Loading...
HomeMy WebLinkAboutTR-57-85 �m .. i_ 3(c) CORPORATION OF THE TOWN OF NEWCASTLE TREASURY DEPARTMENT K. CAMPBELL, C.A.,TREASURER 40 TEMPERANCE STREET TEL.(416) 623-3379 BOWMANVILLE, ONTARIO L 1 C 3A6 REPORT TO THE GENERAL PURPOSE AND ADMINISTRATION COMMITTE MEETING HELD SEPTEMBER 3, 1985. REPORT NO. : TR-57-85 SUBJECT: TENDER NO. T85-11 - DESIGN AND CONSTRUCTION OF AN ADDITION TO HAMPTON WORKS DEPOT. RECOMMENDATION: It is respectfully recommended to Council the following: 1 . that this report be received; and 2. that Gerr Construction Limited, Bowmanville, Ontario with a total bid in the amount of $155, 100.00 being the lowest responsible bidder meeting all terms, conditions, and specifications of Tender No. T85-11 be awarded the contract for the design and construction of an addition to Hampton Works Depot; and 3. that the funds expended be provided from the approved 1985 Public Works budget of $100,000.00 account #7212-261-1001-5 and that $55, 100.00 be provided from the Fleet Reserve account #2900-X-10-7. BACKGROUND AND COMMENT: Tender specifications were provided by Totten Sims Hubicki Associates for the Design and Construction of an addition to Hampton Works Depot as required by the Department of Public Works. Subsequently tenders were advertised with bids being received and tabulated as follows : Bidder Bid Amount Gerr Construction Limited, $ 155,100.00 Bowmanville, Ontario. _ 2 _ REPORT NO. : TR-57-85 TENDER NO. T85-11 - DESIGN AND CONSTRUCTION OF AN ADDITION TO HAMPTON WORKS DEPOT. The 1985 funds budgeted for the renovations to the Hampton Works Depot are in the amount of $100,000.00, however the bid amounts for the project total $155,100.00, detailed as follows: - Washroom/lunchroom construction $ 112,500.00 - Truck washbay construction 37,500.00 - Septic system installation 4,500.00 - Epoxy floor finish 600.00 Total $ 155,100.00 These bid amounts have been reviewed by staff and the Town' s consultant,. and found to be quite within reason, especially since the contractor will be required to pay costs for architectural and design services and there is a considerable amount of specialized mechanical , electrical work and plumbing involved. Unfortunately out of six contractors who obtained contract documents, only one submitted a bid. A subsequent discussion with some of them to establish the reason for this indicated that they felt the job was too small to absorb the costs of the architectural and design services they would have to provide. Thus, only the one bid from Gerr Construction Limited, Bowmanville was received. This contractor has constructed facilities for the Town in the past and his services have been quite acceptable. To make up the shortfall of some $55,000.00, it is recommended that funds be drawn from the Fleet Reserve account #2900-X-10-7. It is felt that such an arrangement is quite appropriate for the following reasons : 1 . The truck washbay, with a cost of $37,500.00 is specifically for washing, painting and maintenance of fleet, therefore payment from that account is not unreasonable. 2. Modifications to the existing building and inventory area will remove the lunch facilities presently used in those areas to the benefit of fleet inventory. Thus a portion of associated costs should be attributed to fleet. - 3 - REPORT NO. : TR-57-85 TENDER NO. T85-11 - DESIGN AND CONSTRUCTION OF AN ADDITION TO HAMPTON WORKS DEPOT. 3. The fleet reserve is consistently in a healthy state and it is not felt that using a portion of it for the construction would be detrimental , especially since the fleet will benefit from the renovations. Having considered relevant factors such as the unacceptability of the present washroom/lunchroom facilities, the undesirability and hazard of washing and painting trucks in the general garage area, escalation of costs with time and the availability of funds for the shortfall , it is recommended that the award proceed. Respectfully submitt d, ( Kathryn A. Campbell , C.A. , B.Comm. , Treasurer. /OOR. G Eng. , Director of Public Works. KAC/RGD/os.