Loading...
HomeMy WebLinkAboutCS-33-88TOWN OF NEWCASTLE MEETING: COUNCIL MEETING DATE: December 19, 1988 REPORT #: CS -33 -88 FILE #: SUBJECT: VISUAL ARTS CENTRE - DELEGATION RECOMMENDATIONS: File # Res. # By -Law # It is respectfully recommended that Council approve the following: - 1. That Report No. CS -33 -88 be received; and 2. That staff be authorized to engage the firm of Totten Sims Hubicki Associates Limited for the purpose of conducting a structural report of the Visual Arts Centre in accordance with Attachment #2 to Report CS- 33 -88; and 3. That the required funds be drawn from the Unclassified Administration Contingency Account Number 7007 - 00000 -0298; and 4. That staff be instructed to address capital requirements of the Visual Arts Centre through the 1989 Budget Deliberations; and 5. That the Visual Arts Centre be advised of Council's decision. ../2 GENERAL PURPOSE & ADMINISTRATION COMMITTEE REPORT NO. CS -33 -88 PAGE 2. BACKGROUND & COMMENTS: On Wednesday, September 21, 1988 staff met with Mrs. Pat Best representing the Visual Arts Centre regarding a concern with the deterioration of the north wall of the Visual Arts Building. It is suggested by staff that the issue raised regarding the brick work was just one of a number of concerns that should be addressed. A subsequent meeting was held with the Building Inspector where a number of structural concerns were raised. At this point, it was suggested that a structural analysis of the building be performed by a qualified engineering firm. A structural report (Attachment #1) of the Visual Arts Centre was conducted in June of 1982 by Totten Sims Hubicki Associates Limited. A number of deficiencies were identified at that time, however no action was taken. Because of the time which has elapsed, staff is recommending that a more current report be conducted as outlined in recommendation #2 contained in this report. A proposal (Attachment #2) from Totten Sims Hubicki Associates Limited was requested by staff to conduct an update study. If approved, the report will inevitably recommend capital works to be completed on the building. Totten Sims Hubicki Associates Limited has indicated that the completed report will be available in February of 1989. With this in mind, staff will address estimated capital requirements through the 1989 budget deliberations. With respect to concerns raised with the sewer connection for the Visual Arts Centre. Through its 1986 Budget request, the Visual Arts Centre requested a $6,000 Capital Grant for the purpose of hooking -up to the Town's sewer system. Subsequent to receiving funding, Community Services staff was requested by the Visual Arts ../3 GENERAL PURPOSE & ADMINISTRATION COMMITTEE REPORT NO. CS -33 -88 PAGE 3. Centre to initiate the required works. It was then determined that there was not sufficient finances to complete the work as estimates were in the neighborhood of $13,000.00 leaving a shortfall of approximately $7,000.00 (Attachment #3). In the interim, staff had the existing septic system checked and found a vent was not functioning and was contributing to the odour backing up into the building. This situation was rectified, however staff did suggest to Mr. Hately of the Visual Arts Centre that subsequent funding be applied for to complete the sewer connection. Estimated costs of the works were provided by staff to Mr. Hately. At this point, additional funding has not been requested by the Visual Arts Centre. With approval of this report, staff will address the additional funds required through 1989 Budget deliberations with works to commence as soon as possible in 1989 subject to Council approval. The context of this report has been discussed with the Deputy Treasurer who concurs with the recommendations. ATTACHMENT #1 STRUCTURAL REPORT VISUAL ARTS CENTRE BARLEY MILL TOWN OF NEWCASTLE JUNE, 1982 TOTTEN SIMS HUBICKI ASSOCIATES (1981) LIMITED CONSULTANTS 3 D11111i CONSULTANTS totten sims hubicki associates corporation of the Town of Newcastle 40 Temperance Street Bowmanville, Ontario L1C 3A6 G , 1011EN E3 SI'. P Enq R k. SIMS BAS,, Ping J M tiUWCKI B A Sc P Enq k i WIN )OW4 MS( 1'(-: P i, LBENLEE B A Sc P Erq TOT TEN SIMS HUBICKI ASSOCIATES 119811 LIMITED 1500 HOPKINS STREET. WHITBY, ONTARIO LIN 2C3 14161 6689363 June 30th, 1982. Attention: Mr. T. A. Fanning Director, Department of Community Services Re: Structural Inspection, Barley Mill Visual Arts Centre, Town of Newcastle Dear Sir: Attached please find five (5) copies of our 'Structural Report, Barley Mill Visual Arts Centre', which outlines the results of our inspection, testing and structural evaluation of the major structural components of the Barley Mill. The building's structural system is in fair to good condition and generally adequate in relation to the Ontario Building Code's loading requirements. Recommendations for repair and reinforcement work required to bring specific areas up to current requirements of the Building Code are detailed in the Report. In the event that you have any questions with regard to the above and /or the inspection results reported in the enclosed Report, please do not hesitate to contact our office. Yours very truly, E•' ig. M;u1ager, Buildin, Group D1,B!