HomeMy WebLinkAbout06/20/2017Final
clffftwn
Special Planning and Development
Committee Agenda
Date: June 20, 2017
Time: 7:00 PM
Place: Council Chambers, 2nd Floor
Municipal Administrative Centre
40 Temperance Street
Bowmanville, Ontario
Inquiries & Accommodations: For inquiries about this agenda, or to
make arrangements for accessibility accommodations for persons attending, please
contact: Michelle Chambers, Committee Coordinator, at 905-623-3379, ext. 2106 or by
email at mchambers(a)_clarington.net.
Alternate Format: If this information is required in an alternate format, please contact
the Accessibility Coordinator, at 905-623-3379 ext. 2131.
Audio Record: The Municipality of Clarington makes an audio record of General
Government Committee meetings. If you make a delegation or presentation at a
General Government Committee meeting, the Municipality will be audio recording you
and will make the recording public by publishing the recording on the Municipality's
website.
Cell Phones: Please ensure all cell phones, mobile and other electronic devices are
turned off or placed on non -audible mode during the meeting.
Copies of Reports are available at www.clarington.net
CIarington Special Planning and Development
Committee Agenda
Date: June 20, 2017
Time: 7:00 PM
Place: Council Chambers
1 Call to Order
2 Adopt the Agenda
3 Declaration of Interest
4 Public Meetings
4.1 Kaitlin Homes Application for a Proposed Zoning By-law Amendment Page 4
Limited
Public Meeting Applicant: Kaitlin Homes Limited
Report: PSD -042-17
4.2 Simon Gill & Applications for a Proposed Official Plan and Zoning Page 6
Janet Gill By-law Amendment
Public Meeting
Applicants: Simon Gill & Janet Taylor Gill
Report: PSD -043-17
4.3 Marina Villas Application for a Proposed Zoning By-law Amendment Page 8
Ltd. (Kaitlin)
Public Meeting Applicant: Marina Villas Ltd. (Kaitlin)
Report: PSD -044-17
4.4 Worden East Applications for a Neighbourhood Design Plan & Three Page 9
Public Meeting Proposed Plans of Subdivsion
Applicants: Schleiss Development Company, Clifford
Curtis, Michael Zygocki and Baseline
Properties Limited
Report: PSD -045-17
Page 2
ClaClllgtioll
Special Planning and Development
Committee Agenda
Date: June 20, 2017
Time: 7:00 PM
Place: Council Chambers
5 Delegations
No Delegations
6 Planning Services Department Reports
6.1 PSD -042-17 An Application by Kaitlin Homes Limited to Amend the Page 11
Zoning By-law to Permit the Extension of a Temporary
Use Zoning By-law to Facilitate a Temporary Homes
Sales Pavilion at 3 Martin Road, Bowmanville
6.2 PSD -043-17 An Application by Simon Gill and Janet Taylor Gill to Page 20
Permit Agri -Tourism Uses on their Farm Property
Including Special Events and a Nano-Cidery
6.3 PSD -044-17 An Application by Newcastle Marina Villa Ltd. (Kaitlin Page 31
Corporation) To Permit 27 Townhouse Condominium
Units in the Port of Newcastle
6.4 PSD -045-17 An Application by a Group of Land Owners to Amend the Page 38
Worden East Neighbourhood Design Plan and Three
Applications to Subdivide a Portion of those Lands in
Courtice
6.5 PSD -046-17 Process Enhancement Project Progress Update Page 55
7 Adjournment
Page 3
Clarbgton
Notice of Public Meeting
A land use change has been proposed, have your say!
The Municipality is seeking public comments before making a decision on an application to amend
the Zoning By-law.
VZOISIS
Kaitlin Homes Limited has submitted an application to amend the Zoning By-law to permit
the extension of a Temporary Use for a home sales pavilion having 335 square metres in
total floor space with an associated parking lot.
' • • -
3 Martin Road, Bowmanville
South-west corner of Regional Highway 2 and Regional Road 57, North of the Canadian
Pacific Railway Tracks.
Hi hway,2-
,. Durham 9,*
00
Subject Site
CIFO
c�
4
•S ���, ��,
r4
y
G
zsa 20 ii 7-00
How to be Informed
The proposed amendment, and additional information are available for review at the Planning
Services Department. Questions? Please contact Amanda Watson 905-623-3379, extension
2420, or by email at awatson(a)_clarington.net
rovide
How . PComments
Speak at the Public Meeting:
Date: Tuesday June 20, 2017
Time: 7:00 pm
Place: 40 Temperance Street, Bowmanville, ON L1 C 3A6
Municipal Administrative Centre
Council Chambers
Or write to the Planning Services Department to the attention of Amanda Watson.
File Number: ZBA2017-0013
Freedom of Information and Protection of Privacy Act
The personal information you submit will become part of the public record and may be released to the
public. Questions about the information we collect can be directed to the Clerk's Department at 905-
623-3379, extension 2102.
Accessibility
If you have accessibility needs and require alternate formats of this document or other
accommodations please contact the Accessibility Coordinator at 905-623-3379 ext. 2131.
Appeal Requirements
If you do not speak at the public meeting or send your comments or concerns to the Municipality of
Clarington before the by-law is passed, you will not be entitled to appeal the decision to the Ontario
Municipal Board and you will not be able to participate at a hearing of an appeal before the Ontario
Municipal Board unless, in the opinion of the Board, there are reasonable grounds to do to.
David J. Crome, MCIP, RPP
Director of Planning Services
5
Clarbgton
Notice of Public Meeting
A land use change has been proposed, have your say!
The Municipality is seeking public comments before making a decision on an application to amend
the Official Plan and Zoning By-law for an agri-tourism proposal.
' • • •
Simon Gill and Janet Taylor Gill are proposing to use an existing barn, outdoor gardens and a
temporary accessory tent to host a maximum of 13 special events per year for up to 140 guests per
event on their farm property. Included in the proposal is to use apples grown on the farm for a small
cidery to serve event guests.
The application submission has been deemed complete.
4704 Pollard Road, Former Township of Clarke
The property is located south of Concession Road 5 on the west side of Pollard Road.
Concession Road_5 - -
0 T1.
_.
law
t -
ti.
s
Cz
0
j T'
Subject Site .=
CMU
,
�.y r,F� 1/11ehe In Tl e HHayfield_ Lawn -Parking
Now Daylily Gardens' Area Maximum
-- N& ,; Apple Lawn &Gardens: Capacity: 204
�='�
,
Orchard Outdoor E ent Area &
/�/ Ternporary Tent Area Event and Commercial
Entrance. (Existingi)
Ant Structure Psi ate Residential &
fisting) Ancillary Strucfures
z7.0012 (E
COPA2017•-0008
How to • - Informed
The proposed Official Plan and Zoning By-law amendments together with any additional
information and background studies are available for review at the Planning Services Department
and on our website at clarington.net/developmentproposals Questions? Please contact Planner
David Addington at 905-623-3379, extension 2419, or by email at daddington clarington.net
rovide
How . PComments
Speak at the Public Meeting:
Date: Tuesday, June, 20, 2017
Time: 7:00 pm
Place: 40 Temperance Street, Bowmanville, ON L1 C 3A6
Municipal Administrative Centre
Council Chambers
Or write to the Planning Services Department to the attention of David Addington.
File Number: COPA2017-0008 & ZBA2017-0012
A•
Freedom of Information and Protection of Privacy Act
The personal information you submit will become part of the public record and may be released to the
public. Questions about the information we collect can be directed to the Clerk's Department at 905-
623-3379, extension 2102.
Accessibility
If you have accessibility needs and require alternate formats of this document or other
accommodations please contact the Accessibility Coordinator at 905-623-3379 ext. 2131.
Appeal Requirements
If you do not speak at the public meeting or send your comments or concerns to the Municipality of
Clarington before the by-law is passed, you will not be entitled to appeal the decision to the Ontario
Municipal Board and you will not be able to participate at a hearing of an appeal before the Ontario
Municipal Board unless, in the opinion of the Board, there are reasonable grounds to do to.
David J. Crome, MCIP, RPP
Director of Planning Services
I:\^Department\LDO NEW FILING SYS ication Files\ZBA-Zoning\2017\ZBA2017-0012 4704 Pollard Road\Public Meeting\PM Notice 4704 Pollard Road May 17-16.docx
7
Clarbgton
Notice of Public Meeting
A land use change has been proposed, have your say!
The Municipality is seeking public comments before making a decision on an application to amend
the Zoning By-law.
•••
Marina Villas Ltd. (Kaitlin) proposes to develop 27 three storey townhouse units in
condominium tenure.
65 Shipway Avenue, being west of Shipway Avenue and north of Lakebreeze Drive in the
Port of Newcastle.
r
L
. SH�pW
i
How to be Informed
The proposed zoning by-law amendment, additional information and background studies are
available for review at the Planning Services Department and on our website at
clarington.net/developmentproposals Questions? Please contact Cynthia Strike, Principal
Planner 905-623-3379, extension 2410, or by email at cstrike@clarington. net
How to Provide Comments
Speak at the Public Meeting:
Date: Tuesday, June 20, 2017
Time: 7:00 pm
Place: 40 Temperance Street, Bowmanville, ON L1 C 3A6
Municipal Administrative Centre
Council Chambers
Or write to the Planning Services Department to the attention of Cynthia Strike
File No: ZBA 2017-0005, cross reference SPA 2017-0017
Freedom of Information and Protection of Privacy Act
The personal information you submit will become part of the public record and may be released to the
public. Questions about the information we collect can be directed to the Clerk's Department at 905-
623-3379, extension 2102.
Accessibility
If you have accessibility needs and require alternate formats of this document or other
accommodations please contact the Accessibility Coordinator at 905-623-3379 ext. 2131.
Appeal Requirements
If you do not speak at the public meeting or send your comments or concerns to the Municipality of
Clarington before the by-law is passed, you will not be entitled to appeal the decision to the Ontario
Municipal Board and you will not be able to participate at a hearing of an appeal before the Ontario
Municipal Board unless, in the opinion of the Board, there are reasonable grounds to do to.
David J. Crome, MCIP, RPP
Director of Planning Services
iies\ZBA-Zoning\2017\ZBA2017-00051&a Villa\Public Notice\PM ZBA2017-0005- Public Meeting Notice_May 18, 2017.docx
Clarbgton
Nonce of Public Meeting
A land use change has been proposed, have your say!
The Municipality is seeking public comments before making a decision on applications to amend the
Worden East Neighbourhood Design Plan and for three proposed Plans of Subdivision.
The Municipality of Clarington has received an application from a group of land owners including
Schleiss Development Company Limited, Clifford Curtis, Michael Zygocki and Baseline Properties
Limited to amend the Worden East Neighbourhood Design Plan (NDP). Approval of an
amendment to the NDP is required prior to subdivision approval.
Subdivision applications have also been submitted by three of the above land owners containing a
total of 29 single detached dwelling lots plus future development blocks. Each lot within the
proposed plan will have a minimum 15 metres lot frontage in compliance with the Urban Residential
Type One (R1) zone. Open space blocks are proposed along the west and north sides.
West side of Tooley Road, Courtice
N
�
�
�Y
SC 2017-0003
Neighbourhood Design Plan
D QRl�
�p
LADE
Amendment Area
SC� -0004
= � F a
E
w
SG
-000 o
O
CIRCLE
CT'.
��SG 02�
LEIT CT
x2017-00�
EL
POP YFILU
W
o
o
w
_
__ ®
w
LLJ
.8
O
:Z
Z
LLJ
V
!�
- I . ;;
BIRCHFIELDmDR
0
SC 2017 - 0002 & 0003 & 0004
Q
The proposed Neighbourhood Design Plan amendment, draft plans of subdivision, additional
information and background studies are available for review at the Planning Services Department
and on our website at clarington.net developmentproposals. Questions? Please contact Mitch
Morawetz, 905-623-3379, extension 2411 or mmorawetz( clarington.net or Cynthia Strike, 905-
623-3379, extension 2410 or cstrike clarington.net
Speak at the Public Meeting:
Date: Tuesday, June 20, 2017
Time: 7:00 PM
Place: 40 Temperance Street, Bowmanville, ON L1 C 3A6
Municipal Administrative Centre
Council Chambers
Or write to the Planning Services Department to the attention of Mitch Morawetz or Cynthia Strike.
