Loading...
HomeMy WebLinkAboutCOD-010-17Clarftwn Corporate Services Report If this information is required in an alternate accessible format, please contact the Accessibility Coordinator at 905-623-3379 ext. 2131. Report To: General Government Committee Date of Meeting: May 29, 2017 Report Number: COD -010-17 Resolution: File Number: CL2017-2 By-law Number: Report Subject: Third St and Bernard St Reconstruction Recommendations: 1. That Report COD -010-17 be received; 2. That Nick Carchidi Excavating Ltd. with a total bid amount of $713,635.11 (Net HST Rebate) being the lowest compliant bidder meeting all terms, conditions and specifications of Tender CL2017-2 be awarded the contract for the reconstruction of Third Street and Bernard Street as required by the Engineering Services Department; 3. That the funds required for this project in the amount of $874,900.00 (Net HST Rebate) which includes the construction cost of $713,635.11 (Net HST Rebate) and other related costs such as design, Ontario Land Surveyor, inspection and contract administration, materials testing and contingencies of $161,264.89 (Net HST Rebate) be funded by the Municipality as follows: Third Street Reconstruction Pavement Rehabilitation Sidewalk Replacement - Unspecified Region of Durham 110-32-330-83331-7401 110-32-330-83212-7401 110-32-331-83215-7401 100-00-000-00000-1010 $230,000.00 $ 92,310.67 $ 15,389.33 $ 537,200.00 4. That all interested parties listed in Report COD -010-17 and any delegations be advised of Council's decision by the Purchasing Department. Municipality of Clarington Report COD -010-17 Page 2 Report Overview To request authorization from Council to award the contract for the Third St and Bernard St Reconstruction work as required by the Municipality of Clarington's Engineering Services Department. 1. Background Tender specifications were prepared by the Engineering Services Department and provided to the Purchasing Services Division. This project relates to the reconstruction of Third St and Bernard St. The limits established for this work is Bernard St from the south limit to Third St and Third St from west of Bernard St to Liberty St. The Municipality is working in conjunction with the Region of Durham who will be replacing the watermain and sanitary sewers and related replacement of the road structure and new sidewalks. Tender CL2017-2 was issued by the Purchasing Services Division and advertised electronically on the Municipality's website. Notification of the availability of the document was also posted on the Ontario Public Buyer's Association website. Nine (9) companies downloaded the document. The tender closed on Friday, March 17, 2017. 2. Analysis Three (3) bids were received in response to the tender call. Bids were reviewed and tabulated by the Purchasing Services Division (see Attachment 1). All submissions were deemed compliant. The results were forwarded to the Engineering Services Department for their review and consideration. After review and analysis of the submissions by the Engineering Services Department and the Purchasing Services Division, it was mutually agreed that the low bidder, Nick Carchidi Excavating Ltd. be recommended for the award of contract CL2017-2. Nick Carchidi Excavating Ltd. has successfully completed work for the Municipality in the past. 3. Financial The funds required for this project in the amount of $874,900.00 (Net HST Rebate) which includes the construction cost of $ 713,635.11 (Net HST Rebate) and other related costs such as design, Ontario Land Surveyor, inspection and contract administration, materials testing and contingencies of $161,264.89 (Net HST Rebate) to be funded as follows: Third Street Reconstruction 110-32-330-83331-7401 $230,000.00 Municipality of Clarington Report COD -010-17 Page 3 Pavement Rehabilitation Sidewalk Replacement - Unspecified Region of Durham 4. Concurrence 110-32-330-83212-7401 $ 92,310.67 110-32-331-83215-7401 $ 15,389.33 100-00-000-00000-1010 $ 537,200.00 This report has been reviewed by the Director of Engineering Services who concurs with the recommendations. 5. Conclusion It is respectfully recommended that Nick Carchidi Excavating Ltd. being the lowest compliant bid be awarded the contract for the Third St and Bernard St Reconstruction in the amount of $ 713,635.11 (Net HST Rebate) as per the terms and conditions of Tender CL2017-2. 6. Strategic Plan Application Not applicable. Submitted by: Marie Marano, H.B. Sc., CMO Director of Corporate Services Nancy Tayor,B A, CPA, CA Director of Finance/Treasurer Reviewed by: Curry Clifford, MPA, CMO Interim CAO Staff Contact: David Ferguson, Purchasing Manager, ext. 2209 or dferguson@clarington.net Attachment 1 — Bid Summary List of interested parties to be notified of Council's decision is on file in the Corporate Services Department. Municipality of Clarington $ W W D F K P H Q W CL2O17-2 Third St and Bernard St Reconstruction Bid Summary BIDDER TOTAL BID (Including HST) TOTAL BID (net HST Rebate) Nick Carchidi Excavating Ltd. $ 792,460.37 $ 713,635.11 Hard -Co Construction Ltd. $1,016,504.50 $ 915,393.78 Elirpa Construction $1,175,767.67 $1,058,815.20