Loading...
HomeMy WebLinkAboutCOD-008-10Staff Report # 1 CI~t"1I1~0I1 REPORT CORPORATE SERVICES DEPARTMENT Meeting: COUNCIL Date: APRIL 12, 2010 Report: COD-008-10 Resolution#: C~/$S-~O FEIe#: By-law#: 004/ 0 -O3 ~ Subject: TENDER NO. CL2010-1 -RENOVATIONS TO DARLINGTON SPORTS CENTRE RECOMMENDATIONS: It is respectfully recommended to Council the following: 1. THAT Report COD-008-10 be received; and 2. THAT Gerr Construction Limited, Courtice, Ontario, with a revised bid in the amount of $1,999,800.00 being the lowest responsive bidder meeting all terms, conditions and specifications of Tender CL2010-01, be awarded the contract for the Renovations for Darlington Sports Centre, Hampton, Ontario at a total revised bid of $1,999,800.00, plus GST; 3. THAT the expenditure in the total amount of $2,219,800.00 ($1,999,800.00 tender plus contingency), be charged to the following accounts: Account# 110-42-421-84267-7401 Account- 110-42-421-84268-7401 (RinC) $1,847,800.00 $372,000.00 4. THAT the additional funds required of $200,000.00 be drawn from the General Municipal Purposes Reserve Fund; and 5. THAT the E authorizing Submitted by: attached to Report COD-008-10 marked Schedule "A" ayor and the Clerk to execute the necessary agreement be -Marie Marano, H.B.Sc., C.M.O., Dire of Corporat erv' s ~;, Nancy Ta or, .B ., C. ., Director of Finan e/Treasurer MMIJDB\km Reviewed by: ~' ~`""~"~ --~ ~w Franklin Wu, Chief Administrative Officer REPORT NO.: COD-008-10 PAGE 2 1.0 BACKGROUND AND COMMENT 1.1 Tender specifications were provided by Barry Bryan Associates Limited for the Renovations for the Darlington Sports Centre as required by the Community Services Department. 1.2 Bidders were invited from the list of pre-qualified contractors and the prequalified tender was advertised electronically for the benefit of sub- trades. Tenders closed March 12, 2010. Subsequently tenders were received and tabulated as follows: BIDDER TOTAL 8ID GST Extra Gerr Construction Limited Courtice, Ontario $2,415,000.00 Graham Construction Engineering Mississau a, Ontario $2,458,000.00 James Kemp Construction Limited Hamilton, Ontario $2,555,533.00 J.J. McGuire General Contractors Inc. Pickerin ,Ontario $2,597,000.00 Dineen Construction Corporation Toronto, Ontario $2,630,000.00 2.0 ANALYSIS 2.1 As all bids received exceeded the total funds available, and in accordance with guidelines of the Canadian General Contractors Association, the three low bidders were invited to respond to a Post Tender Addendum requesting credits for 32 items for consideration. A copy of the Post Tender Addendum listing the 32 options is attached as Schedule "B"'. REPORT NO.: COD-008-10 PAGE 3 2.2 Subsequently, the available credits were identified are as follows: BIDDER Option i O{stion 2 Option 3*' Items 1 to 32 Items 1 to 32 ltems.l to 32 Excluding 24 Exctuding 26" Exct~ding 3 0 & 25' 6, 15 to 17 & 26 Gerr Construction Limited Courtice, Ontario $575,200.00 $470,700.00 $406,200.00 Graham Construction Engineering Mississau a, Ontario Withdrew from Com etition James Kemp Construction Limited Hamilton, Ontario $715,326.00 $625,493.00 $550,685.00 Items 24 & 25 are considered as an alternate to 26 "* By accepting all available credits noted in Options 1 and 2 very little work proposed would be evident in the public areas. Option 3 provides for the retention of some public area upgrades by retaining painting, replacement of doors, renovation of washrooms and the concession area. 2.3 In addition to the list of 32 credit items, the bidders were invited to propose additional cost reducing items and the corresponding credits for consideration. Each bidder provided suggestions as follows: Gerr Construction Limited Change Roofing to 45 gauge $9,000.00 Courtice, Ontario TPO System and delete epoxy rout James Kemp Construction Limited Substitute Galvanized steel Hamilton, Ontario frames in lieu of aluminum at $3,000.00 dasher board 2.4 After reviewing all options the preferred credits were selected to reduce the original tender amount to establish Option 3 for the project. The revised project cost as depicted by Option 