Note: A Public Information Centre will be scheduled for a later date and notice will be given
File Numbers: PLN 31.5.6 — Worden East Neighbourhood Design Plan Amendment
S -C-2017-0002 — Michael Zygocki
S -C-2017-0003 — Schleiss Development Company Limited
S -C-2017-0004 — Clifford Curtis
Freedom of Information and Protection of Privacy Act
The personal information you submit will become part of the public record and may be released to the
public. Questions about the information we collect can be directed to the Clerk's Department at 905-
623-3379, extension 2102.
Accessibility
If you have accessibility needs and require alternate formats of this document or other
accommodations please contact the Accessibility Coordinator at 905-623-3379 ext. 2131.
Appeal Requirements
If you do not speak at the public meeting or send your comments or concerns to the Municipality of
Clarington before the by-law is passed, you will not be entitled to appeal the decision to the Ontario
Municipal Board and you will not be able to participate at a hearing of an appeal before the Ontario
Municipal Board unless, in the opinion of the Board, there are reasonable grounds to do to.
David J. Crome, MCIP, RPP
Director of Planning Services
IAADepartment\LDO NEW FILING SYSTEMWpplication Files\SC-Subdivision\S-C-2017\S-C-2017-0002 Zygocki\Public Notice\PM_SC2017-0002-Public Meeting Notice_May'19'2017.docx
10
ciffbooff
Planning Services
Public Meeting Report
If this information is required in an alternate accessible format, please contact the Accessibility
Coordinator at 905-623-3379 ext. 2131.
Report To: Planning and Development Committee
Date of Meeting: June 20, 2017
Report Number: PSD -042-17 Resolution Number:
File Number: ZBA2017-0013 By-law Number:
Report Subject: An Application by Kaitlin Homes Limited to Amend the Zoning
By-law to permit the extension of a Temporary Use Zoning By-law to
facilitate a temporary homes sales pavilion at 3 Martin Road,
Bowmanville.
Recommendations:
Provided there are no significant concerns raised at the Public Meeting:
1. That Report PSD -042-17 be received;
2. That the proposed application for Rezoning ZBA2017-0013 by Kaitlin Homes Limited be
approved and the By-law contained in Attachment 1 to Report PSD -042-17, be adopted;
3. That the Region of Durham Planning and Economic Development Department and
Municipal Property Assessment Corporation be forwarded a copy of Report PSD -042-17
and Council's decision; and
4. That all interested parties listed in Report PSD -042-17 and any delegations be advised of
Council's decision.
11
Municipality of Clarington
Report PSD -042-17 Page 2
Report Overview
This report recommends the approval of an application by Kaitlin Limited to amend the Zoning
By-law to permit an extension of a Temporary Use Zoning By-law for an existing sales pavilion
located at 3 Martin Road in Bowmanville.
1. Application Details
1.1. Owner: 668390 Ontario Limited (Kaitlin Homes Limited)
1.2. Applicant: Enzo Bertucci
1.3. Proposal: Amend Zoning By-law 84-63 to permit the extension of a
Temporary Use Zoning By-law for an existing sales pavilion.
1.4. Area: 0.5 hectares
1.5. Location: 3 Martin Road, Bowmanville
1.6. Roll Number: 18-17-010-020-16005
1.7. Within Built Boundary: Yes
2. Background
On September 15, 2008, Council originally approved a Temporary use By-law to permit a
new home sales pavilion for Kaitlin's various projects in Clarington. In January 2013,
Council approved zoning by-law amendment to permit the extension of a Temporary Use
By-law for the existing home sales pavilion. The use includes the sales office building and
an associated parking lot. The site is located immediately north of the Canadian Pacific
Railway and west of Martin Road in Bowmanville. The applicant has now reapplied to
extend the existing use for an additional three year period.
3. Land Characteristics and Surrounding Uses
3.1 Kaitlin's current sales pavilion, along with the associated parking lot has been located on
the site since 2013. The property has frontage on Martin Road (Durham Regional Road
57) and abuts the north limits of the Canadian Pacific Rail Line. The property is generally
flat, gently sloping from east to west (See Figure 1).
3.2 The surrounding uses are as follows:
North -
Road Allowance for the Future Expansion of Prince William Boulevard and
vacant land
South -
Canadian Pacific Railway, land owned by Metrolinx for future GO Station
East -
Existing Residential Subdivision south of the railway and vacant lands
north of the railway
West -
Vacant lands, Go Commuter lot and Bus Station, and Commercial uses
12
Municipality of Clarington
Report PSD -042-17 Page 3
Figure 1: Site Location Map
4. Provincial Policy
4.1 Provincial Policy Statement and Provincial Growth Plan
The Provincial Policy Statement and the Growth Plan for the Greater Golden Horseshoe
address the need to maintain and direct land use to achieve efficient development and
land use patterns. Land use must be carefully managed to accommodate appropriate
development to meet the full range of current and future needs, while achieving efficient
development patterns. The application conforms.
13
Municipality of Clarington
Report PSD -042-17
5. Official Plans
5.1 Durham Regional Official Plan
Page 4
The Durham Region Official Plan designated the subject property as a Regional Centre.
Regional Centres shall be planned and developed as the main concentrations of urban
activities within area municipalities, providing a fully integrated array of community, office,
service and shopping, recreational and residential uses.
The proposed temporary use conforms with the Regional Official Plan.
5.2 Clarington Official Plan
The Clarington Official Plan designates the lands as Town Centre. The lands are also
within the Bowmanville West Town Centre Secondary Plan area. Within the Bowmanville
West Town Centre Secondary Plan, the land is designated "Mid -rise High Density
Residential".
The Official Plan allows Council to pass Temporary Use By-laws subject to conditions.
The Official Plan policies relating to Temporary Use By-laws state that Temporary Use
By-laws may be passed to permit the use of lands, buildings or structures, on a
temporary basis, for any purpose provided that:
a) The proposed use is temporary in nature;
b) The proposed use is compatible with the adjacent existing land uses, there is
minimal impact on the natural features and hazard lands, or satisfactory measures
to mitigate any adverse impact will be applied;
c) There will be no adverse impacts on traffic or transportation facilities or services in
the area;
d) Adequate access and parking are provided;
e) The use can be removed and the site can be restored to its original condition;
f) Adequate sewage disposal and water services are available in compliance with
provincial and regional standards; and
g) It does not jeopardize the long term implementation of the plan.
The sales pavilion is a commercial use and is consistent with the policies of the `Town
Centre' designation. The use is consistent with the Temporary Use policies; it will have no
impact on natural features; generally has no adverse impact on traffic or transportation
facilities; and will not have an impact on the long term implementation of the Plan.
The proposed temporary use conforms with the Clarington Official Plan.
5.3 Clarington Official Plan as amended by Amendment 107
On November 1, 2016, Council adopted Official Plan Amendment 107 (OPA 107) to bring
the Clarington Official Plan into conformity with the Regional Official Plan and the
Provincial policies. The subject lands are identified as an Urban Centre.
14
Municipality of Clarington
Report PSD -042-17
Page 5
The sales pavilion is a commercial use and is consistent with the policies of the `Urban
Centre designation. Section 23.4.4 of the Official Plan, which allows temporary rezoning
has remained and is unchanged in any significant way.
The proposal conforms with the policies of the OPA 107 as adopted by Council.
6. Zoning By-law
As the previous Temporary Use By-law has expired, the property is currently zoned
"Agricultural (A)". The expired "Agricultural Exception (A-82) Zone" permitted a
Temporary Sales office with a maximum of 3 sales trailers or a temporary building used
exclusively by a realtor, builder, developer or contractor on a temporary bases for the
sale, display and marketing of residential lots, or dwelling units within a Draft Approved
Subdivision of Condominium Plan. The applicant wishes to continue the use as a
temporary Sales Office, requiring the further rezoning.
7. Public Notice and Submissions
DEVELOPMENT PROPOSAL.
Figure 2: Notice of Development Proposal
7.1 Public Notice was mailed to each landowner within 120 metres of the subject property
and a public meeting sign was installed on the Martin Road frontage 30 days prior to the
Public Meeting.
7.2 As of writing this report, no inquiries have been received.
15
Municipality of Clarington
Report PSD -042-17
8. Agency Comments
8.1 Canadian Pacific Railway and Metrolinx
Page 6
The application was circulated to the Canadian Pacific Railway and Metrolinx, both of
whom have advised they have no concerns with rezoning.
8.2 Durham Region Departments
The application was circulated to the Durham Planning and Works Departments. The
Durham Region Works Department has no objection to the rezoning application. As of the
writing of this report, no comments had been received from the Durham Planning
Department.
9. Departmental Comments
9.1 Engineering Services has no objection to the proposal.
9.2 Emergency and Fire Services has no fire safety concerns.
9.3 The Building Division has no concerns with the proposal.
10. Discussion
10.1 This proposal conforms to the Clarington Official Plan with respect to temporary uses.
10.2 The proposed rezoning application provides for a temporary use of otherwise
undeveloped land until future development occurs. The proposed trailers exist on the site
on a temporary basis will be removed once the by-law expires or the site is ready for
redevelopment. As such the site will be relatively unaltered thereby maintaining a good
opportunity for redevelopment of the site in the future.
10.3 The site has operated for over three years with no major issues. A few times, the site has
been very busy with a new residential subdivision or new phase release. Parking has
overflowed onto Regional Road 57. Part of this was the recent sales frenzy. We cannot
base site requirements on these extraordinary events. The site meets the zoning By-law
requirements for parking. However, recognizing that this is an arterial road with limited
opportunities for side street parking and that there may continue to be a few extraordinary
days in the future, staff have requested an amendment to the site plan to better address
the overflow parking on the site.
10.4 There are no objections to the approval of this application from the circulated
departments and agencies.
11. Concurrence
Not applicable
16
Municipality of Clarington
Report PSD -042-17
12. Conclusion
Page 7
Given the minor and temporary scale of this proposal and that no public inquiries have
been made, it is recommended that the application be approved, provided there are no
concerns raised at the public meeting.
13. Strategic Plan Application
Not applicable.
Submitted by:
David J. Crome, MCIP, RPP
Director of Planning Services
Reviewed by.
Curry Clifford, MPA, CMO,
Interim CAO
Staff Contact: Amanda Watson, Planner I, 905-623-3379 ext. 2420 or awatson(a_clarington.net
Attachments:
Attachment 1: Proposed Zoning By-law Amendment
The following is a list of the interested parties to be notified of Council's decision.
Enzo Bertucci, Brookfield Residential
AW/CP/df
17
Attachment 1 to
Municipality of Clarington Report PSD -042-17
Corporation of the Municipality of Clarington
By-law Number 2017 -
being a By-law to amend By-law 84-63, the Comprehensive Zoning By-law for the
Corporation of the Municipality of Clarington
Whereas the Council of the Corporation of the Municipality of Clarington deems it advisable to
amend By-law 84-63, as amended, of the Corporation of the Municipality of Clarington for
ZBA2017-0013;
Now Therefore Be It Resolved That, the Council of the Corporation of the Municipality of
Clarington enacts as follows:
Section 6.4 "Special Exceptions - Agricultural (A) Zone" is hereby amended by introducing
a new subsection 6.4.82 as follows:
"6.4.82 SPECIAL EXCEPTIONS — AGRICULTURAL (A-82) ZONE
Notwithstanding Section 3.12, 3.26, 6.1, 6.2 and 6.3 c) iii), d), those lands zoned
A-82 as shown on Schedule "A" attached to this By-law shall only be used for a
Temporary Sales Office with a maximum of 3 sales trailers or a temporary
building, subject to the following zone regulations:
a) Yard Requirements
i) Interior Side yard (minimum) 2 metres
b) Lot Coverage (maximum) 10%
c) Loading Spaces (minimum) 0
Pursuant to the requirements of Section 39 of the Planning Act, 1990, as amended,
this use may be permitted for a period of three years, ending on June 20, 2020."
