HomeMy WebLinkAboutCOD-009-06 ... . Cl~.n REPORT CORPORATE SERVICES DEPARTMENT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE Date: February 6, 2006 Report #: COD-009-06 File#_ By-law # h03 .{} ~'t~Tlb Subject: Tender CL2006-1, Hampton Pond Recovery Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: ~" 1. THAT Report CO[)---o9:106 be received; 2. THAT Hard-Co Construction Ltd., Whitby, Ontario with a total bid in the amount of $90,541.51 (plus G.S.T.), being the lowest responsible bidder meeting all terms, conditions, and specifications of Tender CL2006-1, be awarded the contract for the Hampton Pond Recovery as required by the Operations Department; 3. THAT the total funds required in the amount of $90,541.51 (plus GST) be drawn from Hampton Pond Recovery Account # 100-00-000-02153-2015; and 4. THAT the attached By-law marked Schedule "A" authorizing the Mayor and the Clerk to execute the necessary agreement be approved; FORTHWITH" Submitted by: ~ ~ rvfarie Marano, H.B.Sc., C.M.O. Director of Corporate Services f ~ ~/ fred !/<<val-h Fred Horvath Director of Operations OAQI~ ~ -tUL Nancy Taylor, B.B.A., C.A., Director of Finance Reviewed b~---:"~' Franklin Wu, Chief Administrative Officer MM\ASC\NT\LAB\sm . REPORT NO.: COD-009"()6 PAGE 2 BACKGROUND AND COMMENT Tender specifications were provided by Totten Sims Hubicki Associates for the Hampton Pond Recovery within the Municipality of Clarington, as required by the Operations Department. This project will be completed for the Municipality of Clarington, under the direction of the Director of Operations and involves the construction of two ponds with one outlet structure. Also, included is the top soiling and seeding of the disturbed areas. Tenders were advertised in local papers, as well as electronically. Subsequently, tenders were received and tabulated as per Schedule "B" attached. The total project cost of the pond work and consulting fees of $2,800 will be provided from Hampton Pond Recovery account #100-00-000-02153-2015 and is within the total project allocation. The low bidder has previously performed satisfactory work for the Municipality of Clarington. The Director of Finance has reviewed the funding requirements and concurs with the recommendation~ Queries with respect to department needs, spedfications, etc., should be referred to the Director of Operations. After further review and analysis of the bids by the Operations Department and Purchasing, it was mutually agreed that the low bidder, Hard-Co Construction Limited, Whitby, Ontario, be recommended for the contract for the Hampton Pond Recovery. Attachment #1 Schedule A By-law Attachment #2 Schedule B Bid Summary CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T(905)623-3379 F (905)623-4169 Schedule "A" THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON BY-LAW 2006- Being a By-law to authorize a contract between the Corporation of the Municipality of Clarington and Hard-Co Construction Limited, Whitby, Ontario, to enter into agreement for the Hampton Pond Recovery. THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY ENACTS AS FOLLOWS: 1 . THAT the Mayor and Clerk are hereby authorized to execute, on behalf of the Corporation of the Municipality of Clarington and seal with the Corporation Seal, a contract between, Langley Utilities Contracting, Bowmanville, Ontario, and said Corporation; and 2. THAT the contract attached hereto as Schedule "A" form part of this By-law. By-law read a first and second time this day of ,2006. By-law read a third time and finally passed this day of ,2006. John Mutton, Mayor Patti L. Barrie, Municipal Clerk SCHEDULE "B" BID SUMMARY Tender CL2006-1 HAMPTON POND RECOVERY BIDDER TOTAL BID Hard-Co Construction Ltd. $96,879.42 Whitby, ON S & F Excavating Limited $133,969.35 KinQ City, ON B.N. Fenton Construction Ltd. $170,461.70 Courtice, ON Safire Infrastructure Inc. $187,250.00 Brampton, ON Varcon Construction Co. Ltd. $192,323.94 Brampton, ON NLG Construction Ltd. $195,509.79 * Mississauga, ON Aim Waste Management Inc. $195,509.79 Hamilton, ON JMX Contracting Inc. Rejected - No Bid Deposit Gormley, ON Ron Robinson Limited $211,806.33 Bowmanville, ON Boyle Excavating Ltd. Rejected - No Bid Deposit & Bowmanville, ON no Agreement to Bond Esposito Bros. Construction Ltd. $246,609.56 * Nobleton, ON North York Excavating & Contracting Limited $247,363.81 North York, ON Dig-Con International Limited $286,044.17 Bolton, ON Peninsula Construction Inc. $299,780.92 FONTHILL, ON Elirpa Construction & Material Ltd. $368,063.97 Pickering, ON Dagmar Construction Inc. $368,451.34 Markham, ON * Extension Errors