HomeMy WebLinkAboutCS-35-89TOWN OF NEWCASTLE
GENERAL PURPOSE & ADMINISTRATION COMMITTEE
October 23, 1989
REPORT #: CS -35 -89 FILE #:
COMMUNITY SERVICES DEPARTMENT CAPITAL PROJECT UPDATE
RECOMMENDATIONS:
File #/
Res. #
By -Law R
It is respectfully recommended that the General Purpose & Administration
Committee recommend to Council the following: -
1. That Report No. CS -35 -89 be received for information.
v•/_-� • //g
-________„____________________-_____-_..___.----_ ___________a__- _-- ____-- ____ -__
1.0 BACKGROUND AND COMMENTS:
1.1 The Community Services Department has had a very productive spring and
summer season, having met the majority of our goals as outlined in the
1989 Capital Budget.
1.2 As we enter the fall season, our parks development projects are
continuing to progress on schedule. For the most part, tree and
vegetative plantings are scheduled to take place in early October which
represents the majority of outstanding work to be completed.
1.3 The attached information is provided to members of Council as an update on
the status of our Capital Budget as it relates to Administration and
Programs (Schedule I), Facilities (Schedule II) and Parks (Schedule III).
fully submitted, Recommended for presentation
to the Committee
IZY V__
h P. Caruana, Director
tment of Community Services
JC:sa
Lawrenc¢ EY. Kotseff
Chief dm nistrative Officer
PROGRAM DIVISION
ADMINISTRATION & PROGRAM CAPITAL PROJECTS
1. ADMINISTRATION
STATUS: Complete
DETAIL
LETTERING SYSTEMS
$3,750
ACTUAL TO DATE
$3,713.74
( *PURCHASE
ORDER QUOTE)
The Kroy Lettering Systems were received in early September and utilized
immediately for display signage at the Orono Fair, and subsequently, the
Fitness Centre. It is anticipated that these machines will improve
signage for display and information purposes in the future as well as
reduce staff time in preparation time for signage.
PROJECT DETAIL BUDGET ACTUAL TO DATE
2. ADMINISTRATION LAYOUT LIGHT $900 $1,215
TABLE & CHAIR
STATUS: Complete
This equipment was received in the summer months and will assist staff
in doing layouts for signage, the semi- annual Activity Guide, as well as
slide preparation development.
PROJECT DETAIL BUDGET ACTUAL TO DATE
3. ADMINISTRATION CAMCORDER ACCESSORIES $450 $463.32
STATUS: Complete
Video lighting units, a tripod and a telephoto wide angle lens were
purchased in the summer to improve quality of video presentations being
prepared. These items will be utilized in the Fall and Winter months if
the Department is successful in obtaining a volunteer co -op student.
PROJECT DETAIL BUDGET ACTUAL TO DATE
4. ADMINISTRATION DISPLAY SYSTEM $850 $760
ACCESSORIES
STATUS: Complete
Additional panels for the main display system were purchased to provide a
more uniform display in larger areas (ie. Orono Fair and Home Show).
These panels will be used to supplement the existing system as well as
provide an opportunity for varied display lay -out. Additional small items
(ie. literature holder, etc.) may be purchased if any money is remaining
after other purchases are complete.
../2
902
- 2 - SCHEDULE I
PROJECT DETAIL BUDGET ACTUAL TO DATE
5. ADMINISTRATION MEDIA STORAGE CABINETS $1,300 $922.32*
(Purchase
Order Quote)
STATUS: Complete
These cabinets were ordered in July but have not arrived yet. They will
be utilized for storing photographs staff have been accumulating for
marketing purposes.
-----------------------------------------------------------------------
BUDGET ACTUAL TO DATE
TOTAL ADMINISTRATION $7,250 $7,074.38
PROJECT DETAIL BUDGET ACTUAL TO DATE
1. PROGRAM- AQUATIC LIFEJACKETS & PFD'S $500 $507.48
STATUS: Complete
This was replacement equipment primarily for the aquatic programs and
were utilized immediately this summer for use at all pools.