2. Schedule `3' to By-law 84-63, as amended, is hereby further amended by changing the
zone designation from "Agricultural (A) Zone" to " Agricultural Exception (A-82) Zone" as
illustrated on the attached Schedule `A' hereto.
3. Schedule `A' attached hereto shall form part of this By-law.
4. This By-law shall come into effect on the date of the passing hereof, subject to the
provisions of Sections 34, 36 and 39 of the Planning Act.
By -Law passed in open session this day of , 2017
Adrian Foster, Mayor
18C. Anne Greentree, Municipal Clerk
This is Schedule "A" to 6y-law 2017- , passed this day of
2017 A.D.
Durham Highway 2
a
r
4a
�rdC�
�r
Zoning Change From "A" To "A-82"
/V
Bowmanville • ZBA 2017-0013 • Schedule 3
Adnan Faster, Mayor C. Anne Greentree. Municipal cierk
19
Clarftwa
PI nnin Services
Planning Se ces
Public Meeting Report
If this information is required in an alternate accessible format, please contact the Accessibility
Coordinator at 905-623-3379 ext. 2131.
Report To: Planning and Development Committee
Date of Meeting: June 20, 2017
Report Number: PSD -043-17 Resolution Number:
File Number: COPA2017-0008 and ZBA2017-0012 By-law Number:
Report Subject: An Application by Simon Gill and Janet Taylor Gill to permit agri-
tourism uses on their farm property including special events and a
nano-cidery
Recommendations:
That Report PSD -043-17 be received;
2. That staff consider the public comments received in the further processing of the
Clarington Official Plan and Zoning By-law Amendment applications submitted by Simon
Gill and Janet Taylor Gill to permit agri-tourism uses on their farm property; and
3. That all interested parties listed in Report PSD -043-17 and any delegations be advised of
Council's decision.
20
Municipality of Clarington
Report PSD -043-17
Report Overview
Page 2
Simon Gill and Janet Taylor Gill have submitted applications to amend the Clarington Official
Plan and Zoning By-law to permit farm -related agri-tourism uses on their farm property
including special events for up to 140 patrons over the summer season and a small cidery for
serving event guests. The applicants intend on using an existing 266 square metre barn,
outdoor daylily gardens and a temporary accessory tent for the events. No new permanent
buildings are proposed.
1. Application Details
1.1. Owner/ Applicant: Simon Gill and Janet Taylor Gill
1.2. Proposal: The applicant is proposing to establish farm -related agri-tourism
uses as follows:
A maximum of 13 special events per summer season
including weddings and other private and charitable events
accommodating up to 140 guests per event
Utilize apples grown on-site for use in a small `4 -barrel'
cidery within the existing farm building to serve to event
guests
1.3. Area: 4.45 hectares (11 acres)
1.4. Location: Part Lot 33, Concession 4, Former Township of Clarke
1.5. Roll Number: 181703005006504
1.6. Within Built Boundary: No
2. Background
2.1 On April 21, 2017, the applicant submitted the above referenced rezoning for an existing
agricultural property in the former Township of Clarke. On May 1, 2017, the applicant
revised the application to include a Clarington Official Plan Amendment application. This
second application was submitted as a precaution should approval of Official Plan
Amendment 107 be delayed.
2.2 The subject property is actively farmed with daylily flowers and apples being grown. For
the past 28 years, daylilies have been cultivated and sold from the farm which is known
as "We're in the Hayfield Now Daylily Gardens". There has been a yearly summer daylily
festival held at the property since the mid -1980's which has consisted of many visitors,
vendors, catering and entertainment. Furthermore, there have been five weddings of
family members and friends since 2002 at the property.
21
Municipality of Clarington
Report PSD -043-17
Page 3
2.3 The applicants, Simon Gill and Janet Taylor Gill, purchased the property and the existing
daylily business in June 2015 and have continued operating the annual daylily festival.
The apple orchard component of the farm is currently being rented out to a tenant farmer
while the applicants are cultivating the daylilies. The existing orchard lease will end by the
time that a future site plan application related to this proposal is expected to be finalized,
at which point the applicants are intending to take a greater role in farming the orchard.
Apples from the orchard are intended for use for the proposed cidery.
LO
A �
O
e,
Subject SiteAgo', 06. �"` ► '` a
- -H
0WOOF W'�erree 1n The Hayfield
Now Day'IiLy Gardens',, Lawn Parking 1
Area Maximum _
Apple Lawn &Gardens:
Capacity: 204
Orchard Outdoor Event Area & ��� P Y�
.� Te porary Tent Area` 4
Event and 6ornmercial
• Entrance (Existing:) -
_... Barn
-I X_ Structure . Private Residential &
(E is ingi :jTP. Ancillary Struetwres
$"1W 76
r
ZBA 2017-0012 t
Figure 1: Site Location and layout
22
Municipality of Clarington
Report PSD -043-17
Page 4
2.4 A Planning Justification Report, Conceptual Site Plan and Barn Building Floor Plan were
submitted in support of the applications. The Planning Justification Report is summarized
in Section 7 of the report.
2.5 A Site Plan Approval application has not yet been submitted but will be required should
the subject applications be approved.
3. Land Characteristics and Surrounding Uses
3.1 The subject lands are 4.45 hectares in area (11 acres) with approximately 0.5 hectares
(1.2 acres) in daylily cultivation and 1.9 hectares (4.7 acres) in cultivation as an apple
orchard. There is a lawn and garden area in the middle of the property that is bordered by
mature vegetation on each side and a large, open grassed area at the front of the
property that is approximately 0.6 hectares in area (1.6 acres). The built structures
consist of a residential dwelling, a barn, three detached accessory buildings and a pool all
clustered in the south east corner of the property. There is a small stream running along
the front on the property.
Figure 2: Existing barn proposed for events
23
Municipality of Clarington
Report PSD -043-17 Page 5
Figure 3: Existing entrance proposed for event guests
Figure 4: Lawn and gardens area
24
Municipality of Clarington
Report PSD -043-17
Page 6
Figure 5: Lawn area proposed for guest parking
3.2 The surrounding uses are as follows:
North - Rural residential dwelling and agricultural field
South - Rural residential dwelling and orchard
East - Open agricultural field
West - Farm buildings and open agricultural field
4. Provincial Policy
4.1 Provincial Policy Statement
The subject lands are located in a Prime Agricultural Area. Uses permitted in Prime
Agricultural Areas include agricultural uses, agriculture -related uses and on-farm
diversified uses. On-farm diversified uses shall be compatible with and shall not hinder
surrounding agricultural operations. Criteria for these uses are based on guidelines
developed by the Province or municipal approaches, as set out in municipal planning
documents, which achieve the same objectives.
"On-farm diversified uses" are defined as uses that are secondary to the principal
agricultural use of the property, and limited in area. On-farm diversified uses include, but
are not limited to, home occupations, home industries, agri-tourism uses, and uses that
produce value-added agricultural products.
25
Municipality of Clarington
Report PSD -043-17
Page 7
"Agri -tourism" means those farm -related tourism uses, including limited accommodation
such as bed and breakfast, that promote the enjoyment, education or activities related to
the farm operation.
4.2 Greenbelt Plan
The subject property is within a location of the rural area that is not covered by the
Greenbelt Plan.
5. Official Plans
5.1 Durham Regional Official Plan
The Durham Region Official Plan designates the subject lands as Prime Agricultural
Areas. Small-scale uses that are secondary to the agricultural use that produce value-
added agricultural products, such as cottage wineries and agri-tourism uses, such as bed
and breakfast establishments, farm vacation homes and farm tours are permitted as
secondary agricultural uses, provided such uses are directly related to, or exclusively
devoted to the existing farm operation.
5.2 Clarington Official Plan
Current Official Plan (1996)
The Clarington Official Plan designates the subject lands as Prime Agricultural Areas.
Prime Agricultural Areas shall be used only for farm and farm -related uses including the
growing of crops and nurseries. Seasonal farm produce stands may be permitted
provided the produce is grown locally.
The sale of the daylilies grown on the property is permitted however, the special event
venue and cidery is not identified as a permitted use and therefore an amendment to the
Prime Agricultural Area policies is required.
Clarington Official Plan (OPA 107) as amended by Amendment 107
On November 1, 2016, Council adopted Official Plan Amendment 107 (OPA 107) which
brought the Clarington Official Plan into conformity with the Regional Official Plan and
Provincial Policies. The Official Plan, as amended designates the subject property as
Prime Agricultural and Environmental Protection Area. The existing barn that is proposed
to be used as the event venue is located within the area of the property designated Prime
Agricultural Areas. The amended Policies permit on-farm diversified uses including agri-
tourism uses in Prime Agricultural Areas.
6. Zoning By-law
Zoning By-law 84-63 zones the subject lands "Agricultural (A)" which permits agricultural
uses including the sale of agricultural products produced on the farm as well as a
residential dwelling. The proposed special events use and cidery is not a permitted use.
26
Municipality of Clarington
Report PSD -043-17
7. Summary of Background Studies
7.1 Planning Justification Report, Clark Consulting Services, March 2017
Page 8
The report provides an overview of the subject property and the special events and cidery
proposal. The following details were included in the report:
• Special events are to be secondary to the existing agricultural use and will consist of
catered weddings and private and charitable events for up to 140 guests (plus
wedding off iciants and wedding party) in an existing barn and outdoor gardens.
• The events will relate directly to the daylily farm products and orchard by using the
daylilies for event themes and as a photography setting, garden tours of the daylily
garden and orchard during events and using apples as event menu items and for
the cidery which will serve event guests.
• There will be no land removed from agricultural production, no site development or
soil disturbance including no grading for the parking area or any new buildings.
• A temporary accessory tent will be used within the garden area as necessary.
• The barn is not insulated so events will be held only during the summer and will not
exceed 13 events per year.
• Portable, self-contained washroom facilities are intended to be used during events
• The proposed cidery will use a `4 barrel system' size or smaller (approximately 8
times larger than what can be brewed on a residential stove) and will be located
within the existing ancillary farming structure.
• Parking can be accommodated on-site within the front lawn area which will become
a shared use space with hay to be planted and harvested in the fall and spring
• A site plan application will be submitted after the current applications are completed.
• The event venue meets all Minimum Distance Separation (MDS) requirements.
The Planning consultant provides an analysis of applicable policies from the Provincial
Policy Statement and finds that the proposed use is consistent with the Rural and Prime
Agricultural policies that permit on- farm diversified uses, including agri-tourism uses.
The proposal was reviewed for compliance with the Durham Regional Official Plan and
was found to conform to the policies that permit small-scale uses that are secondary to
the agricultural use of the property including agri-tourism uses.
The consultant notes that policies for on-farm diversified uses, including agri-tourism are
included in the Clarington Official Plan (OPA 107).
The consultant notes that a Zoning By- law Amendment is required to add site specific
policies to permit the special events and cidery on the property.
27
Municipality of Clarington
Report PSD -043-17
8. Public Notice and Submissions
Page 9
8.1 Public notice was given by mail to each landowner within 300 metres of the subject lands.
The public notices for these applications were mailed on May 17, 2017 and the
appropriate signage outlining the applications was installed on the subject lands along
Pollard Road.
8.2 At the time of writing, staff have received no submissions regarding the proposal.
9. Agency Comments
9.1 Regional Municipality of Durham
To date comments have not been received from the Durham Regional Planning
Department or the Durham Region Health Department.
