. 10. Departmental Comments 10.1 Engineering Services The Engineering Services Department has no objection, in principle, to the proposed outlet centre use. Engineering Services supports with the approach and recommendations provided in the Traffic Impact Study (TIS) and Functional Servicing Report. The applicant will be required to submit additional detailed plans to address the ultimate grading, drainage, servicing, soils management, as well as legal plans. In addition to the improvements to the Waverley Road 401 interchange and Regional Road 57, the TIS should further discuss the effects of the proposed development on the Lake Road and Liberty Street intersection. Additionally, analysis should be provided regarding impacts to traffic during peak shopping periods (i.e. holiday season) which may generate increased volumes of traffic over and above regular Saturday peak levels for sustained periods of time. The Functional Servicing Report should provide further discussion regarding any requirements of MTO for drainage to their lands as well as discussion and detail regarding how detention for erosion control is to be achieved on site. As a significant earthworks hauling program will be required for the proposed site plan, the Applicant will be required to receive approval for a Site Alteration Permit. The Municipality of Clarington is scheduled to construct an extension of the Bowmanville Creek Trail east of the development property. The trail will extend from Baseline Road to the existing Waterfront Trail south of Highway 401 / CN Rail corridor. The Municipality will require a trail connection from the proposed development to the Bowmanville Creek Trail extension. A 3.0m wide multi-use pathway will ultimately be constructed on the south side of Baseline Road, from where it currently ends, to the east limits of the site. 10.2 Emergency and Fire Services The Clarington Emergency and Fire Services Department has no objections to the proposed outlet centre. Municipality of Clarington Report PSD-047-17 Page 17 10.3 Finance Department The Finance Department has confirmed that the taxes on these properties are up to date. 11. Public Notice and Submissions 11.1 During February and March of 2017, Planning Staff attended the regular meetings of the three downtown BIAs (Bowmanville, Newcastle and Orono) to provide them with information about the proposed retail outlet centre. At that time, the Newcastle and Orono BIAs did not express any direct concerns with the proposed development. The response from the Bowmanville BIA was mixed. Some members welcomed the increased exposure and growth that a retail outlet centre might bring. Other members saw the proposed outlet centre as a direct competition with their existing business. 11.2 Notice for the Public Meeting and the Public Information Centre were placed in Clarington This Week, Orono Weekly Times and given by letter to all property owners within 120 metres of the subject site. Notice was posted on the Municipal website, the Municipal Facebook page and in the Planning Services Department E-Update newsletter. Two signs advertising the Public Meeting were also posted on the subject site. 11.3 The Applicant and their consultants held a Public Information Centre on June 19, 2017. This meeting provided residents and business owners with the opportunity to learn more about the proposed outlet centre and ask questions of the consultants. Some of the questions asked at the Public Information Centre were: • What will happen to the access at Lockhart Gate from Baseline Road? • How will the intersection of Baseline Road / Duke Street / Liberty Street be improved? • Will the connection from the existing valley trail to the waterfront trail be made before the outlet centre opens? • How will universal access be provided in the parking lot and throughout the centre? • What stores will be in the outlet centre? • How much noise will be generated? • Will it be monitored 24/7? Will it be used by teenagers after hours? • When will the highway interchange improvements be made? 12. Staff Comments Through the continued review of this application, Staff will be evaluating number of key areas. Municipality of Clarington Report PSD-047-17 Page 18 12.1 Urban Design and Sustainability Good quality building design is an essential marketing element of all commercial development. Outlet centres in particular must display a high standard of urban design in order to match the expectations of the customers. The design of the outlet centre will need to reflect the distinction over and above the day-to-day shopping experience. Since the outlet centre will also serve as a shopping-tourism destination it will need to incorporate a quality of design that reflects an attractive image of Clarington. Integrated with the aesthetic design of the outlet centre will be the sustainable design of the buildings and site. Exceptional landscaping will be required to combat the “heat island” effect of the large parking area. Low impact stormwater solutions will need to be utilized. Innovative materials and fixtures will be necessary to reduce the overall consumption of water and energy. A Transportation Demand Management Plan will be submitted in conjunction with the revised Traffic Impact Study that will identify opportunities to reduce car dependency of staff and local customers by coordinating transit services and infrastructure with active transportation options. Pedestrian connectivity within the site and to the surrounding area must be included. These sustainable design elements will be required within the site and on the surrounding Municipal right of ways. 12.2 Transportation Impacts As a retail tourism destination, the proposed outlet centre is expected to draw customers from outside of the Clarington area. The impacts of the increased traffic will need to mitigated to ensure the safe and efficient flow of traffic to, from and around the outlet centre. Improvements will be required to the Highway 401 interchange as well as Regional and local streets on both the east and west sides of the site. The first two are discussed at 10.1 of this report. One area of particular interest will be the access to the Lockhart / John Scott neighbourhood located to the north of the development site. Vehicle access to that neighbourhood is currently provided exclusively from Lockhart Gate (see Figure 4). Part of the transportation review will include examining the need for extending John Scott Avenue to Spry Avenue to provide an alternative access. 12.3 Impacts on the Natural Environment In order for this development to proceed, significant changes must be made to raise the lands at the east end of the site out of the floodplain. In doing so, care must be taken to ensure that the natural heritage features that are being removed can be replaced or appropriately compensated for somewhere else within the Bowmanville Creek watershed. This matter will require careful review. Municipality of Clarington Report PSD-047-17 Page 19 12.4 Local Commercial Business While the subject site has been previously identified for retail development it currently includes floor area and use restrictions intended to ensure that it does not negatively impact the planned commercial function of other business areas in Clarington and specifically in downtown Bowmanville. The proposed changes to the zoning are being reviewed with the same approach. 13. Strategic Plan Among the many priorities of the Clarington Strategic Plan are: • Job creation; • Improvements to Highway 401 interchanges; and • Build trails that connect our community to the waterfront. The proposed retail outlet centre supports these key priorities. 14. Conclusion The purpose of this report is to provide background information on the proposed retail outlet centre submitted by SmartREIT and receive public comments. Staff will take into consideration all comments raised at this meeting. A future report will be prepared once all agency comments have been received and issues resolved. Submitted by: Reviewed by: David J. Crome, MCIP, RPP Curry Clifford, MPA, CMO, Director of Planning Services Interim CAO Staff Contact: Paul Wirch or Carlos Salazar, 905-623-3379 extension 2418 or pwirch@clarington.net List of interested parties to be notified of Council's decision is on file in the Planning Services Department PW /COS/tg/df I:\^Department\LDO NEW FILING SYSTEM\Application Files\ZBA-Zoning\2017\ZBA2017-0016 Outlet Centre\5-Reports\PSD-047-17.docx