HomeMy WebLinkAboutCOD-041-10CORPORA
REPORT
TE SERVICES DEPARTMENT
Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
Date: July 5, 2010 Resolution#: Gr PA-kS~-14 By-law#: d?t7/0"CJ 4P
Reporl#: COD-041-10 Flle#:
Subject: TENDER CL2010-24, PAVEMENT REHABILITATION, VARIOUS LOCATIONS
RECOMMENDATIONS:
It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
THAT Report COD-041-10 be received;
2. THAT Coco Paving Inc., Oshawa, Ontario, with a total revised bid in the amount
of $1,215,353.51 (net of H.S.T. Rebate), being the lowest responsible bidder
meeting all terms, conditions and specifications of Tender CL2010-24 be
awarded the contract for Pavement Rehabilitation, Various Locations, as required
by the Municipality of Clarington, Engineering Department;
3. THAT the funds required in the amount of $1,500,000.00 (which includes
$1,215,353.51 for tendering, design, contract administration and contingencies)
be drawn from the Accounts, as follows:
Account Project Budget Amount
110-32-330-83212-7401 2008 Pavement Rehabilitation $100,000.00
110-32-330-86212-7401 2009 Pavement Rehabilitation $490,000.00
110-32-330-83212-7401 2010 Pavement Rehabilitation $910.000.00
Total Funds Required $1.500.000.00
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T(905)623-3379 F (905)623-4169
REPORT NO.: COD-041-10
PAGE 2
4. THAT the By-law attached to Report COD-041-10 marked Schedule "A"
authorizing the Mayor and the Clerk to execute the necessary agreement be
approved.
Submitted by:
~~.
Marie Marano, H.B.Sc., C.M.O.,
Director of Corporate Services
s /
Nancy Ta or, B.B ., C.A.,
Director of FinancelTreasurer
Reviewed by: (~'~ -~
Franklin Wu,
Chief Administrative Officer
MMIJDB1bh
REPORT NO.: COD-041-10
PAGE 3
1.0 BACKGROUND AND COMMENT
1.1 Tender specifications were provided by AECOM Canada Ltd. for the Pavement
Rehabilitation, Various Locations.
1.2 Tender CL2010-24 Pavement Rehabilitation, Various Locations was advertised
electronically on the Municipality's website and the Ontario Public Buyer's
Association website. Subsequently, tenders were reviewed and tabulated as per
Schedule "B" attached.
2.0 ANALYSIS
2.1 A total of two (2) submissions were received in response to the tender call. All
submissions were deemed compliant.
2.2 Based on the bids submitted, the project cost is in excess of the budget amount.
In order to bring the cost within the budget limit and allow for a contingency Part
J - Solina Road has been deleted from the schedule of work. This change was
applied consistently to all bids submitted and the bid submitted by Coco Paving
Inc. remains the low compliant bid.
2.3 After further review and analysis of the compliant bids by the Engineering
Department and Purchasing, it was mutually agreed that the low bidder, Coco
Paving Inc., Oshawa, Ontario be recommended for the contract for the
Pavement Rehabilitation, Various Locations. A copy of the recommendation
memo from the Department of Engineering is attached as Schedule "C°.
2.4 The low bidder has provided similar services to the Municipality of Clarington in
the past and the level of service has been satisfactory.
2.5 The references were contacted by AECOM and were found to be acceptable.
REPORT NO.: COD-041-10 PAGE 4
2.6 Queries with respect to the department needs, specifications, etc. should be
referred to the Director of Engineering.
3.0 FINANCIAL
3.1 The total project cost is $1,215,353.51 (net of H.S.T. Rebate). The funding
required for the project is outlined in the memo from Engineering Services
attached as Schedule "B".
3.2 Funding for this project w
Account
110-32-330-83212-7401
110-32-330-86212-7401
110-32-330-83212-7401
4.0 CONCLUSION
ill be drawn from the following Engineering Accounts:
Project Budget Amount
2008 Pavement Rehabilitation $100,000.00
2009 Pavement Rehabilitation $490,000.00
2010 Pavement Rehabilitation $910.000.00
Total Funds Required 1.500.000.00
4.1 To award the contract to Coco Paving Inc., Oshawa, Ontario for the Pavement
Rehabilitation, Various Locations.
5.0 INPUT FROM OTHER SOURCES
5.1 The Director of Finance has reviewed the funding requirements and concurs
with the recommendation.
5.2 This report has been reviewed by the Purchasing Manager, with the appropriate
department and circulated as follows:
Concurrence: Director of Engineering
REPORT NO.: COD-041-10
PAGE 5
Attachments:
Schedule "A", By-law
Schedule "B", Bid Tabulation
Schedule "C", Memo from Engineering Services
Schedule "A"
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
BY-LAW 2010-
Being a By-law to authorize a contract between the
Corporation of the Municipality of Clarington and Coco Paving
Inc., Oshawa, Ontario, to enter into an agreement for
Pavement Rehabilitation, Various Locations.