PROJECT DETAIL BUDGET ACTUAL TO DATE
2. PROGRAM- AQUATIC UNDERWATER CAMERA $375 $496
ACCESSORIES
STATUS: Complete
A strobe flash and wide angle lens were purchased to improve the quality
of underwater photographs for the purposes of selling photos to parents.
Staff have been "practicing" with the camera over the summer months and
anticipate photographs will be available for sale during the fall program.
PROJECT DETAIL BUDGET ACTUAL TO DATE
3. PROGRAM - AQUATIC VERSA LIFT $4,700 $3,124.80
STATUS: Complete
A Versa Lift was purchased in June for the purposes of assisting
physically disabled clients from their wheelchairs to the handicap chair
in the pool area. Staff were able to purchase this item at significant
savings to the Town. This equipment has been gratefully utilized by
Bowmanville Memorial Hospital staff with chronic patients and it is
anticipated it will make better access to the facility for all physically
disabled residents.
../2
903
PROJECT
4. PROGRAM-AQUATIC
STATUS: Complete
- 3 -
SCHEDULE I
DETAIL BUDGET ACTUAL TO DATE
EXPO DRY ERASE SYSTEM $100 $59.85
This system is located in the pool for assisting instructors in teaching
with visual aids as well as providing general information to patrons of
the Fitness Centre pool facility.
..� DGET ACTUAL TO DAT-3
5. PROGRAM-AQUATIC FLIP CHART $225 $85.05
STATUS: Complete
Located primarily upstairs in the Fitness Centre Multi Purpose Room the
flipchart is being utilized for staff training, leadership course
instruction and other presentations.
PROJECT DETAIL BUDGET ACTUAL TO DATE
6. PROGRAM-AQUATIC RESOURCE LIBRARY $1,000 $505.66
STATUS: Partially Complete
A shelving unit for storage of various resources have been purchased and
staff are presently in the process of ordering various resource books,
slides and video presentations. These responses will be utilized
primarily by staff for instruction/training purposes as well as limited
access to the general public with the assistance of staff.
PROJECT DETAIL BUDGET ACTUAL TO DATE
7. PROGRAM-AQUATIC LEISURE TOYS:
WATERSLIDE & INFLATOR $4,800 0
INFLATABLES $4,500 0
FUNNY FLOATS $ 475 0
TARZAN ROPE $ 450 0
STATUS: Ordered/Awaiting Arrival
These "leisure toys" have been purchased for the purposes of improving
attendance at recreational swims by making the pool more enjoyable, fun
and leisure-oriented. A grant in the amount of fifty percent funding
has been requested for these items through the Ministry of Tourism
and Recreation. Until staff received a "complete" letter on September
14, 1989 purchase of the equipment could not be done as part of the grant
application conditions. Purchase requisitions were submitted September
18th and the equipment is anticipated in early November. We are also
awaiting the outcome on the grant application.
BUDGET ACTUAL TO DATE
TOTAL PROGRAM $17,125 $4,778.84
91, n 4
SCHEDULE II
OPERATIONS DIVISION
FACILITY DEVELOPMENT & IMPROVEMENTS
PROJECT DETAIL BUDGET
1. NEWCASTLE OFFICE FURNITURE $8,300
ADMINISTRATION (desk, credenza, chair,
BUILDING 4 side chairs, 2 filing
cabinets, 4 book cases)
STATUS: Complete
STATUS: Complete
PROJECT
DETAIL BUDGET
BUILDING UPGRADING $7,100
(ramp repair, railing,
exhaust fans,
dehumidifier)
DETAIL BUDGET
3. CLARKE LIBRARY BUILDING UPGRADING $9,000
(flashing, exterior
and joist repairs)
STATUS: Scheduled for completion in late October.
PROJECT DETAIL BUDGET
4. FIRE/COURT BUILDING BUILDING UPGRADING $16,000
(masonry & caulking
repairs, new
compressor)
ACTUAL TO DATE
$8,200
ACTUAL TO DATE
$6,389
ACTUAL TO DATE
0
ACTUAL TO DATE
$4,150
STATUS: Complete
The new compressor has been installed. Masonry and caulking repairs are
schedule for late October.