10. Departmental Comments
10.1 Engineering Services
Engineering Services has reviewed the application and have no objection to the Official
Plan amendment and the proposed zoning change. The following comments will apply to
the future site plan application should the Official Plan Amendment and the Zoning By-
law Amendment be approved:
• The applicant must provide adequate on-site parking for the proposed use. On -street
parking will not be permitted for the proposed use.
The applicant will be responsible for the illumination of the commercial entrance.
Provision for appropriate on-site illumination must be provided on the site plan.
Engineering Services also provided a number of additional comments and conditions
related to Site Plan Approval including typical comments regarding site alteration,
boulevard works including entrance construction and securities.
10.2 Building Division
The Building Division has reviewed the applications and although they have identified no
objection in principle to the proposal, they have identified a number of issues that will
need to be addressed at the Site Plan Application stage should the Official Plan
Amendment and the Zoning By-law Amendment be approved. These issues include the
need for the proposed event building to be modified for assembly use occupancy, have
water supply for firefighting and have an identified fire route.
10.3 Emergency and Fire Services
The Emergency and Fire Services Department have reviewed the applications and have
stated that a Change of Use Building Permit is required and on-site water supply for
firefighting may be required.
Municipality of Clarington
Report PSD -043-17
11. Discussion
Page 10
11.1 The applicant is proposing to amend the Clarington Official Plan and Zoning By-law to
add site specific policies and regulations to permit agri-tourism uses on an existing 4.45
hectare agricultural property. The applicant intends on submitting a subsequent Site Plan
Approval application to address details of site development should the current proposed
applications be approved.
11.2 Both Provincial and Regional land use policies promote opportunities to support a
diversified rural economy and have evolved to permit on-farm diversified uses (which
includes agri-tourism uses) in both prime agricultural areas and rural areas, provided that
the uses are secondary to the principal agricultural use, are limited in area and are
compatible with the surrounding agricultural area. The Regional Official Plan allows for
secondary uses to an agricultural operation but leaves the criteria for defining them to the
local municipal Official Plan. OPA 107 contains policies permitting agri-tourism uses,
which these applications will be reviewed against. As of the writing of this report, OPA
107 has not been approved by the Region and the 1996 Official Plan does not include
policies by which to assess these types of land uses.
11.3 The proposed special events use and cidery will be assessed in accordance with the
framework included in the Countryside Discussion Paper (2013), OMAFRA's Guidelines
on Permitted Uses in Ontario's Prime Agricultural Areas, and all agency comments. All
such criteria provide similar measures that seek to ensure that agri-tourism proposals
remain secondary to agricultural uses, protect normal farm practices, are limited in size
and are compatible with the rural area.
11.4 The conversion of the site from strictly an agricultural operation to an agri-tourism use will
require the modification of the existing agricultural barn for human occupancy including
the requirement for water supply for firefighting. The provision of sanitary services will be
required for the special events use to the satisfaction of the Durham Health Department.
11.5 The applicant intends to utilize the existing north entrance into the site to accommodate
event guests. The entrance has sufficient visibility, however, it will need to be upgraded to
a commercial entrance standard to the satisfaction of Clarington Engineering Services.
11.6 The applicant is intending to share existing spaces between agricultural uses and the
proposed agri-tourism uses thus limiting the total space permanently removed from
agricultural use. An existing 266 square metre barn is intended to be used to host events
while no new permanent structures are to be built. The barn will share 154 square metres
of floor area for both the agri-tourism uses and agricultural use as the proposed events
are planned to take place only during the summer months, leaving the space available for
agricultural uses during the rest of the year. 55 square metres of the barn will be
dedicated entirely for the agri-tourism use including the proposed cidery and 58 square
metres will be maintained for agricultural storage only. The 0.6 hectare front lawn area is
also intended to be shared as a parking area for event guests and being planted and
harvested with hay during the seasons when events are not taking place. This space is
currently sodded and is not being farmed.
29
Municipality of Clarington
Report PSD -043-17
Page 11
11.7 Comments provided by departments, agencies and the public will continue to be
reviewed and addressed by the applicant and their consultants as they are received.
12. Concurrence
Not applicable
13. Conclusion
The purpose of this report is to provide background information on the applications and
provide opportunity for the public to address Committee with comments related to the
applications. Staff will continue processing the application including the preparation of a
subsequent report.
14. Strategic Plan Application
Not applicable.
Submitted by:
David J. Crome, MCIP, RPP
Director of Planning Services
Reviewed by:
Curry Clifford, MPA, CMO,
Interim CAO
Staff Contact: David Addington, Planner I, 905-623-3379 ext. 2419 or
daddington clarington.net
The following is a list of interested parties to be notified of Council's decision:
Simon Gill and Janet Taylor Gill
Judy and Charles Pell
Anne Wilson
DA/CP/df
30
Clarftwa
PI nnin Services
Planning Se ces
Public Meeting Report
If this information is required in an alternate accessible format, please contact the Accessibility
Coordinator at 905-623-3379 ext. 2131.
Report To: Planning and Development Committee
Date of Meeting: June 20, 2017
Report Number: PSD -044-17 Resolution Number:
File Numbers: ZBA 2017-0005 & SPA 2017-0009 By-law Number:
Report Subject: An Application by Newcastle Marina Villa Ltd. (Kaitlin Corporation)
To permit 27 townhouse condominium units in the Port of Newcastle
Recommendations:
1. That Report PSD -044-17 be received;
2. That staff consider the public comments received in the further processing of the
proposed application for rezoning ZBA 2017-0005 submitted by Newcastle Marina Villa
Ltd; and
3. That all interested parties listed in Report PSD -044-17 and any delegations be advised of
Council's decision.
31
Municipality of Clarington
Report PSD -044-17
Page 2
Report Overview
The Municipality is seeking the public's input on application to amend Zoning By-law 84-63
submitted by Newcastle Marina Villa Ltd. to permit 27 three storey townhouse condominium
units at 65 Shipway Avenue in the Port of Newcastle.
1. Application Details
1.1. Owner: Newcastle Marina Villa Ltd. (Kaitlin Corporation)
1.2. Applicant: Enzo Bertucci
1.3. Proposal: 27 three storey townhouse units in condominium tenure
1.4. Area: 1.721 hectares
1.5. Location: 65 Shipway Avenue, Port of Newcastle. See Figure 1.
1.6. Roll Number: 18-17-030-120-2250
1.7. Within Built Boundary: Yes
Figure 1: Subject site
32
Municipality of Clarington
Report PSD -044-17
2. Background
Page 3
2.1. On February 17 2017, the applicant submitted applications for rezoning and site plan
approval to permit 27 three storey townhouse condominium units. The applications were
deemed incomplete as various fees and supporting documentation were not provided. On
May 2nd, 2017 the final report was provided and the applications were deemed complete.
2.2 Site plan approval was previously issued in June 2007 for a four storey, 63 unit apartment
building with underground parking. The applicant did not proceed with the approved
apartment building and the lands have remained vacant.
3. Land Characteristics and Surrounding Uses
The subject lands have frontage on Shipway Avenue and on a shared access internal to
the site. The lands are relatively flat and are unmaintained.
Figure 2: Subject site — looking south from Shipway Avenue
3.1 The surrounding uses are as follows:
North - Single detached dwellings and stormwater management pond
South - Two three storey apartment buildings
East - Admiral's Walk Clubhouse and beyond marina
West - The Port Reserve townhouse development
33
Municipality of Clarington
Report PSD -044-17
4. Provincial Policy
4.1 Provincial Policy Statement
Page 4
The Provincial Policy Statement encourages planning authorities to create healthy livable
and safe communities by accommodating an appropriate range and mix of residential,
employment, recreational and open space uses to meet long term needs. Some relevant
policies are:
• New development shall occur adjacent to built-up areas, and shall have a compact
form, a mix of uses and densities that allow for the efficient use of land,
infrastructure and public services.
• New housing is to be directed to locations where infrastructure and public services
are or will be available.
• A full range and mix of housing types and densities shall be provided to meet
projected requirements of current and future residents of the regional market area.
• Infrastructure and public services facilities shall be provided in a coordinated,
efficient and cost effective manner.
4.2 Provincial Growth Plan
The Provincial Growth Plan encourages municipalities to manage growth by directing
population growth to settlement areas, such as the Port of Newcastle. Municipalities are
encouraged to create complete communities that offer a mix of land uses, employment
and housing options, high quality open space, and access to stores and services. In
particular:
• Growth is to be accommodated in transit -supportive communities to reduce
dependence on the automobile through the development of mixed use, pedestrian -
friendly environments.
• Growth shall also be directed to areas that offer municipal water and wastewater
systems.
• Municipalities should establish an urban open space system within the built up
areas.
• Municipalities must accommodate residential development within the built up area.
4.3 The development allows for the efficient use of land, infrastructure and public services
and is consistent with the Provincial Policy Statement and the Growth Plan. The
proposed development will allow for various housing types in the Port of Newcastle.
Municipal water and sanitary sewers are available to the site. Transit is available on
Lakebreeze Drive and Shipway Avenue.
34
Municipality of Clarington
Report PSD -044-17
Official Plans
5.1 Durham Regional Official Plan
Page 5
The Durham Region Official Plan designates the subject lands as Living Area. Lands
designated as Living Area permit the development of communities with defined
boundaries, incorporating the widest possible variety of housing types, sizes and tenure
to provide living accommodations that address various socio-economic factors. The
proposed development is permitted within the Living Area designation.
Port of Newcastle is identified as a "Waterfront Place" that shall be developed as having a
mix of uses integrated with the Greenlands system. Waterfront Places shall have a long
term density target or at least 60 units per gross hectare and a floor space index of 2.0.
5.2 Clarington Official Plan
The Clarington Official Plan designates the subject lands "Urban Residential".
The Medium Density designation allows for density of 31 to 60 units per hectare while the
predominant form of housing are for medium density townhouses is to be, quadraplexes,
triplexes or low rise apartments.
5.3 Clarington Official Plan as Amended by Amendment 107
On November 1, 2016, Council adopted the Official Plan Amendment 107 to bring the
Clarington Official Plan into conformity with the Regional Official Plan and provincial
policies. The subject site is identified as a Waterfront Place and remains designated
Urban Residential. Waterfront Place shall have a minimum density of 40 units per gross
hectare and floor space index of 2.0 and building heights up to 12 floors. A variety of
building forms is permitted. OPA 107 provides site development criteria for medium and
high density development. The proposal is consistent with the criteria with one exception.
It is not consistent with the criteria that each condominium corporation block shall have
direct street frontage and direct vehicular access to a public street without reliance on
easements through another condominium corporation block.
6. Zoning By-law
Zoning By-law 84-63 zones the subject lands "Holding -Residential Exception ((H) R4-19)",
which permits an apartment building at a maximum density of 80 units per hectare and a
maximum height of 12 metres. A rezoning is required to permit the proposed townhouses.
7. Public Notice and Submissions for Public Meeting Report
7.1 The Public Notice of this meeting was given by mail to landowners within 120 metres of
the subject site. Public Notice sign was also installed on each property's frontage along
Shipway Avenue and one on the internal shared access easement.
35
Municipality of Clarington
Report PSD -044-17
Page 6
The concerns of one resident representing the condominium board from the two buildings
to the south are summarized below.
• No construction traffic or crews should be permitted to use the current access road,
as it will be damaged and unmaintained by Kaitlin.
• The existing entrance is not sufficient for current users and the proposed
development. A new entrance on the north side of Shipway Avenue should be
required for all construction traffic, garbage and utility trucks.
• A cost sharing agreement is required with the new development in the event that no
new entrance is created for maintenance purposes.
• Kaitlin has frozen the purchase of parking spaces to the existing condos. They have
not contributed financially to the upkeep and have no intention of doing so.
• Poor site lines at the north east entrance on Shipway Avenue.
• The design of the existing development and the new townhouses will make
snowplowing very difficult.
7.2 One resident had concerns with the unsightly state of the site.
7.3 Two other inquiries were received regarding the process.
8. Agency Comments
Canada Post and Enbridge Gas has offered no objections.
