Loading...
HomeMy WebLinkAboutWD-61-81 Report TOWN OF NEWCASTLE PUBLIC WORKS DEPARTMENT Director's Report to Mayor Rickard and Members of Council. Item: WD-61-81. Date: April 16, 1981. Subject: Road Treatment Recommendation: THAT this report be received for information, and adopted. Report: At the Public Works Committee Meeting of April 14, 1981, a request was made for a summary of comparisons(between 1980 and 1981 in relation to materials required for road treatment, and the dollar value of same) to be compiled, for submission to Council. Attached is an analysis which details the actual materials used, and expenditure involved, for 1980, as compared to the estimated amounts for 1981. The 1981 figures are based on those relevant to recent tender specifications and contract awards, and are, thus, subject to slight fluctuation prior to final costs, etc. , becoming known. In summary, the salient facts are as follows: Dust Control: The costs estimated for 1981 are increased by 18.7%, while the quantity of materials this represents is decreased by 11 .42%. Gravel: The costs estimated for 1981 are increased by _. 6.9%, but the quantity of materials is also increased - by 1.16%. Surface Treatment: The estimated costs are increased by 7.55%, while the quantities of material represented is decreased by 13.00% The overall conclusion can be drawn that costs to the Municipality for the provision of services have substantially increased since 1980, while the materials necessary to supply those services have decreased (with one exception) rather than being maintained. In short, it will be clearly seen that the Town is obliged to pay more in 1981 for less than it received in 1980. The attached does not include any costs in respect of "preparation" of roads for services, nor for administration; the relevant figure would be in the region of $10,000. 00. The item "Dust Control" should be noted in that the 1980 (total) materials expenditure amounted to $353,442. 55�,,, while the 1981 (estimated) figures amount to $419,597. 50�. In the Current Budget the total of $408,000. 00 is included for this item, leaving a minimum shortfall of $11,597. 50c not including estimated costs for preparation and administration (approximately $10,000. 00. , as stated above) . As all contracts for 1981, thus far, have been tendered at quantities below the minimum required to maintain satisfactory services to Town roads, it will be necessary to gain the required funds for the successful completion of the Road Treatment Program from elsewhere in the Budget, as a further reduction in services would result only in increased expenditure for remedial measures in the future. Respectfully submitted, J. DUNHAM Director of Public Works. vli 0 11 �I I ii I LI TOWN OF NEWCASTLE PUBLIC WORKS DEPARTMENT COMPARISON OF QUANTITIES AND EXPENDITURES BETWEEN 1980 AND 1981 ROAD TREATMENT DESCRIPTION ACTUALS - 1980 1980 AS PER CONTRACTS - 1981 A N A I, Y S I S Quantity Unit @ Total Quantity Unit @ Total Qty. % $ % + or - + or - DUST CONTROL: Prime 237,250 galls. 0.89 211,152. 50 220,000 galls. $1,2273 270,000 - 8.00 + 23.00 Sand Blotter 4,723.34 tons $3. 70 54,476. 35 13,000 tons $3.86 50,180 -13.50 - 8.00 Road Oil 217,900 galls. 0.403G 87,813. 70 190,167.17 galls. $0.523 99,417.50 -12.75 + 13.25 TOTAL - DUST CONTROL ---------------------------- *1980* $ 353,442. 55� ------------------------ *1981* $ 419,597.50 GRAVEL: average average Crush, Deliver, Off-Belt, Stockpile 76,118 tons $1.02 77,624. 58 77,000 tons $1.080 82,983. + 1.16 + 6.90 TOTAL - GRAVEL ---------------------------------- *1980* $ 77,624. 58� ------------------------ *1981* $ 82,983. 00( SURFACE TREATMENT: R.Sl.K. 57,000 galls $0.879 50,542. 50 50,000 galls $1.198 59,900 -15.00 + 18.50 3/8" Chips 3,885.50 tons $7.60 29,529. 80 3,500 tons $7.632 26,712 -11 00 - 10.70 TOTAL SURFACE TREATMENT --------------- -------- *1980* '$ 80,072. 30� ------------------------ *1981* $ 86,612. 000 SUMMARY OF COMPARISONS 1980 & 1981. DUST CONTROL Estimated Cost UP 18.7%, Quantity of Materials DOWN 11.42% GRAVEL Estimated Cost UP 6.9%, Quantity of Materials UP 1.16% SURFACE TREATMENT Estimated Cost UP 7.55% Quantity of Materials DOWN 13.00%