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY ENACTS AS
FOLLOWS:
1. THAT the Mayor and Clerk are hereby authorized to execute, on behalf of the
Corporation of the Municipality of Clarington and seal with the Corporation Seal, a
contract between, Coco Paving Inc., Oshawa, Ontario, and said Corporation; and
2. THAT the contract attached hereto as Schedule "A" form part of this By-law.
By-law read a first and second time this day of , 2010.
By-law read a third time and finally passed this day of , 2010.
Jim Abernethy, Mayor
Patti L. Barrie, Municipal Clerk
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T(905)623-3379 F (905)623-4169
G1ar.~ ~
Leading tke Way ~~
Municipality of Clarington
SCHEDULE "B"
BID SUMMARY
Tender CL2010-24
Pavement Rehabilitation, Various Streets
.BIDDER TOTAL BID
(Net of HST Rebatel REVISED BID
(Net of HST Rebatel
Coco Paving
OSHAWA, Ontario
$1,349,020.71
$1,215,353.51
Miller Paving Limited
MARKHAM, Ontario
$1,382,093.99 "
$1,257,356.79
*Calculation Error
SCHEDULE "C°
Leadrxg the W~~~~~~..1
MEMO
TO: Jerry Barber, Purchasing M anager
FROM: Ron Albright, Manager, Infrastructure and Capital Works
DATE: June 25, 201D
RE: PAVEMENT REHABILITATION, VARIOUS LOCATIONS, CL2010.24
Our File: CPR.2010.1
The Engineering Services Department has reviewed the recommendation provided by
AECOM and offers the following comments.
We concur with the recommendation to award the contract to Coco Paving Inc. but due
to a budget shortfall further recommend that Part J: Solina Road be deleted from the
contract resulting in an amended tender amount of $1,194,333.24 exclusive of HST for
the Pavement Rehabilitation program which includes 2010 and carry over from the 2009
program. The amended contract amount inclusive of net HST is $1,215,353.51.
A contingency amount of approximately 10% is carried forward for the project based on
previous years. With the deletion of Part J the total project costs are estimated at
$1,500,000.00, including design, tender and contract administration fees as well as
materials testing. The engineering department advises the following Municipal
breakdown for the above referenced project with the deletion of Part J: Solina Road;
Project Breakdown
Total Project Value $ 1,500,000
Budget Amount
2008 Pavement Rehabilitation 110-32-330-83212-7401
2009 Pavement Rehabilitation 110-32-330-83212-7401
2010 Pavement Rehabilitation 110-32-330-83212-7401
$ 100,000.00
$ 490,000.00
$ 910,000.00
Estimated Unexpended Budget $1,500,000.00
Additional Funding Required $0
i
r F
~~ ~ _ ,~;~. ~ .c. ~t~ticn SCHEDULE "C"
o~~sL i.~r;. wr~e25.201_i
.,~ ri2!`'10.` 2
We recommend the report to Council move forward based on the above funding
allocations and as further detailed on the attached cost apportionment.
Should you have any further questions, please feel free to contact the undersigned.
Regards,
Ron Albright, P
Manager, Infrastructure and Capital Works
/dv
Attachment
Pc: Nancy Taylor, Director of Finance
A.S. Cannella, Director of Engineering Services
I r„ul~-i~l,"E 1~-S201~A brgnE.06 °5 .0_Pa~:enr rsl-2anah. s'a onl^caCOrS~L_,?J. ;L ~r P, ~@'C'~doc.
A=COM
June 25, 2010
Mr. A. S. Cannella, C.E.T.
Director, Engineering Services
The Municipality of Clarington
40 Temperance Street
BOWMANVILLE,Ontario L1C3A6
Dear Sir:
AECOM
513 Division Street
Cabowg, ON, Canada K9A 5G8
vww.aecom.cam
SCHEDULE°C"
905 372 2121 tel
905 372 3821 faz
Project No: 112446
Regarding: Pavement Rehabilitation, Various Streets,
Contract No. CL2010-24 (the "Contract"), Municipality of Clarington
Tenders for the above project were opened at the Municipal Offices on June 24, 2010 at 2:15 p.m. A
list of the bids received is provided in the table below. All numbers are exclusive of HST.
BIDDER TOTAL BID
Coco Paving Inc. $1,325,688.59
Oshawa, ON
Miller Paving Ltd. $1,358,189.85"
Markham, ON
txrensron trror
The Municipality of Clarington's Purchasing Department (the "Purchasing Department") reviewed both
bids to confirm compliance with the Clarington Purchasing By-Law and both bids were deemed
compliant. AECOM Canada Ltd. ("AECOM") has reviewed both bids and confirmed the bid values
noted above, Coco Paving Inc. is the lowest bidder. Its submitted tender has been reviewed and
was confirmed to be compliant. The bid from Miller Paving Ltd. had an extension error in the amount
of $180.00. This does not affect the bid order.