9. Departmental Comments
9.1 Engineering Services
The applicant proposes a multi -unit residential development. Engineering Services have
reviewed the above -noted application and have no objection to this proposal. Engineering
Services agrees with the approach taken in regards to servicing and grading. Minor
revisions are required on the drawings for erosion control, grading and servicing. Detailed
comments will be provided on the site plan.
10. Discussion
10.1 The proposal includes three dual frontage townhouse blocks fronting onto Shipway
Avenue, and two blocks internal to the site. The townhouse units are three storey in
height, with parking in the rear. The private amenity space for each unit would be located
above the garage.
36
Municipality of Clarington
Report PSD -044-17 Page 7
10.2 The applicant had approvals for an apartment building containing 63 units, however did
not proceed with the construction of the building. The access for the apartment building
was also from a shared access route which also services the two buildings to the south.
The access route was established by a consent application by Kaitlin and approved
several years ago. The burden of maintaining the access route has fallen on the
condominium corporation to the south. The condo board is requesting that another
access be provided to the service the proposed townhouse development, failing that, that
a cost sharing arrangement required between the existing condo board, and the new
condo board for maintenance and upkeep of the shared access.
11. Conclusion
This report provides background information on the proposal for 27 unit townhouse
project submitted by Newcastle Marina Villa Ltd. for the Public Meeting. Staff will consider
the public comments received and further process the application. A subsequent
recommendation report will be prepared upon receipt of outstanding comments from
departments and agencies and resolution of the identified issues.
mi r Reviewed
Sub
Submitted by pe by i
David J. Crome, MCIP, RPP Curry Cliffo&d, M , CMO,
Director of Planning Services Interim CAO
Staff Contact: Cynthia Strike, Principal Planner, 905-623-3379 ext. 2410 or
cstrike clarington.net
The following is a list of the interested parties to be notified of Council's decision:
Sharon Osborne
John Pierrepont
Peter J.W. Beecroft
Yvonne and Sam Fairley
Christina Plourde
CS/CP/tg
I:\ADepartnnent\LDO NEW FILING SYSTEMApplication Files\ZBA-Zoning\2017\ZBA2017-0005 Marina Villa\Staff Report\PSD-044-17.docx
37
Clarftwa
Planning Services
Public Meeting Report
If this information is required in an alternate accessible format, please contact the
Accessibility Coordinator at 905-623-3379 ext. 2131.
Report To: Planning and Development Committee
Date of Meeting: June 20, 2017
Report Number: PSD -045-17 Resolution:
File Number: PLN 31.5.6, S -C-2017-0002,
S -C-2017-0003 and S -C-2017-0004 By-law Number:
Report Subject: An application by a group of land owners to amend the Worden
East Neighbourhood Design Plan and three applications to
subdivide a Dortion of those lands in Courtice
Recommendations:
That Report PSD -045-17 be received;
2. That staff consider the public comments received in the further processing of the
applications submitted by the group of lands owners to amend the Worden East
Neighbourhood Design Plan and for the development of three plans of subdivision
S -C-2017-0002, S -C-2017-0003 and S -C-2017-0004; and
3. That all interested parties listed in Report PSD -045-17 and any delegations be
advised of Council's decision.
Municipality of Clarington
Report PSD -045-17
Report Overview
Page 2
The Municipality is seeking public comments on an application by a group of land owners to
amend the Worden East Neighbourhood Design Plan. Three subdivision applications
containing a total of 29 single detached dwelling lots plus future development blocks have also
been submitted.
1. Application Details
1.1 Owners / Applicants: Schleiss Development Company Limited,
6490101 Ontario Limited,
Clifford Curtis,
Michael Zygocki Limited (Finefield Homes),
Boothia Developments Limited (Finefield Homes), and
Baseline Properties Limited
1.2 Agent: D.G. Biddle and Associates Limited
1.3 Proposal:
Worden East Neighbourhood Design Plan Amendment
To amend the Worden East Neighbourhood Design Plan to redesignate land from
Environmental Study Area to Single Detached Residential and Environmental
Protection.
Plans of Subdivision
Three draft plan subdivision applications containing a total of 29 single detached
dwelling lots plus future development blocks along the extension of Springfield Lane.
Each lot within the proposed plans of subdivision will have a minimum 15 metres lot
frontage in compliance with the Urban Residential Type One (R1) zone. Open space
blocks are proposed along the west and north sides of the Design Plan area.
1.4 Location:
1.5 Roll Numbers
1.6 Within Built Boundary:
West side of Tooley Road, north of the Towns of Tooley Mills
development in Courtice.
181701010007300,
181701010007810,
181701010008200,
181701010008600
Yes
39
181701010007505,181701010007610,
181701010007950,181701010008100,
181701010008400 and
Municipality of Clarington
Report PSD -045-17
2. Background
Applications
Page 3
2.1 On February 10, 2017, Schleiss Development Company Limited, 6490101 Ontario
Limited, Clifford Curtis, Michael Zygocki Limited and Boothia Developments Limited
submitted applications for three plans of subdivision. On March 17, 2017, these
applicants plus Baseline Properties Limited submitted an application to amend the
Worden East Neighbourhood Design Plan.
2.2 A number of studies were submitted and circulated for comments. A summary of these
reports is included in Section 7 of this report.
• Phase One Environmental Site Assessment Report
• Preliminary Stormwater Drainage and Functional Servicing Report
• Traffic Impact Study
• Hydrogeological Assessment Report
• Sustainability Report
• Environmental Impact Study
• Planning Report
• Archaeological Study
2.3 Figure 1 shows the limits of the three proposed subdivision applications and the lands
within the Neighbourhood Design Plan (NDP) subject to amendment. S -C-2017-0002 was
filed by Michael Zygocki Limited and Boothia Developments, S -C-2017-0003 was filed by
Schleiss Development Company Limited and 6490101 Ontario Limited and S -C-2017-
0004 was filed by Clifford Curtis.
HE
Municipality of Clarington
Report PSD -045-17
Figure 1: Three subdivision applications within the Worden East
Neighbourhood
v
--
�i
- f E
SC 2017-0003`
Neighbourhood Design Plan
�p
p
LANE,
Amendment Area
SC� -040
a
E�
SC 2�7�-0ao
w
0
CIRCLE
CT
2017-
0i7-PCP
LEI CT
LU
PCPYFIEL
p
A
0
0
��
LU
'
S
O
Z
L)
BIRCHFIELD DR
SC 2017 - 0002
8. 0003 1 0004
d
Q
Page 4
Neighbourhood Design Plan
2.4.1 Under the current Clarington Official Plan, Neighbourhood Design Plans are required
prior to consideration of a plan of subdivision. A Neighbourhood Design Plan details the
following:
• Environmentally sensitive lands;
• Locations of schools, parks and open space blocks, including stormwater
management blocks;
• Generalized lotting patterns and residential densities;
• Road alignments within a neighbourhood, including right of way widths and
required road widenings; and
• Walking or cycling trail systems and future transit routes.
41
Municipality of Clarington
Report PSD -045-17 Page 5
2.4.2 The Worden Neighbourhood is within the Courtice Urban Area and is bounded by
Townline Road to the west, Farewell Creek to the east, Durham Highway 2 to the south,
and the Courtice urban area boundary to the north. Most of the neighbourhood is
developed but there remains infill opportunities on Tooley Road. To coordinate this
redevelopment, a Neighbourhood Design Plan was prepared for the eastern portion of
the neighbourhood referred to as Worden East Neighbourhood. It covers the area that is
east of Centrefield Drive to Farewell Creek and north of Nash Road to the urban area
boundary.
2.4.3 The Worden East Neighbourhood Design Plan was approved in 2002. It was the result of
a negotiated Memorandum of Understanding with Clifford Curtis of Tooley Road, to
provide an alternative location for a separate elementary school as well as determine
servicing and road patterns.
Update to the Worden East Neighbourhood Design Plan (2016)
2.4.4 In December, 2014, H & H Properties Inc. (Halminen Homes) submitted development
applications for lands on the west side of Tooley Road including an application to amend
the Worden East Neighbourhood Design Plan. This was required to delete the separate
elementary school site and facilitate the Towns of Tooley Mills development that is
currently underway immediately south of the subject lands.
2.4.5 On June 25, 2015 and November 10, 2015, staff held workshops with residents and
landowners to develop principles and preliminary options for the area. Prior to finalizing a
proposed Plan and making a recommendation on the H & H application, staff met with
CLOCA and landowners throughout the review process, including a "kitchen -table" type
meeting January 19th, 2016 with nine residents from Tooley Road who had made
submissions on the proposed neighbourhood design plan amendment. At the Council
meeting of February 8, 2016, Clarington Council approved a resolution that supported the
revised Worden East Neighbourhood Design Plan, shown in Figure 2.
2.4.6 The main changes that were made in 2016 to the original Neighbourhood Design Plan
included:
• Elimination of the separate elementary school and parkette;
• Termination of Cloverfield street as a public street;
• addition of Multi -unit Low Density area (Towns of Tooley Mill);
• Extension of Poppyfield Drive from Centrefield to Tooley Road;
• Recognition of infill opportunities within existing residential;
• Expansion of the Environmental Study Area and removal of the underlying lotting
and road pattern;
• Addition of Medium Density Residential at the south west corner of Tooley Road
and future Adelaide Avenue;
• Future Trails;
• Identification of Stormwater Management Ponds to facilitate development.
42
Municipality of Clarington
Report PSD -045-17
Page 6
Figure 2: 2016 Worden East Neighbourhood Design Plan
FUTUREAD"IDEAVENUE
f
LL_
� LANE
_ d 1
-J..
N
x
LEGEND
Environmental Prolection
Existing Residential And
Infill Opportunity
Single Detached Residential
Multi -unit Low Density
Rasidaatial
Multi -unit Medium Density
Residential
Enwronmental SWdy Area
{Netu Herft q features require
fu h Ey tletarmtm
de I p M A, reads and
po b{ep hon. mogat on
n Fe 4on meesu�es.)
Church
-
Location Cf Stormwater
Management Pond
(Local on of future stormwa[cr
nagmaM poMtsj to Faelhale
tleve3opmeMwq be tleh=,nn ned
aroigh �valepmam
pplicatrons}
---
Possible Future Trail
(Alig m tmad�mrmm.d)
+ P _ +I I V
LIRHCOl1RT
r�
POPPYFIELO DRIVE
I
-
L — f _ L
o— -.— y-
w---
w ��� + -
--�
DAVID CRID.E FEB 71120115
LL
TONY CANNELLA FEB 1112015
--
�IT\ WORDEN EAST NEIGHBOURHOOD PLAN
11
J
LAVH 5E cnNCEPT PLAN
NASH ROAD �.
43
Municipality of Clarington
Report PSD -045-17
2.4.7 The amendment to the Worden East Neighbourhood Design Plan proposed by the
applicants would replace the Environmental Study Area with:
Page 7
• a 30 metre wide Open Space area behind the lots on Centrefield between Springfield
and Poppyfield;
• Provide an open space block at the north end of Springfield Lane extension;
• Extend Springfield Lane from its current terminus in a north/south alignment;
• Provide for 15 m wide residential lots on all new roads;
• Terminate Poppyfield Drive at the proposed extension of Springfield Drive, rather
than extending all the way from Centerfield Drive to Tooley Road.
• Provide a stormwater management facility on the east side of Tooley Road.
Figure 3: Proposed Neighbourhood Design Plan amendment
MI
Municipality of Clarington
Report PSD -045-17
3. Land Characteristics and Surrounding Uses
3.1 The surrounding uses are as follows:
Page 8
North Limited residential fronting on Tooley Road and natural areas including various
vegetation communities
South Towns of Tooley Mills with singles fronting on Tooley Road and townhouse
development
East Existing residential properties
West Residential subdivision (Centerfield Drive and Springfield Lane)
3.2 The lands subject of the subdivision applications in most cases are made of lands that
have been severed from the rear of the lots fronting the west side of Tooley Road. All
three subdivision applications are covered in varying degrees with a woodlot that extends
southerly to Poppyfield Drive. Lands to the north of Springfield Lane, including the west
limits of S -C-2017-0003 are identified as a wetland.