PROJECT DETAIL BUDGET ACTUAL TO DATE
5. HAMPTON HALL BUILDING UPGRADING $13,500 0
(roof caulking &
exterior repairs)
STATUS: Scheduled for Completion early November
No action taken pending a decision on the future of this building.
../2
Cy 05
STATUS: Completed
All buildings have been inspected with the reports expected by
November let~
PROJEC DETAIL BUDGET ACTUAL TO DATE
10. 8{WMJQNVILL8 }BBCIDI&TZ(N WATERPROOF D}T]IBIUD $I3,630"50
COMPLEX MASONRY, D0T8&0CE LIGHTS
AND MARQUIS SIGN $29,500
CIRCULATING PUMP, ICE
EDGER, NETS, MICROWAVE,
3 STAGE ELECTRICAL 0WZT
$10'162 $10,I62
7UO
O��
- 2 -
SCHEDULE II
PROJECT
DEC&IL
B[�Q��
��l&� TO DATE
ACTUAL
6.
}D\YD[N B&IL
BUILDING UPGRADING
$3r000
O
(masonry repairs)
STATUS: Work order has
been issued.
P
DETAIL
BUDGET
TO DATE
7.
NEWCASTLE COMMUNITY
BUILDING UPGRADING
$9,500
U
8ALJ,
(install new windows)
STATUS: Completion in November
Some 000fooiuu with the
Ball Boards requested grant has
delayed this
project. Administration and tendering is progressing with estimated
completion in November.
28UJ
DETAIL
BUDGET
TO DATE
8.
OROBK} ARMORIES
BUILDING UPGRADING
$7'500
U
(iuooIatimu' parapet,
structural and nooIkiog
repairs)
STATUS: Action pending
status of building.
PROJECT
DETAIL
BUDGET
ACTUAL TO DATE
9.
BUILDING PROFILES
CONSULTANT SERVICES
$48'000
$8'000
(17 building profiles)
STATUS: Completed
All buildings have been inspected with the reports expected by
November let~
PROJEC DETAIL BUDGET ACTUAL TO DATE
10. 8{WMJQNVILL8 }BBCIDI&TZ(N WATERPROOF D}T]IBIUD $I3,630"50
COMPLEX MASONRY, D0T8&0CE LIGHTS
AND MARQUIS SIGN $29,500
CIRCULATING PUMP, ICE
EDGER, NETS, MICROWAVE,
3 STAGE ELECTRICAL 0WZT
$10'162 $10,I62
7UO
O��
® 3 °- SCHEDULE II
10. BOWMANVILLE RECREATION FURNITURE DOLLIES,
COMPLEX Continued... WINDOW BLINDS,
10 TABLES, FOLDING
DOOR (MPR) $39,700 $7,984
DESK, CHAIR, 2 SIDE
CHAIRS, FILING
CABINET, WINDOW
BLINDS (OFFICE) $4,300 $2,750
STATUS: Partially Completed
The sealing of exterior walls has been recently completed. The marquis
sign and entrance lighting is planned to be included with the proposed
contract for park development.
The circulating pump, ice edger, microwave oven have been received.
The three stage electrical breaker has proven unnecessary. The nets
are on back order.
The furniture dollies, blinds and 10 tables have been received. The
folding door prices are currently being reviewed with a decision to be
made shortly.
Some furniture is on backorder.
11. DARLINGTON SPORTS
CENTRE
DETAIL
BUILDING UPGRADING
(new PA system, nets
& exterior repairs)
STATUS: Partially Complete
$14,000 $9441
The nets are currently on backorder. The PA system was installed
September 18 and the exterior masonry repairs have been completed.
PROJECT DETAIL BUDGET ACTUAL TO DATE
12. NEWCASTLE FITNESS
CEN'T'RE
BUILDING UPGRADING
(4 hair dryers,
electric heaters,
exterior repairs)
STATUS: Partially Completed
$9,000 $2,811
The four hair dryers have been purchased and the electric duct heaters are
being researched. Exterior repairs are scheduled for late October.