(1h STRUCTIJrb L REPORT VISUAL ARTS CENTRE BARLEY MILL TOWN OF NEWCASTLE TABLE OF CONTENTS Page 1. Introduction 1 2� Observations 2 3. Structural Evaluation 4 !4. Conclusions 5 5. Recommendations Appendices 0 STRUCTURAL REPORT VISUAL ARTS CENTRS BARLEY MILL TOWN OF NEWCASTLE INTRODUCTION At the request of Mr. T. A. Fanning, Director of Recreation, we have carried out a structural inspection and evaluation of the Old Barley Mill building in Bowmanville, Ontario. The primary objective of our inspection was to inspect the material of the structural components of `he building, analyse the structural capacity of the components and evaluate their adequacy with respect to current load requirements of the Ontario Building Code. It is noted that consideration is being given to conversion of the third floor area, which is presently unused, to a classroom and /or display area. The proposed use for the third floor area was assumed in the structural analysis, and the structural feasibility of converting the third floor to usable space was determined. A visual examination of the Old Barley Mill building was carried out in March, 1982 at which time the timber roof joists, columns, floor joists and masonry walls were examined. It is noted that certain areas of the structure were not accessible for 'close -up' examination of the structural components. Therefore, a visual examination cannot ensure that all critical structural deficiencies were detected. The original structure of the Barley Mill building, constructed in 1908, consists of timber roof joists supported by an interior timber beam and column system and exterior load bearing brick masonry walls. The building is three stories high with a full height basement. Floor framing for each floor level consists of timber joists supported by interior timber beams and columns and exterior masonry walls. The overall outside dimensions of the building are 50'+ by 32' -4 " +. A single storey addition with basement is located at the north side of the main mill structure. The overall outside dimensions of the addition are 35' -411+ by 32' -2 " +. A 12' -3 "+ by 9' -7 "+ single storey shed addition is located at the south wall of the main mill building. A schematic layout plan of the Barley Mill building is shown in Sketch No. 1 included in Appendix I. The main roof of the Barley Mill consists of a central high loft area approximately 10' -8 "+ wide by 50'+ long. Roof structure for the loft roof consists of 2" x 4" rafters at 167+ centres that are supported by the 2" x 4" scud walls of the loft on the north and south. The walls in turn are supported by 8" x 8" timber beams that span approximately 11' -3 "+ between 8" x 8" timber columns. Timber tie braces span between the walls at three (3) locations. The lower portions of the main building roof consists of 2" x 6" roof joists at various centres (16 "+ minimum and 24 "+ maximum) spanning 9' -10 "+ between the exterior north and south brick masonry walls and the interior 8" x 8" timber beams which also support the higher loft roof. The exterior brick masonry walls are 8 "+ thick between the third floor and roof Level. - 2 - In addition to the main timber roof support beams that span east and west, three additional rows of 8" x 8" timber tie beams span north and south between the exterior masonry walls and interior columns. The primary function of these beams is to provide lateral support for the masonry walls and timber columns. The structural framing for the third, second and first floor of the main building is similar at each level. The floor support consists of 3" x 10" timber joists spaced at 18 "+ centres spanning east and west approximately 12' -0 "+ between interior timber floor beams and the exterior masonry walls. The floor joists are supported in the interior of the building by 10" x 10" timber floor beams that span approximately 10' -8 "+ between interior columns and the north and south exterior masonry