4. Provincial Policy
4.1 Provincial Policy Statement
The Provincial Policy Statement encourages planning authorities to create healthy
liveable and safe communities by accommodating an appropriate range and mix of
residential, employment, recreation, park and open space, and other uses to meet long
term needs. Some relevant policies are:
• New development shall occur adjacent to built-up areas and shall have compact
form, a mix of uses and densities that allow for the efficient use of land, infrastructure
and public services;
• New housing is to be directed to locations where infrastructure and public services
are or will be available;
• Municipalities are to identify appropriate locations for intensification and
redevelopment;
• Infrastructure and public service facilities shall be provided in a coordinated, efficient
and cost effective manner; and
• Promote development patterns that conserve biodiversity and consider the impacts of
a changing climate.
45
Municipality of Clarington
Report PSD -045-17
4.2 Provincial Growth Plan
Page 9
The Provincial Growth Plan encourages municipalities to manage growth by directing
population growth to settlement areas, such as the Courtice Urban Area. Municipalities
are encouraged to create complete communities that offer a mix of land uses,
employment and housing options, high quality open space, and access to stores and
services. In particular:
• Growth is to be accommodated in transit -supportive communities, to reduce
dependence on the automobile, through the development of mixed use, pedestrian
friendly environments;
• 40% of growth after 2015 is to be located within the Built Boundary on a regional
basis;
• Growth shall also be directed to areas that offer municipal water and wastewater
systems;
• Municipalities should establish an urban open space system within built up areas;
and
• Identify natural heritage features and areas that complement, link or enhance natural
systems.
4.3 Provincial Growth Plan 2017
The updated Provincial Growth Plan released May 18, 2017 comes into effect on July 1,
2017. The new Growth Plan continues to reinforce and provide stronger policies to guide
growth.
5. Official Plans
5.1 Durham Regional Official Plan
The Durham Region Official Plan designates the lands as Living Areas. Lands within the
Living Areas designation shall be used predominantly for housing purposes incorporating
the widest possible variety of housing types, sizes, and tenure. Living Areas shall be
developed in a compact form through higher densities and by intensifying and
redeveloping existing areas.
The Durham Regional Official Plan requires a minimum intensification target of 32% for
lands within the built boundary in Clarington. The goal of the urban system is protect key
natural heritage or hydrologic features and functions from the impacts of urbanization.
. e
Municipality of Clarington
Report PSD -045-17
5.2 Clarington Official Plan
Page 10
The Clarington Official Plan designates the majority of the subject lands Urban
Residential. A small portion of the subject lands on the property known as 3362 Tooley
Road are designated Environmental Protection Area. Map C — Natural Features identifies
some of the lands as being within the Lake Iroquois Beach and identifies a wetland on the
lands north of Springfield Lane.
Clarington Official Plan as amended by Official Plan Amendment 107
On November 1, 2016, Council adopted Clarington Official Plan Amendment 107. OPA
107 expands the Environmental Protection Area designation in the rear of the houses
fronting on the west side of Tooley Road between Poppyfield Drive and Springfield Lane,
based on the identified natural heritage system found on Map D (see Figure 4). In
addition the transportation system has been modified with Poppyfield Drive designated as
a collector road from Centrefield to Tooley Road. The other significant difference is that
the policies of OPA 107 require a minimum vegetation protection zone from a significant
woodlot or watercourse of 15 metres within the urban area, as determined through an
Environmental Impact Study.
Figure 4: Land use designation in Clarington Official Plan Amendment 107
0
VE
CIRCLE
BIRCHFIELD DR
:�= Ei�
w
❑
w
':SC2097=0003
sc: z0�
47
LANDUSE - OPA 107
CIEnvironmental Protection
F-1 Urban Residential
1
CT,
SC 2017 - 0002 & 0003 & 0004
Municipality of Clarington
Report PSD -045-17
6. Zoning By-law
Page 11
Zoning By-law 84-63 zones the majority of the subject lands "Holding Urban Residential
Type One ((H)R1)". A portion of the property known as 3146 Tooley Road is zoned
Urban Residential Type One (R1) and a portion of the property known as 3362 Tooley
Road is zoned Environmental Protection (EP).
7. Summary of Background Studies
7.1 Planning Report
The Planning Report describes the sites proposed for development and their
surroundings, how the proposed pieces of the development fit together and fit in with the
existing residential development. The report also reviews how the proposed
development conforms with Provincial, Regional and local land use policies.
7.2 Traffic Impact Study
The study examined the traffic levels along Tooley Road and Nash Road as well as the
Centerfield Drive and Nash Road intersection. For the purposes of the study, the Towns
of Tooley Mills development is included in the background traffic volumes. Under
anticipated future conditions after buildout of the proposed development, the study
projects that intersections in the area of the development will maintain good levels of
service during peak traffic conditions. No mitigating measures are recommended by the
study to address the minor increase in traffic flow in the area.
7.3 Environmental Impact Study
The study examines natural features in an area including the property known as 3362
Tooley Road south to approximately 35 metres north of Poppyfield Drive and from the
rear lot lines of the residential properties fronting on Centerfield Drive to the rear lot lines
of the residential properties fronting on Tooley Road. The study concludes that
development of the subject properties including the construction of single detached
dwellings will not have a significant impact on the functional natural heritage system or
the Harmony -Farewell Iroquois Beach provincially significant wetland provided that the
mitigation measures and recommendations of the study are implemented.
7.4 Hydrogeological Assessment Report
A Hydrogeological Assessment was conducted for an area including the property known
as 3362 Tooley Road south to Poppyfield Drive and from the rear lot lines of the
residential properties fronting on Centerfield Drive to the rear lot lines of the residential
properties fronting on Tooley Road. It is expected that some groundwater will be
encountered during construction, however water can be handled using appropriate
engineering techniques. The report states that there is minimal potential for groundwater
impact as a result of the proposed development and that the site has a minor role in the
overall baseflow of the Farewell Creek. Good construction and mitigation techniques
would minimize the potential for any impact. Low Impact Development (LID) strategies
Municipality of Clarington
Report PSD -045-17
Page 12
should be used where possible to infiltrate rain water into the ground. The report
concludes that the proposed development is suitable from a hydrogeological perspective
and there should not be any significant constraints for this development due to
groundwater.
7.5 Archaeological Study
A study was undertaken for each of the three draft plan of subdivision areas. The lands
adjacent to the draft plan areas were not studied. Each of the three studies concluded
that no material of cultural significance or otherwise was discovered and therefore no
additional archaeological work is required at this time. If any archaeological resources
are discovered during construction of the development, all excavation must stop and an
archaeologist contacted.
7.6 Sustainability Report
The Environmental Sustainability Plan submitted with the application provides a high level
summary of sustainable development principles and practices, which will be implemented
through the proposed subdivision developments. The plan is generally acceptable at this
stage, and satisfies the policies of the Clarington Official Plan. Sustainable development
measures will continue to be reviewed through the subdivision process.
7.7 Phase One Environmental Site Assessment Report
A Phase One Environmental Site Assessment was conducted for an area including the
property known as 3362 Tooley Road south to Poppyfield Drive and from the rear lot lines
of the residential properties fronting on Centerfield Drive to the rear lot lines of the
residential properties fronting on Tooley Road. The report states that no areas of
potential environmental concern or potentially contaminating activities were identified that
would warrant further investigation. A Phase Two Environmental Site Assessment is not
recommended, however it is noted that all test wells and water wells on the subject lands
must be abandoned in the proper fashion.
7.8 Preliminary Stormwater Drainage and Functional Servicing Report
The report reviews the infrastructure requirements to provide services for the proposed
development. This includes all lots in the NDP amendment area, not just the three draft
plans of subdivision. The report also discusses storm water quality and quantity control
objectives for the Farewell Creek.
New watermains to service the development are proposed to connect to existing services
on Springfield Lane, Poppyfield Drive and Tooley Road. A new storm sewer system
would service the majority of the lands, draining southeast to a proposed underground
stormwater storage facility on the east side of Tooley Road. Water from this facility would
be discharged to Farewell Creek. A new storm sewer at the north end of the subject
lands would connect to the existing storm sewer on Springfield Lane, which was designed
to handle the additional flow. The sanitary sewer that would service the majority of these
lands will need to be extended north on Tooley Road from where it terminates presently.
Similar to the storm sewer drainage, a small portion of the north end of the development
Municipality of Clarington
Report PSD -045-17
Page 13
on the extension of Springfield Lane can be serviced to the west via the sanitary sewer
on that street. It is noted that a sanitary sewer connection is available at the present
terminus of Poppyfield Drive, though it is not expected to be used to service the proposed
development.
8. Public Notice and Submissions
8.1 Public Meeting notice was mailed to area residents and details of the application were
included in the Planning Services Department E -update and posted to the municipal
website. Five Public Notice signs are posted — three along Tooley Road, one at the end
of Springfield Lane (Figure 5) and one at the end of Poppyfield Drive (Figure 6). At the
time of writing the report, 7 individuals have contacted staff regarding the applications.
Staff have received two written submissions via email.
Figure 5: Public Notice sign at the end of Springfield Lane
50
Municipality of Clarington
Report PSD -045-17
Figure 6: Public Notice sign at Poppyfield Drive
8.2 To date, concerns raised relate to:
• Removal of large portions of the woodlot;
• Flooding potential;
• Loss of natural beauty/history;
• Potential negative impacts to high groundwater table;
• Desire to protect for large lots;
• Lack of green space in proposed plan; and
• Possible well impacts.
9. Agency Comments
Paue 14
9.1 Most agency comments have not been received as of the writing of this report. Once
received, they will be included in a subsequent report.
9.2 Durham Region Transit
No objection to the proposals.
9.3 Other Agencies
Hydro One, Canada Post, Rogers and Enbridge have no objections to the application.
51
Municipality of Clarington
Report PSD -045-17
10. Departmental Comments
10.1 Engineering Services Department
Page 15
The applicants propose residential development containing a total of 29 detached
residential lots and 12 future development lots for a total of 41 lots. The Engineering
Services Department has reviewed the above -noted applications and cannot support the
applications at this time. There are concerns that not all required property has been
acquired to facilitate this development. In addition, the Municipality requires additional
information on the proposed stormwater management facility proposed for this
development and requires additional information to complete a comprehensive review.
10.2 Building Division and Emergency and Fire Services
No objection to the proposals.
10.3 Operations Department
Clarington Operations has reviewed the proposed plans and requests details for all new
public infrastructure. Quantities are necessary to determine future impacts on existing
municipal staffing resources and to estimate maintenance costs. In addition to the total
length and width of new roadway, the proposal must also include length of curb, length of
sidewalk, length of storm sewer, number of catchbasins, areas of grassed boulevard,
number of boulevard street trees and the number of streetlights.
Protection measures will be required to guard against any mud tracking from the site onto
the area roadways for the full period of construction. Measures shall include mud mats
and a regular program of roadway sweeping and flushing. A response by the Operations
Department for unsatisfactory road conditions will result in the back -charge of all
associated costs plus a 35% administration fee.
10.4 Clarington Accessibility Advisory Committee
The Committee requested that all paths of travel (sidewalks) are barrier free and meet the
technical requirements of Ont. Reg. 191/11, Design of Public Spaces Standard. In
particular, where curb ramps or depressed curbs are used, tactile surface warning
indicators are required. Community mailboxes must be accessible to everyone, including
persons with disabilities. They should be located somewhere that is connected to a
sidewalk that has barrier -free connections. The Committee encourages the developer to
offer accessible housing options for buyers, to make this an inclusive community where
people of all abilities can live. Housing that has the potential to be made accessible is a
strong recommendation from the Committee. "Adaptable housing" allows people to age
in place by making adjustments to their house later in life. For example, an adaptable
house will have stairs without landings or turns because stair lifts will be easier and
cheaper to install.