3 and the acceptable extra credits offered by Gerr Construction Limited are as follows: REPORT NO.: COD-008-10 PAGE 4 2.5 After review and analysis of the bids by the Community Services Department, Barry Bryan Associates and Purchasing, it was mutually agreed that the low bidder for Option 3, Gerr Construction Limited, Courtice, Ontario, be awarded the contract for the Renovations for Darlington Sports Centre. A memo from Barry Bryan Associates providing details of the process and confirming the recommendation is attached as Schedule "C". Gerr Construction Limited has completed a number of similar projects for other municipalities and has completed projects for the Municipality of Clarington, all satisfactorily. 3. FINANCIAL 3.1 The total project cost, including contingency is $2,219,800.00. This cost exceeds the budget amount by $200,000.00. However, any further reductions in the scope would affect the integrity and objectives of the project. It is therefore recommended that an additional $200,000.00 be funded by the General Municipal Purposes Reserve Fund and added to account #110-42-421-84267- 7401. The project is split into two capital accounts: REPORT NO.: COD-008-10 PAGE 5 Account# 110-42-421-84267-7401, 2009 Capital (partially Provincial surplus funding) $1,847,800.00 Account#110-42-421-84268-7401(RinC Program) $372,000.00 Total Funds Available $2,219,800.00 4. CONCLUSION 4.1 After review and analysis of the bids by Purchasing, the Community Services Department and Barry Bryan Associates, it is recommended that Gerr Construction Limited be awarded the contract for the Renovations for the Darlington Sports Centre project. 5. INPUT FROM OTHER SOURCES 5.1 The Director of Finance has reviewed the funding requirements and concurs with the recommendation. Queries with respect to department needs, specifications, etc., should be referred to the Director of Community Services. 5.2 This report has been reviewed for recommendation by the Purchasing Manager with the appropriate departments and circulated as follows. Concurrence: Director of Community Services Attachments: Schedule "A", By-law Schedule "B", Post Tender Addendum Schedule "C", Memo from Barry Bryan Associates Schedule "A" THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON BY-LAW 2010- Being a By-law to authorize a contract between the Corporation of the Municipality of Clarington and Gerr Construction Limited, Courtice, Ontario, to enter into agreement for the Renovations for the Darlington Sports Centre. THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY ENACTS AS FOLLOWS: 1. THAT the Mayor and Clerk are hereby authorized to execute, on behalf of the Corporation of the Municipality of Clarington and seal with the Corporation Seal, a contract between, Gerr Construction Limited, Courtice, Ontario, and said Corporation; and 2. THAT the contract attached hereto as Schedule "A" form part of this By-law. By-law read a first and second time this day of , 2010. By-law read a third time and finally passed this day of , 2010. Jim Abernethy, Mayor Patti L. Barrie, Municipal Clerk Schedule "B" POST TENDER ADDENDUM NO. 1 Page 1 of 5 BARRY•BRYAN ASSOCIATES 11991M limited Alditecls Engieera Laldscaps ArdBect Project Managers Project No.: 09040 Project: TENDER CL2010-1 DARLINGTON SPORTS CENTRE RENOVATION Date: March 18, 2010 The .following. information supplements and/or supersedes the bid documents issued on February 16,2010 This Addendum forms part of the contract documents and is to be read, interpreted, and coordinated with all other parts. The cost of all changes contained herein to be included in the contract sum. The following revisions supersedes the information contained in the original• drawings and specifications issued for the above-named project to the extent referenced and shall become part thereof. Failure to do so may subject bidder to disqualification. The tenders received were greater than the 15% of the original construction budget. This tender will invite the 3 low bidders to participate in a Post Tender Addendum. The original base bid for each contractor is to