walls. A stairwell connecting all floor levels is located in the south -east corner of the building. The exterior load bearing masonry walls of the building are constructed of solid brick masonry for the full height of the structure. The thickness of the wall varies from 18 "+ at the first floor, 12 "+ at the second floor, and 8 "+ from the third floor to roof level. The foundation walls of the building are 2' -0 "+ thick rubblestone. A single storey addition housing washrooms, a meeting and 'a storage area on the ground floor, and, the furnace room and Model Train Club meeting room in the basement is located on the north side of the main building. The roof deck consists of a corrugated metal roof system. The roof framing consists of 1 inch tongue and groove roof sheathing supported by 2" x 6" joists at 30 "+ centres. The roof joists span east and west between the exterior brick masonry walls, an intermediate 8" x 8" roof beam and a central masonry wall at the peak of the roof. The 8" x 8" intermediate timber beams spanning north and south are supported by 8" x 8" timber beams that span between the exterior and central interior masonry wall. The maximum span of the roof joists is approximately 8' -9 " +. The floor framing of the shed addition consists of 2" by 10" joists at 16 inch + centres that span 17' -6 "+ between the exterior and interior masonry walls. A one storey shed addition to the main mill building is located on the south wall at the basement level. The addition is presently used as a storage area and provides access to the basement. The roof consists of a corrugated metal deck supported by 2" x 4" roof joists at 1611+ centres that span approximately 4' -4" between the exterior walls and central roof peak. The walls consist of metal siding on 2" x 4" studs. The floor of the addition is a concrete slab on grade. Sketches No. 1 to 10 dated May, 1982 illustrating the structural framing for the various areas of the Barley Mill Visual Arts Centre are attached in Appendix I. OBSERVATIONS The following is a summary of our observations noted during the March, 1982 inspection of the Barley Mill building that are considered to be of 'structural' significance: 1. The timber columns throughout the interior of the structure are checked to varying degrees. 2. The cap plates between columns and floor beams are checked in varying amounts throughout the structure. Most cap plates have a vertical check in line with the connecting bolts and some cap plates have an additional horizontal check. Most checks extend completely through the cap plate. 3. Most of the vertical bolts through the cap plate and beam were loose at the time of our inspection. 4. The timber floor joists, beams and columns in the interior of the building are generally in fair condition with little evidence of material decay or rot. 5. The timber roof joists of the main mill building are in good condition with no evidence of material deterioration or distress. It was reported that portions of the lower roof area have blown off in the past and were replaced at that time. 6. The 8" x 8" timber beams that span north and south are partially rotted at the masonry wall bearing points at the roof level. 7. It is noted that the timber sill plate at the top of the masonry wall is not anchored into the wall along the north and south sides. 8. The masonry walls below the roof area are deteriorating in various locations. This north 4all at the third and second floors Other areas of spalling and deterioration the third floor and on the exterior of th the north shed addition. spalled and the mortar is is particularly severe on the below the beam bearing seats. noted were on the south wall, at building on the east wall near 9. The masonry pilasters are cut back approximately 401 to the wall line at the third floor level. 10. It is noted that the north and south masonry walls are tilted to the south by approximately 1/2 inch + between the third floor and roof level. 11. A 1/2" to 3/8" vertical crack was noted in the south wall at the east windows. The crack extended from the roof level to the first floor. 12. The timber tie beams spanning between the north and south masonry walls at the roof level are deflected vertically at the centre of their span. This condition appears to be related to settlement of the roof support columns A and the transfer of the roof load to these beams. It was noted that these beams do not bear on the roof columns and that small shims have been placed in the 3/8 "+ space between the beam and column top. 13. It was noted that one of the timber tie braces between the loft walls is missing and that one of the braces is partially burned away. 14. The mortise connections between the roof support beams and columns were loose at the time of our inspection. The beams bear only 1/2" to 3/4" on the bearing seats that are cut into the columns. 