52
Municipality of Clarington
Report PSD -045-17 Page 16
11. Discussion
11.1 The Environmental Impact Study does not appear to cover all the lands identified as
containing a Natural Feature in OPA 107 and will need to be extended south to
Poppyfield Drive and address the policies contained in OPA 107. The Municipality, in
consultation with the Conservation Authority is in the process of having the Environmental
Impact Study and Hydrological Assessment Report peer reviewed at the Owners'
expense.
11.2 Poppyfield Drive is identified as a Collector Road in OPA 107, providing direct connection
to Tooley Road from Centrefield Drive. The proposed Neighbourhood Design Plan
Amendment does not reflect this. This issue will need to be addressed.
11.3 The Holding Urban Residential Type One ((H)R1) zone is in place for most of the subject
area. A Zoning By-law amendment will be needed to zone the proposed 30 metre wide
open space block immediately east of the homes on Centrefield as Environmental
Protection (EP), and to zone the lots north of Springfield Lane R1 as that area is
presently zoned EP. The Holding (H) will have to be removed from the R1 zone prior to
any permits being issued.
11.4 The draft plans proposed through applications S -C-2017-0002 and S -C-2017-0004 are
premature at this time. Additional parcels of land are needed to connect these plans to
the existing road network and to allow for efficient servicing of the subject lands.
Conversely, draft plan S -C-2017-0003 can be serviced via Springfield Lane.
11.5 Staff recognize the need for additional opportunities for public consultation. Residents of
this neighbourhood have longstanding concerns about the impact of developing the
subject lands. It is anticipated that a Public Information Centre will be held in the future
pending further review of the supporting documents, completion of the peer review, and
possible revisions to the proposals to address agency and peer review comments.
11.6 The purpose of the public meeting is to provide an opportunity for further public input.
These public comments will be compiled, discussed with the applicant and addressed in
a subsequent staff report.
12. Concurrence
Not Applicable.
53
Municipality of Clarington
Report PSD -045-17
13. Conclusion
Page 17
The purpose of this report is to provide background information on the applications
submitted by the group of lands owners to amend the Worden East Neighbourhood
Design Plan and for the development of three plans of subdivision for the Public Meeting
under the Planning Act. Staff will continue processing the applications including the
preparation of a subsequent report upon resolution of the identified issues and receipt of
the outstanding agency comments. A Public Information Centre will be scheduled at a
later date and notice will be given to all interested parties.
14. Strategic Plan Application
Not applicable.
G �.r
Submitted ed by per
David J. Crome, MCIP, RPP
Director of Planning Services
Reviewed by:
Curry Clifford, MPA, CMO
Interim CAO
Staff Contact: Mitch Morawetz, Planner, 905-623-3379 ext. 2411 or
mmorawetz(a clarington.net
The following is a list of the interested parties to be notified of Council's decision:
Rose Crag
Halina Workman
Eleanor Von Gunten
Deborah Rowsell
Ernie Rainbow
Dawna Murray
Lorne Hanewich
M M/C P/tg
I:\^Department\LDO NEW FILING SYSTEMWpplication Files\SC-Subdivision\S-C-2017\S-C-2017-0002 Zygocki\Staff Report\PSD-045-17.docx
54
Clarftwa
PI nnin Services
Planning Se ces
Report
If this information is required in an alternate accessible format, please contact the Accessibility
Coordinator at 905-623-3379 ext. 2131.
Report To: Special Planning and Development Committee
Date of Meeting: June 20, 2017
Report Number: PSD -046-17 Resolution Number:
File Number: PLN 27.17.1 By-law Number:
Report Subject: Process Enhancement Project Progress Update
Recommendations:
1. That Report PSD -046-17 be received for information.
55
Municipality of Clarington
Report PSD -046-17 Page 2
Report Overview
Engineering and Planning Services, in conjunction with the Interim Chief Administrative Officer,
initiated a deep review of the land development process. The review involved a number of
departments, external agencies, and industry representatives. The purpose of the Process
Enhancement Project was to determine where opportunities for enhancement and process
redesign of the land development review process could / should be implemented. The results
of the review and identification of opportunities has underlined the importance of adequately
resourcing the process. There is a need for additional staff positions, as identified in the 2017
Budget. There is also the need for new software applications to assist with development
tracking. The land development process review has helped Clarington determine how it can
best facilitate investment and economic development in the context of increased transparency
and public participation and a changing provincial policy environment.
1. Introduction
A deep review of the land development process is one of three reviews initiated by the
Interim Chief Administrative Officer in 2017. The other reviews include the IT Strategic
Plan and the Service Delivery Review process. The land development process review is
a collaborative initiative of the Engineering and Planning Services Departments with input
provided by other Departments involved in the land development process. It was initiated
in March 2017 and was branded as the Process Enhancement Project (or "PEP").
On February 6, 2017, Council passed Resolution #C-031-17 relating to the undertaking of
internal reviews, including the Building and Planning process review now branded as the
PEP initiative:
That a net tax levy funding envelope of $300,000, exclusive of positions approved earlier
in the meeting, be approved, provided that prior to hiring for the relevant positions a
review be undertaken, including job designs, silos, service delivery process, Building and
Planning process review, and the IT Strategic Plan and that the review be reported on to
Council.
The purpose of this report is to:
Update Council on the results of the review — the PEP initiative;
Provide a summary of the key process enhancement opportunities that were
identified through the internal process review and external consultation; and
Inform Council that based on this, the positions in Planning Services included in the
2017 budget, funded through the approved net tax levy funding envelop of $300,000
will now be filled per the Interim Chief Administrative Officer's direction. These
include one full time Senior Planner for Development Review and moving the Clerk I
in Planning Services from part time to full time to assist with data input for
development tracking.
56
Municipality of Clarington
Report PSD -046-17
2. What is the Process Enhancement Project?
Page 3
The Process Enhancement Project, or PEP, is about developing a strategy for the
enhancement and continuous improvement of the current land development process to
better support:
Policy and regulation;
Economic development and investment; and
Public participation.
Conducting a review of our land development process represents an opportunity to build
upon previous process improvement initiatives, to identify challenges that affect the work
that we do and collaborate to identify solutions to these challenges. In doing so, PEP will
contribute to advancing the actions of Council's Strategic Plan.
Some of the previous process improvement initiatives implemented by Planning Services
include:
• Developing more detailed internal procedural manuals for various land development
processes;
• Website postings of the more complex development application material;
• Updating of informational brochures;
• Development of Site Plan Approval guidebooks;
• Standardization of the pre -consultation process;
• Updating and simplification of the Subdivision Agreement and conditions;
• Delegation of authority where possible to the Director of Planning or the Manager of
Development Review;
• Creation of a new public notice sign template to more clearly convey information
about a proposal and to incorporate Municipal branding; and
• Increasing the minimum public notice distance from 120 metres to 300 metres for all
Official Plan and Zoning By-law Amendment applications located outside of a
settlement area.
3. What Does the PEP Involve?
External consulting services were retained to provide business process expertise and
facilitation support, and a scoped work program was designed. Senior Planner Amy
Burke was the municipal project manager, allowing for the scoping of the external
consultant's work. The PEP is based on an `end-to-end' approach that focuses on the
subdivision and site plan development processes from the first point of contact with
proponents to the completion of works, inclusive of the building permitting and inspection
process. It is expected than many of the PEP learnings and resulting process
improvements, once implemented, will be transferable to other land development -related
57
Municipality of Clarington
Report PSD -046-17
processes (e.g. minor variance, zoning by-law amendments, building permitting,
construction inspections, etc.).
Steps in the PEP include the following:
Current State Review
o Detailed mapping of the current land development process
o Internal critique of the current state
o Gathering input and best practices from external stakeholders
Process Analysis
Page 4
o Process enhancement visioning
o Redesign working group session
Future State Recommendations
o Recommendation of a proposed `future state' and implementation plan (by
Consultant)
o Final reporting (by Consultant)
In order to draw upon the varied roles and experiences of Staff, to build consensus, and
to encourage ownership of recommended process changes, the approach taken has had
extensive Staff involvement. All Engineering and Planning Services Staff have had an
opportunity to participate in the PEP and to share their experiences and ideas. In
addition, input was sought from other Departments involved in the land development
process (Operations, Finance, and Legal).
4. How Were Enhancement Opportunities Identified?
Process enhancement opportunities were identified through both an internal review
process and external consultation. Detailed process maps developed by Staff at the
outset of the PEP provided a foundation for analysing the land development process and
contemplating redesign opportunities.
A facilitated workshop involving a dedicated working group comprised of Staff from
Engineering and Planning Services and the Clarington Board of Trade critiqued the
"current state" process flows, identifying process gaps and challenges. These included
things that are both within and outside of Municipal control. The process flows and
results of the working group critique were then made available to all other Engineering
and Planning Services Staff and to other Departments for further issue identification and
comment on opportunities for improvement.
PP
Municipality of Clarington
Report PSD -046-17
Page 5
Figure 1: The development of detailed process maps by the PEP Process Working Group
t7 ��
M
y
L�
Figure 2: Posting of the process maps within the Departments to ensure all Engineering
Services and Planning Services Staff had an opportunity to participate in the review.
59
Municipality of Clarington
Report PSD -046-17
' Business Proces&ag
i - 4k 0
■
lllli�i I -
Page 6
Figure 3: A working board from a facilitated internal working group session to identify
opportunities for process enhancement.
For external perspective, a series of stakeholder "voice of the customers" roundtables
were held to gather feedback on the current processes and input on potential process
improvement measures, including preferred practices used by other municipalities. The
Municipality hosted the following four roundtables:
• Subdivision Development Roundtable for Developers;
• Site Plan Development Roundtable for Developers;
• Development Consultant's Roundtable;
• External Agencies Roundtable, involving the local Conservation Authorities and
Region of Durham Works and Economic Development & Planning Departments.
To further supplement the input received through the internal review process and
stakeholder roundtables, a range of best practice study reports and guidelines on land
development and building approvals processes were reviewed. In addition, a meeting
was held with representatives of the Residential Construction Council of Ontario, which
provided insight on their on-going analysis of action that is needed to modernize the land
development and building process in Ontario to achieve greater efficiency and innovation.
5. What Have We Heard?
The following summary highlights the key opportunities for enhancement identified
through the land development process review.
Municipality of Clarington
Report PSD -046-17
Page 7
Enhanced early issue identification — This involves increasing the comprehensiveness
of early stage pre -application consultation services and more clearly defining and
detailing minimum eligibility requirements for a formal Pre -Consultation Meeting. This
has the potential to:
Positively influence the quality of the application and application documents
submitted to the Municipality; and
Reduce the risk of requiring additional information later in the process.
Developing supporting tools, such as an application requirements questionnaire can:
Help direct prospective proponents to relevant policy and regulation, resources, and
guidelines; and
Support the early identification of critical factors that may affect the overall feasibility
of a proposal.
Further improving the communication of requirements — While a range of supporting
documents and guidelines have previously been developed to assist applicants, there are
additional opportunities to enhance the clarity of the process. Primary to this is the
preparation of standardized terms of reference for supporting documents and studies that
can be customized by the Applicant based on site specific characteristics and reviewed
for concurrence by the appropriate review authority prior to initiating the work. In addition
to detailing expected scope, terms of reference can clarify the purpose of the
requirement, at what point in the process it is required to be submitted and to whom, and
the responsible review authority (with delineation of roles where multiple review
authorities exist).
This will:
Help to reduce the risk of unnecessary cost expenditures;
Manage expectations; and
Increase transparency.
