Loading...
HomeMy WebLinkAboutCOD-014-17Corporate Services Report If this information is required in an alternate accessible format, please contact the Accessibility Coordinator at 905-623-3379 ext. 2131. Report To: General Government Committee Date of Meeting: June 19, 2017 Report Number: COD-014-17 Resolution: GG-362-17 File Number: CL2016-16 By-law Number: Report Subject: 2017 Stormwater Management Pond Cleanout and Maintenance Recommendations: 1.That Report COD-014-17 be received; 2.That Ground Force Environmental Inc. be authorized to complete the previously approved work on Robert Adams Pond in addition to the work required on the adjacent quantity pond, with a cost of $222,641.19 (Net HST Rebate). The award is contingent on the Municipality receiving funding from Clean Water and Wastewater Fund (CWWF). Ground Force Environmental was previously awarded work required for this location as stipulated in CL2016-16 and awarded via PS-010-16; 3.That the funds required for this project in the amount of $293,602.38 (Net HST Rebate) which includes the construction cost of $222,641.19 (Net HST Rebate) and other related costs such as design, inspection, material testing, contingency of $70,961.19 (Net HST Rebate) be funded by the Municipality as follows: Stormwater Pond Cleanout 110-36-386-83454-7401 $ 293,602.38 4.That all interested parties listed in Report COD-014-17 and any delegations be advised of Council's decision by the Department. Municipality of Clarington Report COD-NNN-17 Page 2 Report Overview To request authorization from Council to amend the award for the contract for the pond maintenance and sediment removal, outlet structure restoration and minor erosion repairs for Robert Adams Pond and quantity pond as required by the Municipality of Clarington’s Engineering Services Department. 1. Background This project relates to the the pond maintenance and sediment removal, outlet structure restoration and minor erosion repairs for Robert Adams Pond. This project was previously awarded under PS-010-16 (Attachment 1). The previous award had a provision to complete the work required for Robert Adams Pond over a three year period. The work is completed in stages to minimize the area of disturbance, allow for dewatering and flow management, and to minimize the duration of time required to complete in-water works. The first stage of work was completed in 2016. This report seeks authorization to amend the existing contract to allow for the completion of the balance of the work required at Robert Adams Pond within one year rather than two years and includes the additional work required at the adjacent quantity pond. Due to the dollar value of this work, approval is requested to amend the existing agreement with Ground Force Environment to include the quantity pond and complete the work in one year rather than two. 2. Financial The funds required for the work, including the initial project and the addition of the adjacent quantity pond, in the amount of $293,602.38 (Net HST Rebate) which includes the construction cost of $222,641.19 (Net HST Rebate) and other related costs such as design, inspection, material testing, contingency of $70,961.19 (Net HST Rebate) will be funded by the Municipality as follows: Stormwater Pond Cleanout 110-36-386-83454-7401 $ 293,602.38 Due to the difficult nature of this work and the environmental sensitivities that have to be avoided a larger than normal contingency amount is allotted for this contract, based on past experience. Although significant engineering design was completed to address the pond cleanout the nature of the ponds do not allow a full and thorough inventory of the pond and therefore an added contingency has be allotted for this contract. Contract inspection for this contract will be provided by CIMA with administration of the contract by Clarington staff. In addition fish rescue has to be performed by qualified professionals at both ponds which has been included in the project costing. The award is contingent on the Municipality receiving funding from Clean Water and Wastewater Fund (CWWF). Municipality of Clarington Report COD-NNN-17 Page 3 3. Concurrence This report has been reviewed by the Director of Engineering Services and the Director of Operations who concur with the recommendations. 4. Conclusion It is respectfully recommended that Ground Force Environmental Inc. be authorized to complete the SWM Pond Cleanout and Maintenance at Robert Adams Pond in the amount of $ 222,641.19 (Net HST Rebate) as an extension to Tender CL2016-16. 5. Strategic Plan Application The recommendations contained in this report conform to the Strategic Plan. Submitted by: Reviewed by: Marie Marano, H.B. Sc., C.M.O., Curry Clifford, MPA, CMO Director of Corporate Services Interim CAO Nancy Taylor, BBA, CPA, CA Director of Finance/Treasurer Staff Contact: David Ferguson, Purchasing Manager, 2209 or dferguson@clarington.net List of interested parties to be notified of Council's decision is on file in the Corporate Services Department. Attachment 1 to COD-014-17 Attachment 1 to COD-014-17 Attachment 1 to COD-014-17 Attachment 1 to COD-014-17 Attachment 1 to COD-014-17 Attachment 2 to COD-014-17 Attachment 2 to COD-014-17 Attachment 2 to COD-014-17