15. The beams supporting the third floor are vertically deflected. The deflection appeared to be related to settlement of the interior columns. 4 - 17. It is noted that the floor beams and roof support beams are tied to the exterior masonry walls with forged 3/4" diameter bolts and 1/4 "+ x 1"+ steel plates. The 3/4" bolt penetrates the masonry wall and is connected by a nut and large steel washer on the exterior of wall. The plate end of the wall tie is spiked 'into the top or side of the timber beam with three (3) spikes. In some cases the timber beam is checked and the spikes are loose. 18. The timber roof joists and beams of the north shed addition are in fair IL condition with no evidence of material distress or deterioration. It is 41 noted that the sill plate is not mechanically anchored to the exterior masonry walls. i 19. The timber floor joists of the north shed addition are in fair condition. iOne fractured joist was noted in the storage room. 20. The timber and steel deck materials of the shed addition at the south of 41 the main building are in fair to good condition with no evidence of material distress or deterioration. 21. Although not structurally significant, the stair risers of the first to second floor stairwell are not uniform and create a tripping hazard. STRUCTURAL EVALUATION The criteria that have been used to evaluaie the structural components of the Barley Mill Visual Arts Centre are based on requirements outlined in the following documents: 1. Ontario Building Code (and the National Building Code of Canada, 1980 and Supplements). 2. Timber Design Manual - Laminated Timber Institute of Canada, 1972. 3. Timber Construction Manual - Canadian Institute of Timber Construction, 1961. 4. Field observations and measurements. 5. Handbook of Steel Construction - Canadian Institute of Steel Construction, 1972. The Ontario Building Code's basic loading requirements for analysis of the Old Barley Mill's main structural components are as follows: Ground Snow Load - 44 pounds per square foot (roof load varies from 35 to 132 lbs. per sq. ft.). Wind Load - 11.5 pounds per square foot basic wind pressure. Assembly Area Floor Load - 100 pounds per square foot. Washroom Area Floor Load - 50 pounds per square foot. - 5 - Tne analysis of the building's structural components was based on the following material assumptions. - The timber roof joists and deck of the north shed addition and main mill building are Spruce, Species Group D, Grade No. 1. - The timber deck of the main mill roof is Jack Pine, Species Group C, Grade No. 3. All steel elements conform to ASTM A9 with a minimum yield stress of 33 Ksi. - All floor joists, timber beams and columns are Jack Pine, Species Group C, Grade No. 1. - The foundations are adequate to support the superimposed design loads. The structural components have been analysed based on the loading requirements of the Ontario Building Code and the assumptions outlined above. On the basis of the calculated member forces and bending moments and the calculated capacity of the members, the structural adequacy of the structural elements of the building have been determined. The results of the structural analysis are summarized in the accompanying Table No. 1. C()NCT.TTq TONG Based on observations and a structural evaluation of the structural components of the Barley Mill Visual Arts Centre building our conclusions are as follows: I. The timber roof decking of the Mill building and North addition is in fair to good condition and adequate to support loading requirements of the Ontario Building Code. 2. The timber roof joists are in fair to good condition. The joists of the north shed addition and main building lower roofs are not structurally adequate to support the load requirements of the Building Code with respect to loading caused by snow drifting against adjacent higher walls. The roof joists of the main building loft are adequate to support the loading requirements of the Building Code. 3. The timber roof beams, floor joists, floor beams and building columns are in fair condition and adequate to support the loading requirements of the Ontario Building Code. Severe checking of some beam and column members is not considered to have reduced the load carrying capacity of the sections at this time. 4. The