Coco Paving Inc. has completed several projects for the Municipality of Clarington in recent years in
which AECOM has provided Contract Administration, including CL2008-25 (2008 Asphalt
Resurfacing) and CL2009-18 (Concession Roads 6 & 7, Road and Bridge Rehabilitation). Quality of
work and adherence to standards was satisfactory for these projects. As requested by the
Purchasing Department, references were checked only for the lowest bidder. Coco Paving Inc. has
completed a number of projects of similar scope and value including work for the Region of Durham
uzue - a,rt Lo- ro as. c"~.m.-cuo,au r..a.r aw.e im.,.o«
SCHEDULE"C°
A=COM
Page 2
June 25, 2010
and Clay of Oshawa. Staff contacted at the above references stated that Coco Paving Inc. has
completed the work to specification and to their satisfaction.
Estimated costs for various project components, based on Coco Paving's bid, are summarized on the
attached Low Bid Cost Apportionment.
With the low bid from Coca Paving Inc., and other associated project costs as noted on the attached
Cost Apportionment, the project is over budget by approximately $140,000.00. As a result, the
Municipality of Clarington may want to consider removing the Provisional Part'J' - Solina Road
section from this Contract to bring the scope of work within budget. Please note that this revision
would not affect the bid order. Should funding be available, it is our opinion, based on the input
provided 6y the references contacted regarding performance on previous projects, that the bid in the
amount of $1,325,688.59 (exclusive of HST) maybe awarded to Coco Paving Inc. of Oshawa,
Ontario, subject to all provisions of the Clarington Purchasing Bylaw being met.
Bid Cheques or Bid Bonds shall be retained for Coco Paving Inc. and Miller Paving Ltd., the second
low bidder, until the Contract has been executed.
Should you have any questions regarding this matter, please contact the undersigned.
Sincerely,
AECOM Canada Ltd.
W. McCrae, P.Eng.
Manager, Cobourg Office
will. mccrae@aecom. com
WM:cs
Encl.
cc: Mr. Ron Albright, P.Eng., Manager of Infrastructure and Capital Works. Municipality of Clarington
nzws-pen ~e *o n a. c.,nen". cu"m-xs Imo, nw.,e te"er.oa~
2070 Asphalt Rehabilitation
SCHEDULE "C"
Apportionment hosed on Low Bid
~aa CL2010-24 Revised June 24,
AECOM Project # 60119175 (11
DeacrlDtlon Clarington
Total 2070 Aaphak Comments
instruction Coab Corrtract CL2070-24 7407
PartA Black peek Trail
S 17849425 $ 17848425
Part B WiMSOr Valley Gate
$ 39,556.71 $ 39,556.71
Part C Carriage Lane
$ 48,327.52 $ 48,327.52
PartD Onario Street
$ 183,852.50 § 183,852.50
PartE Ontario Street
$ 194,130.96 $ 194,130.98
Part F HIIlsitla Orive
$ 134,090.80 $ 134,090.80
PartG Hillaitle COUrt
$ 35,207.50 $ 35,207.50
Part H Davls Court
$ 86,614.25 $ 88,614.25
Partl Windsor Valley Place
$ 724,249.65 $ 124,249.65
Part) Solina Rcad
$ 131,355.35 $ 131,355.35
Part K Concession Road 8
$ 140,809.08 $ 140,809.08
Part L Price Adjustment
§ 26,000.00 $ 26,000.00
I Conatructlon -
S 7,326,686.59
S
7,326,688.69
gn and Tentlertng AECOM Project No. 80719176
Up to May 7, 200910 May 28
2010
, $ 21,944.89 $ 21,944.89
I Design and Tendering
$ 21,944.89 $ 21,944.89
tact Adminiafntlonsnd Materials Testing AECOM Protect No 60119176
Estimated Costs
$ 132,600.00 $ 132,800.00
Conatructlon Atlministretlon
$ 132,600.00 $ 132,600.00
total Estimated Project COafa
S 1,480,233.48 S 1,480,233,48
ngencies (10°A, of Construction Costs)
$ 132,568.66 § 132,568.88
Estimated Protect COets
S 1,612,802.36 S 1,612,802.34
:ipal Share of the HST 17;t.tez -app0aa to rout coos ""Wales Oe"ien)
$
27
999
09
,
.
$ 27,999.09
Project Cost
S 1,640,801.43 S 7,640,807.43
at Amount
§ 1,500,000.00 $ 1,500,000.00
I/Under eutlgat Amount ,,,-__, __