remain as is. The Post Tender Document is to show further possible credits that could be utilized to bring this project within budget. The Municipality of Clarington reserves the right to select any or all credits proposed whichever is in their best interest. The credits proposed and selected will be used in determining the overall low bidder. The Post Tender Closing Date is Thursday, March 25, 2010 at 2:00:00 pm Closing at: Office of the Clerk Corporation of the Municipality of Clarington 40 Temperance Street Bowmanville, Ontario L1C 3A6 1.1 SEPARATE CREDIT PRICES We submit the following Separate Credit Prices (originally included in the stipulated price) as credits for price reductions: is~~~ a~~ O ~,~~ 250 WaterStreet. WNtby, Ontario Canada L1N OG5 Tela 905-560-5252 Taromo: 905.427.4495 Fax: 905.606-5258 Ematl: boa@hba•archeng.cwn www.bba-ardcelg.com 1. Delete new concrete sidewalk at east and north sides of building from south edge of refrigeration room to existing exit doors on north wall including sawcutting, removal and replacement of asphalt paving. $ cr 2. Delete decommissioning and filling with concrete of existing monitoring welt. $ cr 3. Delete removal and replacement of wood fence and gate at exterior refrigeration equipment. Existing wood fence and gate to remain. $ cr 4. Delete replacement of existing fixtures with all new washroom fixtures including lavatories, urinals and water closets in existing lower level washrooms 6103 $ cr and B105. 5. Delete removal and replacement of toilet partitions in existing lower level washrooms 6103 and 8105. $ cr 5. Remove Concession Room 101 renovation from scope. Delete all new doors,-counters, millwork, aluminum counter shutter and all finishes, fittings and equipment related to this area. $ cr POST TEDNER ADDENDUM #1 (FINALI 09040PTA01180310 Schedule "B" POST TENDER ADDENDUM NO. 1 Page 2 of 5 7. Drawing A200: Delete removal of VCT flooring in Corridor 8110 from door to Stair B126 to limits of skate file at Officials room. Leave existing painted concrete-floor in place. $ cr 8. Delete removal of all existing spectator bleacher seating and replacement with new plastic seating in Ice Pad 112. $ cr 9. Delete new display cases (add drywall to replace). $ cr 10. Confirm that dasher board contractors have included in price the re-use of existing 6' arena glass and supports. $ cr 11. Deleta Electric vertical lift gate and replace with dasherboard manufacturer's standard 10'-0" wide swing machine gates $ cr 1 IIelete dasherboard surfacing orr outside surface of dasher _ __ -- - -- boards on north and west sides of rink (but not including inside of penalty and timekeepers benches. $ cr 13. Delete removal of existing ceiling grids in dressing rooms and showers No. 6118, 6119, 8120, 8122, B123, 8124. Replace ceiling file only with new. Delete painting of structure and services above these ceilings. $ cr 14. Delete painting of existing rink walls, slabs, and roof steel in Ice Pad 112. $ cr 15. Delete all painting in Storage 115. $ ~ cr 16. Delete painting of existing basement level meeting room and washrooms. $ cr 17. Delete removal and replacement of Doors no. B101, 8103, 8104, B105, 8116, 8117, 8109, 8111, 8118, B120, 8122, 8124. Paint all existing doors and frames to remain. $ cr 18. Delete removal of existing skylight and replacement with new aluminum framed skylight. $ cr 19. Delete new recessed foot grille at Vestibule 105. $ cr 20. Delete removal of three existing planters and removal and replacement of three existing exterior light fixtures in planters west of the new front addition. $ cr 21. Specification Section 08800: Change glass type GL3 from Heat Mirror glass to double glazed sealed units, low E coated and argon filled. 