exterior masonry walls are in poor to fair condition. The walls are not laterally supported in an adequate manner at beam and roof joist connections. The observed lateral wall movement and crack in the south exterior wall are likely related to the lack of lateral support at the roof and floor levels. - 6 - The observed deterioration and spalling of the brick masonry is considered to be a result of two factors. Spalling is typically associated with moisture penetration into the brick wall system. Pressure can build up below the surface of the brick as a result of ice formation or crystal growth within the brick pores. When the pressure reaches a certain level, the face of the brick can spall off. The process will continue as successive layers of the brick are 'popped' off by the pressure build up. A second problem is related to brick masonry manufacturing processes in use during the time of construction of the Barley Mill building. Inconsistencies in the kiln firing procedures, the location of the brick pallet within the kiln and the location of the individual brick on a pallet have resulted in non - uniform brick quality and performance. This manufacturing related problem has resulted in specific areas where the brick quality varies and where deterioration has progessed more rapidly then other areas. At this time the structural capacity of the masonry wall has not been reduced significantly. 5. The checking and loose bolts of the column cap plates are not considered to be of structural significance. 6. The cut back in the masonry pilasters at the third floor level is not considered to be of structural significance. 7. Some settlement of interior columns and lateral tilting of exterior masonry walls has occurred. If the columns are properly shimmed, the tie beams replaced and the walls adequately tied to floor beams and the roof system it is considered that the movements observed at present will not reduce significantly the load carrying capacity of these elements. Rectification of the settlement would likely result in additional stress and therefore monitoring of the structure is recommended. 8. The spalling and deteriorated brick masonry on the exterior of the east wall appeared related to wind blown water from the north shed rain gutter penetrating the wall and causing freeze -thaw spalling. RECOMMENDATIONS Based on the conclusions noted above and our on -site observations of structural deficiencies, the following recommended repair and reinforcement work must be completed to bring the Barley Mill building to current standards of the Ontario Building Code. 1. The timber roof joists of the main building low roof and north shed must be reinforced to support the snow drift load requirements of the Ontario Building Code. 2. All roof sill plates should be securely anchored into the supporting masonry walls. The anchorage should consist of 1/2" diameter threaded rods grouted into core- drilled holes drilled into the top of the masonry wall through the sill plate. 3. Tie rods running east and west connecting the exterior masonry walls of the mill building should be installed at the third and second floor levels. The existing masonry wall should be repaired along the full - 7 - 4. All steel tie bars between the exterior masonry walls and interior timber beams must be securely connected to the timber beams. This may require modification of the existing tie bars. 5. The roof beams of the main mill building should be shimmed to provide full bearing on the supporting timber columns. Monitoring of the roof beams is recommended to detect further movement. 6. The missing and deteriorated tie beams at the loft should be replaced. 7. All severely spalled brick on the interior of the north wall of the third floor level and other localized areas should be replaced and the mortar joints raked out and pointed. An acrylic based sealant containing methyl methacrylate should be applied to the exterior of all walls to reduce moisture penetration into the wall system and further deterioration of the masonry. One suitable product for this work is Thoroglaze (Semi - Gloss) as manufactured by Thorosystem Products of Canada Limited. 