../4
0 07
- 4 - SCHEDULE II
PROJECT DETAIL BUDGET ACTUAL TO DATE
13. NEWCASTLE LIONS POOL FACILITY UPGRADING $6,800 $6,787
(repair fence, replace
roof, facia boards,
2 spinal boards)
STATUS: Complete
PROJECT DETAIL BUDGET ACTUAL TO DATE
15. VISUAL ARTS CENTRE SEWER, BUILDING $65,000 $18,000
RETROFIT
STATUS: Partially Complete
The sanitary sewer connection is complete. Action delayed on repairs
subject to decision on the future of this building. Contract
specifications are being prepared for repair work to proceed starting
November lst and completed by late December.
BUDGET ACTUAL TO DATE
TOTAL FACILITY DEVELOPMENT & IMPROVEMENTS $300,362 $98,294.50
908
OPERATIONS DIVISION
P&ID< DEVELOPMENT 6 UPGRADING
PROJECT DETAIL BUDGET ACIUAL]ODATE
I. DOWMANVZLL8 EROSION CONTROL $100,000 0
CEMETERY
STATUS: Complete
Following of the 1989 Capital Budget the Central Lake Ontario
Conservation Authority announced their intention to assume the lead
in this project. The ozotzaot has been let and completed with the
assessment of the Town's share yet to be determined.
PROJECT DETAIL BUDGET ACTUAL TO DATE
2. ENNISKILLEN IAJD< PURCHASE $50,000 O
(approx. 3 to 5
acres)
STATUS: Awaiting Negotiations
Staff are in progress of negotiating to acquire the necessary
parkland.
PROJECT UE1Y\1L BUDGET ACTUAL T} DATE
3^ TYRONE COMMUNITY PARK gDfKC8ASB $35,000 ¢30,970
CENTRE (approx. 5 acres)
STATUS: Complete
Staff have completed the purchase of 4 acres adjacent the Tyrone
Community Centre and pack. This addition will be considered for
development in the I990 Capital Budget submission.
PROJECT 0ETlIL BUDGET ACTUAL TO DATE
4. I9\BK 6 CEMETERY DU8CB&SB 0F: ¢38/300 $33r120
EQUIPMENT 3/4 ]O0 CREW (3&B
10 RADIOS
2-88 INCH RIDING MOWERS
6 LINE TRIMMERS
l CHAIN SAW
MISC. TOOLS
8IY7TDS: Completed
All equipment has been ordered and received.
^^/2
7U7
OD8
5. COURTICE WEST PARK
2 _
DETAIL BUDGET
PARK UPGRADING $13,300
(tree planting, steps,
benches, waste
receptacles, signs,
bleachers)
SCHEDULE III
ACTUAL TO DATE
$12,700
STATUS: Complete
A staircase to the ball diamond has been constructed, benches and
waste receptacles installed and park signs, bleachers and trees
ordered for inclusion this fall.
PROJECT DETAIL BUDGET ACTUAL TO DATE
6. FIRWOOD PARK PARK UPGRADING $16,800 0
(tree planting,
playground park
signs)
STATUS: Complete
The playground has been installed and trees and park signs ordered for
inclusion this fall.
PROJECT DETAIL BUDGET ACTUAL TO DATE
7. FOXHUNT PARK PARK UPGRADING $16,800 $13,300
(tree planting,
playground, park
signs)
STATUS: Partially Completed
The playground has been installed and park sign and tree planting ordered
for inclusion this fall.
PROJECT DETAIL BUDGET ACTUAL-TO-DATE
8. GATEHOUSE PARKETTE PARK UPGRADING $13,800 $10,125
(walkway, tree
planting, basketball
court, park signs)
STATUS: Partially Completed
The walkway basketball court and backboard have been installed and tree
planting and park signs ordered for inclusion in the fall.
../3
1
- 3 - SCHEDULE III
PROJECT DETAIL BUDGET ACTUAL TO DATE
9. COURTICE SOUTH PARK PARK UPGRADING $7,500 $5,200
(backstop, baseline
fence & ground
restoration)
STATUS: Partially Completed
The backstop, baseline fencing and infield upgrading have been completed
with top soiling and sod repairs scheduled for later this fall.