6 mm thick clear inner and outer lights. $ cr 22. Delete new wood header trench cover. Remove and reinstall existing wood cover. $ cr POST TEDNEft ADDENDUM qi IFINAL) 09040PTA01 180310 Schedule "B" POST TENDER ADDENDUM NO. 1 Page 3 of 5 23. Refer to attached sketch SK-A05: Delete entirely new Resurfaces Room 117 and Workroom 116. Delete new steel fire shutter 117A and overhead door 1178 to resurfaces room. Delete doors 116A, 1168 and 116C. Delete all mechanical and electrical services, fixtures and devices serving these areas. Decrease mechanical connections to accommodate relocated Mechanical Room: Delete removal and infill of service doors (overhead doors from rink to Storage 115 and from Storage 115 to Exterior). Delete exterior paving and concrete apron outside of rooms 116 and 117. Existing Resurfaces Room (Proposed Storage 115) to remain as is. All existing Zamboni refill electric heaters to be left in place. Construct new service room for mechanical equipment as indicated on the attached BBA Sketch SK-A05 "Part Plan Mechanical Room 8106' dated March 17, 2007 and relocate water service to this new space. Relocate new 300 MBH bailer and 500 gal. storage tank to new mechanical room and recirculation pump. Delete sump and associated work. Relocate new heating and ventilation to new water treatment room. $ cr 24. Delete specified new hot water bailer and storage tanks relocated to new mechanical room (Sketch SK-A05) and leave existing hot water boiler and storage tank in Mechanical Room 8108. Connect existing hot water tank to new cold water feed. Delete new domestic hot water and domestic hot water recirculation lines in dressing room area. Re-use existing domestic hot water and domestic hot water recirculation lines to feed new fixtures. $ cr 25. In the new Mechanical Room noted above in Item 24, leave existing Water Treatment Package providing potable water supply to Arena. Revise booster pump package and delete VFD's from scope. Supply and install two (2) pumps (only) (one duty, one standby). $ cr 26. In item 23 above, water treatment system was relocated. In this option delete new water system and avoid building mechanical room 8106. Plumbing changes include the following: "1. Drawing M-001 a) Delete all work associated with relocating well feed to building. Retain existing. system. 2. Drawing M-201A and M-201-D a) Delete bottle filler BF-1 and DCW - BF line. b) In lower level dressing room area do not demolish existing DCW and DHW and DHWR lines. Delete new DCW line, DHW line, TW line, and DHWR line. Pipe new fixtures in lower Ievei dressing room area from existing DCW, and DHW lines. 3. Drawing M-201 B and M-201 B-D a) Delete DCW - BF line. b) In lower level dressing room area do not demolish existing DCW, DHW, and DHWR lines. Delete new DCW line, DHW line, TW line, and DHWR line. Pipe new fixtures in lower level dressing room area from existing DCW, and DHW lines. POST TEDNER ADDENDUM pl (FINAL) 09040PTA01 180310 Schedule "B" POST TENDER ADDENDUM NO. 1 Page 4 of 5 4. Drawing M-2028 and M-2028-D a) Do not delete existing water lines, and sanitary lines: Delete new DCW, DHW, DHWR, TW and DCW - BF, and 4° sanitary line. 5. Drawing M~01 and M-701 a) Do not demolish existing equipment in mechanical rooms or zamboni room. ' b) Retain existing water system including domestic hot water and zamboni electric hot water tanks. c) Delete all work associated with detail 2lM701: .1 Delete new laundry tub LT-1 2 Delete new 48" sanitary sump pit and pumps. .3 Provide new water filters and one new pressurized tank on existing water system. ' .4 Replace existing W system with new. 6. Drawing M~02 (Detail-M-602) a) Delete unit heater UH-1, SF-2 and associated controls and ductwork. b) Delete exhaust fan EF-4 and associated controls and ductwork. c) Delete infrared heater IFC-2. d) .Delete new wall louvers." $ cr 27. Delete DX cooling capacity from new AHU. Provide heating capacity only. Unit to become heating only with outside air free cooling when conditions permit. $ cr 28. Delete new ground mounted AHU and replace with new unit in existing location Storage 118. Provide additional supplementary electric heating in ramp area and handicap W/R. $ cr 29. Delete exterior lighting on east wall (7 fixtures type N). $ cr 30. Delete fencing and concrete pad at new AHU. $ cr 37. Modify lobby ductwork to expand existing HV coverage. $ cr 32. Drawing M-401A and M-401 B a) Delete notes 4 and 5. Do not replace existing supply and return