Application streaming - An increasing array of factors have the potential to influence
land development proposals and correspondingly the effort and time that may be required
for their review. The establishment of a system for streaming applications based on
clearly defined and consistently applied criteria, with applications being classified as
simple, moderate or complex, can support the identification of application requirements,
such as the need for a public information centre, and the establishment of target review
timeframes, thereby contributing to increased certainty of the process. The degree of
required early stage pre -application consultation and standardized terms of reference
could also reflect the various application complexity streams.
61
Municipality of Clarington
Report PSD -046-17
Page 8
Service level agreements — Establishing service level agreements, internally across
departments and externally with agencies involved in the land development review
process will support the establishment of defined customer service objectives. Clearly
defining roles and responsibilities in the review process will minimize the risk of overlap or
duplication, while establishing decision making authority can contribute to addressing
conflicting review comments. Seeking agreement on the reasonable expectation of time
for review, will inform the setting of review timeframe targets.
Updating technology in application processing — Modernization through the use of
technology to support online application submissions and tracking, shared access
(internal departments, external agencies, applicants) to complete and up-to-date
application information and outstanding issues or requirements, electronic redlining of
drawings, mobile field inspection technology, and public access to application information
and status. This will require a new business software solution for land development
process automation, a subject addressed in the IT Strategic Plan.
Establishment of a management dashboard — An easy to use and up-to-date data
management system for progressively and proactively managing the process. This
includes measuring the total volume of work, work in progress, and backlog, and for
tracking and monitoring of key performance indicators. This workflow management tool
is a critical component of a complete business software solution for automation of the
land development process.
Conduct an assessment of fees and securities - A critical evaluation and assessment
of all land development process -related fees and securities, including purpose, timing of
payments, acceptable form of payment, roles and responsibilities of various departments,
payment tracking, and the availability of information to applicants about the various types
of fees and securities and the collection, repayment (where applicable) and release of
securities processes. An examination should also give consideration to the introduction
of fees for multiple resubmissions of incomplete applications, studies and design
drawings, and ensuring applicants provide annotated drawings indicating where changes
have been made. There is an opportunity to assess whether a portion of Building Permit
fee reserves to support updating technology in application processing and other process
enhancements would be an applicable investment.
Refine the role of the Clarington Board of Trade — Clarify the role and responsibility of
the Clarington Board of Trade as it relates to the land development process. Leverage
the potential for CBOT to assume a greater role providing planning application
assistance, provide property realtor education, assist prospective proponents to access
municipal land use and zoning information, maintain an industrial and commercial
property search tool, and assist with the determination of "fit for purpose". The
assessment should:
Eliminate current service gaps and areas of overlap with Engineering and Planning
Services;
Clarify CBOT's role as both an economic development driver for the Municipality
and business facilitator; and
Determine Staff training needs.
62
Municipality of Clarington
Report PSD -046-17
Overarchina considerations in what we heard:
In reviewing the summary presented above, it is important to recognize:
Page 9
That although municipalities and the development industry often work together to
achieve objectives which are important to the community, the Municipality is a
regulatory approval authority who must also protect the public interest and minimize
municipal liability.
2. That the development review process is complex, involving a range of stakeholders,
and developers, external agencies, the public and Council also play a role in the
success of land development process improvement efforts.
3. That increased public involvement adds transparency and accountability, and adds
time to the review of development applications.
It is also important to note the positive feedback that was received from external
stakeholders at the roundtables. Participants commended Staff for their openness,
approachability, timeliness of response, and efforts in a period of strong growth and
related demand from the land development industry. Further, participants indicated that
many elements of our land development process are aligned with current practice
elsewhere in Ontario, or provide an example of best practice. In addition to expressing
appreciation to the Municipality for undertaking the PEP initiative, the importance of
turning the resulting PEP strategy into action was reinforced.
6. Where Are We Going?
With the Current State Review and Process Analysis phases of PEP complete, the final
recommendations from the business process expert for a proposed `future state' and
implementation plan are in preparation. Final reporting is on track for completion within
the third quarter of 2017.
To address what we heard and to make the necessary business process adjustments,
the Director of Engineering Services, Director of Planning Services and Interim Chief
Administrative Officer examined staff resourcing. The findings of this review
demonstrated the importance of and need for additional staff to support development
review. The Interim Chief Administrative Officer has therefore authorized
hiring/reclassifying the remaining positions in Planning Services included in the 2017
budget. These include one full time Senior Planner for Development Review and moving
the Clerk I in Planning Services from part time to full time to assist with data input for
development tracking.
While Clarington's land development process has continually strived for continuous
improvement, making incremental enhancements over time, the PEP will result in a
comprehensive roadmap that will complement and support the significant transition in the
community that the Municipality is both facilitating and responding to. This is the "new
normal" where implementation will require the on-going availability and commitment of
staff resources, while continuing to balance regular workloads and other priority projects.
63
Municipality of Clarington
Report PSD -046-17
7. Financial Considerations
Page 10
Below is a breakdown of the recommended positions showing total salary and benefits for
each. These positions would be funded through the next tax levy funding envelope of
$300,000, approved in the 2017 budget.
One full time Senior Planner position for Development Review: $101,300;
Upgrading a Clerk I position from part to full time: $27,000.
8. Concurrence
While the recommendations of this report are specific to the Planning Services
Department, PEP is a collaborative initiative of the Engineering Services and Planning
Services Departments. Accordingly, this report has been reviewed by Tony Cannella,
Director of Engineering Services, who concurs with the recommendations.
9. Conclusion
In March 2017, Engineering and Planning Services in conjunction with the Interim Chief
Administrative Officer initiated a deep review of the land development process, including
building permitting and construction inspection processes. A critical internal and external
review process involving Staff from a number of departments, external agencies and
industry representatives has contributed to the identification of a range of opportunities
for process enhancement. A summary of key opportunities are highlighted in this report.
Detailed description of the issues and challenges, analysis of the opportunities for
enhancement and process redesign, recommendations for a redesign and an
implementation plan will be included in the final PEP report, now being prepared by the
business process expert retained for the PEP initiative.
The results of the review and identification of opportunities has underlined the importance
of and need for additional staff to support development review in the Planning Services
Department and these positions, identified in the 2017 Budget, will now be filled. A deep
review of the land development process has helped Clarington determine how it can best
facilitate investment and economic development in the context of increased transparency
and public participation and a changing provincial policy environment.
10. Strategic Plan Application
The recommendations contained in this report advance action item 1.3 of the Strategic
Plan.
ID
Municipality of Clarington
Report PSD -046-17
Submitted by:
David J. Crome, MCIP, RPP
Director of Planning Services
Page 11
Submitted by:
Curry Cliff rd, M A, CMO,
Interim CAO
Staff Contact: David Crome, Director of Planning Services, 905-623-3379 ext. 2402 or
dcrome(a_clarington.net
There are no interested parties to be notified of Council's decision.
ACB/DC/FL/df;tg
65
Presentations and Handouts
Application By: Kaitlin Homes Limited
An Application to amend the Zoning By-law to extend
a Temporary Use to permit a Home Sales Pavilion for a
maximum of three years.
3 Martin Road, Bowmanville
Public Meeting: June 20, 2017
Background
LEM
Public Notice and Agency Comments
DEVELOPMENT PROPOS
Applicant
Kaiti n Hj)mes Limited
prop05al: Kaitfin Homes
Lim i ted PFOPose' a n
pxxerls+on of a YempOWY Ilse
Z,O.no BY•law for an existing
5dje5 pavilion.
FILE: Zvnmg epld r Arnendmen:
i;o] T 0013
fapvonn for House Salo$
•�
'
-
04 Fd
�OILop
Application By: Simon Gill and Janet Taylor Gill
To permit farm -related agri-tourism uses including special events and a
small apple cidery on a farm property.
Public Meeting: June 20, 2017
- M
1
4
' -
Cbncessio Road -.5
- *443,
IL
Subject SiteCL
- � —
0
4 -kI
I
. e r, ayield ' , Lawn -Parking -,
, -woo. il, � i ardens' w Area Maximum- ..r■'� i 1541
Capacity, 20
tEvan# and. ommercjal
Tenh rea 04 �-:
;s Entrance (Ex sLirty�
—Event' kfu ur a Fesrential r
trucku
COPA2 cbCa
Site Context
r
A
Front yard / Proposed parking area
- Barn / Proposed event venue looking north Gardens / Proposed outdoor event area
Policy &Zoning
"TOW
M
• Provincial Policy
Provincial
Statement
• Durham Regional
Official Plan
• Clarington Official
Plan
• Zoning By-law 84-63
f,k
Application By: Newcastle Marina Villa Ltd.
(Kaitlin Corporation)
65 Shipway Avenue, Port of Newcastle
Public Meeting: Tuesday June 20, 2017
4*-a
6 'llor—
� A.
414, 0
W -Of
J 'd I
jo
.. of -C4.
4
0001"
4L.
v
►.� y�yl X11 � ►' �.�..•:.. �_
4r
Comments
• Comments from the public
• Shared access
• Site maintenance
• Lack of retail and personal
services
• Comments are outstanding
from the majority of the
agencies
I'N-L.L. '
J' i I 77 ISL
50
ati Iii
1
wim
ii
Applications by:
Schleiss Development Company Limited,
6490101 Ontario Limited,
Clifford Curtis,
Michael Zygocki Limited (Finefield Homes),
Boothia Developments Limited (Finefield Homes), and
Baseline Properties Limited
Proposal to amend the Worden East Neighbourhood
Design Plan and three applications for proposed plans of
subdivision for a portion of those lands in Courtice
Tooley Road, Courtice
Public Meeting: June 20, 2017
Approved Worden East Neighbourhood Design Plan
_ f
poll
t
1
LEGEND
4� �4-rwaw
'47�atfowrt
�Y4v/ LYr ��
Ahld,tli
_w�rl� I�YVf GhYM1h
M•yar�n 4r{
wAmandroarkk
-j F.
j
f-'}
—fr '
Open Space
ExWing Reslderilial Areas
Residential Davebpmenl Areas
Futum B" Area
Proposed Worden East Neighbourhood
road and lot pattern
� I
+} LEGEND
F
�YiOprw�
4
k
February 2016 Approved
Worden East Neighbourhood
Design Plan
_ _ f
4
i
r I
�� Aroa Su bac# To Amerrdmen# �
r
�k
h `;4
February 2016 Approved
Worden East Neighbourhood
Design Plan
4
i
February 2016 Approved
Worden East Neighbourhood
Design Plan
SC 20'17-0003
LANE q
Wetland
I c
CIRCLE"
POP YF1E
Lu
e u.1
uj
uj
LLI u
W
W.
1318 HRELE) DR
5C 2017 - 0002 & 0003 & OU04
7.
G?
LU
1wi
Neighbourhood Design Plan
AmendmerrtArea
LEITH OF
Public Comments
Removal of trees
• Flooding potential
• Loss of natural beauty
High groundwater table
• Desire to protect large lots
• Possible well impacts
Lack of green space in
proposed plan
Comments
COPA 107
o Poppyfield Drive
o Environmental Impact Study
*Further public
consultation
*Agency comments
outstanding
/ LANDUSE - OPA 747
M F.nv ronmental N'otecdan
5
n Lkbon ReAcnhal
SC 201; -00C -3't
- I
7.: .
a
VE r w
.SC 201? -0002
O
CIRCLE [:1
w
POP Y
8C W
3 }
O
_ O
W eL
W 1K'+
W
Z
W
I U
BIRCHFIELD DR 1
LD4� _ 9C 2017` 4402 80043 & 0004
D �
�Ya Harr ci
E
CIRCLE
SC 2017-0003 „
201 7MOO
ry
moo J
0
Neighbourbood Design Pian
Amendment Area
impl
c
j
'FIELD D
�m
m_
�
L
u
'
�
O
z
TLU
BIR HF-IE_LD DK
LTO,2017
- 0Cl02 8. 0a404
SC 2017-0003 „
201 7MOO
ry
moo J
0
Neighbourbood Design Pian
Amendment Area
impl
2
'FIELD D
�m
m_
r
elm