8. The rain water leader from the shed at the east wall should be relocated to prevent water from spilling onto the exterior wall. 9. The loose mortise connection between the roof support beams and timber columns should be reinforced with additional bearing seats to avoid overstressing timber at the joists. The preliminary estimated cost for the repair and reinforcement work described above is estimated to be $25,000.00 and is comprised of the following areas of work: I. Reinforce roof joists 2. Secure roof sill plates including removal and replacement of roofing as required 3. Install new tie rods 4. Secure existing wall ties 5. Shim roof beams to top of columns, replace missing loft tie beams and reinforce mortise joints 6. Repair and replace spalled brick 7. Apply sealant to exterior brick masonry 8. Relocater rainwater leader TOTAL PRELIMINARY ESTIMATED COST Preliminary Estimated Cost $ 3,000.00 $ 3,000.00 $ 4,500.00 $ 1,500.00 $ 3,000.00 $ 6,500.00 $ 3,000.00 $ 500.00 $25,000.00 We would be pleased to supplement the findings reported and to elaborate further and /or assist in the implementations of the recommendations as may be required. Respectfully Submitted, STRUCTURAL REPORT BARLEY MILL VISUAL AMTS CENTRE BOWMANVILLE, TOWN OF NEWCASTLE, ONTARIO TABLE I SUMMARY OF STRUCTURAL ANALYSIS RESULTS Stress Stress Material Condition Condition Type Uniformly Drift Member Assumed Distr.Load Snow Load Main Mill Building 3/4" Roof Deck Jack Pine, Group C, No. 3 Loft Roof Joists Spruce 2 "x4" @ 16 "+ c/c Group D, No. 1 Main Roof Joists Spruce, 2 "x6" @ 24 "+ c/c Group D, No. 1 ,,Main Roof Joists Spruce, 2 "x6" @ 16 "+ c/c Group D, No. 1 8 "x8" Roof Beams Pine, Group C, No. 1 Floor Joists Jack Pine, 3 "x10 "@ 18 "+ c/c Group C, No. 1 10 "x10" Floor Pine, Beams Group C, No. 1 10 "x10" Columns Pine, Group C, No. 1 North Shed Addition 1" Tongue & Spruce, Groove Roof Deck Group D, No. 1 Roof Joists Spruce, 2 "x6" @ 30 "+ c/c Group D, No. 1 8 "x8" Roof Beams Pine, Group C, No. 1 Allowable Uniformly Distributed Load (1) Adequate Adequate N/A Adequate N/A N/A 9.5% 121% 37 p.s.f. Overstress Overstress Adequate 47% 55 p.s.f. Overstress Adequate(2) Adequate(2) N/A Adequate N/A N/A Adequate(2) N /A(2) N/A Adequate(2) Adequate(2) N/A Adequate Adequate N/A Adequate 165% 52 p.s.f. Overstress Adequate(2) 24% Over- 76 p.s.f. stress beam adjacent to main bldg. 18% central 76 p.s.f. beam Adequate- N/A North Beam Floor Joists Spruce, Adequate N/A N/A 2 "x10" @ 16 "+ c/c Group D, No. 1 Note: (1) The allowable uniformly distributed load is given where overstress STRUCTURAL REPORT VISUAL ARTS CENTRE BARLEY MILL TOWN OF NEWCASTLE APPENDIX I SKETCHES 1 to 10 4 t• I NN M z 0 0 0 a } W O H W J Cf z ZL UP 0 s +, m III��1. UP ENTRANCE LAYOUT PLAN +I • tp m UP CZ) A 32'- 0' ± 0 u , Q DARKROOM DARK ROOM UP BASEMEN ADDITION TO SKE T �-- EXISTING WINDOW OPENINGS FlLLED WITH CONC. l�LACK3 3 (TYPICAL) i BASEMENT PLAN of MILL. BUILDING N.T.S. i O O V) T OF I REFER CH NQ 9 N 10" x IG" COLUMNS �F ( TYPICAL) TYP. NGLLE +I ■ i� t2f - 3" ± BASEMENT OF MAIN BUILDING CONCRETE SLAB UP ON GRADE -7 TO TRAIN ROOM - +I SHED TO SHED o n }� u , Q DARKROOM DARK ROOM UP BASEMEN ADDITION TO SKE T �-- EXISTING WINDOW OPENINGS FlLLED WITH CONC. l�LACK3 3 (TYPICAL) i BASEMENT PLAN of MILL. BUILDING N.T.S. i O O V) T OF I REFER CH NQ 9 A SEE SKETCH NQ 7 FOR CROSS SECTION (Z, 32' - 4 • t ENTRANCE GROUND FLOOR PLAN of MILL BUILDING KT. S. @ +i a +1 r O'' 1 N.T.S. 32' - 4 "t I +1 �I a V ~ 10 "x10" COL. TYP. e r +1 a 12 "f 96-3 "t 10' -8 "t 9' -5"f � ;;DD TYR SRC)( W4LL _ — — H 10 "X b" SEAM (TYR) +1 v V Q ' � =x tY +i a +1 r O'' 1 N.T.S. A 32' - 4" + 91-10" 0 tiA +1 EXIST. WINDOW COVERED WITH PLYWOOD -4A THIRD FLOOR PLAN of MILL. BUILDING N.T. S. -�I O 10 "X b" COL. EXIST. WINDOW ERE WITH B +1 • o a Pik I TYP. SOLID BRICK WALL SEE SKETCH N°6 FOR ROOF FRAMING .I o 0 91-10" 0 tiA +1 EXIST. WINDOW COVERED WITH PLYWOOD -4A THIRD FLOOR PLAN of MILL. BUILDING N.T. S. B � COVERED(TYP.�) I I ROOF LINE i I 1 1 I I 10' -10" + 2 "z 4" 2"x4" at 6 at 18 10, - 10 "+ I I I I ! I i I I I A LOFT PLAN ®f MILL BUILDING N.T.S. ASPHALT SHINGLES 1/2 ROOF DECK CROSS SECTION A-A N. T. S. r 0 a 8 J LL p w N 4 F- w x w 0) Q m +i 'O F- i tp J ME m V.7 lh OC +I 8 o � It tl O 0 +I a n: IL a .n .n M O a a 11 IT, mmmm* ROOF SNOW LOAD DIAGRAM ASPHALT SHINGLES 112•' TIMBER DECK 2 "x 4'@ 16" `/e JOISTS 3 "x 10 "(N 18"% DRYWALL CEIUN43 10x10 BEAM 10" x 10" COLUMN J m CROSS SECTION 8-8 N.T.S. ASPHALT SHINGLES TIMB €R SHEATHING 2'x4 STUD WALL ASHALT SHINGLES I/2" TIMBER DECK 2 "x 6" JOISTS @ 16'Et MIN. 8 2 4 ""/o MM. 2. 