HomeMy WebLinkAbout1983-10-06 Memo to CommitteeMEMO TO: Members, Ad Hoc Committee, Heating - Bowmanville Library Louise Aasen Don Hargest FROM: Barbara Schon DATE: 6 October, 1983 Following are some facts and opinions in regard to the building and heating system. The building was cold and damp, therefore it was necessary to provide some temporary heat immediately. Rented from Tim's Rental: 7 220v 4800w industrial electric heaters 4 to be placed in the library 2 for the auditorium 1 for the Senate Room and adjoining space We understand from Standard Mechanical and the electrician that this heat supply will only be adequate during the fall months before the temperature drops to the freezing level. The existing wiring will not take any additional load. Estimated costs: 7 heaters @ $48 per month $336.00 PST 23.52 Total 359.52 3 months rental ($359.52 x 3) $1,079 Installation 250. (est.) Hydro Newcastle PUC estimate per month $720 3 months Hydro (720 x 3) 2,160. (est.) TOTAL 3,489• (est.) These expenses can be covered from the budgeted amount for heating costs. This form of electrical heating is an interim measure and will only be adequate until the temperature drops to the freezing point. Memo - October 6, 1983 (cont.) Costs have been projected for a three-month period on the assumption that: 1) the fall will be mild 2) a tender will be accepted during that period It is recommended that the library provide temporary heat only until the contract has been signed; and that the Contractor assume responsibility for the provision of heat at his expense from the time the contract is accepted or within a reasonable time; and that provision of temporary heat be included in the specifications. Closing the library It should be understood that the library is to remain open as long as possible and when a closing is necessary, that adequate notice as to date and duration of closing be given the library Board in order that the public may be informed.(minimum of 3 weeks) f iati c.L�U✓ 1. .�. cc: Board members