10. ZION PARK PARK UPGRADING $2,000 $6,217
(improving drainage
& driveway)
STATUS: Completed
The solving of the sheet drainage problem across a mired driveway has
proven more involved than first estimated. This project has been
successfully completed.
PROJECT
11. MEARNS AVENUE PARK
DETAIL
PARK UPGRADING
(park signs,
installation of
playground & tree
planting)
STATUS: Partially Completed
BUDGET ACTUAL TO DATE
$4,800 $5,705
The installation of a previously purchased playground is complete. Park
signs and trees have been ordered for inclusion this fall.
PROJECT DETAIL BUDGET ACTUAL TO DATE
12. SOPER CREEK PARK PARK UPGRADING $101,000 0
(bleachers & ball
diamond lighting)
STATUS: Partially Completed
A contract has recently been let for installation of ball diamond lights
in late October or early November for a price within budget. The
bleachers have been ordered for inclusion this fall.
../4
911
- 4 -
SCHEDULE III
PROJECT DETAIL BUDGET ACTUAL TO DATE
13. BOWMANVILLE RECREATION PARK DEVELOPMENT $170,000 0
COMPLEX (skateboard park,
fine grading, field
drainage, irrigation)
STATUS: Partially Completed
A request for bids was offered in July and resulted in no bidders.
Potential bidders indicated they could not meet the schedule of seeding
prior to September lst. At present new more comprehensive specifications
are being prepared for tendering in October with below ground services to
be installed this fall, including the skateboard portion and the seeding
to be completed in the spring of 1990.
PROJECT DETAIL BUDGET ACTUAL TO DATE
14. FOSTER CREEK PARKETTE PARK UPGRADING $7,000 $2,500
(landscaping,
seeding, playground
relocation)
STATUS: Partially Completed
A report presented in late spring to G.P.A. and Council has made relocation
of the playground unnecessary. Tree planting is scheduled later this fall.
The developer has not proceeded with development of adjacent homes as
previously expected and has stored topsoil on parkland. It would not be
cost effective to proceed with park development at this time.
15. NEWCASTLE MEMORIAL
PARK
PARK UPGRADING $14,200
(playground,
landscaping,
irrigation, flower
bed)
STATUS: Partially Completed
ACTUAL TO DATE
$5,700
The new northerly portion of the park has been graded, top - soiled and is
currently awaiting sodding by the developer. The playground has been
installed. The flower and shrub beds have been installed and
the irrigation and tree planting are ordered and scheduled for inclusion
this fall.
PROJECT DETAIL BUDGET ACTUAL TO DATE
I. •`• • `•
STATUS: Complete
PARK IMPROVEMENT
(backstop & baseline
fencing)
1
$7,700 $4,665
PROJECT
17. ORONO PARK
M
DETAIL
PARK IMPROVEMENT
(backstop and
bridge)
SCHEDULE III
BUDGET ACTUAL TO DATE
$11,500 $9,000
STATUS: Complete
PROJECT DETAIL BUDGET ACTUAL TO DATE
18. INA BROWN PARK PARK DEVELOPMENT $6,000 $3,000
(grading & seeding,
landscaping)
STATUS: Partially Completed
Grading and seeding is complete with tree planting scheduled for this
fall.
PROJECT DETAIL BUDGET ACTUAL TO DATE
19. HARVEY JACKSON PARK PARK IMPROVEMENT $9,500 $7,300
(backstop, baseline
fencing, replace
dugout roofs)
STATUS: Complete
PROJECT DETAIL BUDGET
20. GENERAL LANDSCAPING PARK IMPROVEMENTS $12,500
(20 evergreen,
25 caliper sized
trees, 20 bare root
trees)
STATUS: Partially Completed
Scheduled for various park locations in late October.
PROJECT DETAIL BUDGET
21. GENERAL FURNITURE PARK IMPROVEMENT $10,100
(15 benches,
30 trash receptacles,
40 picnic tables)
STATUS: Complete
ACTUAL TO DATE
0
ACTUAL TO DATE
$9,900
BUDGET ACTUAL TO DATE
TOTAL PARK DEVELOPMENT & UPGRADING $647,800 $149,402
913