2 x 6 * 30 "% GROUND FLOOR OF D. ; . , �►;, . OF 1 35' - 4" ± i UlY IIORTH ADDITION BASEMENT PLAN N.T.S. +I N N M z O 0 Q WW N N a E- z z W= MU W F- ( W QY m N 35'- 4 "± MT. S. �`� l 0 +J N N M CONSULTANTS totten sims hubicki associates Town of Newcastle Department of Community Services 40 Temperance Street Bowmanville, Ontario L1C 3A6 Attention: Mr, J. Caruana Director of Community Services Re: Building Inspection Visual Arts Centre, Barley Mill Town of Newcastle Dear Sir: ATTACHMENT #2 G.L. TOTTEN B.Sc., P Eng, R.E. SIMS B.A.Sc., P.Eng. J.M. HUBICKI B.A.Sc., OAA, P.Eng. R.L. WINDOVER M.Sc.. P.Eng. P.C. EBERLEE B.A.Sc., P.Eng. TOTTEN SIMS HUBICKI ASSOCIATES (1981) LJMRED 1500 HOPKINS STREET, WHITBY, ONTARIO CANADA, LIN 2C3 (418) 8869383 Fox: 888-0221 December 9th, 1988 We are pleased to present a proposal for a complete building inspection and report on the condition of the Visual Arts Centre, Barley Mill in the Town of Newcastle. We understand that the Town is currently considering renovation of the building to provide additional services for the people of the Town. The purpose of our inspection and report will be to determine the present condition of the building with respect to minimum requirements of the Ontario Building Code which must be met by the building for use by the public. In addition, areas of remedial work or maintenance measures which should be carried out will be identified. In May 1982, TSH completed a structural inspection and report on the condition of the Visual Arts Centre. At that time, various areas of deterioration of the building structure and remedial measures to upgrade the structure to comply with the requirements of the Ontario Building Code were identified. At this time, we propose to update our previous report to identify areas where deterioration has progressed since our previous report and to confirm structural upgrading required to comply with the Code. We also propose to carry out an architectural review of the existing building. This review will identify areas of the building which require upgrading to comply with Part 9 of the Ontario Fire Code. TSH has completed numerous architectural reviews of buildings with respect to compliance under the Fire Code to assist Owners whose publicly operated properties must conform to the Fire Code. - 2 - The electrical and mechanical systems of the building will be inspected and areas which require upgrading will be identified. Our inspection will generally involve a visual inspection of the elements of the building which are accessible for observation. If we identify areas of the building that must be opened to enable inspection, we have assumed that Town personnel will be available to assist in this work. In addition, we have assumed that ladders and related equipment can be made available from the Town to enable access to the building areas. We will prepare a comprehensive inspection report on our findings with recommendations and preliminary cost estimates for the necessary remedial work to rehabilitate the existing structure to comply with the requirements of the Ontario Building Code and to extend the life of the structure. We estimate that our total fee for the inspection and report will be $5,000.00, including an allowance of $500.00 for disbursements. The estimated costs to carry out the work are based on the APEO Schedule of Suggested Fees for Engineering Services, 1988; Fee Basis 'A' Time Based. The payroll factor which our firm would apply for this project will be 1.70 plus reimbursement for properly incurred expenses at cost. We propose that Mr. G. L. Aleong, P. Eng., Vice - President, Structural will serve as 'Project Manager' because of his background knowledge of the type of work being contemplated and Mr. C. Howson, P. Eng, will be the assigned 'Project Engineer'. Mr. Howson was also the Project Engineer in the 1982 inspection of the building carried out by our firm and is consequently very familiar with the building. We thank you for the opportunity to submit this proposal for a building inspection and report on the Visual Arts Centre, Barley Mill. We are available at your convenience to elaborate on the above or answer any questions that you have. Yours very truly, G. L. Aleong, P. Eng. Vice - President, Structural GLA /an 4 TOWN OF NEWCASTLE MEMORANDUM TO. Joseph P. Caruana, Director of Community Services FROM: James D. Cameron, operations Superintendent DATE: December 7, 1988 SUBJECT: VISUAL ARTS CENTRE - SEWER CONNECTION ATTACHMENT #3 CS88573 In 1986, the Visual Arts Centre applied for a $6,000 Capital Grant for a sewer connection and $4,500 for operations. A cheque was issued on April 9, 1986 in the amount of $10,500. In January of 188, Fred wrote to you to advise that the cost for Durham Region's work was $7,527.50. Jack Burgess would charge $5,500 for the connection. Total cost for 1988 was $13,027.50. The increased cost for 1989 are not expected to exceed 10 %, therefore, the cost is estimated at $13,027.50 x 110% = $14,330.25. JDC /dm