air grilles. Retain existing. $ cr 1.2 ALTERNATE SEPARATE PRICES In addition to the Credit Prices ident'rfied in Item 1.1 above, we offer the following proposed changes to the project plans and specifications with the following Credits. Description of Proposed Change Credit L $ cr 2. $ cr 3. $ cr. POST TEONER ADDENDUM tt1 (FINAL(09040PTA01180310 Schedule "B" POST TENDER ADDENDUM NO. 1 Page 5 of 5 Revised 4. S cr 5. S cr It is understood, by signing and submitting this Post Tender Addendum, the undersigned islare fully aware of the requirements outlined herein. Furthermore, it is certified that the undersigned is/are authorized and empowered to sign and submit this Addendum. End of Post tender Addendum No. 1 Ba s tes (1991) Limited C.M. O CM/ck Attachments: Drawing SK-A05 Part Plans Mechanical Room 8106 Address Label I/we hereby acknowledge receipt of this addendum. Signed (Must be Signing Officer of Firm) Position Name of Firm 2af2 CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T(905)623-3379 F (905)623-3330 Schedule "B" iM NENBRNiE AOOF RxLYN)HERED iP0 ROOF NEMBR.WE iIPEAEO INSUTAigN (WHRE MANS INgG1EO) PROTECTON BOWAO ON STRUCNRW, STEEL OECN. TC'7~ _ V_- l2x s1nPE I sLwPEle flWL AVD SPLLSN POD i6'-0' ROOF PLAN K-AO vis =r-o^ 8 Po SAPo i 12' CONCRETE iOUWNiION MU1 N10 'IO' v 24' STEPPED FOOIiNG i0 MATCM F%ISiING 16"-0' 17-0' CIFPII HEIGHT ROOF FRAMING PLAN K-AO vis^=r-o^ N[iK 59IK4 - - BUNNOi EU%N RT EWNBO) mMxR -_ cam, sN.wr _ ~ HYAUP BOM ACED OROR 8 EWiC DETAIL HEAD 0 _' FRAME TYPES F1 DOOR TYPES M 6' BUB ON CFALE WIM6%fi wD1A-D WIRE MESH M ttPE ODOR PNO FI HN FPANE Er~_r!nn _ enpNO 1/R' YA'BG1 COPRIIG1iED NETN. '7 slBxc aN 4' 4EAlICAL~ wZ-gRl6 (MERNNLY BROKEN) Cvn 3' SPM1ID INSUU110N 0l50 ACPNC ~ A$ N11EWL NR/VNPOUR 6WRIER 10~ L0.W BUftlNG COHdRIE BLOCK A ~ 4'-0' r 5'-0' CONCRETE PN] f'R0.1CE 2 iLONESCEM IJGHf FlXNRES ANO POWFR 10 SER4E WR1EN i6EATNENf Ifi'-0' EOIgPMFNi FLOOR PLAN K-AO vis^=r-o~ BARPV~DAVAN e ~ ^tl PROJECT DRAWING: R : gSSOQATFS ~1981~ LIMITED ~-.. OY DARLINGTON SPORTS CENTRE PART PLAN pNNML ~-. MECHANICAL ROOM ~ A~NxW P.a~M~r o„e B106 w s M. n.xRla vm r u-. ,A.,~,~~.~. HAMPTON ONTPRN7 r- reoBeeesRSR I~rvl•O , ~ ~ MUNICPALITY OF CLARINGTON Ct4Y°""'"`°°"°°""`°" ~~ ° ""r°° C~V~PM^~`1 ^[WI[Pn Ci MCdY"LIIIrt W^~-W!!^riEPl~ I' . ~ YM.ECIIIC OMNHIXI """ °"' ~°"~'"~`~'°'"`°~°""°" ~ ~ 09040 SK-A05 Schedule "B" THE CORPORATION OF THE MUNICIPALITY OF CLALINGTON PURCHASING DIVISION ADDITIONS AND RENOVATIONS, DARLINGTON SPORTS CENTRE, 2276 TAUNTON ROAD, HAMPTON POST TENDER ADDENDUM ADDRESS LABEL PLEASE FIRMLY AFFIX THIS ADDRESS LABEL TO THE ENVELOPE CONTAINING YOUR SUBMISSION FOR SUBMITTING BY MAIL OR COURIER. ---------__-~.._-.-.-_----cut here-----~~..------ TENDER ENVELOPE RETURN NAME: NAME ................................................ ADDRESS .......................................... TELEPHONE ....................................... CORPORATION OF THE MUNICIPALITY OF CLARINGTON OFFICE OF THE CLERK 40 TEMPERANCE ST. BOWMANVILLE, ONTARIO L1C 3A6 TENDER NUMBER: CL2010-1 (POST TENDER ADDENDUM) SPECIFICATION: ADDITIONS AND RENOVATIONS, DARLINGTON SPORTS SEALED BID CENTRE, CLOSING TIME & DATE: 2:00:00 P.M., THURSDAY MARCH 25, 2010 here-__.-_-_~--.~_--- Note: Should you decide to use your own return envelope in lieu of the envelope provided, the label above must be affixed to the front of your envelope. ALL of the information shown on the above label must be complete. The Municipality of Clarington cannot be held responsible for documents submitted in envelopes that are not labelled in accordance with the above instructions. If you have any questions, feel free to contact Purchasing at 905-623-3379. Schedule "C" March 31, 2010 Municipality of Clarington 40 Temperance Street Bowmanville, Ontario L1C 3A6 Attention: Mr. Jerry Barber, Purchasing Manager BARRY•BRYAN ASSoCiArES Re: Tender Summary and Recommendations 11991) Limited Darlin ton S orts Centre Renovation g P 2276 Taunton Road, Hampton, Ontario Arcnitects - Municipality of Clarington Tender No. CL2010-1 Engineers BBA Project No. 08040 Landscape Architect PfOJeC" ~~rs Dear Sir: As requested, we have reviewed the tender submissions received for the Darlington Sports Centre Renovation, 2276 Taunton Road, Hampton, Ontario, Municipality of Clarington Tender CL2010-1 Tenders for the Darlington Sports Centre Renovation were received by the Municipality of .Clarington on Friday March 12, 2010. Tenders were received by the Purchasing Manager of the Municipality of Clarington at or before the stipulated tender closing time. Five bids were received from approved pre-qualified General Contractors. One of the pre-qualified bidders, Jasper Construction, did not submit a tender. Tenders were opened at 2.15 pm immediately following receipt of the tenders at a public kender opening at the Municipal Administrative Centre. The following table summarizes the five tenders received. Name of Bidder Total Lump Sum Tender Price` Dineen Construction Corporation $ 2 830 000 00 Gerr Construction Ltd. $ 2 415 000.00 Graham Construction & Engineering $ 2 548 OOO.DO JJ McGuire General Contractors Inc. _ __ $ 2,597,000.00 James Kemp Construction Ltd. $ 2 555 533 QO ,~ ` Totaf Lump Sum Tender Price excluding GST. ~ sg Each of the bidders correctly acknowledged receipt of Addenda No.'s 1-3. ~''~~- Each of the bids identified an amount for Separate Price item No.1, hazardous materials abatement. Y50 Weter Street Each of the bids included amounts for Optional Price items 2.1 to 2.5 in the tender form. Whitby, Onterin Canada LlNOG5 Each of the bids included an amount as stipulated of $352,475.00 for pre-tendered work which Tele: 905.666.5252 includes the supply and installation of the Refrigeration System. This work was pre-tendered by the Toronto: ss5-ary-aas5 Municipality (Tender CL2009-45) and is to be assigned to the selected General Contractor as a Fax:905-666.5256 normal sub-trade. Email: bba~bba-archeng.can www.bba~archeng.com Each of the bids included the total Cash Allowances of $70,000.00. Og040L310310 Tender Summary Leder.wptl Schedule "C" Page 2 An Agreement to Bond in the amount of Fifty Percent of the Amount of Tender for each of the Performance Bond and Labour and Material Payment Bond were provided by all bidders. The Tender Forms were signed by all bidders. Upon review of the tentlers received itwas determined that the lowest tendered amount exceeded the budget established by the Municipality. In accordance with the guidelines of the Canadian General Contractors Association, the three bw tenderer's were invited to respond to a Post TenderAddendum, which was issued on March 19, 2010. The Post Tender Addendum requested credit pricing for 32 items. There was also an opportunity for the bidders to make recommendations with pricing for additional revisions to the scope which may assist in lowering the total tendered amount, Two of the three low bidders, Gerr Construction Ltd. and James Kemp Construction Ltd., responded and submitted Post Tender Addendum pricing on March 30, 2016, at 2.00 P.M. Summary Based on our review of the tenders and the subsequent post tender addendum pricing we recrommend that the tender for the Darlington Sports Centre Renovation. be awarded to Gerr Construction Ltd. of Solina Ontario for the Total Lump Sum Tender Price of 51.999.800.00 (exclusive of applicable taxes} being the amount of original tendered price less the amounts for items 1, 2, 7, 8, 9,10,11,12, 13,14, 18, 19, 20, 21, 22, 23, 24, 25, 27, 28, 29, 30, 31 and 32 and the bidders alternate separate items. Tenders are open to acceptance by the Municipality of Clarington for Sixty (60} days We believe that to the best of our knowledge, the tenders for this project have been received and reviewed and our recommendations have been made in accordance with the guidelines sat forth in the Canadian Construction Documents Committee Document CCDC-23- A Guide to Calling Bids and Awarding Contracts. Should you have any questions or require further assistance, please do not hesitate to contact our office. Yours very truly, Limited ct, Project Managers Chris M. Earle, Attachment. c.c. McGeorge Acorn, Municipality of Clarington 090a0L3103107ender Summary Lelter.wpd